| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01000713 ↗ | 295 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 05/14/2024 | 06/03/2024 | Design ROBERT DERECTOR ASSOCIATES Contractor ABCO-PEERLESS SPRKLR CORP Filer METROPOLIS GROUP INC | Modification of existing sprinkler system. No change to use, egress or occupancy. |
| M01003406 ↗ | 295 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 05/08/2024 | 05/31/2024 | Design E38 ARCHITECTS, PC Contractor STRUCTURE TONE, LLC | Replace Louvers, install new windows at various location on the 4th floor indicated on plan. No change to use, egress or occupancy. |
| M01000703 ↗ | 295 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 05/14/2024 | 05/30/2024 | Design ROBERT DERECTOR ASSOCIATES Contractor STRUCTURE TONE, LLC Filer METROPOLIS GROUP INC | Removal and installation of ductwork, diffusers, fans, A/C units, radiators and related mechanical piping. No change to use, egress or occup… |
| M01000699 ↗ | 295 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 05/14/2024 | 05/28/2024 | Design SILMAN Contractor STRUCTURE TONE, LLC | TENANT IMPROVEMENTS TO 4TH FLOOR OF AN EXISTING COMMERCIAL BUILDING TO ADD NON-STRUCTURAL PARTITIONED SPACES FOR OFFICE USE. NO CHANGE TO US… |
| M01000709 ↗ | 295 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 05/14/2024 | 05/28/2024 | Design ROBERT DERECTOR ASSOCIATES Contractor A & M WARSHAW PLBG & HTG Filer METROPOLIS GROUP INC | Installation of plumbing fixtures and related piping. No change to use, egress or occupancy. |
| M01003392 ↗ | 295 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 03/12/2024 | 04/17/2024 | Design E38 ARCHITECTS, PC Contractor STRUCTURE TONE, LLC Filer METROPOLIS GROUP INC | INTERIOR INSTALLATION OF WALLS, DOORS, CEILINGS AND FLOOR FINISHES AS PER PLANS, NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Name | Projects together | Most recent |
|---|---|---|
| ROBERT DERECTOR ASSOCIATES | 3 | 02/27/2025 |
| E38 ARCHITECTS, PC | 2 | 05/11/2026 |
| SILMAN | 1 | 05/14/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| STRUCTURE TONE, LLC | 4 | 05/11/2026 |
| A & M WARSHAW PLBG & HTG | 1 | 05/14/2024 |
| ABCO-PEERLESS SPRKLR CORP | 1 | 05/14/2024 |
| CAPITOL FIRE SPRINKLER CO | 1 | 05/14/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| METROPOLIS GROUP INC | 4 | 05/11/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01000713 ↗ | 295 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 05/14/2024 | 06/03/2024 | Design ROBERT DERECTOR ASSOCIATES Contractor ABCO-PEERLESS SPRKLR CORP Filer METROPOLIS GROUP INC | Modification of existing sprinkler system. No change to use, egress or occupancy. |
| M01003406 ↗ | 295 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 05/08/2024 | 05/31/2024 | Design E38 ARCHITECTS, PC Contractor STRUCTURE TONE, LLC | Replace Louvers, install new windows at various location on the 4th floor indicated on plan. No change to use, egress or occupancy. |
| M01000703 ↗ | 295 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 05/14/2024 | 05/30/2024 | Design ROBERT DERECTOR ASSOCIATES Contractor STRUCTURE TONE, LLC Filer METROPOLIS GROUP INC | Removal and installation of ductwork, diffusers, fans, A/C units, radiators and related mechanical piping. No change to use, egress or occup… |
| M01000699 ↗ | 295 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 05/14/2024 | 05/28/2024 | Design SILMAN Contractor STRUCTURE TONE, LLC | TENANT IMPROVEMENTS TO 4TH FLOOR OF AN EXISTING COMMERCIAL BUILDING TO ADD NON-STRUCTURAL PARTITIONED SPACES FOR OFFICE USE. NO CHANGE TO US… |
| M01000709 ↗ | 295 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 05/14/2024 | 05/28/2024 | Design ROBERT DERECTOR ASSOCIATES Contractor A & M WARSHAW PLBG & HTG Filer METROPOLIS GROUP INC | Installation of plumbing fixtures and related piping. No change to use, egress or occupancy. |
| M01003392 ↗ | 295 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 03/12/2024 | 04/17/2024 | Design E38 ARCHITECTS, PC Contractor STRUCTURE TONE, LLC Filer METROPOLIS GROUP INC | INTERIOR INSTALLATION OF WALLS, DOORS, CEILINGS AND FLOOR FINISHES AS PER PLANS, NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Building | Filings | Most Recent |
|---|---|---|
| 295 LAFAYETTE STREET ↗ | 6 | 05/11/2026 |