Whole building & multi-floor projectsThe Plaza Condominium3 filings
PIPE SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
21 documents
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
No filed description on record for this project.
On file for this project
4 documents · 12 drawing sheets
RoofPlaza Hotel kitchen exhaust reconfiguration1p · 1 filing · 7 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Filing for minor duck work reconfiguration of the existing kitchen exhaust as per plan filed herewith. No change to use, egress, and occupancy.
On file for this project
7 documents · 1 drawing sheet
BulkheadRooftop bulkhead and cooling unit workUnder Construction2p · 2 filings · 4 docs
General
IRA to assist with Condition Assessment.
On file for this project
2 documents · 2 drawing sheets
IRA TO ASSIST WITH CONDITION ASSESSMENT.
On file for this project
2 documents · 1 drawing sheet
Floor 18Unit 18011 filing
ArchitectureCivilEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Supported Scaffold
Installation of new heat pumps and associated ducts & piping throughout kitchen and bedrooms of unit #1801
On file for this project
4 documents
Floor 17
Floor 16
Floor 15Unit 1503, Unit 15052 filings · 20 docs
ArchitectureCivilEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Plumbing work as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
11 documents
Filing for minor interior renovations, including new finishes for bathrooms and kitchens. Pluming work will be filed under separate application.
On file for this project
9 documents · 8 drawing sheets
Floor 14Unit 14042 filings
ArchitectureCivilEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
Addition of new cooling system in conjunction with the renovation of an existing 14th floor apartment, unit 1404, at 1 Central Park South, as per plans filed herewith. No change of use, egress, or occupancy.
On file for this project
11 documents
Renovation of an existing 14th floor apartment, unit 1404, at 1 Central Park South, as per plans filed herewith. There is no exterior work being proposed in any way whatsoever. No change of use, egress, or occupancy.
On file for this project
8 documents
Floor 13
Floor 12
Floor 11Unit 1103, Unit 1105Under Construction1 filing · 5 docs
ArchitectureCivilEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Supported Scaffold
General construction work associated with the combination of apartments 1103 & 1105. There is no change proposed to use, egress, or occupancy.
On file for this project
5 documents
Floor 10Unit 10031 filing
ArchitectureCivilEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Supported Scaffold
Relocation and replacement of 3 existing WSHP units within apartment 1003, and all associated piping and wiring. Patching as required. NO CHANGES TO USE, OCCUPANCY OR EGRESS
On file for this project
14 documents
Floor 9Unit 9151 filing · 7 docs
ArchitectureCivilEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Supported Scaffold
Relocation and replacement of 5 existing WSHP units within apartment 915, including all associated piping and wiring. Patching as required. NO CHANGES TO USE, OCCUPANCY OR EGRESS
On file for this project
7 documents
Floor 8
Floor 7Water damage repair in meeting rooms2p · 1 filing
ArchitectureCivilEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Supported Scaffold
repair water damage at meeting rooms at 4th and 5th fl and rooms at 5t, 6th nd 7th floors identified on plans. work include repairing the ceiling, walls and other finishes damaged. no change in use, egress or occupancy.
On file for this project
7 documents · 2 drawing sheets
Floor 6Unit 6153p · 2 filings
ArchitectureCivilEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
repair water damage at meeting rooms at 4th and 5th fl and rooms at 5t, 6th nd 7th floors identified on plans. work include repairing the ceiling, walls and other finishes damaged. no change in use, egress or occupancy.
On file for this project
7 documents · 2 drawing sheets
REPLACE AIR CONDITIONING UNITS
On file for this project
3 documents · 1 drawing sheet
Floor 5Water damage repair in meeting rooms2p · 1 filing
ArchitectureCivilEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Supported Scaffold
repair water damage at meeting rooms at 4th and 5th fl and rooms at 5t, 6th nd 7th floors identified on plans. work include repairing the ceiling, walls and other finishes damaged. no change in use, egress or occupancy.
On file for this project
7 documents · 2 drawing sheets
Floor 4The Plaza Hotel3 filings · 16 docs
ArchitectureCivilEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Sprinklers · Supported Scaffold
install 19 new sprinkler heads and branch piping. no change in use, egress or occupancy.
On file for this project
10 documents
installing non structural partitions, completing fire rating at walls and ceilings as required including insulation where necessary. install two new lintels and brick or block existing openings where necessary . no change to egress or occupancy or use.
On file for this project
10 documents
repair water damage at meeting rooms at 4th and 5th fl and rooms at 5t, 6th nd 7th floors identified on plans. work include repairing the ceiling, walls and other finishes damaged. no change in use, egress or occupancy.
On file for this project
7 documents
Floor 3Unit 301, Unit 305Under Construction17p · 2 filings · 20 docs
ArchitectureCivilEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Supported Scaffold
Proposed plumbing work at existing residential condominium units 301 and 305 as per plans, in conjunction with proposed renovation filed under Job# M00858480-I1
On file for this project
49 documents · 16 drawing sheets
replace and relocate plumbing fixtures, install 3 new urinals
On file for this project
4 documents · 1 drawing sheet
Floor 2
Floor 1The Plaza CondominiumUnder Construction4p · 3 filings · 19 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
12 documents
INTERIOR RENOVATIONS ASSOCIATED TO THE RESTORATION OF RESIDENTIAL LOBBY AS INDICATED ON PLANS. NO CHANGE OF USE EGRESS OR OCCUPANCY.
On file for this project
7 documents · 3 drawing sheets
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Cellar1p · 1 filing · 2 docs
Architecture
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Sub-CellarThe Plaza Hotel heat pump replacement1 filing · 4 docs
Mechanical
Issued Permit Scope
Mechanical Systems
IN-KIND REPLACEMENT OF 2-HEAT PUMPS IN THE 3RD SUB-CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Site & exteriorThe Plaza CondominiumUnder Construction7 filings · 20 docs
CivilElectricalEquipmentGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
12 documents · 7 drawing sheets
INSTALLATION OF TEMPORARY STORAGE AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY
On file for this project
9 documents · 7 drawing sheets
INSTALLATION OF SIDEWALK SHED FOR PEDESTRIAN SAFETY DURING CONSTRUCTION. SIDEWALK SHED SHALL COMPLY WITH NYCC 2014 CHAPTER 33 . NO CHANGE IN EGRESS, USE, OR OCCUPANCY.