← Back
BuildNYC
Elevator cooperative
1 GRACIE TERRACE
MANHATTAN · BIN 1051381
💬 Discuss this project
1953Year Built
20Stories
D4Building Class
R10AZoning
222,200 sfGross Floor Area
160Units
LL97 CoveredRent Stabilized3 Active Violations 2 unresolved · 1 paperwork only 2 likely answered ▸FISP: SWARMP
Elevator cooperative · Owner of record: Gracie Terrace Apt · 17,300 sf lot · 12.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsFacade repairs and waterproofing1 filing
RoofOutrigger beam wire rope tieback2p · 2 filings · 19 docs
Floor 19Unit 19A, Unit 19B1p · 4 filings · 16 docs
Floor 18Unit 18A2p · 3 filings · 15 docs
Floor 17Unit 17BUnder Construction1p · 1 filing · 20 docs
Floor 16
Floor 15Unit 15A, Unit 15K1 filing · 6 docs
Floor 14Unit 14E3 filings · 16 docs
Floor 13
Floor 12Unit 12B, Unit 12C, Unit 12F1p · 3 filings · 9 docs
Floor 11Unit 11A, Unit 11FG4 filings · 16 docs
Floor 10
Floor 9Unit 9C, Unit 9E, Unit 9F +13 filings · 16 docs
Floor 8Unit 8H1 filing · 7 docs
Floor 7Unit 7A, Unit 7B1 filing · 10 docs
Floor 6
Floor 5
Floor 4
Floor 3Unit 3D2p · 1 filing · 16 docs
Floor 2
Floor 1Unit 1C, Unit 1E, Unit 1FUnder Construction3p · 5 filings · 16 docs
Sub-CellarConcrete repair and masonry re-pointingUnder Construction1p · 2 filings · 7 docs
Site & exteriorTemporary heavy duty sidewalk shed installation3 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Gracie Terrace Apartment10103/22/2026
Rasok707/08/2026
Simkowitz103/21/2026
Atlas Design Contractors103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHB ConstructionGeneral Contractor1107/08/2026
Everest ScaffoldingScaffold403/21/2026
Arsenal ScaffoldScaffold304/09/2026
Kings Group NYScaffold303/21/2026
Air Zone HVACspecialty_contractor303/21/2026
Genesis Design & ConstructionGeneral Contractor307/08/2026
Lex InteriorsGeneral Contractor303/21/2026
Nickos ConstructionGeneral Contractor303/21/2026
Zaids Renovation ServicesGeneral Contractor303/21/2026
Atlas & Design ContractorsGeneral Contractor203/21/2026
Michael G O'MaraGeneral Contractor203/21/2026
Arco Plumbing and HeatingPlumbing207/08/2026
A & M Warshaw Plumbing & HeatingPlumbing207/08/2026
All HVAC Service Cospecialty_contractor203/21/2026
Lake ContractingGeneral Contractor207/08/2026
Ranger PlumbingPlumbing207/08/2026
Nash Electric ServicesElectrical103/22/2026
J&R Rey Electric ContractingElectrical103/21/2026
Art + 1General Contractor107/08/2026
Bayside ContractingGeneral Contractor107/08/2026
Cotiy Building ManagementGeneral Contractor104/09/2026
Magic RenovationsGeneral Contractor107/08/2026
RCD RestorationsGeneral Contractor104/09/2026
Lake ContractingScaffold104/09/2026
EH Plumbing & HeatingPlumbing107/08/2026
Fernandez Heating & MechanicalPlumbing107/08/2026
Flint MechanicalPlumbing107/08/2026
Fred Smith P&H CoPlumbing107/08/2026
Intercity Plumbing & HeatingPlumbing107/08/2026
New York Standard MechanicalPlumbing107/08/2026
Peak Plumbing SolutionsPlumbing107/08/2026
Proto P & H ServicesPlumbing107/08/2026
Unipipe Plumbing & HeatingPlumbing107/08/2026
Kwong Ming ElectricElectrical103/21/2026
Wynne Plumbing & HeatingPlumbing107/08/2026
Diaz Electric of New YorkElectrical103/21/2026
A & S Master ElectricalElectrical103/22/2026
JLC Electrical ContractingElectrical103/21/2026
CMY ElectricalElectrical103/22/2026
Deluxe Electrical & MaintenanceElectrical103/22/2026
Diaz AnaElectrical103/21/2026
Evs ElectricElectrical103/22/2026
Falco Electrical ServicesElectrical103/22/2026
Schwartz Electric ContractorsElectrical103/21/2026
J.G.C. ElectricElectrical103/22/2026
Olympic Electric WiringElectrical103/21/2026
A.M. Electric Corp of NYElectrical103/21/2026
Power Surge ElectricElectrical103/21/2026
WCK ElectricElectrical103/21/2026
Mistretta ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Skyline Engineering267507/10/2026
New Age Engineering7746204/29/2026
George J. Xerakias, PE1658503/03/2026
Howard L Zimmerman Architects1712205/22/2025
Catalpa Special Inspectio2004103/27/2025
Eab Engineering2048311/20/2024
Robert Papazian Architect3491409/10/2024
Michael Zenreich Architects1724210/18/2023
Indetail Design Architect4828402/14/2023
A2 Architect2504401/18/2023
Jack Green Associates422309/26/2022
Yao W Guo Architect1754204/25/2022
David Mishkin Architect6538201/03/2022
D.r.hammerman, Architect6334308/26/2021
Salamon Engineering1264107/01/2020
Building Lifecycle
All (300)Filed (55)Permit Issued (48)Signed Off (30)Facade (FISP) (15)Violation (49)Inspection (31)Objection (42)Special Inspection (30)
08/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/10/2026
Filed — Alteration
Application filed to renovate apartment 17B interior. Includes modifications of existing non-bearing partitions with new finished. Installation of mini-split AC system with condenser on terrace. No change to use, egress or occupancy under this application
M01244912-P3
07/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Matthew Wavro
07/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
07/06/2026
Permit issued — General Construction
M01173353-I1-GC
06/29/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/24/2026
Signed off — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE REPAIR AND INSPECTION
M01233139-I1
06/24/2026
Permit issued — Suspended Scaffold
M01233139-I1-SC
06/20/2026
Violation issued (ECB, open)
Cranes and Derricks
06/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/02/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/18/2026
Filed — Alteration
Application filed to renovate apartment 17B interior. Includes modifications of existing non-bearing partitions with new finished. Installation of mini-split AC system with condenser on terrace. No change to use, egress or occupancy under this application
M01244912-P2
05/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Matthew Wavro
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
05/11/2026
Special inspection requirement — Lighting in dwelling units
Stephen Shishko
05/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
05/11/2026
Special inspection requirement — Mechanical Systems
Stephen Shishko
05/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
05/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
05/11/2026
Special inspection requirement — Final
Stephen Shishko
05/11/2026
Special inspection requirement — Post-installed Anchors
Stephen Shishko
04/29/2026
Filed — Alteration
Application filed to renovate apartment 17B interior. Includes modifications of existing non-bearing partitions with new finished. Installation of mini-split AC system with condenser on terrace. No change to use, egress or occupancy under this application
M01244912-P1
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
04/27/2026
Special inspection requirement — Final
Stephen Shishko
04/27/2026
Special inspection requirement — Post-installed Anchors
Stephen Shishko
04/27/2026
Special inspection requirement — Mechanical Systems
Stephen Shishko
04/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
04/27/2026
Special inspection requirement — Lighting in dwelling units
Stephen Shishko
04/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
03/30/2026
Permit issued — Sidewalk Shed
M01232727-I1-SH
03/03/2026
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE REPAIR AND INSPECTION
M01233139-P4
02/26/2026
Special inspection requirement — Post-installed Anchors
George Xerakias
02/26/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
01/27/2026
Permit issued — Plumbing
M01244912-S2-PL
01/19/2026
Filed — Alteration
Application filed to renovate apartment 17B interior. Includes modifications of existing non-bearing partitions with new finished. Installation of mini-split AC system with condenser on terrace. No change to use, egress or occupancy under this application
M01244912-S2
01/16/2026
Permit issued — Mechanical Systems
M01244912-I1-GC
12/11/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
11/18/2025
Objection raised — Other
11/18/2025
Objection raised — Scope
11/18/2025
Objection raised — Other
11/10/2025
Filed — Alteration
Application filed to renovate apartment 17B interior. Includes modifications of existing non-bearing partitions with new finished. Installation of mini-split AC system with condenser on terrace. No change to use, egress or occupancy under this application
M01244912-I1
10/28/2025
Signed off — Alteration
M01197642-I1
10/20/2025
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE REPAIR AND INSPECTION
M01233139-P3
09/19/2025
Permit issued — General Construction
M01196215-I1-GC
09/09/2025
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE REPAIR AND INSPECTION
M01233139-P2
09/03/2025
Violation issued (ECB, closed)
Construction
07/31/2025
Permit issued — General Construction
M01222177-I1-GC-CX
07/31/2025
Permit issued — General Construction
M01196215-I1-GC
07/09/2025
Objection raised — Other
07/09/2025
Objection resolved — Addressed
07/08/2025
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE REPAIR AND INSPECTION
M01233139-P1
07/01/2025
Permit issued — General Construction
M01173353-I1-GC
06/30/2025
Objection resolved — Addressed
06/30/2025
Objection resolved — Addressed
06/30/2025
Objection resolved — Addressed
06/30/2025
Objection resolved — Addressed
06/30/2025
Objection resolved — Addressed
06/30/2025
Special inspection requirement — Post-installed Anchors
George Xerakias
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLake Contracting07/06/2026
DOB NOWSuspended ScaffoldSigned-offRCD Restorations06/24/2026
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold03/30/2026
DOB NOWPlumbingPermit IssuedPeak Plumbing Solutions01/27/2026
DOB NOWMechanical SystemsPermit IssuedCotiy Building Management01/16/2026
DOB NOWGeneral ConstructionPermit IssuedCHB Construction09/19/2025
DOB NOWGeneral ConstructionPermit IssuedRCD Restorations07/31/2025
DOB NOWGeneral ConstructionPermit IssuedCHB Construction07/31/2025
DOB NOWGeneral ConstructionPermit IssuedLake Contracting07/01/2025
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold06/12/2025
DOB NOWSuspended ScaffoldSigned-offRCD Restorations06/04/2025
DOB NOWGeneral ConstructionPermit IssuedCHB Construction05/02/2025
DOB NOWProtection and Mechanical MethodsSigned-offLake Contracting04/24/2025
DOB NOWPlumbingSigned-offWynne Plumbing & Heating12/02/2024
DOB NOWGeneral ConstructionSigned-offAtlas Design Contractor11/18/2024
DOB NOWMechanical SystemsSigned-offAll HVAC Service Co10/02/2024
DOB NOWSuspended ScaffoldPermit IssuedJepol Construction07/22/2024
DOB NOWGeneral ConstructionSigned-offMichael G O'Mara05/21/2024
DOB NOWPlumbingSigned-offFernandez Heating & Mechanical12/05/2023
DOB NOWGeneral ConstructionSigned-offMagic Renovations11/16/2023
DOB NOWPlumbingSigned-offNew York Standard Mechanical06/22/2023
DOB NOWMechanical SystemsSigned-offGenesis Design Construction01/11/2023
DOB NOWGeneral ConstructionSigned-offGenesis Design Construction01/11/2023
DOB NOWPlumbingSigned-offEH Plumbing & Heating12/23/2022
DOB NOWGeneral ConstructionSigned-offArt + 112/07/2022
DOB NOWPlumbingSigned-offIntercity Plumbing & Heating10/24/2022
DOB NOWGeneral ConstructionSigned-offBayside Contracting06/29/2022
DOB NOWPlumbingSigned-offProto P & H Services05/11/2022
DOB NOWGeneral ConstructionSigned-offLex Interiors05/04/2022
DOB NOWGeneral ConstructionSigned-offCHB Construction04/20/2022
DOB NOWPlumbingSigned-offA & M Warshaw Plumbing & Heating04/08/2022
DOB NOWGeneral ConstructionSigned-offCHB Construction02/16/2022
DOB NOWPlumbingSigned-offUnipipe Plumbing & Heating02/15/2022
DOB NOWGeneral ConstructionSigned-offCHB Construction10/20/2021
DOB NOWMechanical SystemsSigned-offCHB Construction10/19/2021
DOB NOWPlumbingSigned-offRanger Plumbing10/08/2021
DOB NOWPlumbingSigned-offFred Smith P&H Co10/07/2021
DOB NOWMechanical SystemsSigned-offAir Zone HVAC09/02/2021
DOB NOWPlumbingSigned-offFlint Mechanical08/24/2021
DOB NOWGeneral ConstructionSigned-offNickos Construction08/23/2021
+ 58 more permits on file
2 projects · most recent 07/10/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/10/2026Permit IssuedCotiy Building ManagementAir Conditioning Systems
Cooling
Mitsubishi Electric MITSUBISHI MXZ-5D36NL MULTI-ZONE HEAT PUMP (OUTDOOR UNIT) SEZ-AD18NL-U1 DUCTED INDOOR UNIT SEZ-AD09NL-U1 DUCTED INDOOR UNIT MLZ-KX12NL ONE-WAY CEILING CASSETTE INDOOR UNIT 36,000 BTU · Condensing Unit ×2
07/01/2020——Ventilation Systems
Ventilation
Zephyr AK9240AS 390 CFM · Kitchen Exhaust ×1
2 projects · most recent 07/10/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/10/2026Permit IssuedPeak Plumbing SolutionsGas, Water/Sanitary
11/09/2020Signed-offArco Plumbing and HeatingGas
25 projects · most recent 05/27/2026
General Wiring
FiledStatusContractorScope
05/27/2026CompleteCMY ElectricalGeneral Wiring
01/19/2026Permit IssuedKwong Ming ElectricGeneral Wiring
06/20/2025Permit IssuedNash Electric Services—
05/06/2025CompleteJ.G.C. ElectricGeneral Wiring
05/09/2024CancelledMaven ElectricGeneral Wiring
01/17/2024CompleteNortheast Electl ContingGeneral Wiring
06/12/2023CompleteEvs ElectricGeneral Wiring
06/08/2023CompleteFalco Electrical ServicesGeneral Wiring
05/02/2023CompleteRobert ChimentiGeneral Wiring
11/01/2022CompleteDeluxe Electrical & MaintenanceGeneral Wiring
08/17/2022CompleteP.S. Marcato Elev. Co—
07/01/2022CompleteLaredo Electric—
05/25/2022CompleteKings Electric CoGeneral Wiring
04/15/2022CompleteJam Electrical—
03/15/2022CompleteLive Wire Electric 1General Wiring
2 projects · most recent 05/22/2025
FiledStatusContractorScope
05/22/2025Permit IssuedRCD Restorations1 scope_items
03/27/2025Permit IssuedCHB Construction1 scope_items
1 project · most recent 06/12/2025
Sidewalk Shed
FiledStatusContractorScope
06/12/2025Permit IssuedArsenal ScaffoldSidewalk Shed
▾Field Inspections (DOB CAP) — 31
DateTypeResultReport
08/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/29/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/02/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/27/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/12/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/05/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/26/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/10/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 31.
▾Special Inspection Requirements (DOB NOW) — 122
DateRequirementInspectorRole
07/10/2026Energy Code Compliance InspectionsMatthew Wavroprogress
07/10/2026Fire-Resistant Penetrations and JointsMatthew Wavrospecial
05/18/2026Energy Code Compliance InspectionsMatthew Wavroprogress
05/18/2026Fire-Resistant Penetrations and JointsMatthew Wavrospecial
05/11/2026FinalStephen Shishkoprogress
05/11/2026HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
05/11/2026Lighting in dwelling unitsStephen Shishkoenergy_progress
05/11/2026Fire-Resistant Penetrations and JointsStephen Shishkospecial
05/11/2026Mechanical SystemsStephen Shishkospecial
05/11/2026Post-installed AnchorsStephen Shishkospecial
05/11/2026HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
04/27/2026HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
04/27/2026Fire-Resistant Penetrations and JointsStephen Shishkospecial
04/27/2026Mechanical SystemsStephen Shishkospecial
04/27/2026Post-installed AnchorsStephen Shishkospecial
04/27/2026Lighting in dwelling unitsStephen Shishkoenergy_progress
04/27/2026HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
04/27/2026FinalStephen Shishkoprogress
02/26/2026Post-installed AnchorsGeorge Xerakiasspecial
02/26/2026Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
06/30/2025Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
06/30/2025Post-installed AnchorsGeorge Xerakiasspecial
03/18/2025MeteringJEREMY SINGERenergy_progress
03/18/2025Interior lighting powerJEREMY SINGERenergy_progress
03/18/2025Fire-Resistant Penetrations and JointsERIC BERLENTspecial
Latest 25 of 122.
▾Documents — 1,040 on file (BIS + DOB NOW)
▸Plans & Drawings54
▸DOB NOWPlans/Sketch46
09/06/2026M00054174-I1Request digital key ↗
09/03/2026M00544333-I1Request digital key ↗
09/03/2026M00544333-P1Request digital key ↗
Showing 3 of 46 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/04/2026M00335073-I1Request digital key ↗
09/04/2026M00435829-S1Request digital key ↗
Showing 2 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/04/2026M00339372-I1Request digital key ↗
09/04/2026M00435829-I1Request digital key ↗
09/04/2026M00435829-P2Request digital key ↗
▸Applications & Permits176
▸BISWORK PERMIT APPLICATION89
01/12/2021140979118Open ↗
07/06/2020140916640Open ↗
09/17/2019123487440Open ↗
Showing 3 of 89 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION87
08/26/2025104570983Open ↗
06/09/2021140979118Open ↗
12/21/2020140979118Open ↗
Showing 3 of 87 on file for this type
▸Seals & Professional Certifications272
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION91
01/24/2020123767147Open ↗
11/19/2019123592610Open ↗
10/08/2019123417203Open ↗
Showing 3 of 91 on file for this type
▸DOB NOWProgress Inspector Seal & Signature69
10/04/2026M00648432-I1Open ↗
10/04/2026M00648432-I1Open ↗
10/04/2026M00648432-I1Open ↗
Showing 3 of 69 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature49
09/04/2026M00435829-S1Open ↗
09/04/2026M00435829-I1Open ↗
09/04/2026M00435829-P2Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature36
10/04/2026M00648432-I1Open ↗
09/23/2026M01244912-I1Open ↗
09/23/2026M01244912-I1Open ↗
Showing 3 of 36 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/25/2020140916640Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/25/2020140916640Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/25/2020140916640Open ↗
Showing 1 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/21/2020140979118Open ↗
▸Trade Schedules & Equipment71
▸BISSELF-CERT PLUMBING NOTICE25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE24
09/26/2019123417203Open ↗
09/17/2019123417203Open ↗
06/17/2019123487440Open ↗
Showing 3 of 24 on file for this type
▸BISSCHEDULE B - PLUMBING16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISEQUIPMENT USE PERMITS2
01/22/2019122354745Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/22/2019122354745Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection16
▸BISTenant Protection Plan and Notes6
06/13/2019123767147Open ↗
03/27/2019123592610Open ↗
03/19/2019123487440Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
06/13/2019123767147Open ↗
Showing 1 of 2 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
01/03/2021140979118Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos89
▸DOB NOWDEP ACP-5: Asbestos Assessment Report44
09/04/2026M00435829-S1Open ↗
09/04/2026M00435829-I1Open ↗
09/04/2026M00435829-P2Open ↗
Showing 3 of 44 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)25
12/21/2020140979118Open ↗
06/25/2020140916640Open ↗
06/13/2019123767147Open ↗
Showing 3 of 25 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)4
04/22/2019123127286Open ↗
Showing 1 of 4 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
10/25/2018123127286Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance88
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS42
11/19/2019123592610Open ↗
10/08/2019123417203Open ↗
06/13/2019123767147Open ↗
Showing 3 of 42 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS21
09/30/2020123487440Open ↗
09/16/2020123767147Open ↗
11/19/2019123592610Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
03/15/2023140979118Open ↗
01/14/2021140979118Open ↗
09/30/2020123487440Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/25/2020140916640Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/15/2023140979118Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY11
09/03/2025104570983Open ↗
03/15/2023140979118Open ↗
01/14/2021140979118Open ↗
Showing 3 of 11 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
08/25/2025104570983Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs67
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST38
09/08/2025104570983Open ↗
03/17/2023140979118Open ↗
09/30/2020123487440Open ↗
Showing 3 of 38 on file for this type
▸BISADMINISTRATIVE OBJECTIONS16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
03/13/2019123592610Open ↗
Showing 1 of 9 on file for this type
▸BISSUPERSEDING LETTER2
05/15/2019123592610Open ↗
Showing 1 of 2 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership84
▸BISCOST AFFIDAVIT79
12/21/2020140979118Open ↗
09/30/2020123487440Open ↗
09/16/2020123767147Open ↗
Showing 3 of 79 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
08/25/2025104570983Open ↗
03/15/2023140979118Open ↗
▸Filing & Intake Forms87
▸BISEFILING COVER SHEET33
06/13/2019123767147Open ↗
03/19/2019123487440Open ↗
03/13/2019123592610Open ↗
Showing 3 of 33 on file for this type
▸BISADDITIONAL INFORMATION25
07/06/2021140979118Open ↗
01/03/2021140979118Open ↗
06/25/2020140916640Open ↗
Showing 3 of 25 on file for this type
▸BISBOROUGH INTAKE FORM24
12/31/2019123767147Open ↗
11/19/2019123592610Open ↗
10/08/2019123417203Open ↗
Showing 3 of 24 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
12/21/2020140979118Open ↗
06/25/2020140916640Open ↗
Showing 2 of 5 on file for this type
▸Other Documents20
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
06/25/2020140916640Open ↗
06/25/2020140916640Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWManufacturer's Specifications5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWCalculations5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
12/21/2018123442881Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type