Roof62p · 20 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to plumbing systems as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
6 documents · 2 drawing sheets
Alterations including fit out of existing 2-story interior space and 2nd floor terrace with partitions, ceilings, and finishes. No change to use, egress, or occupancy.
On file for this job
4 documents · 1 drawing sheet
PLUMBING MODIFICATIONS FOR EXISTING RETAIL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this job
23 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 558p · 7 filings · 20 docs
Fire ProtectionGeneralPlumbingStructural
Structural work on the 54th and 55th floor (Roivant) as indicated on drawings.
On file for this job
3 documents · 2 drawing sheets
Structural work associated with new convenience stair, steel reinforcement, stair removal and stair infill on the 54th and 55th floors as indicated on drawings.
On file for this job
5 documents · 1 drawing sheet
Plumbing work on the 55th floor (core restrooms) as indicated on drawings. No change in use egress or occupancy.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 547p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Structural work on the 54th and 55th floor (Roivant) as indicated on drawings.
On file for this job
3 documents · 1 drawing sheet
Plumbing demolition on the 54th floor as indicated on drawings.
On file for this job
4 documents · 1 drawing sheet
Mechanical demolition and duct relocations on the 55th floor as indicated on drawings.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 53Under Construction11p · 13 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Sprinkler work on the 53rd floor (Orion) as indicated on drawings.
On file for this job
4 documents · 2 drawing sheets
Mechanical work on the 53rd floor (corridor) as indicated on drawings.
On file for this job
7 documents · 1 drawing sheet
Sprinkler work on the 53rd floor (corridor) as indicated on drawings.
On file for this job
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 5216p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Modifications to standpipe systems as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
10 documents · 1 drawing sheet
Installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change in use, egress or occupancy.
On file for this job
12 documents · 6 drawing sheets
Mechanical work on the 52nd floor as indicated on drawings.
On file for this job
8 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 51Under Construction36p · 8 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Sprinkler work on the 51st floor (Safehold) as indicated on drawings.
On file for this job
4 documents · 3 drawing sheets
Plumbing work on the 51st floor (Safehold) as indicated on drawings.
On file for this job
4 documents · 3 drawing sheets
Construction work on the 51st floor (Safehold) as indicated on drawings.
On file for this job
5 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 5017p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Minor mechanical work on the 50th floor (Hartford) as indicated on drawings
On file for this job
5 documents · 1 drawing sheet
Sprinkler work on the 50th floor (Hartford) as indicated on drawings
On file for this job
4 documents · 1 drawing sheet
Minor architectural work on the 50th floor (Hartford) as indicated on drawings.
On file for this job
5 documents · 5 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 497p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Plumbing work on the 49th floor (Orchestrade) as indicated on drawings.
On file for this job
3 documents · 2 drawing sheets
Sprinkler work on the 49th floor (Orchestrade) as indicated on drawings.
On file for this job
7 documents · 4 drawing sheets
Mechanical work on the 49th floor (Orchestrade) as indicated on drawings.
On file for this job
10 documents · 1 drawing sheet
Floor 4828p · 11 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Chardan - Plumbing work on the 48th floor as indicated on drawings
On file for this job
3 documents · 1 drawing sheet
Chardan - Sprinkler work on the 48th floor as indicated on drawings.
On file for this job
7 documents · 2 drawing sheets
Chardan - Mechanical work on the 48th floor as indicated on drawings.
On file for this job
20 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 47Under Construction11p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
Interior demolition of non load bearing partitions on the 47th floor as indicated on drawings.
On file for this job
3 documents · 1 drawing sheet
Interior demolition of non load bearing partitions on the 47th floor as indicated on drawings.
On file for this job
3 documents · 1 drawing sheet
Plumbing renovation of core toilets on the 47th floor as indicated on drawings.
On file for this job
3 documents
Latest 3 of 5 filings on this floor.
Floor 464p · 2 filings · 7 docs
Fire ProtectionPlumbing
Sprinkler work on the 46th floor (Valley National) as indicated on drawings.
On file for this job
4 documents · 2 drawing sheets
Plumbing work on the 46th floor Valley National ) as indicated on drawings.
On file for this job
3 documents · 2 drawing sheets
Floor 4516p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanical
NF Smith - Mechanical work o the 45th floor as indicated on drawings. No change in use egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Sprinkler work on the 45th floor (core restrooms/public corridor) as indicated on drawings. No change in use egress or occupancy.
On file for this job
4 documents · 3 drawing sheets
Mechanical work on the 45th floor (core restrooms/public corridor) as indicated on drawings
On file for this job
7 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 4442p · 17 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Sprinklers
Sprinkler work on the 44th floor (corridors and restrooms) as indicated on drawings.
On file for this job
6 documents
Mechanical work on the 44th floor (corridors and restrooms) as indicated on drawings.
On file for this job
5 documents · 2 drawing sheets
Mechanical work on the 44th floor (Schumann) as indicated on drawings
On file for this job
18 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 43Under Construction9p · 1 filing · 6 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy.
On file for this job
6 documents
Floor 4228p · 11 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralLandscapeMechanicalPlumbing
Issued Permit Scope
General Construction · Sprinklers
Sprinkler work on the 42nd floor (restrooms/corridors) as indicated on drawings
On file for this job
8 documents · 1 drawing sheet
Mechanical work on the 42nd floor (restrooms/corridors) as indicated one drawings
On file for this job
12 documents · 5 drawing sheets
Plumbing work on the 14th, 33rd and 42nd floor as indicated on drawings
On file for this job
3 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 4130p · 9 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Minor architectural work on part of the 41st floor (Molton Brown/Kao) as indicated on drawings.
On file for this job
3 documents
Minor mechanical work on part of the 41st floor (Molton Brown/Kao as indicated on drawings
On file for this job
9 documents · 4 drawing sheets
Sprinkler work on the 41st floor (prebuild space/restrooms) as indicated on drawings
On file for this job
4 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 40Under Construction27p · 11 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Structural
Plumbing work on the 40th floor (Tickpick) as indicated on drawings.
On file for this job
3 documents · 2 drawing sheets
Mechanical work on the 40th floor (Tickpick) as indicated on drawings.
On file for this job
16 documents · 2 drawing sheets
Plumbing work on the 40th floor (restrooms) as indicated on drawings.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3963p · 19 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Interior demolition on the 15th, 16th, 18th, 22nd, 25th, 27th and 39th floor as indicated on drawings.
On file for this job
20 documents · 1 drawing sheet
INTERIOE DEMOLITION OF NON-BEARING PARTITIONS ON PATR OF THE 39TH FLOOR AS INDICATED ON DRAWINGS.
On file for this job
3 documents · 1 drawing sheet
Plumbing work on the 39th floor (LXP) as indicated on drawings.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3843p · 17 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe
Sprinkler work on the 38th floor (Prosperity Service Group) as indicated on drawings
On file for this job
3 documents · 4 drawing sheets
Mechanical work on the 38th floor (Prosperity Service Group) as indicated on drawings
On file for this job
4 documents · 4 drawing sheets
Sprinkler work on the 38th floor (IBI) as indicated on drawings
On file for this job
8 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3721p · 8 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Plumbing work on the 37th floor (Cheil) as indicated on drawings.
On file for this job
3 documents · 2 drawing sheets
Sprinkler work on the 37th floor (Cheil) as indicated on drawings.
On file for this job
8 documents · 5 drawing sheets
Mechanical work on the 37th floor (Cheil) as indicated on drawings.
On file for this job
12 documents · 7 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3618p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
3 documents · 7 drawing sheets
Modifications to mechanical systems as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
16 documents · 1 drawing sheet
Application filed herewith to revise occupancy counts for the building as per plans filed herewith. Installation of interior non-bearing partitions & related finishes on 35&36 floors. Change in use and occupant for both flrs and establishing PA on 36 fl
On file for this job
24 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 3516p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
3 documents · 6 drawing sheets
Modifications to mechanical systems as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
16 documents · 1 drawing sheet
Application filed herewith to revise occupancy counts for the building as per plans filed herewith. Installation of interior non-bearing partitions & related finishes on 35&36 floors. Change in use and occupant for both flrs and establishing PA on 36 fl
On file for this job
24 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3413p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Dell expansion - Plumbing work on the 34th floor as indicated on drawings.
On file for this job
3 documents · 2 drawing sheets
Construction work on the 34th floor (RKS Rolnick Kramer Sadighi) as indicated on drawings. No change in use egress or occupancy. EN drawings for lighting are submitted under M00992259-I1
On file for this job
5 documents · 7 drawing sheets
Interior demolition of non load bearing partitions on the 34th floor as indicated on drawings. No change in use egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 337p · 7 filings · 20 docs
ElectricalFire ProtectionGeneralMechanicalPlumbing
Plumbing work on the 14th, 33rd and 42nd floor as indicated on drawings
On file for this job
3 documents · 2 drawing sheets
Mechanical work on the 33rd floor (prebuild space) as indicated on drawings
On file for this job
8 documents · 1 drawing sheet
Plumbing work on the 33rd floor (prebuild-S) as indicated on drawings
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 32Under Construction9p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction
Interior demolition of non load bearing partitions on the 32nd floor (north suite) as indicated on drawings.
On file for this job
2 documents
Interior demolition of non load bearing partitions on the 32nd floor (west suite) as indicated on drawings.
On file for this job
4 documents
Plumbing work on the 32nd floor (Pure Storage Turnkey) as indicated on drawings. No change in use egress or occupancy under this application.
On file for this job
12 documents · 3 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 3111p · 16 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Sprinkler work on the 31st floor (corridor) as indicated on drawings.
On file for this job
11 documents · 2 drawing sheets
Mechanical work on the 31st floor (EyeBio) as indicated on drawings.
On file for this job
18 documents · 2 drawing sheets
Construction work on the 31st floor (EyeBio) as indicated on drawings.
On file for this job
12 documents
Latest 3 of 8 filings on this floor.
Floor 3015p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Mechanical filing to show removal of AC units on the 17th, 28th, 29th and 30th floor to comply with FDNY control # 331116830067841, 331127230058461, 331129390067821, 331130080038325
On file for this job
3 documents · 1 drawing sheet
Standpipe riser interconnection to be rerouted on the 30th floor as indicated on drawings
On file for this job
3 documents · 1 drawing sheet
New access stair between the 29th and 30th floor as indicated on drawings
On file for this job
5 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2915p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Architectural work on the 29th and 30th floor (Canaccord) as indicated on drawings. EN drawings for lighting are submitted under M00990347-I1
On file for this job
3 documents · 3 drawing sheets
Sprinkler work on the 29th and 30th floor (Canaccord) as indicated on drawings.
On file for this job
7 documents · 2 drawing sheets
Plumbing work on the 29th and 30th floor (Canaccord) as indicated on drawings
On file for this job
9 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2817p · 11 filings · 20 docs
DMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Sprinklers
Mechanical work on the 28th floor (Weaver & Tidwell) as indicated on drawings.
On file for this job
3 documents · 2 drawing sheets
Restrooms - Sprinkler work on the 28th floor as indicated on drawings.
On file for this job
6 documents · 1 drawing sheet
Restrooms - Construction work on the 28th floor as indicated on drawings
On file for this job
17 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2725p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems
Interior demolition of non load bearing partitions on the 27th floor (former Orchestrade ) as indicated on drawings.
On file for this job
3 documents · 1 drawing sheet
Plumbing work on the 27th floor (Norstella) as indicated on drawings.
On file for this job
7 documents · 4 drawing sheets
Sprinkler work on the 27th floor (Norstella) as indicated on drawings.
On file for this job
6 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 2626p · 13 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Structural
Restrooms - Mechanical work on the 26th floor as indicated on drawings. No change in use egress or occupancy
On file for this job
3 documents · 2 drawing sheets
Restrooms - Plumbing work on the 26th floor as indicated on drawings. No change in use egress or occupancy.
On file for this job
3 documents · 2 drawing sheets
Restrooms - Construction work on the 26th floor as indicated on drawings. No change in use egress or occupancy.
On file for this job
9 documents
Latest 3 of 8 filings on this floor.
Floor 25Under Construction75p · 14 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Plumbing work on the 25th floor (Samsung-phase I ) as indicated on drawings.
On file for this job
5 documents · 3 drawing sheets
Mechanical work on the 25th floor - (Samsung - phase I and phase 2) as indicated on drawings.
On file for this job
9 documents
Construction work on the 25th floor (Samsung - phase 1 and phase 2 ) as indicated on drawings.
On file for this job
12 documents
Latest 3 of 8 filings on this floor.
Floor 2427p · 9 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Mechanical Systems · Sprinklers
Architectural work on the 29th and 30th floor (Canaccord) as indicated on drawings. EN drawings for lighting are submitted under M00990347-I1
On file for this job
3 documents · 1 drawing sheet
Sprinkler work on the 24th floor (Jacobs Engineering); installation of temporary sprinkler loop as indicated on drawings. No change in use egress or occupancy.
On file for this job
12 documents · 3 drawing sheets
Mechanical work on the 24th floor (Jacobs Engineering) as indicated on drawings. No change in use egress or occupancy.
On file for this job
11 documents
Latest 3 of 8 filings on this floor.
Floor 23
Floor 2251p · 24 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Interior demolition on the 15th, 16th, 18th, 22nd, 25th, 27th and 39th floor as indicated on drawings.
On file for this job
20 documents · 2 drawing sheets
Modifications to the existing pantry and adjacent conference room in Suite 2200. No change to use, egress, or occupancy.
On file for this job
3 documents · 3 drawing sheets
Rerouting of ductwork and diffusers in accordance with new architectural plans.
On file for this job
6 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 21Under Construction37p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Mechanical work on the 21st floor (VRC) as indicated on drawings.
On file for this job
6 documents · 1 drawing sheet
Construction work on the 21st floor (VRC) as indicated on drawings.
On file for this job
5 documents
Plumbing work on the 21st floor (VRC) as indicated on drawings.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 20Under Construction57p · 15 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Construction work on the 20th floor (corridor) as indicated on drawings.
On file for this job
8 documents
Construction work on the 20th floor (restrooms) as indicated on drawings.
On file for this job
5 documents
Mechanical work on the 20th floor (corridor) as indicated on drawings.
On file for this job
12 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 1918p · 9 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
(UHG @ 1 PENN) FILING HEREWITH PLANS TO INDICATE STRUCTURAL WORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, PCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
3 documents · 1 drawing sheet
GENERAL CONSTRUCTION AND INTERIOR RENOVATION AS PER PLANS FILED HEREWITH. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
8 documents · 9 drawing sheets
(UHG @ 1 PENN) FILING HEREWITH MECHANICAL PLANS TO INDICATE MECHANICAL HVAC ANS DUCTWORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, PCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 184p · 2 filings · 20 docs
DMMechanical
Interior demolition on the 15th, 16th, 18th, 22nd, 25th, 27th and 39th floor as indicated on drawings.
On file for this job
20 documents · 1 drawing sheet
mechanical work on the 18th floor (DBS-POE) as indicated on drawings
On file for this job
4 documents · 3 drawing sheets
Floor 1732p · 29 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Mechanical Systems
Interior demolition of non load bearing partitions on the 17th floor as indicated on drawings
On file for this job
5 documents · 1 drawing sheet
Construction work on the 17th floor (Quadient) as indicated on drawings. EN drawings for lighting are submitted under M01049016-I1
On file for this job
8 documents · 1 drawing sheet
Blackline - Plumbing work on t he 17th floor as indicated on drawings. No change in use egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 1643p · 13 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems
Interior demolition on the 15th, 16th, 18th, 22nd, 25th, 27th and 39th floor as indicated on drawings.
On file for this job
20 documents · 1 drawing sheet
Plumbing work on the 16th floor (Avego LLW) as indicated on drawings.
On file for this job
3 documents · 1 drawing sheet
Sprinkler work on the 16th floor (Avego LLW) as indicated on drawaings.
On file for this job
8 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 1563p · 26 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Mechanical work on the 15th floor (Coforge LLW) as indicated on drawings.
On file for this job
10 documents · 2 drawing sheets
Interior demolition on the 15th, 16th, 18th, 22nd, 25th, 27th and 39th floor as indicated on drawings.
On file for this job
20 documents · 2 drawing sheets
Plumbing work on the 15th floor (Coforge LLW) as indicated on drawings.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 1413p · 21 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Sprinklers
Construction work on the 14th, 33rd and 42nd floors as indicated on drawings
On file for this job
21 documents · 1 drawing sheet
Mechanical work on the 14th, 33rd and 42nd floor as indicated on drawings
On file for this job
4 documents · 1 drawing sheet
Interior demolition on the 14th, 33rd and 42nd floor as indicated on drawings
On file for this job
5 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 131p · 1 filing · 8 docs
Structural
Structural modification related to the installation of chillers as per plans. Installation of steel framing, removal of existing slabs, hook support framing, reinforcement, welding, and bolting. No change of use, occupancy or egress.
On file for this job
8 documents · 1 drawing sheet
Floor 128p · 3 filings · 20 docs
Fire ProtectionMechanicalStructural
Modifications to sprinkler systems as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
15 documents · 5 drawing sheets
Structural modification related to the installation of chillers as per plans. Installation of steel framing, removal of existing slabs, hook support framing, reinforcement, welding, and bolting. No change of use, occupancy or egress.
On file for this job
8 documents · 1 drawing sheet
Job M01361041
No filed description on record for this job.
On file for this job
3 documents · 2 drawing sheets
Floor 115p · 2 filings · 6 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction
Demolition and construction work on 11th floor as per plans. No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
3 documents · 1 drawing sheet
Floor 10Under Construction33p · 11 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Plumbing work on the 10th floor (Ramboll) as indicated on drawings.
On file for this job
3 documents · 2 drawing sheets
Mechanical work on the 10th floor (Ramboll) as indicated on drawings.
On file for this job
3 documents · 2 drawing sheets
Sprinkler work on the 10th floor (Ramboll) as indicated on drawings.
On file for this job
4 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 947p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sprinklers
Mechanical work on the 9th floor (Cisco toilets) as indicated on drawings.
On file for this job
12 documents · 1 drawing sheet
Installation of plumbing fixtures as per plans filed herewith. For more details on the fixtures proposed, please see scope of work and sign/seal plans. No change in use, occupancy or egress.
On file for this job
3 documents · 1 drawing sheet
Removal of sprinkler heads and installation of temporary sprinkler loop on the 26th, 27th, 28th and 29th floor as indicated on drawings
On file for this job
7 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 8Under Construction4p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneralPlumbing
Issued Permit Scope
General Construction · Sprinklers
Installation of temporary sprinkler loop on the 8th floor as indicated on drawings
On file for this job
3 documents
Interior demolition of non load bearing partitions on the 8th floor as indicated on drawings.
On file for this job
3 documents · 1 drawing sheet
Chardan - Construction work on the 48th floor as indicated on drawings
On file for this job
21 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 75p · 4 filings · 20 docs
Fire ProtectionMechanicalStructural
Sprinkler work on the 27th floor (Norstella) as indicated on drawings.
On file for this job
6 documents · 1 drawing sheet
Structural modifications as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
3 documents · 1 drawing sheet
Removal of sprinkler heads and installation of temporary sprinkler loop on the 26th, 27th, 28th and 29th floor as indicated on drawings
On file for this job
7 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 612p · 22 filings · 20 docs
ArchitectureDMFire ProtectionLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Construction work on part of the 6th floor (Hull and Company) as indicated on drawings.
On file for this job
9 documents
Sprinkler work on the 6th floor (Hull and Company) as indicated on drawings.
On file for this job
4 documents · 2 drawing sheets
Mechanical work on the 6th floor (Hull and Company) as indicated on drawings
On file for this job
7 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 5Under Construction39p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Sprinkler work on the 5th floor (WSP) as indicated on drawings.
On file for this job
4 documents · 2 drawing sheets
Construction work on the 5th floor (WSP) as indicated on drawings.
On file for this job
5 documents · 10 drawing sheets
Mechanical work on the 5th floor (WSP) as indicated on drawings.
On file for this job
6 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 44p · 6 filings · 20 docs
ArchitectureFire ProtectionStructural
Change of use on the 55th floor to establish eating and drinking establishment and offices and related work as indicated on drawings.
On file for this job
13 documents
Minor architectural changes on the 4th floor as indicated on drawings.
On file for this job
5 documents · 1 drawing sheet
Architectural work on the 44th floor (Schumann) as indicated on drawings. EN for lighting are filed under M01079398-I1
On file for this job
10 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 340p · 12 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Structural modifications as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
12 documents · 3 drawing sheets
Installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
14 documents · 3 drawing sheets
Structural modifications as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
6 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 251p · 27 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to sprinkler systems as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
22 documents · 2 drawing sheets
Structural modifications as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
12 documents · 2 drawing sheets
Installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, occupancy or egress.
On file for this job
13 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 1Under Construction141p · 45 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructuralZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
ALT 2 APPLICATION TO RUN NEW WATER PIPING LINES PER NEW DEMISED SPACE INSTALLING ONE NEW FLOOR SINK AND INSTALL NEW WASTE LINES TO TIE BACK TO EXISTING GREASE TRAP and sprinkler work. No change to use egress or occupancy.
On file for this job
13 documents
Modifications to sprinkler systems as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
22 documents · 5 drawing sheets
Removal and installation of plumbing fixtures at 1st Floor and Roof as per plans. No change to use, occupancy or egress under this application.
On file for this job
20 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Cellar145p · 34 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Structural
Filing herewith for use of mechanical means DS1 in conjunction with application #123764480. No change in use, egress, or occupancy.
On file for this job
2 documents · 2 drawing sheets
Modifications to mechanical systems as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
18 documents · 2 drawing sheets
Interior Alteration to existing concourse level space. New Plumbing fixtures and sprinkler heads to be installed. No change of use, egress or occupancy under this application. See comment#24
On file for this job
18 documents · 5 drawing sheets
Latest 3 of 8 filings on this floor.
Sub-Cellar283p · 52 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Plumbing · Sprinklers
Filing herewith for use of mechanical means DS1 in conjunction with application #123764480. No change in use, egress, or occupancy.
On file for this job
2 documents · 2 drawing sheets
Modifications to mechanical systems as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
18 documents · 2 drawing sheets
Modifications to plumbing and sprinkler systems as per plans filed herewith. No change of use, occupancy or egress.
On file for this job
8 documents · 11 drawing sheets
Latest 3 of 8 filings on this floor.
Basement1p · 1 filing · 6 docs
Fire Protection
RENOVATION TO SPRINKLER AND PLUMBING SYSTEMS AS PER SUBMITTED DRAWINGS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this job
6 documents · 1 drawing sheet