← Back
BuildNYC
Office with commercial, 1-6 stories
1 PIER 57
MANHATTAN · BIN 1012253
💬 Discuss this project
1900Year Built
5Stories
O5Building Class
M1-5Zoning
396,000 sfGross Floor Area
5Units
LL97 Covered0 Active Violations
Office with commercial, 1-6 stories · 327,389 sf lot · 1.21 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofCity Winery33p · 5 filings · 20 docs
Floor 5City Winery66p · 5 filings · 20 docs
Floor 4Google133p · 14 filings · 20 docs
Floor 3Google, Made on YouTube +2Under Construction180p · 25 filings · 20 docs
Floor 2Google, City Winery253p · 18 filings · 20 docs
Floor 1Google, City Winery +2439p · 25 filings · 20 docs
MezzanineCity Winery2p · 1 filing · 20 docs
CellarGoogle, City WineryUnder Construction275p · 18 filings · 20 docs
Site & exteriorGoogle, City Winery4p · 4 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RXR Realty22810/07/2026
Super P5710603/21/2026
P57 Investors3303/21/2026
Youngwoo & Associates1203/21/2026
Prodject403/21/2026
Whitney Museum of American Art103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants16003/21/2026
J.A.M. Associates10003/21/2026
M G McLaren Engineering1203/21/2026
JP Expedite803/21/2026
Arup103/21/2026
Municipal Building Consultants103/21/2026
A1 Expediting Service403/21/2026
Eurocelt Expediting203/21/2026
Kazam Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RXR Construction ServiceGeneral Contractor6907/08/2026
Structure ToneGeneral Contractor2408/26/2026
Good Sense & Co Product SGeneral Contractor1209/15/2026
Preferred Sprinkler and MechanicalFire Protection1008/20/2026
Maccarone PlumbingPlumbing707/08/2026
Donato PlumbingPlumbing707/08/2026
Winick ProductionsGeneral Contractor507/08/2026
Safway AtlanticScaffold507/08/2026
Signs CadSign hanger407/08/2026
Maccarone PlumbingFire Protection407/08/2026
RXR Construction ServiceScaffold303/21/2026
Tuxedo Electrical ContractingElectrical303/21/2026
Marco Properties IGeneral Contractor303/21/2026
Platform SolutionsScaffold303/21/2026
KG SprinklerFire Protection307/08/2026
Par Fire ProtectionFire Protection307/08/2026
Preferred MechanicalPlumbing307/08/2026
Lawrence J. LevineFire Protection203/21/2026
Par Plumbing CoPlumbing207/08/2026
NY Electric Maintenance & DataElectrical103/22/2026
Knight Electrical ServiceElectrical103/22/2026
Allran Electric of NYElectrical103/22/2026
Balaton ConsultingSign hanger107/08/2026
Abco-Peerless SprinklerFire Protection107/08/2026
GearGeneral Contractor107/08/2026
Transform Electl Contractors IElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Consulting and Testing SE61524609/09/2026
Milrose Consultants2003808/13/2026
Enthink Engineers6247402/21/2024
Atlantic Engineeringlabor13811502/01/2023
Dominick R. Pilla1300111/07/2022
Socotec Engineering4983101/27/2022
DNA Controlled Inspection554810/19/2021
Alan Margolin & Associates423810/09/2020
Building Lifecycle
All (300)Filed (74)Permit Issued (62)Signed Off (54)Violation (9)Inspection (39)Objection (32)Special Inspection (30)
10/07/2026
Signed off — Alteration
Temporary Installation in Auditorium at 3RD FL to be removed after event
M01451293-I1
09/17/2026
Objection resolved — Addressed
09/14/2026
Permit issued — General Construction
M01451293-I1-GC
09/12/2026
Objection raised — Other
09/11/2026
Filed — Alteration
Temporary Installation in Auditorium at 3RD FL to be removed after event
M01451293-I1
09/09/2026
Filed — Alteration
Installation of 20 heads at shared lobby space
M00484119-P1
09/09/2026
Special inspection requirement — Final
RYAN RIVET-FRAME
09/08/2026
Filed — No Work
M01448368-I1
09/04/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/21/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/18/2026
Permit issued — Mechanical Systems
M01418453-I1-MS
08/18/2026
Permit issued — Sprinklers
M01418459-I1-EW-SP
08/17/2026
Signed off — Alteration
M01262912-I1
08/13/2026
Filed — Alteration
Installation of new sprinkler heads for new walk-in refrigerator room as per plans filed herewith. No change to use, egress, or occupancy proposed.
M01418459-I1
08/13/2026
Filed — Alteration
Installation of mechanical piping for new walk-in refrigerator as per plans filed herewith. No existing building materials are to be disturbed by the proposed work. No change to use, egress, or occupancy.
M01418453-I1
08/04/2026
Special inspection requirement — Maintenance information
Benjamin Plotnick
08/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Benjamin Plotnick
07/28/2026
Special inspection requirement — Sprinkler Systems
DANIEL CREIGHTON
06/17/2026
Special inspection requirement — Final
Benjamin Plotnick
06/17/2026
Special inspection requirement — Mechanical Systems
Benjamin Plotnick
06/11/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/01/2026
Signed off — Alteration
M01313095-I1
05/29/2026
Signed off — Alteration
INSTALLATION OF NEW NON-BEARING PARTITIONS, NEW OFFICE FRONT AND DOORS, INSTALLATION OF NEW CEILING AND FINISH AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01280647-I1
05/20/2026
Signed off — Alteration
M01365421-I1
04/16/2026
Signed off — Alteration
M01262898-I1
03/06/2026
Permit issued — General Construction
M01365421-I1-GC
03/05/2026
Permit issued — Sprinklers
M00484119-I1-EW-SP
03/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/27/2026
Filed — Alteration
M01365421-I1
02/19/2026
Signed off — Alteration
Minor Water and Sanitary piping work. No new plumbing fixtures being installed, no plumbing fixture modification.
M00573082-I1
02/09/2026
Permit issued — Structural
M00484074-S2-ST
02/09/2026
Permit issued — General Construction
M01313095-I1-GC
02/06/2026
Permit issued — General Construction
M01280647-I1-GC
01/28/2026
Filed — Alteration
M01313095-I1
01/28/2026
Signed off — Alteration
MODIFICATION TO EXISTING SMOKE PURGE SYSTEM INCLUDING NEW LOUVER LOCATIONS AND MODIFIED DUCTWORK.
M00286461-I1
01/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DANIEL CREIGHTON
01/27/2026
Special inspection requirement — Post-installed Anchors
DANIEL CREIGHTON
01/26/2026
Filed — Alteration
Minor Water and Sanitary piping work. No new plumbing fixtures being installed, no plumbing fixture modification.
M00573082-P2
01/12/2026
Filed — Alteration
INSTALLATION OF NEW NON-BEARING PARTITIONS, NEW OFFICE FRONT AND DOORS, INSTALLATION OF NEW CEILING AND FINISH AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01280647-I1
12/19/2025
Signed off — Alteration
M01233315-I1
12/05/2025
Signed off — Alteration
M00449589-I1
12/04/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/02/2025
Filed — Alteration
Minor Water and Sanitary piping work. No new plumbing fixtures being installed, no plumbing fixture modification.
M00573082-P1
12/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/26/2025
Permit issued — Plumbing
M00573082-I1-PL
11/20/2025
Signed off — Alteration
Addition of short runs of ductwork and piping to serve phone rooms. No change to use, egress, or occupancy.
M01262903-I1
11/20/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/03/2025
Signed off — Alteration
Temporary Installation in Auditorium at 3RD FL to be removed after event
M01277673-I1
11/03/2025
Special inspection requirement — Final
Stephanie Lan
10/28/2025
Signed off — Alteration
REMOVAL OF ELEVATOR AND INSTALLATION OF CONVENIENCE STAIR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M08022141-S4
10/27/2025
Signed off — Alteration
REMOVAL OF ELEVATOR AND INSTALLATION OF CONVENIENCE STAIR. NO CHANGE IN OCCUPANCY, USE OR EGRESS.
M08022141-S3
10/15/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/14/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/08/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/15/2025
Permit issued — General Construction
M01262898-I1-GC
09/12/2025
Objection resolved — Addressed
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGood Sense & Co Product S09/14/2026
DOB NOWMechanical SystemsPermit IssuedStructure Tone08/18/2026
DOB NOWSprinklersPermit IssuedPreferred Sprinkler and Mechanical08/18/2026
DOB NOWGeneral ConstructionSigned-offGood Sense & Co Product S03/06/2026
DOB NOWSprinklersPermit IssuedLawrence J. Levine03/05/2026
DOB NOWGeneral ConstructionSigned-offStructure Tone02/09/2026
DOB NOWStructuralSigned-offRXR Construction Service02/09/2026
DOB NOWGeneral ConstructionSigned-offStructure Tone02/06/2026
DOB NOWPlumbingSigned-offMaccarone Plumbing11/26/2025
DOB NOWGeneral ConstructionSigned-offStructure Tone09/15/2025
DOB NOWGeneral ConstructionSigned-offGood Sense & Co Product S09/02/2025
DOB NOWMechanical SystemsSigned-offStructure Tone08/26/2025
DOB NOWMechanical SystemsSigned-offStructure Tone08/21/2025
DOB NOWSprinklersSigned-offPreferred Sprinkler and Mechanical08/20/2025
DOB NOWMechanical SystemsSigned-offStructure Tone07/09/2025
DOB NOWGeneral ConstructionSigned-offStructure Tone05/21/2025
DOB NOWGeneral ConstructionSigned-offGood Sense & Co Product S04/17/2025
DOB NOWPlumbingSigned-offDonato Plumbing03/18/2025
DOB NOWPlumbingSigned-offDonato Plumbing03/18/2025
DOB NOWPlumbingSigned-offDonato Plumbing03/18/2025
DOB NOWStructuralSigned-offGear12/26/2024
DOB NOWStructuralSigned-offRXR Construction Service12/17/2024
DOB NOWGeneral ConstructionSigned-offRXR Construction Service12/17/2024
DOB NOWGeneral ConstructionSigned-offRXR Construction Service12/17/2024
DOB NOWStructuralSigned-offRXR Construction Service12/17/2024
DOB NOWMechanical SystemsSigned-offRXR Construction Service12/17/2024
DOB NOWMechanical SystemsSigned-offRXR Construction Service12/17/2024
DOB NOWStructuralSigned-offWinick Productions09/30/2024
DOB NOWStructuralSigned-offWinick Productions09/26/2024
DOB NOWGeneral ConstructionSigned-offGood Sense & Co Product S09/04/2024
DOB NOWSprinklersSigned-offMaccarone Plumbing07/11/2024
DOB NOWPlumbingSigned-offMaccarone Plumbing07/11/2024
DOB NOWGeneral ConstructionSigned-offStructure Tone05/07/2024
DOB NOWGeneral ConstructionSigned-offGood Sense & Co Product S04/17/2024
DOB NOWSprinklersSigned-offH M Sprinkler03/20/2024
DOB NOWPlumbingSigned-offDonato Plumbing03/20/2024
DOB NOWPlumbingSigned-offDonato Plumbing03/20/2024
DOB NOWPlumbingSigned-offDonato Plumbing03/20/2024
DOB NOWPlumbingSigned-offDonato Plumbing03/20/2024
DOB NOWSprinklersSigned-offH M Sprinkler03/20/2024
+ 60 more permits on file
1 project · most recent 07/07/2021
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/07/2021Signed-offRXR Construction ServiceAir Conditioning Systems, Heating Systems
Cooling
Trane GEHE02441H02B0BLF061 2 tons · Packaged Unit ×1
Heating
Trane UHWA Electric Heater ×1
2 projects · most recent 09/09/2026
FiledStatusContractorScope
09/09/2026Permit IssuedPar Fire Protection20 heads
08/13/2026Permit IssuedPreferred Sprinkler and Mechanical2 heads
1 project · most recent 08/13/2026
FiledStatusContractorScope
08/13/2026———
23 projects · most recent 04/18/2026
General Wiring Lighting
FiledStatusContractorScope
04/18/2026CompleteTransform Electl Contractors IGeneral Wiring
11/07/2025Permit IssuedTransform Electl Contractors IGeneral Wiring
12/01/2023Permit IssuedNY Electric Maintenance & Data1 meters, 1 new_meters
07/27/2023CompleteEgg Electric2 meters
06/01/2023Permit IssuedNY Electric Maintenance & Data1 meters, 1 new_meters
03/30/2023CompleteSigns Cad—
02/28/2023CompleteAllran Electric of NYGeneral Wiring
09/28/2022Permit IssuedKnight Electrical ServiceGeneral Wiring
08/31/2022CompleteEgg ElectricGeneral Wiring, Lighting
11/01/2021CompleteB & G Electrical Contracting of NY IGeneral Wiring
10/19/2021CompleteTransel Elev. & ElectricGeneral Wiring
09/21/2021CompleteEgg ElectricGeneral Wiring
08/25/2021CompleteKleinknecht Electric CoGeneral Wiring
03/26/2021CompleteKleinknecht Electric CoGeneral Wiring
08/24/2020Permit IssuedKleinknecht Electric CoGeneral Wiring, Lighting
1 project · most recent 07/07/2021
Steel Concrete Masonry
FiledStatusContractorScope
07/07/2021Signed-offRXR Construction ServiceSteel, Concrete, Masonry
2 projects · most recent 01/14/2021
Scaffold
FiledStatusContractorScope
01/14/2021Permit IssuedPlatform SolutionsScaffold
10/30/2020Permit IssuedSafway AtlanticScaffold
▾Field Inspections (DOB CAP) — 53
DateTypeResultReport
09/04/2026Pass-Final General Construction Non-Directive 14PassView ↗
08/21/2026Fail-Final General Construction Non-Directive 14FailView ↗
06/11/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/20/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/14/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/26/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/11/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/06/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/22/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
Latest 25 of 53.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/09/2026FinalRYAN RIVET-FRAMEprogress
08/04/2026Maintenance informationBenjamin Plotnickenergy_progress
08/04/2026HVAC-R and service water piping design and insulationBenjamin Plotnickenergy_progress
07/28/2026Sprinkler SystemsDANIEL CREIGHTONspecial
06/17/2026Mechanical SystemsBenjamin Plotnickspecial
06/17/2026FinalBenjamin Plotnickprogress
01/27/2026Post-installed AnchorsDANIEL CREIGHTONspecial
01/27/2026Fire-Resistant Penetrations and JointsDANIEL CREIGHTONspecial
11/03/2025FinalStephanie Lanprogress
09/03/2025FinalStephanie Lanprogress
08/26/2025FinalBARTON BREISCHprogress
08/06/2025Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
08/06/2025Post-installed AnchorsChristopher Drutjonsspecial
07/29/2025Mechanical SystemsChristopher Drutjonsspecial
07/29/2025FinalStephanie Lanprogress
07/29/2025Sprinkler SystemsChristopher Drutjonsspecial
07/29/2025FinalChristopher Drutjonsprogress
04/14/2025Fire-Resistant Penetrations and JointsDANIEL CREIGHTONspecial
04/14/2025High-Pressure Fuel-Gas Piping (Welding)DANIEL CREIGHTONspecial
04/07/2025Fire-Resistant Penetrations and JointsDANIEL CREIGHTONspecial
04/04/2025High-Pressure Fuel-Gas Piping (Welding)DANIEL CREIGHTONspecial
04/04/2025Fire-Resistant Penetrations and JointsDANIEL CREIGHTONspecial
02/25/2025Fire-Resistant Penetrations and JointsDANIEL CREIGHTONspecial
02/13/2025Public Assembly Emergency LightingDANIEL CREIGHTONprogress
02/12/2025Public Assembly Emergency LightingDANIEL CREIGHTONprogress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
GoogleOfficeCellar, Floors 1–4
Project M01418453 Alteration · Permit Entire · 08/13/2026
Project M01418459 Alteration · Permit Entire · 08/13/2026
Project M01313095 Alteration · LOC Issued · 01/28/2026
Project M01280647 Alteration · LOC Issued · 01/12/2026
Project M01262903 Alteration · LOC Issued · 08/18/2025
Project M01262912 Alteration · LOC Issued · 08/18/2025
Project M01262898 Alteration · LOC Issued · 08/15/2025
Project M01178658 Alteration · LOC Issued · 05/05/2025
Project M01178668 Alteration · LOC Issued · 05/05/2025
Project M01101726 Alteration · LOC Issued · 08/28/2024
Project M00938259 Alteration · Approved · 09/28/2023
Project M00654132 Alteration · LOC Issued · 01/27/2022
Made on YouTubeEvents & gatheringsFloor 3
Project M01277673 Alteration · LOC Issued · 08/27/2025
Foothouse Bar & RestaurantRestaurant / Food ServiceFloor 1
Project M01180132 No Work · PA Certificate of Operation Issued · 06/23/2025
Android XR UnlockedOfficeFloor 3
Project M01149662 Alteration · LOC Issued · 12/09/2024
City WineryRestaurant / Food ServiceCellar, Floors 1, 2, 5, Roof
Project M00999387 Alteration · LOC Issued · 02/07/2024
Project M00999394 Alteration · LOC Issued · 02/07/2024
Project M00999401 Alteration · LOC Issued · 02/07/2024
Project M00999406 Alteration · LOC Issued · 02/07/2024
Project M00956351 Alteration · LOC Issued · 12/14/2023
Project M00966155 Alteration · LOC Issued · 12/13/2023
Project M00210840 No Work · PA Certificate of Operation Issued · 01/24/2020
Project M00204532 Alteration · LOC Issued · 10/24/2019
Project M00204612 Alteration · LOC Issued · 10/24/2019
YoutubeOfficeFloor 3
Project M00933251 Alteration · LOC Issued · 09/15/2023
Akzo NobelOfficeFloor 1
Project M00845830 Alteration · LOC Issued · 03/21/2023
Project M00845848 Alteration · LOC Issued · 03/21/2023
Project M00845862 Alteration · LOC Issued · 03/21/2023
Project M00845874 Alteration · LOC Issued · 03/21/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,889 on file (BIS + DOB NOW)
▸Plans & Drawings190
▸DOB NOWPlans/Sketch80
10/07/2026M01451293-I1Request digital key ↗
09/06/2026M01034240-I1Request digital key ↗
09/03/2026M00484119-I1Request digital key ↗
Showing 3 of 80 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly23
10/04/2026M01448368-I1Request digital key ↗
09/05/2026M00325695-I1Request digital key ↗
09/02/2026M00750858-I1Request digital key ↗
Showing 3 of 23 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler20
09/05/2026M00265025-I1Request digital key ↗
09/05/2026M00204612-P9Request digital key ↗
09/05/2026M00204612-P2Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Plumbing18
09/05/2026M00204612-P9Request digital key ↗
09/05/2026M00204612-P3Request digital key ↗
09/05/2026M00204612-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Standpipe18
09/05/2026M00204612-P6Request digital key ↗
09/05/2026M00204612-P1Request digital key ↗
09/05/2026M00204612-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly15
09/04/2026M00423540-I1Request digital key ↗
09/02/2026M00781414-I1Request digital key ↗
Showing 2 of 15 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems10
09/05/2026M00204532-I1Request digital key ↗
09/05/2026M00212052-I1Request digital key ↗
09/05/2026M00212052-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/04/2026M00421419-I1Request digital key ↗
09/04/2026M00454155-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/04/2026M00264420-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Protection of Mechanical Methods1
09/04/2026M00467213-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00449589-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/03/2026M00413648-I1Request digital key ↗
▸Applications & Permits265
▸BISPLAN / WORK APPROVAL APPLICATION177
06/09/2025121235350Open ↗
06/05/2025121235350Open ↗
06/03/2025121235350Open ↗
Showing 3 of 177 on file for this type
▸BISWORK PERMIT APPLICATION83
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 83 on file for this type
▸BISPLACE OF ASSEMBLY5
11/01/2021123362208Open ↗
09/09/2021123362208Open ↗
Showing 2 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications508
▸DOB NOWDPL-1: Design Professional Seal & Signature155
10/05/2026M00484119-P1Open ↗
10/04/2026M01448368-I1Open ↗
09/16/2026M01451293-I1Open ↗
Showing 3 of 155 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature132
10/05/2026M00484119-P1Open ↗
10/05/2026M08022141-S1Open ↗
10/05/2026M08022141-S1Open ↗
Showing 3 of 132 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION104
04/14/2022123362208Open ↗
Showing 1 of 104 on file for this type
▸DOB NOWProgress Inspector Seal & Signature59
10/05/2026M08022141-S1Open ↗
10/03/2026M00551649-I1Open ↗
10/03/2026M00551649-I1Open ↗
Showing 3 of 59 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISAPPLICANT OWNER SIGNATURE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment135
▸BISEQUIPMENT USE PERMITS64
04/03/2023123774406Open ↗
04/14/2022123681658Open ↗
04/14/2022123681658Open ↗
Showing 3 of 64 on file for this type
▸BISSCHEDULE B - PLUMBING28
09/21/2022121235350Open ↗
12/01/2021123764499Open ↗
10/01/2021123764499Open ↗
Showing 3 of 28 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT16
04/03/2023123774406Open ↗
04/14/2022123681658Open ↗
04/14/2022123681658Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
04/03/2024121235350Open ↗
Showing 1 of 3 on file for this type
▸Safety & Tenant Protection7
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos131
▸DOB NOWDEP ACP-5: Asbestos Assessment Report89
09/05/2026M00204532-P1Open ↗
09/05/2026M00204532-I1Open ↗
09/05/2026M00212052-P1Open ↗
Showing 3 of 89 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)40
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 40 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
03/01/2022123681658Open ↗
Showing 1 of 2 on file for this type
▸BISNYCECC EXEMPTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports96
▸BISTECHNICAL REPORT: RESPONSIBILITY63
03/14/2024121235350Open ↗
03/14/2024121235350Open ↗
03/11/2024121235350Open ↗
Showing 3 of 63 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPOST-INSTALLED ANCHORS1
07/01/2024140922688Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
07/01/2024140922688Open ↗
▸Approvals, Objections & Sign-offs122
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST43
10/24/2025123678715Open ↗
07/02/2024140922688Open ↗
07/01/2024140922045Open ↗
Showing 3 of 43 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE31
06/09/2025121235350Open ↗
06/05/2025121235350Open ↗
06/03/2025121235350Open ↗
Showing 3 of 31 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION20
04/14/2022123362208Open ↗
04/14/2022123362208Open ↗
04/14/2022123362208Open ↗
Showing 3 of 20 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION10
04/03/2024121235350Open ↗
Showing 1 of 10 on file for this type
▸BISSUPERSEDING LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLANDMARKS APPROVAL3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFINAL2
07/01/2024140922045Open ↗
07/01/2024140922688Open ↗
▸BISOTCR Conditional Acceptance letter2
10/14/2021123448661Open ↗
10/14/2021121235350Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership98
▸BISCOST AFFIDAVIT79
05/11/2022123764499Open ↗
03/10/2022123764499Open ↗
03/10/2022123764499Open ↗
Showing 3 of 79 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
07/01/2024140922045Open ↗
07/01/2024140922688Open ↗
09/20/2021123534014Open ↗
Showing 3 of 6 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Filing & Intake Forms182
▸BISADDITIONAL INFORMATION87
07/02/2025121235350Open ↗
04/02/2024121235350Open ↗
02/27/2023121235350Open ↗
Showing 3 of 87 on file for this type
▸BISEFILING COVER SHEET45
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 45 on file for this type
▸BISBOROUGH INTAKE FORM32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸Other Documents101
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION24
11/10/2021123362208Open ↗
08/20/2021123362208Open ↗
Showing 2 of 24 on file for this type
▸DOB NOWProof of Historic Building13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWAlternate Plan 19
09/04/2026M00423540-I1Open ↗
Showing 1 of 9 on file for this type
▸DOB NOWAlternate Plan 27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWAlternate Plan 34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 84
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 64
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 104
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 54
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 44
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 94
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 74
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISALTERNATIVE MATERIALS - OTCR BUILDINGS BULLETIN3
12/01/2025121235350Open ↗
04/03/2024121235350Open ↗
04/03/2024121235350Open ↗
▸DOB NOWAlternate Plan 242
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 132
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 142
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 232
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 122
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 112
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWApproved Plans with no change in layout1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type