10 East 40th Street
10 EAST 40 STREET · BIN 1017601
💬 Discuss this project
1928Year Built
48Stories
O4Building Class
C5-2.5Zoning
442,042 sfGross Floor Area
86Units
LL97 Covered14 Open Violations 8 unresolved · 6 paperwork only ▸FISP: SAFE
Office, 20+ stories, with or without commercial · Owner of record: ROBNET 40TH STREET . · 14,714 sf lot · 30.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof4p · 3 filings · 20 docs
Floor 4818p · 3 filings · 20 docs
Floor 47Under Construction15p · 1 filing · 11 docs
Floor 46
Floor 45Under Construction42p · 3 filings · 20 docs
Floor 4429p · 4 filings · 20 docs
Floor 4314p · 1 filing · 5 docs
Floor 4230p · 3 filings · 20 docs
Floor 4115p · 4 filings · 20 docs
Floor 40
Floor 39Under Construction22p · 5 filings · 20 docs
Floor 3815p · 8 filings · 20 docs
Floor 3713p · 8 filings · 20 docs
Floor 36Under Construction46p · 4 filings · 20 docs
Floor 35134p · 5 filings · 20 docs
Floor 3459p · 8 filings · 20 docs
Floor 33Under Construction58p · 10 filings · 20 docs
Floor 32Under Construction166p · 8 filings · 20 docs
Floor 31Under Construction26p · 6 filings · 20 docs
Floor 3048p · 5 filings · 20 docs
Floor 29
Floor 28
Floor 27Under Construction95p · 9 filings · 20 docs
Floor 263p · 3 filings · 20 docs
Floor 25174p · 6 filings · 20 docs
Floor 24Under Construction30p · 4 filings · 20 docs
Floor 23Under Construction19p · 2 filings · 20 docs
Floor 22Under Construction26p · 4 filings · 16 docs
Floor 21Under Construction14p · 1 filing · 20 docs
Floor 201p · 1 filing · 3 docs
Floor 19Under Construction65p · 4 filings · 20 docs
Floor 184p · 3 filings · 20 docs
Floor 1710p · 3 filings · 20 docs
Floor 16
Floor 15Under Construction30p · 9 filings · 20 docs
Floor 141p · 1 filing · 5 docs
Floor 13150p · 5 filings · 20 docs
Floor 12Under Construction36p · 2 filings · 20 docs
Floor 11
Floor 10Under Construction35p · 6 filings · 20 docs
Floor 9
Floor 83p · 2 filings · 8 docs
Floor 7Under Construction36p · 2 filings · 20 docs
Floor 6
Floor 55p · 4 filings · 20 docs
Floor 4Under Construction33p · 6 filings · 20 docs
Floor 3
Floor 25p · 3 filings · 14 docs
Floor 119p · 9 filings · 20 docs
Mezzanine4p · 2 filings · 12 docs
CellarUnder Construction15p · 2 filings · 20 docs
Sub-CellarUnder Construction16p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GOLFTEC607/08/2026
24 WEST 25TH STREET PROPERTY INVEST507/08/2026
ROBNET 40TH STREET .903/22/2026
PHASE 3 INTERIORS203/22/2026
RONBET 40TH STREET LL9703/22/2026
ROBERT 40TH ST203/22/2026
ROBNET 40 STREET103/22/2026
FIFTH AVENUE CONDO - BHS103/22/2026
RONBET2103/22/2026
SIMEX AMERICA LTD103/22/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CROSS MANAGEMENT CORPGeneral Contractor5107/08/2026
PHASE 3 INTERIORS LLCGeneral Contractor2107/08/2026
EL-ROC CONTG OF BKLYN INCFire Protection1908/07/2026
EL-ROC CONTRACTING OF BKPlumbing1608/20/2026
REPUBLIC SCAFFOLD&HOIST CGeneral Contractor1407/08/2026
CLUNE CONSTRUCTION CO LPGeneral Contractor907/08/2026
FRANK LA GREGAElectrical703/21/2026
SPRING SCAFFOLDING LLCGeneral Contractor604/09/2026
INNER CITY ELEC'L CONTR'SElectrical603/22/2026
REPUBLIC EXTERIOR SERVICEGeneral Contractor407/08/2026
SUMMIT INTERIORS, INCGeneral Contractor408/21/2026
CROSS CONSULTING INCGeneral Contractor407/08/2026
ASE HVAC INCGeneral Contractor404/09/2026
VANGUARD CONSTRUCTION ANDGeneral Contractor307/08/2026
B & A RESTORATION CONTRAGeneral Contractor307/08/2026
DENAIR HVAC INCGeneral Contractor303/21/2026
KAIZEN NY CONTRACTING INCGeneral Contractor307/08/2026
A&A PLUMBING CORPPlumbing307/08/2026
WALTON, MARCElectrical203/21/2026
WILLIAM C. GERAKARIS P&HPlumbing207/08/2026
UNITY CONSTRUCTION GROUPGeneral Contractor208/20/2026
DONNELLY MECHANICAL CORPGeneral Contractor203/21/2026
VOLK INDUSTRIAL SERVICESGeneral Contractor204/09/2026
FOLOR INCGeneral Contractor207/08/2026
ACCURATE MECHANICAL INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WALTER T. GORMAN, P.E., P2687909/10/2026
JACK GREEN ASSOCIATES4225708/17/2026
DNA CONTROLLED INSPECTION554203/31/2025
SALAMON ENGINEERING PLLC1264210/30/2024
LEO Y LEE ASSOCIATES2481108/15/2024
SOCOTEC ENGINEERING4983304/24/2024
OBAID MIAN849103/28/2024
HIRANI ENGINEERING & LAND679112/12/2023
WINTON GROUP ARCHITECTURE4343109/29/2021
DOMANI INSPECTION SERVICE843206/09/2020
Building Lifecycle
All (300)Filed (80)Permit Issued (80)Signed Off (27)Facade (FISP) (3)Violation (7)Inspection (60)Objection (13)Special Inspection (30)
09/10/2026
Filed — Alteration
Alterations to mechanical system as per plans. No change to use, egress or occupancy.
M01050820-P2
08/20/2026
Permit issued — General Construction
M01394749-I1-GC
08/19/2026
Permit issued — Plumbing
M01434984-I1-PL
08/19/2026
Permit issued — Mechanical Systems
M01394757-I1-MS
08/18/2026
Permit issued — Plumbing
M01394822-I1-PL
08/18/2026
Permit issued — Sprinklers
M01434980-I1-EW-SP
08/18/2026
Permit issued — Sprinklers
M01394818-I1-EW-SP
08/18/2026
Permit issued — Mechanical Systems
M01434972-I1-MS
08/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/17/2026
Filed — Alteration
Alterations to sprinkler system on partial 32nd floor as per plans. No change to use, egress or occupancy.
M01434980-I1
08/17/2026
Filed — Alteration
Alterations to mechanical system to partial 32nd floor as per plans. No change to use, egress or occupancy.
M01434972-I1
08/17/2026
Filed — Alteration
Alterations to plumbing system on partial 32nd floor as per plans. No change to use, egress or occupancy.
M01434984-I1
08/14/2026
Filed — Alteration
Alterations to plumbing system on 33rd floor as per plans. No change to use, egress or occupancy.
M01394822-I1
08/14/2026
Filed — Alteration
General construction work on 33rd floor as per plans. No change to use, egress or occupancy.
M01394749-I1
08/14/2026
Filed — Alteration
Alterations to sprinkler system on 33rd floor as per plans. No change to use, egress or occupancy.
M01394818-I1
08/14/2026
Filed — Alteration
Alterations to mechanical system on 33rd floor as per plans. No change to use, egress or occupancy.
M01394757-I1
08/14/2026
Permit issued — General Construction
M01434963-I1-GC
08/13/2026
Filed — No Work
M01443873-I1
08/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/06/2026
Permit issued — Sprinklers
M00907924-I1-EW-SP
08/06/2026
Permit issued — Sprinklers
M00920892-I1-EW-SP
08/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/05/2026
Permit issued — Sprinklers
M01397960-I1-EW-SP
08/04/2026
Filed — Alteration
Demolition and general construction work in partial 32nd floor as per plans. No change to use, egress or occupancy.
M01434963-I1
08/04/2026
Signed off — Alteration
M01073608-I1
07/29/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/27/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/23/2026
Special inspection requirement — Lighting controls
LAWRENCE GREEN
07/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
LAWRENCE GREEN
07/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LAWRENCE GREEN
07/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
LAWRENCE GREEN
07/23/2026
Special inspection requirement — Maintenance information
LAWRENCE GREEN
07/23/2026
Special inspection requirement — Ventilation and air distribution system
LAWRENCE GREEN
07/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
LAWRENCE GREEN
07/23/2026
Special inspection requirement — Shutoff dampers
LAWRENCE GREEN
07/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
LAWRENCE GREEN
07/23/2026
Special inspection requirement — Interior lighting power
LAWRENCE GREEN
07/22/2026
Special inspection requirement — Mechanical Systems
LAWRENCE GREEN
07/22/2026
Special inspection requirement — Final
LAWRENCE GREEN
07/22/2026
Special inspection requirement — Sprinkler Systems
LAWRENCE GREEN
07/21/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/23/2026
Permit issued — Mechanical Systems
M01397954-I1-MS
06/19/2026
Filed — Alteration
Alterations to plumbing system on 15th floor as per plans. No change to use, egress or occupancy.
M01378824-P1
06/17/2026
Signed off — Alteration
M01092702-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSUMMIT INTERIORS, INC08/20/2026
DOB NOWMechanical SystemsPermit IssuedSUMMIT INTERIORS, INC08/19/2026
DOB NOWPlumbingPermit IssuedBEDROCK PLBG. & HTG., INC08/19/2026
DOB NOWPlumbingPermit IssuedEL-ROC CONTRACTING OF BK08/18/2026
DOB NOWMechanical SystemsPermit IssuedUNITY CONSTRUCTION GROUP08/18/2026
DOB NOWSprinklersPermit IssuedBEDROCK MECHANICAL INC08/18/2026
DOB NOWSprinklersPermit IssuedCAPITOL FIRE SPRINKLER CO08/18/2026
DOB NOWGeneral ConstructionPermit IssuedUNITY CONSTRUCTION GROUP08/14/2026
DOB NOWSprinklersPermit IssuedEL-ROC CONTG OF BKLYN INC08/06/2026
DOB NOWSprinklersPermit IssuedEL-ROC CONTG OF BKLYN INC08/06/2026
DOB NOWSprinklersPermit IssuedCAPITOL FIRE SPRINKLER CO08/05/2026
DOB NOWMechanical SystemsPermit IssuedSUMMIT INTERIORS, INC06/23/2026
DOB NOWGeneral ConstructionPermit IssuedSUMMIT INTERIORS, INC06/11/2026
DOB NOWSprinklersPermit IssuedEL-ROC CONTG OF BKLYN INC05/14/2026
DOB NOWPlumbingPermit IssuedEL-ROC CONTRACTING OF BK05/14/2026
DOB NOWMechanical SystemsPermit IssuedPHASE 3 INTERIORS LLC05/13/2026
DOB NOWSprinklersPermit IssuedBEDROCK MECHANICAL INC04/29/2026
DOB NOWPlumbingPermit IssuedBEDROCK PLBG. & HTG., INC04/28/2026
DOB NOWGeneral ConstructionPermit IssuedPHASE 3 INTERIORS LLC04/28/2026
DOB NOWGeneral ConstructionPermit IssuedJOHN GALLIN & SON, INC04/15/2026
DOB NOWMechanical SystemsPermit IssuedPHASE 3 INTERIORS LLC04/09/2026
DOB NOWMechanical SystemsPermit IssuedPHASE 3 INTERIORS LLC04/01/2026
DOB NOWGeneral ConstructionPermit IssuedPHASE 3 INTERIORS LLC03/30/2026
DOB NOWMechanical SystemsPermit IssuedPHASE 3 INTERIORS LLC03/24/2026
DOB NOWGeneral ConstructionPermit IssuedPHASE 3 INTERIORS LLC03/24/2026
DOB NOWMechanical SystemsPermit IssuedVOLK INDUSTRIAL SERVICES03/23/2026
DOB NOWPlumbingPermit IssuedEL-ROC CONTRACTING OF BK03/20/2026
DOB NOWGeneral ConstructionPermit IssuedVOLK INDUSTRIAL SERVICES03/09/2026
DOB NOWSupported ScaffoldPermit IssuedSPRING SCAFFOLDING LLC02/27/2026
DOB NOWMechanical SystemsSigned-offSUPERIOR AIR SYSTEMS MECH02/25/2026
DOB NOWSprinklersPermit IssuedGRUSHINSKY PIPNG & HTG IN02/18/2026
DOB NOWPlumbingPermit IssuedA&A PLUMBING CORP02/17/2026
DOB NOWStructuralSigned-offPHASE 3 INTERIORS LLC02/10/2026
DOB NOWSupported ScaffoldPermit IssuedSPRING SCAFFOLDING LLC02/02/2026
DOB NOWStructuralSigned-offCROSS MANAGEMENT CORP01/27/2026
DOB NOWSprinklersPermit IssuedEL-ROC CONTG OF BKLYN INC01/27/2026
DOB NOWMechanical SystemsPermit IssuedCROSS MANAGEMENT CORP01/27/2026
DOB NOWMechanical SystemsPermit IssuedPHASE 3 INTERIORS LLC01/21/2026
DOB NOWGeneral ConstructionPermit IssuedPHASE 3 INTERIORS LLC01/20/2026
DOB NOWSprinklersPermit IssuedDEPENDABLE MECHANICAL COR01/06/2026
+ 60 more permits on file
8 projects · most recent 08/17/2026
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2026Permit IssuedUNITY CONSTRUCTION GROUPAir Conditioning Systems
Cooling
Skypeak SKY-SDSV180 186,700 BTU ×1
08/14/2026Permit IssuedSUMMIT INTERIORS, INCAir Conditioning Systems
Cooling
Skypeak SKY-SDSV120 4,400 CFM · Packaged Unit ×2
05/01/2026Permit IssuedPHASE 3 INTERIORS LLCHeating and Air Conditioning Systems
Heat / Cool
Lg ARNU073TRD4 265 CFM · Vrf Indoor ×1
04/27/2026Permit IssuedVOLK INDUSTRIAL SERVICESAir Conditioning Systems
Cooling
Skypeak SKY-SDSV120 4,400 CFM · Packaged Unit ×4
09/30/2024Permit IssuedCROSS MANAGEMENT CORPAir Conditioning Systems
Cooling
United Cool Air VA20G3AHA30-C-X 8,000 CFM · Split System ×1
03/19/2024Permit IssuedPHASE 3 INTERIORS LLCAir Conditioning Systems
Cooling
Skypeak SKY-SDSV096 3,200 CFM ×6
SKY-SDSV120 4,000 CFM · Packaged Unit ×6
06/09/2020Permit IssuedDENAIR HVAC INCAir Conditioning Systems—
09/05/2019Permit IssuedCROSS MANAGEMENT CORPAir Conditioning Systems—
13 projects · most recent 08/17/2026
Sprinkler System
FiledStatusContractorScope
08/17/2026Permit IssuedBEDROCK MECHANICAL INC—
08/14/2026Permit IssuedCAPITOL FIRE SPRINKLER CO84 heads
06/05/2026Permit IssuedCAPITOL FIRE SPRINKLER CO91 heads
05/01/2026Permit IssuedEL-ROC CONTG OF BKLYN INC—
03/14/2026Permit IssuedBEDROCK MECHANICAL INC95 heads
03/12/2026Permit IssuedEL-ROC CONTG OF BKLYN INC507 heads
03/12/2026Permit IssuedEL-ROC CONTG OF BKLYN INC595 heads
03/19/2024Permit IssuedGRUSHINSKY PIPNG & HTG IN413 heads
12/12/2023Permit IssuedDENKO MECHANICAL INCSprinkler System
10/12/2023Permit IssuedEL-ROC CONTG OF BKLYN INC382 heads
09/22/2023Permit IssuedEL-ROC CONTG OF BKLYN INC114 heads
05/09/2023———
06/09/2020———
11 projects · most recent 08/17/2026
Water/Sanitary
FiledStatusContractorScope
08/17/2026———
08/17/2026Permit IssuedBEDROCK PLUMBING & HEATING INCWater/Sanitary
08/14/2026———
08/14/2026Permit IssuedEL-ROC CONTRACTING OF BKWater/Sanitary
06/19/2026Permit IssuedEL-ROC CONTRACTING OF BKWater/Sanitary
06/09/2026——Water/Sanitary
03/14/2026Permit IssuedBEDROCK PLUMBING & HEATING INCWater/Sanitary
03/12/2026———
03/19/2024Signed-offEL-ROC CONTRACTING OF BKWater/Sanitary
12/12/2023Signed-offWILLIAM C. GERAKARIS P&HWater/Sanitary
09/17/2020Signed-offACCURATE MECHANICAL INCWater/Sanitary
25 projects · most recent 09/04/2026
General Wiring
FiledStatusContractorScope
09/04/2026Permit IssuedPSM ELECTRIC LLCGeneral Wiring
08/18/2026Permit IssuedL.E.A. ELECTRIC CORP.General Wiring
05/12/2025Permit IssuedINNER CITY ELEC'L CONTR'SGeneral Wiring
03/11/2025CompleteSTRIANO ELECTRIC CO., INCGeneral Wiring
01/03/2025Permit IssuedTOP SHELF ELECTRIC CORP—
09/19/2024Permit IssuedINNER CITY ELEC'L CONTR'SGeneral Wiring
06/25/2024Permit IssuedEDGE ELEC'L CONTR'S INCGeneral Wiring
05/28/2024CompleteINNER CITY ELEC'L CONTR'SGeneral Wiring
07/25/2023Permit IssuedINNER CITY ELEC'L CONTR'SGeneral Wiring
07/05/2023Permit IssuedINNER CITY ELEC'L CONTR'SGeneral Wiring
06/29/2023Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
02/15/2023Permit IssuedNASH ELECTRIC SERVICES IN—
01/20/2023Permit IssuedINNER CITY ELEC'L CONTR'SGeneral Wiring
01/20/2023Permit IssuedINNER CITY ELEC'L CONTR'SGeneral Wiring
01/19/2023Permit IssuedINNER CITY ELEC'L CONTR'SGeneral Wiring
4 projects · most recent 04/21/2026
Steel Concrete
FiledStatusContractorScope
04/21/2026Permit IssuedPHASE 3 INTERIORS LLC1 scope_items
02/09/2026Signed-offPHASE 3 INTERIORS LLCSteel, Concrete
02/02/2026——1 scope_items
05/09/2023——1 scope_items
1 project · most recent 02/27/2020
Scaffold
FiledStatusContractorScope
02/27/2020Permit IssuedREPUBLIC EXTERIOR SERVICEScaffold
▾Field Inspections (DOB CAP) — 111
DateTypeResultReport
08/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/29/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/21/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/30/2026Certified Medical Gas - MG - PL - FinishCertifiedView ↗
04/30/2026Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
04/30/2026Certified Medical Gas - MG - PL - TestCertifiedView ↗
04/28/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/28/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/10/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/03/2026Pass-Final Construction Permit WithdrawalPassView ↗
04/02/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/02/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/13/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/18/2025Fail-Final PL - Up to 9 Requested FloorsFailView ↗
Latest 25 of 111.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/23/2026Ventilation and air distribution systemLAWRENCE GREENenergy_progress
07/23/2026Maintenance informationLAWRENCE GREENenergy_progress
07/23/2026Lighting controlsLAWRENCE GREENenergy_progress
07/23/2026HVAC-R and service water heating equipmentLAWRENCE GREENenergy_progress
07/23/2026HVAC-R and service water heating system controlsLAWRENCE GREENenergy_progress
07/23/2026Interior lighting powerLAWRENCE GREENenergy_progress
07/23/2026Fire-Resistant Penetrations and JointsLAWRENCE GREENspecial
07/23/2026Shutoff dampersLAWRENCE GREENenergy_progress
07/23/2026Fire-Resistant Penetrations and JointsLAWRENCE GREENspecial
07/23/2026HVAC-R and service water piping design and insulationLAWRENCE GREENenergy_progress
07/22/2026Mechanical SystemsLAWRENCE GREENspecial
07/22/2026Sprinkler SystemsLAWRENCE GREENspecial
07/22/2026FinalLAWRENCE GREENprogress
05/26/2026Fire-Resistant Penetrations and JointsWalter Gormanspecial
05/26/2026FinalJohn Giuseffiprogress
05/22/2026FinalJohn Giuseffiprogress
05/20/2026Sprinkler SystemsJACK GREENspecial
05/20/2026Fire-Resistant Penetrations and JointsJACK GREENspecial
05/06/2026FinalLAWRENCE GREENprogress
05/06/2026Mechanical SystemsLAWRENCE GREENspecial
05/01/2026HVAC-R and service water piping design and insulationLAWRENCE GREENenergy_progress
05/01/2026Lighting controlsLAWRENCE GREENenergy_progress
05/01/2026Shutoff dampersLAWRENCE GREENenergy_progress
05/01/2026Interior lighting powerLAWRENCE GREENenergy_progress
05/01/2026Ventilation and air distribution systemLAWRENCE GREENenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Counsel PressOfficeFloors 4, 5
Project M01323152 Alteration · Permit Entire · 12/22/2025
Project M01323648 Alteration · Permit Entire · 12/22/2025
Project M01323650 Alteration · Permit Entire · 12/22/2025
Project M00296879 Alteration · LOC Issued · 02/03/2020
Project M00296961 Alteration · LOC Issued · 02/03/2020
Project M00297024 Alteration · LOC Issued · 02/03/2020
PirelliOfficeFloor 41
Project M01073591 Alteration · LOC Issued · 09/11/2024
Prospect CapitalOfficeFloors 36, 42–45
Project M01050820 Alteration · QA Failed · 07/01/2024
Madison IntlOfficeFloors 10, 19
Project M00999164 Alteration · LOC Issued · 04/24/2024
Project M00988349 Alteration · LOC Issued · 02/14/2024
Project M00988359 Alteration · LOC Issued · 02/13/2024
GolfTECRetailFloors 1, 2
Project M00836471 Alteration · Approved · 05/09/2023
Project M00837743 Alteration · Permit Entire · 05/09/2023
HSBCOfficeFloor 8
Project M00582178 Alteration · LOC Issued · 09/29/2021
Project M00579024 Alteration · LOC Issued · 09/27/2021
WWUnknown—
Project M00198583 Alteration · LOC Issued · 09/19/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 3,175 on file (BIS + DOB NOW)
▸Plans & Drawings195
▸DOB NOWPlans/Sketch178
09/06/2026M00079831-I1Request digital key ↗
09/03/2026M00579024-I1Request digital key ↗
09/03/2026M00582178-I1Request digital key ↗
Showing 3 of 178 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
09/05/2026M00191627-I1Request digital key ↗
09/05/2026M00198566-I1Request digital key ↗
09/05/2026M00198566-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00187258-I1Request digital key ↗
09/05/2026M00198573-I1Request digital key ↗
09/05/2026M00296961-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/05/2026M00198583-I1Request digital key ↗
09/05/2026M00297024-I1Request digital key ↗
09/04/2026M00336338-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00323058-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00297003-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Applications & Permits545
▸BISPLAN / WORK APPROVAL APPLICATION297
01/20/2026121945146Open ↗
12/04/2025121945146Open ↗
12/03/2025121945146Open ↗
Showing 3 of 297 on file for this type
▸BISWORK PERMIT APPLICATION245
04/26/2023121945146Open ↗
04/26/2023121945146Open ↗
04/26/2023121945146Open ↗
Showing 3 of 245 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWState DEC Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications1,089
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION312
03/18/2020123833254Open ↗
01/27/2020123848578Open ↗
01/27/2020123848578Open ↗
Showing 3 of 312 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature197
09/05/2026M00191627-I1Open ↗
09/05/2026M00198566-P1Open ↗
09/05/2026M00198566-I1Open ↗
Showing 3 of 197 on file for this type
▸DOB NOWProgress Inspector Seal & Signature159
09/30/2026M00999164-I1Open ↗
09/30/2026M00999164-I1Open ↗
09/27/2026M01018207-I1Open ↗
Showing 3 of 159 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature126
09/30/2026M00999164-I1Open ↗
09/27/2026M01018207-I1Open ↗
09/23/2026M01266532-I1Open ↗
Showing 3 of 126 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST120
03/18/2020123833254Open ↗
01/27/2020123848578Open ↗
12/26/2019123848569Open ↗
Showing 3 of 120 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT99
08/04/2020140932374Open ↗
06/24/2020140917024Open ↗
03/18/2020123833254Open ↗
Showing 3 of 99 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM60
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 60 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
08/04/2020140932374Open ↗
06/24/2020140917024Open ↗
03/10/2020140890542Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
08/04/2020140932374Open ↗
06/24/2020140917024Open ↗
03/10/2020140890542Open ↗
Showing 3 of 5 on file for this type
▸BISPC FULL REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)2
01/27/2020123848578Open ↗
12/26/2019123848569Open ↗
▸Trade Schedules & Equipment260
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE62
12/30/2019123550497Open ↗
Showing 1 of 62 on file for this type
▸BISEQUIPMENT USE PERMITS54
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 54 on file for this type
▸BISSELF-CERT PLUMBING NOTICE46
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 46 on file for this type
▸BISSCHEDULE B - PLUMBING40
11/21/2025121945146Open ↗
Showing 1 of 40 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8514
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA14
12/30/2019123339477Open ↗
12/17/2019122835307Open ↗
12/16/2019120631842Open ↗
Showing 3 of 14 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-841
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos321
▸DOB NOWDEP ACP-5: Asbestos Assessment Report161
09/05/2026M00191627-I1Open ↗
09/05/2026M00198566-I1Open ↗
09/05/2026M00198566-P1Open ↗
Showing 3 of 161 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)81
08/04/2020140932374Open ↗
06/24/2020140917024Open ↗
03/18/2020123833254Open ↗
Showing 3 of 81 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form14
08/31/2026M00824441-I1Open ↗
Showing 1 of 14 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM6
12/26/2019123848569Open ↗
Showing 1 of 6 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance133
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS90
03/18/2020123833254Open ↗
01/27/2020123848578Open ↗
01/27/2020123848578Open ↗
Showing 3 of 90 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
08/17/2020123848578Open ↗
05/11/2020123803866Open ↗
Showing 2 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
08/17/2020123848578Open ↗
08/06/2020140932374Open ↗
08/04/2020140932374Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
08/04/2020140932374Open ↗
06/24/2020140917024Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification2
09/05/2026M00198566-I1Open ↗
Showing 1 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/08/2023123392364Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/08/2023123392364Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY11
08/17/2020123848578Open ↗
08/06/2020140932374Open ↗
08/06/2020140932374Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs127
▸BISADMINISTRATIVE OBJECTIONS53
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 53 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST53
05/10/2023123392364Open ↗
05/08/2023104857861Open ↗
05/03/2023104805659Open ↗
Showing 3 of 53 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
04/07/2023121945146Open ↗
04/07/2023123527950Open ↗
Showing 2 of 5 on file for this type
▸BISSHED LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFINAL1
05/08/2023123392364Open ↗
▸Cost, Insurance & Ownership203
▸BISCOST AFFIDAVIT200
05/08/2023123392364Open ↗
05/03/2023123392364Open ↗
05/03/2023104857861Open ↗
Showing 3 of 200 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/08/2023123392364Open ↗
▸Filing & Intake Forms274
▸BISEFILING COVER SHEET186
03/18/2020123833254Open ↗
01/27/2020123848578Open ↗
12/26/2019123848569Open ↗
Showing 3 of 186 on file for this type
▸BISBOROUGH INTAKE FORM42
04/26/2023121945146Open ↗
04/24/2023121945146Open ↗
04/19/2023121945146Open ↗
Showing 3 of 42 on file for this type
▸BISADDITIONAL INFORMATION40
02/02/2026121945146Open ↗
12/18/2025121945146Open ↗
05/08/2023123392364Open ↗
Showing 3 of 40 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
08/04/2020140932374Open ↗
06/24/2020140917024Open ↗
03/10/2020140890542Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProperty Ownership Certification1
08/31/2026M00883993-I1Open ↗
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type