| Owner | Filings | Most Recent |
|---|---|---|
| Ery Tenant LLC C/O the Related | 701 | 03/22/2026 |
| Related Hudson Yards Manager | 93 | 07/08/2026 |
| Legacy Yards Tenants | 91 | 03/22/2026 |
| Ery Tennant | 6 | 03/21/2026 |
| NYC Department of Parks and Recreation | 5 | 03/21/2026 |
| Safeway Atlantic | 4 | 03/21/2026 |
| Metropolitan Transportation Authority | 4 | 03/21/2026 |
| Coach | 2 | 03/21/2026 |
| CM & Associates | 1 | 03/22/2026 |
| Intercept | 1 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 08/01/2016 | $119.9M | — | Metropolitan Transportation Authority → LEGACY YARDS TENANT LP | — not available |
| Representative | Filings | Most Recent |
|---|---|---|
| Gilman Consultant | 180 | 03/21/2026 |
| Empire City Consultants | 35 | 03/21/2026 |
| Milrose Consultants | 33 | 03/21/2026 |
| Related Companies | 7 | 03/21/2026 |
| DVA Advisors | 2 | 03/21/2026 |
| Municipal Building Consultants | 9 | 03/21/2026 |
| Louis Striar | 4 | 03/21/2026 |
| Spring Scaffolding | 2 | 03/21/2026 |
| A1 Expediting Service | 4 | 03/21/2026 |
| Gillman Consulting | 22 | 03/21/2026 |
| Rizzo Group | 2 | 03/21/2026 |
| All in Permit Consultants | 1 | 03/21/2026 |
| Clarke Construction Consultants | 1 | 03/21/2026 |
| New York Design Arhictects | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JT Magen & Company | General Contractor | 36 | 07/08/2026 |
| JRM Construction Management | General Contractor | 30 | 07/08/2026 |
| LJG Construction | General Contractor | 12 | 07/08/2026 |
| Structure Tone | General Contractor | 11 | 09/16/2026 |
| Petretti & Associates | General Contractor | 10 | 04/09/2026 |
| Turner Construction Company | General Contractor | 10 | 07/08/2026 |
| Par Plumbing Co | Plumbing | 10 | 07/08/2026 |
| Safway Atlantic | Scaffold | 7 | 07/08/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 7 | 10/04/2026 |
| Richter & Ratner Contracting | General Contractor | 7 | 07/08/2026 |
| Mega Plumbing | Fire Protection | 6 | 07/08/2026 |
| Hudson Yards Construction | General Contractor | 6 | 03/21/2026 |
| Patriot Electric | Electrical | 6 | 03/22/2026 |
| DK Construction One | General Contractor | 6 | 03/21/2026 |
| Par Fire Protection | Fire Protection | 4 | 07/08/2026 |
| SKH Mechanical | Fire Protection | 4 | 07/08/2026 |
| Mega Plumbing | Plumbing | 4 | 07/08/2026 |
| William F Ventura P&H | Plumbing | 3 | 03/22/2026 |
| Ashlar Mechanical | Fire Protection | 3 | 07/08/2026 |
| Go Pro Fire Protection | Fire Protection | 3 | 07/08/2026 |
| NYC Fire Sprinkler | Fire Protection | 3 | 07/08/2026 |
| Spring Scaffolding | Scaffold | 3 | 03/21/2026 |
| Darby Construction Service | General Contractor | 3 | 03/21/2026 |
| Dependable Mechanical | Fire Protection | 2 | 08/07/2026 |
| Commerical Plumbing Svces | Plumbing | 2 | 07/08/2026 |
| Piece Management | General Contractor | 2 | 03/21/2026 |
| Alchemy Development | General Contractor | 2 | 04/09/2026 |
| L.S. Sign Co | Sign hanger | 2 | 07/08/2026 |
| Superior HVAC | specialty_contractor | 2 | 03/21/2026 |
| Sirina Fire Protection | Fire Protection | 2 | 07/08/2026 |
| Lab Plumbing & Heating Co | Plumbing | 2 | 07/08/2026 |
| Starr Tent & Event Group | General Contractor | 2 | 03/21/2026 |
| Ashland Plumbing | Plumbing | 1 | 07/08/2026 |
| E-J Electric Installation Co | Electrical | 1 | 03/22/2026 |
| Erne Valley Electric | Electrical | 1 | 03/22/2026 |
| GMC Electrical | Electrical | 1 | 03/22/2026 |
| Robert B. Samuels | Electrical | 1 | 03/21/2026 |
| RX Electric | Electrical | 1 | 03/22/2026 |
| Top Notch Electric | Electrical | 1 | 03/22/2026 |
| Abco-Peerless Sprinkler | General Contractor | 1 | 03/21/2026 |
| Bowe Patrick | General Contractor | 1 | 03/21/2026 |
| Evos | General Contractor | 1 | 08/05/2026 |
| Nucor Construction | General Contractor | 1 | 07/08/2026 |
| American Sign & Electrical Con | Sign hanger | 1 | 07/08/2026 |
| Five Town Neon Sign Co | Sign hanger | 1 | 07/08/2026 |
| Accurate Mechanical Indstrs | Plumbing | 1 | 07/08/2026 |
| A&H Express Plumbing & Heating | Plumbing | 1 | 06/28/2026 |
| Alltype Fire Protection | Fire Protection | 1 | 07/08/2026 |
| Almar Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Ami and Associates | Fire Protection | 1 | 07/08/2026 |
| A Plus Plumbing | Plumbing | 1 | 07/08/2026 |
| A Plus Plumbing | Fire Protection | 1 | 07/23/2026 |
| Archer Consultants Group | Fire Protection | 1 | 09/15/2026 |
| City Electrical Sign Erectors | Electrical | 1 | 03/22/2026 |
| Enobrac Plumbing | Fire Protection | 1 | 07/08/2026 |
| Five Borough NYC | Fire Protection | 1 | 07/08/2026 |
| George Breslaw Plumbing | Plumbing | 1 | 07/08/2026 |
| Lipsky & Rosenthal | Plumbing | 1 | 07/08/2026 |
| M&T Plumbing and Heating Co | Plumbing | 1 | 07/08/2026 |
| Pace Plumbing | Plumbing | 1 | 07/08/2026 |
| P.S.I. Mechanical | Plumbing | 1 | 07/08/2026 |
| Rael Automatic Sprinkler Co | Fire Protection | 1 | 07/08/2026 |
| Reliable Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Sean Coakley P & H | Fire Protection | 1 | 07/08/2026 |
| William C. Gerakaris P&H | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Catalpa Special Inspectio | 2004 | 6 | 09/08/2026 |
| MEP Inspections | 1102 | 6 | 09/08/2026 |
| AK Engineering | 678 | 37 | 04/15/2026 |
| Paradigm Architecture | 5931 | 4 | 02/05/2026 |
| Skyline Engineering | 267 | 11 | 11/25/2025 |
| Socotec Engineering | 4983 | 23 | 11/17/2025 |
| MWB Engineering | 7942 | 3 | 08/07/2025 |
| Jaros, Baum & Bolles | 1092 | 8 | 02/03/2025 |
| DNA Controlled Inspection | 554 | 27 | 01/07/2025 |
| UG Engineering Services P | 9041 | 2 | 07/17/2024 |
| Wavic Engineering | 1733 | 1 | 06/24/2024 |
| Alan Margolin & Associates | 423 | 1 | 11/18/2022 |
| McAlpine Architecture | 5694 | 3 | 04/04/2022 |
| Lilker Associates Consulting | 816 | 2 | 01/09/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | Structure Tone | 09/15/2026 |
| DOB NOW | Sprinklers | Permit Issued | Archer Consultants Group | 09/14/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Structure Tone | 09/14/2026 |
| DOB NOW | Sprinklers | Permit Issued | Dependable Mechanical | 08/06/2026 |
| DOB NOW | General Construction | Permit Issued | Evos | 08/04/2026 |
| DOB NOW | Sprinklers | Permit Issued | A Plus Plumbing | 07/22/2026 |
| DOB NOW | General Construction | Permit Issued | Structure Tone | 07/06/2026 |
| DOB NOW | General Construction | Permit Issued | Structure Tone | 07/06/2026 |
| DOB NOW | Plumbing | Permit Issued | A Plus Plumbing | 07/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | Mega Plumbing | 05/01/2026 |
| DOB NOW | Plumbing | Permit Issued | Mega Plumbing | 05/01/2026 |
| DOB NOW | General Construction | Permit Issued | LJG Construction | 04/29/2026 |
| DOB NOW | General Construction | Permit Issued | LJG Construction | 04/29/2026 |
| DOB NOW | Structural | Signed-off | JRM Construction Management | 04/24/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM Construction Management | 04/24/2026 |
| DOB NOW | General Construction | Permit Issued | JRM Construction Management | 04/23/2026 |
| DOB NOW | General Construction | Signed-off | Petretti & Associates | 12/05/2025 |
| DOB NOW | Plumbing | Signed-off | Accurate Mechanical Indstrs | 12/05/2025 |
| DOB NOW | Sprinklers | Permit Issued | Ami and Associates | 12/04/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | Structure Tone | 11/20/2025 |
| DOB NOW | General Construction | Permit Issued | Structure Tone | 11/20/2025 |
| DOB NOW | Structural | Permit Issued | Structure Tone | 11/20/2025 |
| DOB NOW | Plumbing | Permit Issued | A&H Express Plumbing & Heating | 10/10/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JT Magen & Company | 10/01/2025 |
| DOB NOW | General Construction | Signed-off | JT Magen & Company | 09/30/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JT Magen & Company | 09/30/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JT Magen & Company | 09/30/2025 |
| DOB NOW | General Construction | Signed-off | JT Magen & Company | 09/29/2025 |
| DOB NOW | Mechanical Systems | Signed-off | LJG Construction | 09/03/2025 |
| DOB NOW | General Construction | Signed-off | LJG Construction | 09/02/2025 |
| DOB NOW | General Construction | Signed-off | LJG Construction | 08/28/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Alchemy Development | 08/27/2025 |
| DOB NOW | General Construction | Signed-off | Alchemy Development | 08/25/2025 |
| DOB NOW | Sprinklers | Signed-off | Alltype Fire Protection | 08/05/2025 |
| DOB NOW | Mechanical Systems | Signed-off | LJG Construction | 07/24/2025 |
| DOB NOW | General Construction | Signed-off | LJG Construction | 07/23/2025 |
| DOB NOW | Sprinklers | Signed-off | Abco-Peerless Sprinkler | 04/10/2025 |
| DOB NOW | General Construction | Signed-off | JT Magen & Company | 04/03/2025 |
| DOB NOW | Plumbing | Signed-off | Par Plumbing Co | 03/31/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JT Magen & Company | 03/28/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/08/2026 | Permit Issued | Structure Tone | Heating Systems | Heating Titus DTFS-F-B08 16,700 BTU · Fan Powered Box ×1 |
| 11/17/2025 | Permit Issued | Structure Tone | Air Conditioning Systems, Heating Systems | — |
| 02/18/2025 | Signed-off | Turner Construction Company | Air Conditioning Systems | Cooling — DME020EDMC022WG 18,300 BTU ×1 |
| 11/15/2023 | Signed-off | Petretti & Associates | Ventilation Systems | Ventilation Titus N/A 1 BTU ×1 |
| 04/07/2021 | Permit Issued | Turner Construction Company | Air Conditioning Systems | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/08/2026 | Permit Issued | Archer Consultants Group | 343 heads |
| 11/25/2025 | Signed-off | Rolando Fire Supp Mechanical | Sprinkler System |
| 11/17/2025 | Permit Issued | Ami and Associates | Sprinkler System |
| 08/07/2025 | Permit Issued | A&H Express Plumbing & Heating | Sprinkler System |
| 02/18/2025 | Permit Issued | Go Pro Fire Protection | Sprinkler System |
| 07/17/2024 | Signed-off | A&H Express Plumbing & Heating | 31 heads |
| 11/15/2023 | Permit Issued | Five Borough NYC | Sprinkler System |
| 03/09/2023 | — | — | 8 heads |
| 03/08/2023 | — | — | 10 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/08/2026 | — | — | — |
| 04/15/2026 | Permit Issued | A Plus Plumbing | Water/Sanitary |
| 11/25/2025 | — | — | — |
| 11/17/2025 | Signed-off | Accurate Mechanical Indstrs | Water/Sanitary |
| 08/07/2025 | Permit Issued | A&H Express Plumbing & Heating | Water/Sanitary |
| 02/18/2025 | Signed-off | Par Plumbing Co | Water/Sanitary |
| 11/15/2023 | Signed-off | Reliable Plumbing & Heating | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/25/2026 | Complete | Kleinknecht Electric Co | General Wiring |
| 08/21/2026 | Permit Issued | Striano Electric Co | General Wiring |
| 07/29/2026 | Permit Issued | Nead Electric | General Wiring |
| 06/30/2026 | Permit Issued | C.M. Richey Electrical Contracting | General Wiring |
| 05/12/2026 | Permit Issued | C.M. Richey Electrical Contracting | — |
| 12/03/2025 | Permit Issued | Ennell Group Electric | General Wiring |
| 11/25/2025 | Complete | Robert B Samuels | General Wiring |
| 05/14/2025 | Complete | Kleinknecht Electric Co | General Wiring |
| 04/14/2025 | Permit Issued | Unity Electric Co | 2 meters |
| 03/20/2025 | Complete | Schlesinger Elect'l Contracting | General Wiring |
| 02/28/2025 | Permit Issued | RX Electric | General Wiring |
| 11/04/2024 | Permit Issued | Signs Cad | — |
| 11/04/2024 | Permit Issued | Signs Cad | — |
| 10/22/2024 | Complete | Kleinknecht Electric Co | General Wiring |
| 08/12/2024 | Complete | Kleinknecht Electric Co | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/17/2025 | Signed-off | Accurate Mechanical Indstrs | Steel |
| 09/03/2019 | — | — | Concrete |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/28/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/23/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/20/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/21/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/19/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/06/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/06/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/05/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/26/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/22/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/11/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/11/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/23/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/14/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/09/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/08/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/07/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/03/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/03/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/03/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/03/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 02/19/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/29/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/24/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/12/2026 | Heating Systems | ERIC BERLENT | special |
| 08/04/2026 | Fire-Resistant Penetrations and Joints | ERIC BERLENT | special |
| 08/04/2026 | Fire-Resistance Rated Construction | ERIC BERLENT | progress |
| 08/04/2026 | Final | ERIC BERLENT | progress |
| 08/04/2026 | Fire-Resistant Penetrations and Joints | ERIC BERLENT | special |
| 08/04/2026 | HVAC-R and service water heating system controls | ERIC BERLENT | energy_progress |
| 08/04/2026 | Mechanical Systems | ERIC BERLENT | special |
| 08/04/2026 | Maintenance information | ERIC BERLENT | energy_progress |
| 08/04/2026 | Sprinkler Systems | Nicolas Crosetto | special |
| 08/04/2026 | HVAC-R and service water heating equipment | ERIC BERLENT | energy_progress |
| 08/04/2026 | Final | ERIC BERLENT | progress |
| 08/04/2026 | Energy Code Compliance Inspections | ERIC BERLENT | progress |
| 07/01/2026 | Final | Randall Collins | progress |
| 06/08/2026 | Fire-Resistant Penetrations and Joints | ERIC BERLENT | special |
| 06/08/2026 | Final | ERIC BERLENT | progress |
| 04/15/2026 | Electrical motors and elevators | Ari Kamo | energy_progress |
| 04/15/2026 | Maintenance information | Ari Kamo | energy_progress |
| 04/15/2026 | Exterior lighting power | Ari Kamo | energy_progress |
| 04/15/2026 | HVAC-R and service water heating system controls | Ari Kamo | energy_progress |
| 04/15/2026 | Duct leakage testing, insulation and design | Ari Kamo | energy_progress |
| 04/15/2026 | Ventilation and air distribution system | Ari Kamo | energy_progress |
| 04/15/2026 | Exhaust and Vent Systems in Plenums and Ducts | Ari Kamo | special |
| 04/15/2026 | HVAC-R and service water piping design and insulation | Ari Kamo | energy_progress |
| 04/15/2026 | HVAC-R and service water heating equipment | Ari Kamo | energy_progress |
| 04/13/2026 | Post-installed Anchors | Ari Kamo | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Tapestry | Office | Floors 6–12, 14–19 | Project M01425349 Project M01367997 Project M01368004 Project M01368014 Project M01236295 Project M00943266 Project M00943257 Project M08029028 Project M08029045 |
| The Boston Consulting Group | Office | Floors 36, 37, 39, 46 | Project M01413421 Project M00793383 Project M00793396 Project M00793410 Project M00793497 Project M00793359 |
| Vaynerx | Office | Floors 20, 21 | Project M01368683 |
| SAP America | Office | Floors 44, 52 | Project M01319364 Project M00977785 |
| Genpact | Office | Floor 33 | Project M01304029 |
| SLT | Fitness / Recreation | Floor 1 | Project M01251882 |
| Kiehl's | Retail | Floors 22–24 | Project M01185426 Project M01185432 Project M01185407 |
| S. Guardian | Office | Floor 18 | Project M01175587 |
| L'Oréal | Office | Floors 22, 23, 25–32 | Project M01092869 Project M01092865 Project M01092868 Project M01092877 Project M01092880 Project M00974454 Project M00974443 Project M00974458 Project M00974470 Project M00974447 Project M00974465 Project M00974423 |
| Guardian Life Insurance | Office | Floors 16–18, 21 | Project M01089063 Project M00538139 Project M00544616 Project M00545656 Project M00544736 Project M00544916 Project M00545368 Project M00497331 Project M00497250 Project M00497318 |
| Ardea | Office | Floor 43 | Project M01070512 |
| Ardea Partners | Office | Floors 42, 43 | Project M00996528 |
| Mercado Little Spain | Restaurant / Food Service | Floors 1–5 | Project M01008049 Project M00112839 Project M00112853 |
| McCourt Global | Office | Floor 33 | Project M00962453 |
| Plaza M Spa | Personal services | Floor 1 | Project M00900726 Project M00900626 Project M00900713 |
| Hudson Hall | Restaurant / Food Service | Floor 1 | Project M08046565 Project M08037388 |
| Ardea Office | Office | Floor 35 | Project M00731003 Project M00730844 Project M00731046 |
| Kohlberg Kravis Roberts | Office | Floor 20 | Project M00490415 Project M00477725 Project M00477774 Project M00477804 Project M00452550 |
| Vaynermedia | Office | Floor 24 | Project M00396919 Project M00396924 |
| Intercept | Office | Floor 35 | Project M00280084 Project M00280136 |
| United | Office | Floor 1 | Project M00199363 |
| Sweetgreen | Restaurant / Food Service | Floor 1 | Project M00045368 |