68
Total Filings
41
Projects on File
21
Buildings Worked
13
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Projects by first filing month40 projects all-time
04913Aug '19 · 1Sep '19 · 1Nov '19 · 2Mar '20 · 1Sep '20 · 2Oct '20 · 1Nov '20 · 12Dec '20 · 2Mar '21 · 3Apr '21 · 1Jul '21 · 1Aug '21 · 1Jun '22 · 1Jul '22 · 3Jul '23 · 1Aug '23 · 1Dec '23 · 1Mar '24 · 1Apr '24 · 1Apr '25 · 1May '25 · 1Sep '26 · 12020202120222023202420252026
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit1332%
Signed off2254%
Filed only615%
By project type
Alteration41
Most active buildings
All buildings →
462 1 AVENUEMANHATTAN · 7 open · latest 09/28/2023
12 projects
1535 BROADWAYMANHATTAN · 1 open · latest 09/11/2024
5 projects
501 WEST 30 STREETMANHATTAN · latest 12/18/2024
3 projects
413 EAST 69 STREETMANHATTAN · latest 02/11/2022
2 projects
500 WEST 33 STREETMANHATTAN · latest 12/23/2019
2 projects
51 EAST 42 STREETMANHATTAN · latest 10/05/2021
2 projects
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01203076 ↗111 WEST 57 STREET
MANHATTAN
AlterationPermit Issued04/18/202509/29/2026
Owner YAMAHALLC
The scope of this project includes modifications to existing ductwork and diffuser routing, relocation of a fire smoke damper and CVR, and t…
M01415584 ↗351 PARK AVENUE SOUTH
MANHATTAN
AlterationPermit Issued09/01/202609/09/2026HEREWITH FILING GENERAL CONSTRUCTION WORK FOR INTERIOR RENOVATION, NON BEARING PARTITION, FLOORING, CEILING, & MILLWORK. NO CHANGE TO USE OC…
M01212844 ↗43 WATER STREET
MANHATTAN
AlterationSigned-off05/30/202507/25/2025Sprinkler and Plumbing modifications on the 38th Floor. No change in use, egress or occupancy.
M00996528 ↗501 WEST 30 STREET
MANHATTAN
AlterationSigned-off03/21/202412/18/2024Filing herewith Interior renovation, removal and installation of non load bearing partitions, ceilings, floors as per plans. No change to u…
M00488088 ↗1535 BROADWAY
MANHATTAN
AlterationPermit Issued03/31/202109/11/2024Modifications to existing sprinkler/standpipe system as noted on plans.
M00460797 ↗1535 BROADWAY
MANHATTAN
AlterationSigned-off03/09/202109/03/2024
Contractor H.T.LYONS, INC
Co-generation addition and ancillary mechanical equipment with associated pipes and ducts as per plans.
Counts cover all 41 projects (41 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
ASDA ARCHITECTURE + DESIGN109/01/2026
CHRISTOPHER COMPTON103/20/2020
DESAI CHIA ARCHITECTURE P.C.102/03/2025
DEWBERRY ENGINEERS INC108/31/2021
SAUL DAVID HAYUTIN ARCHITECTS110/07/2025
SGA105/31/2025
SHOP ARCHITECTS107/12/2023
THORNTON TOMASETTI102/03/2025
WSP110/07/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
PACE PLUMBING CORP707/12/2021
TISHMAN INTERIORS CORP411/10/2020
H.T.LYONS, INC207/30/2024
RICHTER & RATNER CONTRACT202/03/2025
TRYSTATE MECHANICAL, INC207/30/2024
A&H EXPRESS PLBG&HTG CORP112/21/2023
ABCO-PEERLESS SPRKLR CORP105/31/2025
ALBA GROUP INC107/19/2022
ALMAR PLUMBING & HTG CORP102/13/2024
ASHLAR MECHANICAL CORP102/03/2025
CHAMPION COMBUSTION CORP111/18/2021
DARBY CONSTRUCTION SVC LL107/12/2023
DONATO PLUMBING, INC110/07/2025
GEORGE BRESLAW PLBNG LLC102/03/2025
I.M.P. PLBG & HTG CORP111/12/2024
I.M.P. PLBG. & HTG. CORP107/25/2024
JT MAGEN & COMPANY INC108/31/2021
MICHILLI INC111/13/2019
NEWGRANGE CONSTRUCTION CO109/01/2026
PAR PLUMBING CO., INC105/31/2025
PERFECTAIRE CO INC110/07/2025
PRESTIGE PLBG & HTG INC106/23/2022
RIEHM PLUMBING CORP103/31/2022
ROLST CONSTRUCTION CORP104/01/2021
SCIAME CONSTRUCTION LLC106/26/2024
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
HHC807/12/2021
HMC TIMES SQUARE HOTEL LP511/12/2024
SL GREEN REALTY CORP208/31/2021
WEILL CORNELL MEDICAL COLLEGE203/31/2022
1411 IC-SIC PROPERTY LLC104/23/2024
345 PAS HOLDINGS LLC109/01/2026
AVERY HALL INVESTMENTS103/01/2021
HUDSON SQUARE REALTY, LLC102/13/2024
NEW WATER STREET CORP105/31/2025
NEW YORK PUBLIC LIBRARY106/23/2022
NYCH+H/BELLEVUE107/12/2021
NYSE Market (DE) Inc.107/09/2024
RELATED112/21/2023
RUDIN MANAGEMENT CO INC103/20/2020
SEQUOIA PROPERTY111/18/2021
VORNADO REALTY TRUST1—
YAMAHALLC110/07/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
JAROS BAUM & BOLLES705/31/2025
GILLMAN CONSULTING INC302/03/2025
METROPOLIS GROUP INC209/01/2026
MUNICIPAL EXPEDITING INC203/31/2022
CAESAR BUSTAMANTE, AIA105/31/2025
MBE CODE & ZONING LLC110/07/2025
PROJECT TACTICAL SOLUTIONS112/21/2023
RIZZO GROUP104/23/2024
41 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 41Open permit 13Signed off 22Filed only 6
41 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
M01203076 ↗111 WEST 57 STREET
MANHATTAN
AlterationPermit Issued04/18/202509/29/2026
Owner YAMAHALLC
The scope of this project includes modifications to existing ductwork and diffuser routing, relocation of a fire smoke damper and CVR, and t…
M01415584 ↗351 PARK AVENUE SOUTH
MANHATTAN
AlterationPermit Issued09/01/202609/09/2026HEREWITH FILING GENERAL CONSTRUCTION WORK FOR INTERIOR RENOVATION, NON BEARING PARTITION, FLOORING, CEILING, & MILLWORK. NO CHANGE TO USE OC…
M01212844 ↗43 WATER STREET
MANHATTAN
AlterationSigned-off05/30/202507/25/2025Sprinkler and Plumbing modifications on the 38th Floor. No change in use, egress or occupancy.
M00996528 ↗501 WEST 30 STREET
MANHATTAN
AlterationSigned-off03/21/202412/18/2024Filing herewith Interior renovation, removal and installation of non load bearing partitions, ceilings, floors as per plans. No change to u…
M00488088 ↗1535 BROADWAY
MANHATTAN
AlterationPermit Issued03/31/202109/11/2024Modifications to existing sprinkler/standpipe system as noted on plans.
M00460797 ↗1535 BROADWAY
MANHATTAN
AlterationSigned-off03/09/202109/03/2024
Contractor H.T.LYONS, INC
Co-generation addition and ancillary mechanical equipment with associated pipes and ducts as per plans.
M00429834 ↗1535 BROADWAY
MANHATTAN
AlterationSigned-off12/07/202006/20/2024
Contractor H.T.LYONS, INC
Mechanical modifications to existing base building systems. No change to use, egress, or occupancy.
M01016791 ↗1411 BROADWAY
MANHATTAN
AlterationFiled — no permit on record04/23/2024——
M00207773 ↗310 HUDSON STREET
MANHATTAN
AlterationSigned-off08/27/201903/15/2024Installation of new plumbing fixtures as per plans filed herewith. Plumbing scope is filed in conjunction with New Building application #121…
M00914966 ↗85 10 AVENUE
MANHATTAN
AlterationPermit Issued12/21/202301/04/2024SPRINKLER AND STANDPIPE WORK TO INCLUDE NEW FLOW CONTROL ASSEMBLY, PREACTION VALVE, AND MODIFICATION OF EXISTING PREACTION SYSTEM. NO CHANGE…
M00903300 ↗440 PARK AVENUE
MANHATTAN
AlterationSigned-off08/29/202310/20/2023Supplemental Cooling for Electrical Switchgear Room with VRF System. No change in use, egress, or occupancy.
M00416538 ↗462 1 AVENUE
MANHATTAN
AlterationPermit Issued11/05/202009/28/2023
Owner HHC
REPLACE 1 SINK & MEDICAL GAS PIPING & EQUIPMENT ON EXISTING ROUGHING . INSTALL 1 NEW UTILITY SINK & INSTALL 2 NEW SINKS CONNECTING TO EXIST…
M00879419 ↗424 WEST 33 STREET
MANHATTAN
AlterationSigned-off07/12/202308/07/2023General construction work as shown on plans (BWAF).
M00652654 ↗641 5 AVENUE
MANHATTAN
AlterationSigned-off07/19/202202/14/2023
Contractor ALBA GROUP INC
Replacement of perimeter induction units across the floor. Full fitout work to be completed in another application (by tenant). No change t…
M00488043 ↗1535 BROADWAY
MANHATTAN
AlterationSigned-off03/31/202102/08/2023Install new: Sanitary piping, Water piping , Floor Drains, Roof Drains, Gas piping, Emergency shut-off valves, Cogeneration equipment
M00731003 ↗501 WEST 30 STREET
MANHATTAN
AlterationSigned-off07/11/202208/12/2022Filing herewith for Mechanical modification to the existing system as per plans. No change to use, egress or occupancy. 35th Construction/…
M00731046 ↗501 WEST 30 STREET
MANHATTAN
AlterationSigned-off07/07/202207/27/2022Filing herewith removal and installation of sprinkler heads and associated piping work as per plans. No change to use, egress or occupancy.
Q00686989 ↗31-11 THOMSON AVENUE
QUEENS
AlterationPermit Issued06/23/202207/06/2022
Contractor RJ BRUNO INC
Modification of existing plumbing system as per plans filed. No change in occupancy, use or egress
M00330923 ↗413 MADISON AVENUE
MANHATTAN
AlterationPermit Issued03/20/202006/01/2022
Filer ECC, INC
MODIFICATION OF EXISTING SPRINKLER SYSTEM IN ASSOCIATION TO INTERIOR REMOVALS.HEADS TO BE TURNED UP IN COMPLIANCE WITH REVISED CEILING CONFI…
M00456463 ↗413 EAST 69 STREET
MANHATTAN
AlterationSigned-off04/01/202102/11/2022Revised supply and exhaust ductwork including new VAV boxes, a booster fan, air outlet modifications, exhaust connection to lab equipment; n…
M00416186 ↗462 1 AVENUE
MANHATTAN
AlterationSigned-off11/10/202001/10/2022REPLACE & INSTALL NEW DOMESTIC WATER, SANITARY & MEDICAL GAS PIPING & EQUIPMENT TO EXISTING ROUGHING WHERE POSSIBLE AS SHOWN ON DRAWINGS FIL…
M00227891 ↗140 EAST 83 STREET
MANHATTAN
AlterationSigned-off09/23/201910/14/2021Relocating condenser and installation of draft fan in boiler room. Work to also include refrigerant piping and some duct work for the fan.
M00345368 ↗51 EAST 42 STREET
MANHATTAN
AlterationSigned-off09/14/202010/05/2021Additions & modifications to existing HVAC system as shown on drawings. This is tenant fit-out work for McDermott, Will & Emery on 33-36C/ 4…
M00578438 ↗413 EAST 69 STREET
MANHATTAN
AlterationSigned-off08/22/202109/23/2021INSTALL NEW LABORATORY MANIFOLD AND PIPING FOR EQUIPMENT CONNECTION.
M00505005 ↗11 WALL STREET
MANHATTAN
AlterationFiled — no permit on record07/26/2021——
M00358729 ↗462 1 AVENUE
MANHATTAN
AlterationPermit Issued11/04/202003/26/2021
Owner HHC
MODIFY DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00416274 ↗462 1 AVENUE
MANHATTAN
AlterationPermit Issued11/10/202002/25/2021REPLACE 1 SINK ON EXISTING ROUGHING AND INSTALL MEDICAL GAS & PIPING TO EXISTING ROUGHING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN…
M00385509 ↗462 1 AVENUE
MANHATTAN
AlterationPermit Issued11/10/202002/18/2021
Owner HHC
MODIFY DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00385364 ↗462 1 AVENUE
MANHATTAN
AlterationPermit Issued11/05/202002/08/2021MODIFY DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00415643 ↗462 1 AVENUE
MANHATTAN
AlterationPermit Issued11/04/202002/08/2021
Owner HHC
RELOCATE 2 SINKS ON EXISTING ROUGHING. INSTALL 1 NEW SINK AND PIPING IN CEILING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGR…
M00416244 ↗462 1 AVENUE
MANHATTAN
AlterationSigned-off11/10/202002/04/2021
Owner HHC
INSTALL 67 NEW SPRINKLER HEADS, 1 FLOOR CONTROL VALVE WITH PRV & 1 SP WET PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGR…
B00400016 ↗1 BOERUM PLACE
BROOKLYN
AlterationSigned-off10/09/202002/01/2021
Contractor JAMES CRUZ
FILING HEREWITH INSTALLATTION OF NEW BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00416557 ↗462 1 AVENUE
MANHATTAN
AlterationSigned-off11/10/202001/20/2021
Owner HHC
INSTALL 31 NEW SPRINKLER HEADS AND 1 NEW SPRINKLER WET PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00429830 ↗1535 BROADWAY
MANHATTAN
AlterationFiled — no permit on record12/07/2020——
M00385469 ↗462 1 AVENUE
MANHATTAN
AlterationPermit Issued11/10/202011/18/2020
Owner HHC
MODIFY DUCTWORK AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00416355 ↗462 1 AVENUE
MANHATTAN
AlterationFiled — no permit on record11/10/2020——
M00341168 ↗51 EAST 42 STREET
MANHATTAN
AlterationSigned-off09/28/202011/04/2020Additions & modifications to existing sprinkler systems, this is for tenant fit-out: McDermott, Will & Emery. 33-36th, 53rd construction / 4…
M00415782 ↗462 1 AVENUE
MANHATTAN
AlterationFiled — no permit on record11/04/2020——
M00233180 ↗500 WEST 33 STREET
MANHATTAN
AlterationSigned-off11/13/201912/23/2019Filing herewith for Sprinkler modifications to existing systems as per plans. (RU # 108) No change to use, egress or occupancy.
M00233142 ↗500 WEST 33 STREET
MANHATTAN
AlterationSigned-off11/13/201911/19/2019
Contractor MICHILLI INC
Filing herewith for mechanical work to existing systems as per plans. Work includes extension of existing base building ventilation system …
M01361041250 WEST 34 STREET
MANHATTAN
AlterationFiled — no permit on record———
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
351 PARK AVENUE SOUTH ↗109/01/2026
111 WEST 57 STREET ↗410/07/2025
43 WATER STREET ↗205/31/2025
501 WEST 30 STREET ↗802/03/2025
1535 BROADWAY ↗1111/12/2024
11 WALL STREET ↗207/09/2024
440 PARK AVENUE ↗206/26/2024
1411 BROADWAY ↗104/23/2024
85 10 AVENUE ↗112/21/2023
424 WEST 33 STREET ↗107/12/2023
641 5 AVENUE ↗107/19/2022
31-11 THOMSON AVENUE ↗106/23/2022
413 EAST 69 STREET ↗303/31/2022
140 EAST 83 STREET ↗311/18/2021
310 HUDSON STREET ↗511/09/2021
51 EAST 42 STREET ↗308/31/2021
462 1 AVENUE ↗1307/12/2021
1 BOERUM PLACE ↗203/01/2021
413 MADISON AVENUE ↗103/20/2020
500 WEST 33 STREET ↗211/13/2019
250 WEST 34 STREET ↗1—
▾Special Inspection Requirements — 150
DateRequirementBuildingInspectorRole
07/30/2026Energy Code Compliance Inspections351 PARK AVENUE SOUTHRYAN LEANprogress
07/30/2026Post-installed Anchors351 PARK AVENUE SOUTHRYAN LEANspecial
07/30/2026Fire-Resistant Penetrations and Joints351 PARK AVENUE SOUTHRYAN LEANspecial
07/30/2026HVAC-R and service water piping design and insulation351 PARK AVENUE SOUTHRYAN LEANenergy_progress
07/30/2026HVAC-R and service water heating system controls351 PARK AVENUE SOUTHRYAN LEANenergy_progress
07/30/2026HVAC-R and service water heating equipment351 PARK AVENUE SOUTHRYAN LEANenergy_progress
02/18/2026HVAC-R and service water heating system controls250 WEST 34 STREETRYAN LEANenergy_progress
02/18/2026Energy Code Compliance Inspections250 WEST 34 STREETRYAN LEANprogress
02/17/2026Mechanical Systems250 WEST 34 STREETRYAN LEANspecial
02/17/2026Post-installed Anchors250 WEST 34 STREETRYAN LEANspecial
02/17/2026Final250 WEST 34 STREETRYAN LEANprogress
12/15/2025HVAC-R and service water heating system controls111 WEST 57 STREETRYAN LEANenergy_progress
12/15/2025HVAC-R and service water heating equipment111 WEST 57 STREETRYAN LEANenergy_progress
12/15/2025HVAC-R and service water piping design and insulation111 WEST 57 STREETRYAN LEANenergy_progress
12/15/2025Energy Code Compliance Inspections111 WEST 57 STREETRYAN LEANprogress
12/15/2025Final111 WEST 57 STREETRYAN LEANprogress
12/15/2025Post-installed Anchors111 WEST 57 STREETVincent Gentilespecial
12/15/2025Fire-Resistant Penetrations and Joints111 WEST 57 STREETVincent Gentilespecial
12/15/2025Mechanical Systems111 WEST 57 STREETRYAN LEANspecial
10/02/2025HVAC-R and service water piping design and insulation111 WEST 57 STREETRYAN LEANenergy_progress
10/02/2025HVAC-R and service water heating system controls111 WEST 57 STREETRYAN LEANenergy_progress
10/02/2025HVAC-R and service water heating equipment111 WEST 57 STREETRYAN LEANenergy_progress
10/02/2025Final111 WEST 57 STREETRYAN LEANprogress
10/02/2025Energy Code Compliance Inspections111 WEST 57 STREETRYAN LEANprogress
10/02/2025Post-installed Anchors111 WEST 57 STREETVincent Gentilespecial
10/02/2025Mechanical Systems111 WEST 57 STREETRYAN LEANspecial
10/02/2025Fire-Resistant Penetrations and Joints111 WEST 57 STREETVincent Gentilespecial
06/20/2025Standpipe Systems111 WEST 57 STREETRYAN LEANspecial
06/20/2025Sprinkler Systems111 WEST 57 STREETRYAN LEANspecial
04/22/2025Maintenance information43 WATER STREETRYAN LEANenergy_progress
04/22/2025Electrical motors and elevators43 WATER STREETRYAN LEANenergy_progress
04/22/2025Interior lighting power43 WATER STREETRYAN LEANenergy_progress
04/22/2025HVAC-R and service water piping design and insulation43 WATER STREETRYAN LEANenergy_progress
04/22/2025HVAC-R and service water heating system controls43 WATER STREETRYAN LEANenergy_progress
04/22/2025Lighting controls43 WATER STREETRYAN LEANenergy_progress
04/22/2025HVAC-R and service water heating equipment43 WATER STREETRYAN LEANenergy_progress
04/20/2025Energy Code Compliance Inspections43 WATER STREETRYAN LEANprogress
04/20/2025Post-installed Anchors43 WATER STREETRYAN LEANspecial
04/18/2025Final43 WATER STREETRYAN LEANprogress
04/18/2025Mechanical Systems43 WATER STREETRYAN LEANspecial
03/31/2025Mechanical Systems111 WEST 57 STREETRYAN LEANspecial
03/31/2025Final111 WEST 57 STREETRYAN LEANprogress
02/14/2025Sprinkler Systems501 WEST 30 STREETRYAN LEANspecial
02/14/2025Post-installed Anchors501 WEST 30 STREETALEXIS SCHLESSINGERMANspecial
02/14/2025Fire-Resistant Penetrations and Joints501 WEST 30 STREETALEXIS SCHLESSINGERMANspecial
01/30/2025Post-installed Anchors501 WEST 30 STREETRYAN LEANspecial
01/30/2025Fire-Resistant Penetrations and Joints501 WEST 30 STREETRYAN LEANspecial
01/27/2025Sprinkler Systems501 WEST 30 STREETRYAN LEANspecial
11/11/2024Post-installed Anchors1535 BROADWAYRYAN LEANspecial
11/11/2024Fire-Resistant Penetrations and Joints1535 BROADWAYRYAN LEANspecial
Latest 50 of 150.
▾Documents — 673 on file (BIS + DOB NOW)
▸Plans & Drawings107
▸DOB NOWPlans/Sketch63
Showing 3 of 63 on file for this type
▸DOB NOWPlans/Sketch - Plumbing19
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems15
09/04/2026M00358729-I1 · 462 1 AVENUERequest digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler7
09/04/2026M00415782-I1 · 462 1 AVENUERequest digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/02/2026B00400016-I1 · 1 BOERUM PLACERequest digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Standpipe1
09/04/2026M00429830-I1 · 1535 BROADWAYRequest digital key ↗
▸Applications & Permits22
▸DOB NOWLPC Approval/Permit18
08/13/2026M00505005-P2 · 11 WALL STREETOpen ↗
Showing 1 of 18 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit4
08/13/2026M00879419-I1 · 424 WEST 33 STREETOpen ↗
Showing 1 of 4 on file for this type
▸Seals & Professional Certifications424
▸DOB NOWSpecial Inspector Seal & Signature166
09/24/2026M00731046-I1 · 501 WEST 30 STREETOpen ↗
09/24/2026M00731046-I1 · 501 WEST 30 STREETOpen ↗
09/24/2026M00731046-I1 · 501 WEST 30 STREETOpen ↗
Showing 3 of 166 on file for this type
▸DOB NOWProgress Inspector Seal & Signature156
09/23/2026M00505005-P2 · 11 WALL STREETOpen ↗
09/23/2026M01415584-S1 · 351 PARK AVENUE SOUTHOpen ↗
09/23/2026M01415584-S1 · 351 PARK AVENUE SOUTHOpen ↗
Showing 3 of 156 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature102
09/05/2026M00233180-I1 · 500 WEST 33 STREETOpen ↗
09/04/2026M00207773-P5 · 310 HUDSON STREETOpen ↗
09/04/2026M00207773-A2 · 310 HUDSON STREETOpen ↗
Showing 3 of 102 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWTenant Protection Plan5
09/04/2026M00429834-I1 · 1535 BROADWAYOpen ↗
09/01/2026M00227891-I1 · 140 EAST 83 STREETOpen ↗
08/13/2026M00429830-I1 · 1535 BROADWAYOpen ↗
Showing 3 of 5 on file for this type
▸DOB NOWHPD-1: Anti-Harassment Area Checklist2
08/13/2026M00731046-I1 · 501 WEST 30 STREETOpen ↗
08/13/2026M00731003-I1 · 501 WEST 30 STREETOpen ↗
▸DOB NOWCertificate of No Harassment1
08/13/2026M00879419-I1 · 424 WEST 33 STREETOpen ↗
▸Environmental & Asbestos75
▸DOB NOWDEP ACP-5: Asbestos Assessment Report33
09/06/2026M01361041-I1 · 250 WEST 34 STREETOpen ↗
09/04/2026M00358729-I1 · 462 1 AVENUEOpen ↗
09/04/2026M00415782-I1 · 462 1 AVENUEOpen ↗
Showing 3 of 33 on file for this type
▸DOB NOWOER: Notice to Proceed27
09/04/2026M00207773-P8 · 310 HUDSON STREETOpen ↗
09/04/2026M00207773-A3 · 310 HUDSON STREETOpen ↗
09/04/2026M00207773-A2 · 310 HUDSON STREETOpen ↗
Showing 3 of 27 on file for this type
▸DOB NOWOER: Notice of Satisfaction8
08/15/2026M00341168-I1 · 51 EAST 42 STREETOpen ↗
08/13/2026M00879419-I1 · 424 WEST 33 STREETOpen ↗
08/13/2026M00731003-I1 · 501 WEST 30 STREETOpen ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
09/04/2026M00416355-I1 · 462 1 AVENUEOpen ↗
09/04/2026M00416186-I1 · 462 1 AVENUEOpen ↗
09/04/2026M00416274-I1 · 462 1 AVENUEOpen ↗
Showing 3 of 7 on file for this type
▸Energy Compliance10
▸DOB NOWEN2: As Built Energy Analysis.6
08/13/2026M00460797-I1 · 1535 BROADWAYOpen ↗
08/13/2026M00456463-I1 · 413 EAST 69 STREETOpen ↗
08/13/2026M00731003-I1 · 501 WEST 30 STREETOpen ↗
Showing 3 of 6 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification4
08/13/2026M00652654-I1 · 641 5 AVENUEOpen ↗
Showing 1 of 4 on file for this type
▸Approvals, Objections & Sign-offs27
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
09/04/2026M00415782-I1 · 462 1 AVENUEOpen ↗
09/04/2026M00385364-I1 · 462 1 AVENUEOpen ↗
09/04/2026M00416538-I1 · 462 1 AVENUEOpen ↗
Showing 3 of 16 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)9
09/04/2026M00416186-I1 · 462 1 AVENUEOpen ↗
09/04/2026M00416186-P1 · 462 1 AVENUEOpen ↗
08/15/2026M00416244-I1 · 462 1 AVENUEOpen ↗
Showing 3 of 9 on file for this type
▸DOB NOWHigh Line Parks Approval2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type