Multi-story retail building (2+)
29 3 AVENUE
MANHATTAN · BIN 1091804
💬 Discuss this project
1920Year Built
15Stories
K2Building Class
C6-1Zoning
18,164 sfGross Floor Area
6Units
Rent Stabilized0 Open Violations
Multi-story retail building (2+) · 8,775 sf lot · 2.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction17p · 6 filings · 20 docs
Floor 201 filing · 14 docs
Floor 191 filing · 14 docs
Floor 181 filing · 14 docs
Floor 171 filing · 14 docs
Floor 161 filing · 14 docs
Floor 151 filing · 14 docs
Floor 141 filing · 14 docs
Floor 131 filing · 14 docs
Floor 121 filing · 14 docs
Floor 111 filing · 14 docs
Floor 101 filing · 14 docs
Floor 91 filing · 14 docs
Floor 81 filing · 14 docs
Floor 71 filing · 14 docs
Floor 61 filing · 14 docs
Floor 51 filing · 14 docs
Floor 41 filing · 14 docs
Floor 31 filing · 14 docs
Floor 2Under Construction66p · 9 filings · 20 docs
Floor 1Under Construction53p · 7 filings · 20 docs
CellarUnder Construction54p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MONADNOCK DEVELOPMENT304/09/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.4203/21/2026
AE DESIGN SOLUTION603/21/2026
JP EXPEDITE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SETANTA INCGeneral Contractor804/09/2026
COOPER WORKS INCGeneral Contractor607/08/2026
LAWRENCE EXTERIOR RESTORATIONGeneral Contractor403/21/2026
ANAX BUILDING CONTRACTORSGeneral Contractor303/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor303/21/2026
MEGA PLBG CORPFire Protection207/08/2026
SIGNS CADScaffold207/08/2026
CMA PLUMBING & HEATING INFire Protection207/08/2026
MEGA PLBG CORPPlumbing207/08/2026
ON SITE NYC INCGeneral Contractor206/27/2026
AP PLUMBING & HVAC LLCPlumbing106/28/2026
ARK BUILDERS CORPGeneral Contractor107/08/2026
HV ELECTRIC CORPElectrical103/22/2026
TRINITY ELECTRIC GROUPElectrical103/22/2026
ACCURATE MECHANICAL INCFire Protection107/08/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
CROSSFIELD PLBG.&HTG.CORPFire Protection107/08/2026
ALLCOM ELECTRIC CORPElectrical103/22/2026
EDSON HTNG & COOLING LLCGeneral Contractor104/09/2026
ACCURATE MECHANICAL INCPlumbing107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABLE ARCHITECTS9452708/22/2026
METHOD DESIGN ARCHITECTUR5713505/14/2026
AZA ENGINEERING LLC7235405/14/2026
G ENGINEERING PC7778102/25/2026
ANCORA ENGINEERING, PLLC6818206/27/2025
METROSPEC SIA6420404/30/2024
CHEN ENGINEERING SERVICES1826110/10/2023
PROJECT TACTICAL SOLUTION5859102/02/2023
Building Lifecycle
All (156)Filed (40)Permit Issued (29)Signed Off (12)Inspection (30)Objection (15)Special Inspection (30)
09/01/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/26/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/24/2026
Special inspection requirement — Sprinkler Systems
JINN HWANG
08/22/2026
Filed — Alteration
NEW AND RELOCATING EXISTING SPRINKLER SYSTEM
M01182201-P4
08/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JINN HWANG
07/29/2026
Filed — Alteration
NEW AND RELOCATING EXISTING SPRINKLER SYSTEM
M01182201-P3
07/24/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/22/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/17/2026
Special inspection requirement — Sprinkler Systems
JINN HWANG
06/30/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/18/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
06/09/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/08/2026
Objection raised — Other
06/08/2026
Objection raised — Other
06/08/2026
Objection resolved — Resolved
06/05/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
06/02/2026
Objection raised — Scope
06/02/2026
Objection raised — Cost
05/14/2026
Filed — Alteration
Mechanical related to retail store whitebox interior renovation, no change in use, egress or occupancy.
M00848754-P1
05/14/2026
Filed — Alteration
Retail store whitebox interior renovation, no change in use, egress or occupancy.
M00847335-P4
05/14/2026
Filed — Alteration
Plumbing / Sprinkler scope related to the retail store whitebox interior renovation, no change in use, egress or occupancy.
M00848759-P2
05/13/2026
Permit issued — Plumbing
M00848759-I1-PL
05/12/2026
Permit issued — Sprinklers
M00848759-I1-EW-SP
05/05/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Reese Campbell
05/05/2026
Special inspection requirement — Final
Reese Campbell
05/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
Reese Campbell
05/05/2026
Special inspection requirement — Lighting controls
Reese Campbell
05/05/2026
Special inspection requirement — Interior lighting power
Reese Campbell
04/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/16/2026
Filed — Alteration
NEW AND RELOCATING EXISTING SPRINKLER SYSTEM
M01182201-P2
04/13/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/09/2026
Permit issued — Sprinklers
M01182201-S1-EW-SP
04/09/2026
Permit issued — Plumbing
M01182201-S3-PL
04/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/03/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/30/2026
Special inspection requirement — Mechanical Systems
Artem Zolotarev
03/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/30/2026
Special inspection requirement — Final
Reese Campbell
03/25/2026
Filed — Alteration
NEW AND RELOCATING EXISTING SPRINKLER SYSTEM
M01182201-P1
03/25/2026
Permit issued — Sprinklers
B00656974-I1-EW-SD
03/25/2026
Permit issued — Sprinklers
B00656974-I1-EW-SP
03/18/2026
Permit issued — Structural
M01182201-S5-ST
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Artem Zolotarev
03/09/2026
Special inspection requirement — Sprinkler Systems
Artem Zolotarev
02/25/2026
Filed — Alteration
NEW AND RELOCATING EXISTING SPRINKLER SYSTEM
M01182201-S5
02/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/28/2026
Permit issued — Mechanical Systems
M01182201-S2-MS
01/22/2026
Special inspection requirement — Final
JINN HWANG
01/22/2026
Special inspection requirement — Structural Steel - Details
XIONGCAI GU
12/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/21/2025
Filed — Alteration
NEW AND RELOCATING EXISTING SPRINKLER SYSTEM
M01182201-S1
11/21/2025
Filed — Alteration
NEW AND RELOCATING EXISTING SPRINKLER SYSTEM
M01182201-S2
11/19/2025
Filed — Alteration
NEW AND RELOCATING EXISTING SPRINKLER SYSTEM
M01182201-S3
11/12/2025
Signed off — Alteration
SEQUENCE, MEANS AND METHODS FOR THE PROPOSED PARTIAL DEMOLITION OF THE 2ND FLOOR SLAB OF THE 15 STORY BUILDING
M01246018-I1
10/07/2025
Permit issued — General Construction
M01182201-I1-GC
Latest 60 of 156 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.05/13/2026
DOB NOWSprinklersPermit IssuedAMERICAN STANDARD PLUMBING &05/12/2026
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG.CORP04/09/2026
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG04/09/2026
DOB NOWSprinklersPermit IssuedCMA PLUMBING & HEATING IN03/25/2026
DOB NOWSprinklersPermit IssuedCMA PLUMBING & HEATING IN03/25/2026
DOB NOWStructuralPermit IssuedON SITE NYC INC03/18/2026
DOB NOWMechanical SystemsPermit IssuedEDSON HTNG & COOLING LLC01/28/2026
DOB NOWGeneral ConstructionPermit IssuedON SITE NYC INC10/07/2025
DOB NOWStructuralSigned-offSETANTA INC07/03/2025
DOB NOWStructuralPermit IssuedSETANTA INC06/25/2025
DOB NOWPlumbingPermit IssuedREAL PLUMBING CORP12/19/2024
DOB NOWSprinklersPermit IssuedMEGA PLBG CORP11/26/2024
DOB NOWStructuralSigned-offCOOPER WORKS07/24/2024
DOB NOWStructuralSigned-offSETANTA INC07/02/2024
DOB NOWSignSigned-offSIGNS CAD CORP04/25/2024
DOB NOWSignSigned-offSIGNS CAD CORP04/25/2024
DOB NOWMechanical SystemsSigned-offCOOPER WORKS03/11/2024
DOB NOWSprinklersSigned-offACCURATE MECHANICAL INC02/22/2024
DOB NOWPlumbingSigned-offANTHONY DISABATO02/22/2024
DOB NOWConstruction FencePermit IssuedCOOPER WORKS02/02/2024
DOB NOWGeneral ConstructionSigned-offCOOPER WORKS01/25/2024
DOB NOWGeneral ConstructionSigned-offARK BUILDERS CORP12/26/2023
DOB NOWSprinklersPermit IssuedREAL PLUMBING CORP12/11/2023
DOB NOWPlumbingPermit IssuedMEGA PLBG CORP12/11/2023
DOB NOWGeneral ConstructionPermit IssuedSETANTA INC05/18/2023
DOB NOWSupported ScaffoldSigned-offLAWRENCE EXTERIOR RESTORA04/20/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC02/03/2023
DOB NOWSidewalk ShedPermit IssuedANAX BUILDING CONTRACTORS08/13/2018
2 projects · most recent 08/22/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/22/2026Permit IssuedON SITE NYC INCAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric SEZ-AD18NL-U1 & SEZ-AD15NL-U1/ 12,000 BTU · Ahu ×16
Heat / Cool
Mitsubishi Electric MXZ-SM60NAM2 60,000 BTU · Condensing Unit ×4
Ventilation
Greenheck MV-750-VG-115 800 CFM · Exhaust Fan ×3
05/14/2026——Heating Systems
Heating
2 projects · most recent 08/22/2026
Sprinkler System
FiledStatusContractorScope
08/22/2026Signed-offCROSSFIELD PLBG.&HTG.CORPSprinkler System
05/14/2026Permit IssuedAMERICAN STANDARD PLUMBIN94 heads
2 projects · most recent 08/22/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/22/2026Signed-offCROSSFIELD PLBG.&HTGGas, Water/Sanitary
05/14/2026Permit IssuedAMERICAN STANDARD P&H CORWater/Sanitary
13 projects · most recent 04/07/2026
General Wiring
FiledStatusContractorScope
04/07/2026Permit IssuedFALLON ELECTRIC CORPGeneral Wiring
01/16/2026Permit IssuedTIMOTHY COLEMAN LICENSEDGeneral Wiring
10/27/2025Permit IssuedTRINITY ELECTRIC GROUPGeneral Wiring
10/17/2025Permit IssuedKYL ELECTRIC LLCGeneral Wiring
02/07/2025CompleteHESO ELECTRICAL INCGeneral Wiring
04/05/2024CompleteSIGNS CAD CORP—
04/05/2024CompleteSIGNS CAD CORP—
03/20/2024CompleteALLCOM ELECTRIC CORP3 meters, 3 new_meters
01/24/2023CompleteBOROWIDE ELECT'L CONTR'S—
04/21/2022CompleteCENTURY ELECTRIC LLCGeneral Wiring
04/19/2021CompleteE-J ELEC. INSTALLATION COGeneral Wiring
12/09/2020Permit IssuedHV ELECTRIC CORP—
08/08/2018Permit IssuedCOMMERCE ELECL CONTRG COR—
3 projects · most recent 08/22/2026
Steel
FiledStatusContractorScope
08/22/2026Signed-offCROSSFIELD PLBG.&HTG1 scope_items
05/14/2026Permit IssuedSETANTA INC1 scope_items
04/24/2025Permit IssuedSETANTA INCSteel
▾Field Inspections (DOB CAP) — 30
DateTypeResultReport
09/01/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/24/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/30/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/18/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
06/09/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/05/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
04/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/13/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/03/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/13/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/28/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/06/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/28/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/14/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
Latest 25 of 30.
▾Special Inspection Requirements (DOB NOW) — 122
DateRequirementInspectorRole
08/24/2026Sprinkler SystemsJINN HWANGspecial
08/03/2026Fire-Resistant Penetrations and JointsJINN HWANGspecial
07/17/2026Sprinkler SystemsJINN HWANGspecial
05/05/2026Fire-Resistance Rated ConstructionReese Campbellprogress
05/05/2026Lighting controlsReese Campbellenergy_progress
05/05/2026Interior lighting powerReese Campbellenergy_progress
05/05/2026Fire-Resistant Penetrations and JointsReese Campbellspecial
05/05/2026Tenant Protection Plan Compliance—special
05/05/2026FinalReese Campbellprogress
04/23/2026Tenant Protection Plan Compliance—special
03/30/2026Mechanical SystemsArtem Zolotarevspecial
03/30/2026Tenant Protection Plan Compliance—special
03/30/2026FinalReese Campbellprogress
03/09/2026Fire-Resistant Penetrations and JointsArtem Zolotarevspecial
03/09/2026Sprinkler SystemsArtem Zolotarevspecial
01/22/2026FinalJINN HWANGprogress
01/22/2026Structural Steel - DetailsXIONGCAI GUspecial
09/12/2025FinalJINN HWANGprogress
09/12/2025Mechanical SystemsJINN HWANGspecial
06/25/2025Structural Stability – Alterations of existing buildingsGregory Moormannspecial
06/24/2025FinalGregory Moormannprogress
04/21/2025Structural Steel - High Strength BoltingGregory Moormannspecial
04/21/2025Structural Steel - DetailsGregory Moormannspecial
04/21/2025Post-installed AnchorsGregory Moormannspecial
04/21/2025Structural Stability – Alterations of existing buildingsGregory Moormannspecial
Latest 25 of 122.
▾Documents — 198 on file (BIS + DOB NOW)
▸Plans & Drawings40
▸DOB NOWPlans/Sketch40
09/06/2026M00059214-I1Request digital key ↗
08/31/2026M00811248-I1Request digital key ↗
08/31/2026M00811248-P1Request digital key ↗
Showing 3 of 40 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M01027647-I1Open ↗
▸Seals & Professional Certifications120
▸DOB NOWProgress Inspector Seal & Signature47
09/28/2026M01213475-I1Open ↗
09/23/2026M01182201-S2Open ↗
09/01/2026M01246018-I1Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature42
08/31/2026M00811248-I1Open ↗
08/31/2026M00811248-P1Open ↗
08/31/2026M00825091-I1Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature31
09/28/2026M01213475-I1Open ↗
09/23/2026M01182201-S2Open ↗
09/23/2026M01182201-S1Open ↗
Showing 3 of 31 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026M01027647-P1Open ↗
08/13/2026M01027647-I1Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
08/29/2026M00940054-P1Open ↗
08/29/2026M00940054-I1Open ↗
08/28/2026M00987758-S1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M01182201-S5Open ↗
08/13/2026M00848759-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/31/2026M08037032-P1Open ↗
08/31/2026M08037032-I1Open ↗
08/31/2026M08037032-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/31/2026M08037032-I1Open ↗
08/13/2026M00847335-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/27/2026M01027647-P1Open ↗
08/27/2026M01027647-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M01027647-I1Open ↗