| Owner | Filings | Most Recent |
|---|---|---|
| TISHMAN CONSTRUCTION | 2 | 03/22/2026 |
| A1 SPECIALIZED | 1 | 03/22/2026 |
| NORTH SHORE NEON SIGN CO | 1 | 03/22/2026 |
| DEPT OF GENERAL SERVICES | 1 | 03/22/2026 |
| DEPT OF GENERAL SERVIC856 | 4 | 03/22/2026 |
| MANAGEMENT BUILDING | 1 | 03/22/2026 |
| TWIN & SWING SCAFFOLDING INC | 2 | 03/21/2026 |
| NYC DEPARTMENT OF PARKS | 47 | 03/21/2026 |
| METROPOLITAN | 7 | 03/21/2026 |
| 1000 FIFTH AVENUE | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| LEVIN ENGINEERING PLLC | 8 | 09/01/2026 |
| JOSEPH SANTOSUS | 1 | 08/25/2026 |
| CRIMSON ENGINEERING | 3 | 08/20/2026 |
| KOHLER RONAN, LLC | 68 | 08/13/2026 |
| RICHARD W. SOUTHWICK | 15 | 08/13/2026 |
| EXDEM ENGINEERING SERVICES | 6 | 07/22/2026 |
| THORNTON TOMASETTI | 5 | 07/20/2026 |
| ALTIERISEBORWIEBER LLC | 5 | 06/22/2026 |
| URBAN INTEGRATIONS | 5 | 04/24/2026 |
| BEYER BLINDER BELLE | 19 | 04/14/2026 |
| LANGAN ENGINEERING | 3 | 04/01/2026 |
| SILMAN | 10 | 03/20/2026 |
| ANDREW FORMICHELLA | 5 | 03/19/2026 |
| BREEZE NATIONAL INC. | 3 | 02/27/2026 |
| UNIVERSAL BUILDERS SUPPLY, LLC | 5 | 02/06/2026 |
| GENSLER | 1 | 12/11/2025 |
| PLATFORM SOLUTIONS INC | 2 | 10/10/2025 |
| YOUNG ARCHITECTURE PLLC | 2 | 08/11/2025 |
| Moody Nolan | 3 | 04/07/2025 |
| BRAND ACCESS SOLUTIONS | 8 | 03/18/2025 |
| INTEGRAL ENGINEERING SERVICES, PLLC | 2 | 02/11/2025 |
| ENGINEERING SOLUTIONS | 1 | 02/05/2025 |
| GGA STUDIOS, DPC | 2 | 02/03/2025 |
| ANNE NIXON | 10 | 07/22/2024 |
| WJE ENGINEERS & ARCHITECTS, P.C. | 1 | 03/25/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| CONVERSANO ASSOCIATES, INC. | 236 | 03/21/2026 |
| EUROCELT EXPEDITING, INC | 14 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 13 | 03/21/2026 |
| RICHARD LEWIS ARCHITECT | 2 | 03/21/2026 |
| BREEZE NATIONAL | 4 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 2 | 03/21/2026 |
| EXPEDITER | 1 | 03/21/2026 |
| CODE | 20 | 03/21/2026 |
| DOMANI CONSULTING | 2 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 16 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SAFWAY ATLANTIC, LLC | General Contractor | 45 | 09/17/2026 |
| TISHMAN CONSTRUCTION CORP | General Contractor | 41 | 09/25/2026 |
| PJP INSTALLERS INC | General Contractor | 22 | 07/08/2026 |
| GILBANE BUILDING COMPANY | General Contractor | 20 | 06/28/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 18 | 07/08/2026 |
| ARENA EVENT SERVICES INC | General Contractor | 13 | 07/08/2026 |
| ROUNDSQUARE BUILDERS,LLC | General Contractor | 13 | 07/08/2026 |
| UNIVERSAL BUILD SUPP LLC | General Contractor | 10 | 08/21/2026 |
| TURNER CONSTRUCTION COMPANY | General Contractor | 10 | 09/12/2026 |
| OLYMPIC PLBG & HTG SVC IN | Plumbing | 9 | 07/16/2026 |
| TISHMAN INTERIORS CORP | General Contractor | 9 | 07/08/2026 |
| NICHOLSON & GALLOWAY, INC. | General Contractor | 8 | 03/21/2026 |
| ISLAND ACOUSTICS LLC | General Contractor | 6 | 07/08/2026 |
| KNIGHT ELEC'L SERV. CORP. | Electrical | 5 | 03/22/2026 |
| TITAN INDUSTRIAL SVC CORP | General Contractor | 5 | 08/27/2026 |
| RAEL AUTOMATIC SPR.CO INC | Fire Protection | 4 | 07/08/2026 |
| PLATFORM SOLUTIONS, INC | General Contractor | 4 | 09/29/2026 |
| BREEZE NATIONAL INC | General Contractor | 4 | 08/26/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 4 | 07/08/2026 |
| RIEHM PLUMBING CORP. | Fire Protection | 4 | 07/08/2026 |
| RITE-WAY INTERNAL REMOVAL INC | General Contractor | 4 | 03/21/2026 |
| ZHL GROUP INC | General Contractor | 3 | 07/08/2026 |
| ZITO, ROCCO | Electrical | 3 | 03/21/2026 |
| RIEHM PLUMBING CORP | Plumbing | 3 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 2 | 06/28/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| TECTONIC ENGINEERING CONS | 106 | 83 | 09/01/2026 |
| ATLAS ATC ENGINEERING INC | 8011 | 43 | 06/22/2026 |
| LANGAN ENG, ENV, SURVEYIN | 1265 | 2 | 04/01/2026 |
| BEASLEY CHIN & HUNDERMAN | 1238 | 1 | 03/25/2024 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 15 | 02/16/2024 |
| 360 ENGINEERING P.C. | 7496 | 1 | 07/11/2022 |
| AK ENGINEERING PC | 678 | 1 | 06/15/2022 |
| GALLIGAN ASSOCIATES | 623 | 1 | 10/11/2019 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Boiler Equipment | Permit Issued | CHAMPION COMBUSTION CORP | 09/29/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PLATFORM SOLUTIONS, INC | 09/28/2026 |
| DOB NOW | Construction Fence | Permit Issued | PLATFORM SOLUTIONS, INC | 09/25/2026 |
| DOB NOW | Foundation | Permit Issued | TISHMAN CONSTRUCTION CORP | 09/24/2026 |
| DOB NOW | General Construction | Permit Issued | TISHMAN CONSTRUCTION CORP | 09/23/2026 |
| DOB NOW | Support of Excavation | Permit Issued | TISHMAN CONSTRUCTION CORP | 09/23/2026 |
| DOB NOW | Construction Fence | Permit Issued | SAFWAY ATLANTIC, LLC | 09/16/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TURNER CONSTRUCTION COMPANY | 09/10/2026 |
| DOB NOW | Structural | Permit Issued | TURNER CONSTRUCTION COMPANY | 09/10/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | TITAN INDUSTRIAL SVC CORP | 08/26/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | TITAN INDUSTRIAL SVC CORP | 08/26/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | NEW YORK BOOM TRUCKS INC | 08/25/2026 |
| DOB NOW | Structural | Permit Issued | BREEZE NATIONAL INC | 08/21/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | UNIVERSAL BUILD SUPP LLC | 08/20/2026 |
| DOB NOW | Structural | Permit Issued | BREEZE NATIONAL INC | 08/18/2026 |
| DOB NOW | General Construction | Permit Issued | TURNER CONSTRUCTION COMPANY | 08/04/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | STARR INDUSTRIES LLC | 07/31/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | TITAN INDUSTRIAL SVC CORP | 07/20/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | TITAN INDUSTRIAL SVC CORP | 07/20/2026 |
| DOB NOW | Plumbing | Signed-off | OLYMPIC PLBG & HTG SVC IN | 07/15/2026 |
| DOB NOW | Support of Excavation | Permit Issued | TURNER CONSTRUCTION COMPANY | 07/01/2026 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 07/01/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | TITAN INDUSTRIAL SVC CORP | 06/29/2026 |
| DOB NOW | General Construction | Permit Issued | GILBANE BUILDING COMPANY | 06/23/2026 |
| DOB NOW | Structural | Permit Issued | GILBANE BUILDING COMPANY | 06/23/2026 |
| DOB NOW | General Construction | Permit Issued | GILBANE BUILDING COMPANY | 06/23/2026 |
| DOB NOW | Structural | Permit Issued | GILBANE BUILDING COMPANY | 06/23/2026 |
| DOB NOW | General Construction | Permit Issued | GILBANE BUILDING COMPANY | 06/23/2026 |
| DOB NOW | General Construction | Permit Issued | TURNER CONSTRUCTION COMPANY | 06/23/2026 |
| DOB NOW | General Construction | Permit Issued | GILBANE BUILDING COMPANY | 06/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 06/22/2026 |
| DOB NOW | Plumbing | Permit Issued | OLYMPIC PLBG & HTG SVC IN | 06/15/2026 |
| DOB NOW | General Construction | Permit Issued | ISLAND ACOUSTICS LLC | 06/11/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | UNIVERSAL BUILD SUPP LLC | 06/08/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TISHMAN CONSTRUCTION CORP | 05/27/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | UNIVERSAL BUILD SUPP LLC | 05/27/2026 |
| DOB NOW | Structural | Permit Issued | TISHMAN CONSTRUCTION CORP | 05/27/2026 |
| DOB NOW | General Construction | Permit Issued | TISHMAN CONSTRUCTION CORP | 05/27/2026 |
| DOB NOW | Construction Fence | Permit Issued | UNIVERSAL BUILD SUPP LLC | 05/20/2026 |
| DOB NOW | Construction Fence | Permit Issued | STARR INDUSTRIES LLC | 05/19/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/13/2026 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems | Cooling Trane PUY-AH 24 24,300 BTU · Condensing Unit ×2 |
| 08/13/2026 | Permit Issued | BREEZE NATIONAL INC | Air Conditioning Systems, Cooling Towers, Heating Systems, Others | Cooling Mitsubishi Electric PUHY-EP72TNU 72,000 BTU · Vrf Outdoor ×2 TRUYA0421KA70BA 42,000 BTU · Vrf Outdoor ×2 Heating Sterling HS-060B 900 CFM · Unit Heater ×1 HS-108A 245 CFM · Unit Heater ×1 HS-118A 500 CFM · Unit Heater ×1 Cooling Tower Evapco AT 212-4J24 157,500 CFM · Cooling Tower ×8 Other Trane CENTRIVAC CVHF 1 BTU · Water Cooled Chiller ×4 |
| 07/21/2026 | Permit Issued | TURNER CONSTRUCTION COMPA | Cooling Towers, Others, Ventilation Systems | |
| 06/30/2026 | Permit Issued | TISHMAN CONSTRUCTION CORP | Air Conditioning Systems, Ventilation Systems | |
| 06/22/2026 | Permit Issued | GILBANE BUILDING COMPANY | Air Conditioning Systems, Heating Systems | |
| 04/24/2026 | Signed-off | TISHMAN CONSTRUCTION CORP | Air Conditioning Systems | Cooling Ventrol DRISTEEM ULTRASORB LH 11,000 CFM ×4 |
| 03/20/2026 | Signed-off | TISHMAN CONSTRUCTION CORP | Air Conditioning Systems, Ventilation Systems | |
| 10/16/2025 | Permit Issued | TURNER CONSTRUCTION COMPA | Air Conditioning Systems, Ventilation Systems | Cooling Mitsubishi Electric MXZ-SM36NLHZ 36,000 BTU · Condensing Unit ×2 PUZ-A18NKA7 36,000 BTU · Condensing Unit ×1 Ventilation |
| 12/28/2023 | Permit Issued | PEEPLES MECHANICAL CORP | Air Conditioning Systems | Cooling Ventrol CUSTOM, FULL KNOCKDOWN 10,000 CFM ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/01/2026 | Permit Issued | SIRINA FIRE PROT CORP | 21 heads |
| 08/13/2026 | Permit Issued | AGGRESSIVE FIRE PROT LLC | — |
| 08/13/2026 | Permit Issued | PAR FIRE PROTECTION LLC | Sprinkler System |
| 07/21/2026 | — | — | Sprinkler System |
| 06/29/2026 | Signed-off | SIRINA FIRE PROT CORP | — |
| 06/22/2026 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | Sprinkler System |
| 04/24/2026 | Signed-off | SIRINA FIRE PROT CORP | Sprinkler System |
| 04/16/2026 | — | — | Sprinkler System |
| 03/20/2026 | Signed-off | SIRINA FIRE PROT CORP | Sprinkler System |
| 10/16/2025 | Permit Issued | SIRINA FIRE PROT CORP | Sprinkler System |
| 10/14/2025 | Permit Issued | SIRINA FIRE PROT CORP | 195 heads |
| 04/30/2025 | — | — | 5 heads, 1 outlets |
| 05/05/2021 | Permit Issued | RIEHM PLUMBING CORP. | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/13/2026 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 08/13/2026 | Permit Issued | OLYMPIC PLBG & HTG SVC IN | Storm, Water/Sanitary |
| 07/21/2026 | — | — | Storm, Water/Sanitary |
| 04/24/2026 | Signed-off | OLYMPIC PLBG & HTG SVC IN | Water/Sanitary |
| 04/16/2026 | — | — | Storm, Water/Sanitary |
| 03/20/2026 | Signed-off | OLYMPIC PLBG & HTG SVC IN | Water/Sanitary |
| 02/27/2026 | Signed-off | OLYMPIC PLBG & HTG SVC IN | Water/Sanitary |
| 10/16/2025 | Permit Issued | OLYMPIC PLBG & HTG SVC IN | Water/Sanitary |
| 10/14/2025 | — | — | — |
| 05/05/2021 | Signed-off | RIEHM PLUMBING CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | ALLBRIGHT ELECTRIC, INC | — |
| 07/08/2026 | Permit Issued | POLARIS ELEC'L CONST CORP | General Wiring |
| 06/25/2026 | Permit Issued | TF ELECTRICAL CORP | General Wiring |
| 06/19/2026 | Permit Issued | CAMPBELL & DAWES LTD ELEC | General Wiring |
| 06/10/2026 | Permit Issued | KNIGHT ELEC'L SERV. CORP. | General Wiring |
| 02/27/2026 | Permit Issued | H. & L. ELECTRIC INC | General Wiring |
| 02/20/2026 | Complete | ROBERT B SAMUELS, INC | General Wiring |
| 01/20/2026 | Complete | KNIGHT ELEC'L SERV. CORP. | General Wiring |
| 01/08/2026 | Complete | KNIGHT ELEC'L SERV. CORP. | General Wiring |
| 12/11/2025 | Permit Issued | H. & L. ELECTRIC INC | General Wiring |
| 12/01/2025 | Complete | KNIGHT ELEC'L SERV. CORP. | General Wiring |
| 11/06/2025 | Permit Issued | H. & L. ELECTRIC INC | — |
| 11/05/2025 | Permit Issued | ROBERT B SAMUELS, INC | General Wiring |
| 10/23/2025 | Permit Issued | KLEINKNECHT ELEC. CO.,INC | General Wiring |
| 10/17/2025 | Permit Issued | H. & L. ELECTRIC INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/22/2026 | Permit Issued | TITAN INDUSTRIAL SVC CORP | 3 scope_items |
| 07/21/2026 | Permit Issued | CHAMPION COMBUSTION CORP | Steel, Concrete |
| 06/22/2026 | Permit Issued | GILBANE BUILDING COMPANY | Steel, Concrete, Masonry |
| 04/24/2026 | Signed-off | SIRINA FIRE PROT CORP | Steel, Concrete, Masonry |
| 04/16/2026 | Permit Issued | TURNER CONSTRUCTION COMPA | Concrete |
| 04/01/2026 | Permit Issued | TURNER CONSTRUCTION COMPA | 2 scope_items |
| 04/01/2026 | Permit Issued | TURNER CONSTRUCTION COMPA | 2 scope_items |
| 03/20/2026 | Signed-off | TISHMAN CONSTRUCTION CORP | Steel, Concrete |
| 02/27/2026 | Permit Issued | TISHMAN CONSTRUCTION CORP | Steel, Concrete, Masonry |
| 10/16/2025 | Permit Issued | TURNER CONSTRUCTION COMPA | Steel, Concrete, Masonry |
| 08/11/2025 | Permit Issued | MERCER GENERAL WORKS CO L | 1 scope_items |
| 05/09/2023 | Permit Issued | GM ENTERPRISES ONE INC | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2026 | Permit Issued | STARR INDUSTRIES LLC | Fence |
| 10/10/2025 | Permit Issued | PLATFORM SOLUTIONS, INC | Fence |
| 06/11/2025 | Permit Issued | UNIVERSAL BUILD SUPP LLC | Scaffold |
| 05/27/2025 | Permit Issued | UNIVERSAL BUILD SUPP LLC | Fence |
| 05/22/2025 | Permit Issued | UNIVERSAL BUILD SUPP LLC | Sidewalk Shed |
| 01/04/2022 | — | — | Fence |
| 02/10/2021 | Permit Issued | KING HOIST & SCAFFOLDING | Scaffold |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/08/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/03/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/03/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 08/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/10/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/20/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/15/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/15/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/08/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/01/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 06/11/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 06/05/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/05/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/02/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/13/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/11/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/11/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/11/2026 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 04/16/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/09/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/09/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/31/2026 | Sprinkler Systems | GEORGE GHEBRYAL | special |
| 08/03/2026 | Fire-Resistance Rated Construction | GEORGE GHEBRYAL | progress |
| 08/03/2026 | Mastic and Intumescent Fire-resistant Coatings | GEORGE GHEBRYAL | special |
| 08/03/2026 | Sprayed fire-resistant materials | GEORGE GHEBRYAL | special |
| 08/03/2026 | Fire-Resistant Penetrations and Joints | GEORGE GHEBRYAL | special |
| 08/03/2026 | Final | GEORGE GHEBRYAL | progress |
| 07/30/2026 | Final | GEORGE GHEBRYAL | progress |
| 07/30/2026 | Post-installed Anchors | GEORGE GHEBRYAL | special |
| 07/30/2026 | Structural Steel - Welding | GEORGE GHEBRYAL | special |
| 07/30/2026 | Fire-Resistant Penetrations and Joints | GEORGE GHEBRYAL | special |
| 07/30/2026 | Structural Cold-Formed Steel | GEORGE GHEBRYAL | special |
| 07/30/2026 | Structural Steel - Details | GEORGE GHEBRYAL | special |
| 07/30/2026 | High Temperature Hot Water Piping (Welding) | GEORGE GHEBRYAL | special |
| 07/30/2026 | Post-installed Anchors | GEORGE GHEBRYAL | special |
| 07/30/2026 | Emergency and Standby Power Systems (Generator) | GEORGE GHEBRYAL | special |
| 07/30/2026 | Structural Steel - High Strength Bolting | GEORGE GHEBRYAL | special |
| 07/30/2026 | Mechanical Systems | GEORGE GHEBRYAL | special |
| 07/30/2026 | Final | GEORGE GHEBRYAL | progress |
| 07/30/2026 | Concrete - Cast-In-Place | GEORGE GHEBRYAL | special |
| 07/30/2026 | Fire-Resistance Rated Construction | GEORGE GHEBRYAL | progress |
| 07/20/2026 | High-Pressure Steam Piping (Welding) | GEORGE GHEBRYAL | special |
| 07/20/2026 | Fire-Resistant Penetrations and Joints | GEORGE GHEBRYAL | special |
| 07/20/2026 | Mechanical Systems | GEORGE GHEBRYAL | special |
| 07/20/2026 | Heating Systems | GEORGE GHEBRYAL | special |
| 07/20/2026 | Final | GEORGE GHEBRYAL | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Museum of Met | Other | — | Project M01194216 |
| Mineral Springs | Restaurant / Food Service | Floor 1 | Project M00834592 |
| Met Museum | Other | — | Project M00651340 |