Elevator cooperative
1004 LEXINGTON AVENUE
MANHATTAN · BIN 1042844
💬 Discuss this project
1916Year Built
14Stories
D4Building Class
R10AZoning
173,024 sfGross Floor Area
66Units
LL97 CoveredRent Stabilized4 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 72ND TENANTS CORP - B.H.S. (12572) · 15,835 sf lot · 10.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneralOther
Roof1p · 1 filing · 5 docs
Floor 141p · 1 filing · 4 docs
Floor 13
Floor 123p · 2 filings · 20 docs
Floor 11
Floor 10
Floor 9
Floor 83p · 2 filings · 15 docs
Floor 7
Floor 6
Floor 51p · 1 filing · 19 docs
Floor 41p · 1 filing · 4 docs
Floor 34p · 2 filings · 20 docs
Floor 2
Floor 13p · 1 filing · 7 docs
Cellar3p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RENNON CONSTRUCTION1307/08/2026
BROWN HARRIS STEVENS2407/08/2026
J&S WATERPROOFING LLC, SUITE 2703/22/2026
72ND TENANTS9103/22/2026
J & G MARBLET TILE CORP303/22/2026
KELRON CONTRACTING103/22/2026
OWNER OF 125 E 72 ST203/22/2026
72 TENANTS403/22/2026
LAURELTON HOLDINGS203/22/2026
MUNSEY ENTERPRISES103/21/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDALORO CONSTRUCTION LLCGeneral Contractor1207/08/2026
INTERIOR MANAGEMENT LLCGeneral Contractor903/21/2026
BHD GROUP LLCGeneral Contractor807/08/2026
J & G MARBLE & TILE CORPGeneral Contractor607/08/2026
HITE CONSTRUCTION INCGeneral Contractor403/21/2026
RENOV INCGeneral Contractor407/08/2026
RENNON CONSTRUCTION CORPGeneral Contractor407/08/2026
J&S WATERPROOFING LLCGeneral Contractor403/21/2026
ASE HVAC INCGeneral Contractor407/08/2026
CORNERSTONE CONSTRUCTIONGeneral Contractor307/08/2026
WF PLUMBING AND HEATING LPlumbing207/08/2026
JEROME KRITZElectrical203/21/2026
WCK ELECTRIC CORP.Electrical203/22/2026
FIVE STAR AWNINGS INCGeneral Contractor203/21/2026
JOSEPH & SON RESTORATIONGeneral Contractor207/08/2026
ABSOLUTE PLBG & HTG CORPPlumbing207/08/2026
ARCO PLBG AND HTG INCPlumbing207/08/2026
HENRY MYERS P & H, INCPlumbing207/08/2026
HUDSON PLMBING & MCH, LLCPlumbing207/08/2026
MOSES, GUNTHERElectrical103/21/2026
JBJ CONCRETE RENOVATIONSGeneral Contractor104/09/2026
IAN BRUMGNACHElectrical103/21/2026
SMART PLBG & HTG CORPPlumbing107/08/2026
FEGOS, GREGORYElectrical103/21/2026
MAXCO CONTRACTING.INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BERGMAN CONSULTING ENGINE253501/16/2026
OUTSOURCE SPECIAL INSPECT2827101/22/2025
BHK ENGINEERING, D.P.C.9589101/06/2025
ZARINA KINDO, RA4900412/06/2023
NORMAN C. LOK818110/05/2023
VIKATOS ARCHITECT3498104/24/2023
BEYOND ARCH LLC3600702/16/2023
RAD DESIGN & ARCHITECTURE2082709/28/2022
AK ENGINEERING PC678206/30/2022
RODMAN PAUL ARCHITECTS PL7162406/30/2022
Building Lifecycle
All (297)Filed (56)Permit Issued (55)Signed Off (32)Facade (FISP) (12)Violation (60)Inspection (24)Objection (28)Special Inspection (30)
04/28/2026
Signed off — Alteration
New plumbing fixtures and associated pipping installation for apartment renovation in conjunction with GC #: M01100988-I1. No change to use, egress, or occupancy.
M01100988-S2
04/21/2026
Signed off — Alteration
New plumbing fixtures and associated pipping installation for apartment renovation in conjunction with GC #: M01100988-I1. No change to use, egress, or occupancy.
M01100988-I1
02/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/25/2026
Signed off — Alteration
New plumbing fixtures and associated pipping installation for apartment renovation in conjunction with GC #: M01100988-I1. No change to use, egress, or occupancy.
M01100988-S1
02/20/2026
Signed off — Alteration
M01101032-I1
02/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB BERGMAN
01/16/2026
Filed — Alteration
New plumbing fixtures and associated pipping installation for apartment renovation in conjunction with GC #: M01100988-I1. No change to use, egress, or occupancy.
M01100988-P1
01/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB BERGMAN
12/26/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/24/2025
Signed off — Alteration
Replacing old non-functional gas meters with a new.
M01152320-I1
11/24/2025
Signed off — Alteration
Replacing old non-functional gas meters with a new.
M01152320-S1
10/30/2025
Permit issued — Mechanical Systems
M01100988-S1-MS
10/30/2025
Permit issued — General Construction
M01100988-I1-GC
10/30/2025
Permit issued — Structural
M01101032-I1-ST
09/25/2025
Objection resolved — Addressed
09/25/2025
Objection resolved — Addressed
09/24/2025
Objection raised — Admin
09/24/2025
Objection raised — Admin
09/04/2025
Filed — Alteration
Replacing old non-functional gas meters with a new.
M01152320-P2
08/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/14/2025
Permit issued — Plumbing
M01152320-S1-PL
07/03/2025
Inspection — No Access-Final PL - Up to 9 Requested Floors
No Access
View inspection ↗
06/26/2025
Signed off — Alteration
Combination of Apts. 5A & 5F. Interior partition changes and finishes. Replace existing windows with new in existing openings. Remove existing stair and close existing stair opening with new slab at 5th floor.
M00875275-I1
06/20/2025
Signed off — Alteration
INTERIOR RENOVATION TO APT 3C FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00877874-I1
06/18/2025
Signed off — Alteration
INTERIOR RENOVATION TO APT 3C FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00877874-S1
06/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2025
Violation issued (HPD, closed)
A
05/29/2025
Filed — Alteration
INTERIOR RENOVATION TO APT 3C FILED IN CONJUNCTION WITH DOB NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00877874-P2
05/27/2025
Objection resolved — Addressed
05/23/2025
Objection raised — Admin
05/22/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/13/2025
Filed — Alteration
Replacing old non-functional gas meters with a new.
M01152320-P1
04/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/19/2025
Permit issued — Plumbing
M01152320-S1-PL
03/10/2025
Permit issued — General Construction
M01152320-I1-GC
03/04/2025
Objection resolved — Addressed
02/19/2025
Permit issued — Structural
M01101032-I1-ST
02/18/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/14/2025
Objection resolved — Addressed
02/05/2025
Objection raised — Plumbing
01/30/2025
Objection raised — Scope
01/22/2025
Filed — Alteration
Replacing old non-functional gas meters with a new.
M01152320-I1
01/22/2025
Filed — Alteration
Replacing old non-functional gas meters with a new.
M01152320-S1
01/14/2025
Permit issued — Plumbing
M01100988-S2-PL
01/09/2025
Permit issued — Mechanical Systems
M01100988-S1-MS
01/08/2025
Permit issued — General Construction
M01100988-I1-GC
01/06/2025
Filed — Alteration
M01101032-I1
12/12/2024
Filed — Alteration
New plumbing fixtures and associated pipping installation for apartment renovation in conjunction with GC #: M01100988-I1. No change to use, egress, or occupancy.
M01100988-S2
12/12/2024
Filed — Alteration
New plumbing fixtures and associated pipping installation for apartment renovation in conjunction with GC #: M01100988-I1. No change to use, egress, or occupancy.
M01100988-I1
12/12/2024
Filed — Alteration
New plumbing fixtures and associated pipping installation for apartment renovation in conjunction with GC #: M01100988-I1. No change to use, egress, or occupancy.
M01100988-S1
11/27/2024
Signed off — Alteration
Combination of Apts. 5A & 5F. Interior partition changes and finishes. Replace existing windows with new in existing openings. Remove existing stair and close existing stair opening with new slab at 5th floor.
M00875275-S1
09/10/2024
Signed off — Alteration
M01080523-I1
08/23/2024
Special inspection requirement — Final
Stephen Wang
07/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/18/2024
Permit issued — Suspended Scaffold
M01080523-I1-SC
07/13/2024
Filed — Alteration
M01080523-I1
03/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/16/2024
Signed off — Alteration
M00758669-I1
02/16/2024
Signed off — Alteration
Minor demo. & GC for apt. renovation consisting of partition, door, finishes removal & installation, replace windows & new louvers as per plans filed herewith. Mechanical and plumbing filed as subsequent applications. No change to use, egress or occupancy
M00758622-I1
Latest 60 of 297 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBHD GROUP LLC10/30/2025
DOB NOWGeneral ConstructionSigned-offBHD GROUP LLC10/30/2025
DOB NOWStructuralSigned-offBHD GROUP LLC10/30/2025
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC08/14/2025
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC03/19/2025
DOB NOWGeneral ConstructionSigned-offJBJ CONCRETE RENOVATIONS03/10/2025
DOB NOWStructuralSigned-offBHD GROUP LLC02/19/2025
DOB NOWPlumbingSigned-offSMART PLBG & HTG CORP01/14/2025
DOB NOWMechanical SystemsSigned-offBHD GROUP LLC01/09/2025
DOB NOWGeneral ConstructionSigned-offBHD GROUP LLC01/08/2025
DOB NOWSuspended ScaffoldSigned-offROSENWACH TANK CO.,LLC07/18/2024
DOB NOWGeneral ConstructionPermit IssuedMAXCO CONTRACTING.INC12/20/2023
DOB NOWStructuralSigned-offCORNERSTONE CONSTRUCTION12/14/2023
DOB NOWGeneral ConstructionSigned-offCORNERSTONE CONSTRUCTION12/06/2023
DOB NOWGeneral ConstructionSigned-offFIVE STAR AWNINGS11/02/2023
DOB NOWMechanical SystemsSigned-offANDALORO CONSTRUCTION08/22/2023
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC08/21/2023
DOB NOWGeneral ConstructionSigned-offANDALORO CONSTRUCTION08/18/2023
DOB NOWGeneral ConstructionSigned-offANDALORO CONSTRUCTION07/12/2023
DOB NOWMechanical SystemsSigned-offANDALORO CONSTRUCTION07/12/2023
DOB NOWGeneral ConstructionSigned-offANDALORO CONSTRUCTION04/19/2023
DOB NOWMechanical SystemsSigned-offANDALORO CONSTRUCTION04/19/2023
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC10/18/2022
DOB NOWGeneral ConstructionSigned-offANDALORO CONSTRUCTION08/30/2022
DOB NOWMechanical SystemsSigned-offANDALORO CONSTRUCTION08/29/2022
DOB NOWGeneral ConstructionSigned-offRENOV INC07/06/2022
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP04/15/2022
DOB NOWMechanical SystemsSigned-offINTERIOR MANAGEMENT LLC03/31/2022
DOB NOWProtection and Mechanical MethodsSigned-offJ&S WATERPROOFING LLC03/22/2022
DOB NOWSupported ScaffoldSigned-offRENNON CONSTRUCTION CORP02/14/2022
DOB NOWGeneral ConstructionSigned-offJ & G MARBLE & TILE CORP10/22/2021
DOB NOWMechanical SystemsSigned-offJ & G MARBLE & TILE CORP10/22/2021
DOB NOWPlumbingSigned-offABSOLUTE PLBG & HTG CORP10/14/2021
DOB NOWGeneral ConstructionSigned-offJ&S WATERPROOFING LLC09/23/2021
DOB NOWMechanical SystemsSigned-offJ & G MARBLE & TILE CORP09/22/2021
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP09/20/2021
DOB NOWGeneral ConstructionSigned-offJ & G MARBLE & TILE CORP09/20/2021
DOB NOWPlumbingSigned-offHENRY MYERS P & H, INC07/07/2021
DOB NOWMechanical SystemsSigned-offHITE CONSTRUCTION06/21/2021
DOB NOWPlumbingSigned-offWF PLUMBING AND HEATING L06/16/2021
+ 60 more permits on file
1 project · most recent 01/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/16/2026Signed-offSMART PLBG & HTG CORPGas, Water/Sanitary
21 projects · most recent 02/05/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
02/05/2026CompleteLENS ELECTRIC, INCGeneral Wiring
03/10/2025CompleteNYCO ELECTRIC CORPGeneral Wiring
01/29/2025CompleteXELA ELECTRICAL CORP—
11/19/2024CompleteWCK ELECTRIC CORP.General Wiring
11/16/2023Permit IssuedMEGA ELEC'L CONTR'G, INCGeneral Wiring
10/24/2023CompleteAAA'S ELECTL CONTG CORPGeneral Wiring
11/15/2022CompleteMEGA ELEC'L CONTR'G, INCGeneral Wiring
06/16/2022CompletePOLYPHASE ELECTRIC INC.HVAC Wiring
06/14/2022CompleteXELA ELECTRICAL CORPGeneral Wiring
10/12/2021CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
09/23/2021CompleteACCURATE ELEC'L CORP.General Wiring
08/02/2021CompleteRESPONSE ELECTRIC INC.General Wiring
05/12/2021CompleteGREEN POWER ELECTRIC CORP—
05/05/2021CompleteGREEN POWER ELECTRIC CORP—
02/23/2021CompleteVANGUARD MAINTENANCE &General Wiring
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
02/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/03/2025No Access-Final PL - Up to 9 Requested FloorsNo AccessView ↗
06/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/18/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/02/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/02/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/05/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/15/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/22/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 78
DateRequirementInspectorRole
02/04/2026Fire-Resistant Penetrations and JointsJACOB BERGMANspecial
01/07/2026Fire-Resistant Penetrations and JointsJACOB BERGMANspecial
08/23/2024FinalStephen Wangprogress
12/13/2023Structural Steel - DetailsZARINA KINDOspecial
12/13/2023FinalRodney Gibbleprogress
12/13/2023Tenant Protection Plan ComplianceZARINA KINDOspecial
12/13/2023Structural Steel - WeldingZARINA KINDOspecial
12/13/2023Structural Stability – Alterations of existing buildingsZARINA KINDOspecial
12/13/2023Sprayed fire-resistant materialsZARINA KINDOspecial
12/13/2023Concrete - Cast-In-PlaceZARINA KINDOspecial
12/06/2023Structural Stability – Alterations of existing buildingsZARINA KINDOspecial
12/06/2023Concrete - Cast-In-PlaceZARINA KINDOspecial
12/06/2023FinalRodney Gibbleprogress
12/06/2023Tenant Protection Plan ComplianceZARINA KINDOspecial
12/06/2023Structural Steel - WeldingZARINA KINDOspecial
12/06/2023Structural Steel - DetailsZARINA KINDOspecial
12/06/2023Sprayed fire-resistant materialsZARINA KINDOspecial
04/22/2023Fire-Resistant Penetrations and JointsPANAGIOTIS VIKATOSspecial
04/22/2023Fenestration and door U-factor and product ratingsPANAGIOTIS VIKATOSenergy_progress
04/22/2023FinalPANAGIOTIS VIKATOSprogress
04/22/2023Fenestration areasPANAGIOTIS VIKATOSenergy_progress
03/13/2023Tenant Protection Plan Compliance—special
03/06/2023Energy Code Compliance Inspectionsjamal tahaprogress
03/06/2023Sprinkler Systems—special
02/15/2023FinalHackjong Choiprogress
Latest 25 of 78.
▾Documents — 931 on file (BIS + DOB NOW)
▸Plans & Drawings56
▸DOB NOWPlans/Sketch40
09/03/2026M00496281-P1Request digital key ↗
09/03/2026M00496281-I1Request digital key ↗
09/03/2026M00496291-I1Request digital key ↗
Showing 3 of 40 on file for this type
▸DOB NOWPlans/Sketch - Plumbing9
09/04/2026M00373309-I1Request digital key ↗
09/04/2026M00283174-I1Request digital key ↗
09/04/2026M00435418-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
09/05/2026M00283146-I1Request digital key ↗
09/04/2026M00373314-I1Request digital key ↗
09/04/2026M00349334-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00457308-I1Request digital key ↗
▸Applications & Permits190
▸BISPLAN / WORK APPROVAL APPLICATION76
08/13/2025102860281Open ↗
01/27/2021123752224Open ↗
11/23/2020140957169Open ↗
Showing 3 of 76 on file for this type
▸BISWORK PERMIT APPLICATION65
03/24/2021140957169Open ↗
12/03/2020140905723Open ↗
08/21/2020140931829Open ↗
Showing 3 of 65 on file for this type
▸DOB NOWLPC Approval/Permit47
09/04/2026M00373309-I1Open ↗
09/04/2026M00349334-P1Open ↗
09/04/2026M00349334-I1Open ↗
Showing 3 of 47 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
09/28/2020140905723Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
12/03/2020140905723Open ↗
▸Seals & Professional Certifications192
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION69
01/30/2020123789418Open ↗
01/29/2020123752224Open ↗
01/23/2020123864862Open ↗
Showing 3 of 69 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature56
09/05/2026M00283146-I1Open ↗
09/04/2026M00373309-I1Open ↗
09/04/2026M00373314-I1Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWProgress Inspector Seal & Signature28
09/21/2026M00457308-I1Open ↗
09/19/2026M00567568-P1Open ↗
09/19/2026M00567568-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/21/2026M00457308-I1Open ↗
09/02/2026M00589792-I1Open ↗
09/01/2026M01100988-P1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
10/09/2018123599141Open ↗
Showing 1 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
11/23/2020140957169Open ↗
08/17/2020140931829Open ↗
06/22/2020140905723Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/09/2018123599141Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment43
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE19
06/17/2019123752224Open ↗
12/18/2018123365401Open ↗
Showing 2 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING16
01/27/2021123752224Open ↗
Showing 1 of 16 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
05/17/2021123864862Open ↗
▸BISPLUMBING (PL) SIGNOFF1
05/17/2021123864862Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection35
▸DOB NOWTenant Protection Plan15
09/04/2026M00373309-I1Open ↗
09/04/2026M00349334-P1Open ↗
09/04/2026M00349334-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTenant Protection Plan and Notes11
12/11/2020140957169Open ↗
09/28/2020140905723Open ↗
01/30/2020123789418Open ↗
Showing 3 of 11 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM5
09/25/2019123752224Open ↗
08/26/2019123752224Open ↗
Showing 2 of 5 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Environmental & Asbestos67
▸DOB NOWDEP ACP-5: Asbestos Assessment Report32
09/05/2026M00283146-I1Open ↗
09/04/2026M00373309-I1Open ↗
09/04/2026M00373314-I1Open ↗
Showing 3 of 32 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)17
11/23/2020140957169Open ↗
08/17/2020140931829Open ↗
12/17/2019123864862Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form10
09/04/2026M00435457-I1Open ↗
09/03/2026M00457308-I1Open ↗
09/02/2026M00525243-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
12/03/2020140905723Open ↗
Showing 1 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance41
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS19
01/29/2020123752224Open ↗
01/23/2020123864862Open ↗
11/15/2019123365401Open ↗
Showing 3 of 19 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS9
05/19/2022123429129Open ↗
10/27/2021140957169Open ↗
04/19/2021123864862Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
05/19/2022123429129Open ↗
10/27/2021140957169Open ↗
05/17/2021123864862Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
09/04/2026M00435457-I1Open ↗
09/02/2026M00525243-I1Open ↗
Showing 2 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC EXEMPTION1
08/17/2020140931829Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/19/2022123429129Open ↗
▸Inspections & Test Reports29
▸BISTECHNICAL REPORT: RESPONSIBILITY20
05/19/2022123429129Open ↗
10/29/2021140931829Open ↗
10/27/2021140957169Open ↗
Showing 3 of 20 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
01/09/2023140905723Open ↗
05/19/2022123429129Open ↗
▸BISPOST-INSTALLED ANCHORS2
01/09/2023140905723Open ↗
10/29/2021140931829Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISMASONRY1
05/19/2022123429129Open ↗
▸Approvals, Objections & Sign-offs82
▸BISLANDMARKS APPROVAL30
11/23/2020140957169Open ↗
09/28/2020140905723Open ↗
08/17/2020140931829Open ↗
Showing 3 of 30 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST22
02/08/2023140905723Open ↗
05/25/2022123429129Open ↗
11/01/2021140931829Open ↗
Showing 3 of 22 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
07/21/2020123789418Open ↗
09/25/2019123752224Open ↗
09/25/2019123752224Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISLANDMARKS SIGNOFF6
02/08/2023140905723Open ↗
05/25/2022123429129Open ↗
11/01/2021140931829Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL2
01/09/2023140905723Open ↗
05/19/2022123429129Open ↗
▸BISSUPERSEDING LETTER2
07/01/2019123429129Open ↗
Showing 1 of 2 on file for this type
▸BISMECHANICAL (MH) SIGNOFF1
05/17/2021123864862Open ↗
▸Cost, Insurance & Ownership62
▸BISCOST AFFIDAVIT52
05/19/2022123429129Open ↗
10/27/2021140957169Open ↗
04/19/2021123864862Open ↗
Showing 3 of 52 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
02/08/2023140905723Open ↗
05/25/2022123429129Open ↗
10/29/2021140931829Open ↗
Showing 3 of 4 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms95
▸BISADDITIONAL INFORMATION41
11/17/2020123752224Open ↗
11/17/2020123752224Open ↗
10/20/2020140931829Open ↗
Showing 3 of 41 on file for this type
▸BISEFILING COVER SHEET30
01/30/2020123789418Open ↗
12/17/2019123864862Open ↗
06/17/2019123752224Open ↗
Showing 3 of 30 on file for this type
▸BISBOROUGH INTAKE FORM20
11/15/2019123365401Open ↗
11/12/2019123365401Open ↗
10/29/2019123365401Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
11/23/2020140957169Open ↗
08/17/2020140931829Open ↗
06/22/2020140905723Open ↗
Showing 3 of 4 on file for this type
▸Other Documents35
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION25
05/17/2021123864862Open ↗
09/28/2020140905723Open ↗
09/25/2019123752224Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProof of Historic Building6
08/15/2026M00758622-I1Open ↗
08/13/2026M00758691-P1Open ↗
08/13/2026M00758691-I1Open ↗
Showing 3 of 6 on file for this type
▸BISMonitoring Report-1 (MR-1)1
10/09/2018123599141Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01080523-I1Open ↗