| Owner | Filings | Most Recent |
|---|---|---|
| 101 PARK AVENUE ASSOCIATES | 710 | 09/13/2026 |
| H J KALIKOW | 261 | 07/08/2026 |
| CONVENE | 5 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | 5 | 03/22/2026 |
| 101 PARK AVENUE ASSOCIATES II LLC | 1 | 03/22/2026 |
| TURNER CONSTRUCTION COMPA | 1 | 03/22/2026 |
| GILBANE RESIDENTIAL CONST | 1 | 03/22/2026 |
| 101 PARK AVE ASSOCIATES 1 | 1 | 03/22/2026 |
| 101 PARK AVENUE REALTY | 8 | 03/22/2026 |
| KALIKOW | 9 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| WILLIAM LEGGIO ARCHITECT LLC | 8 | 07/21/2026 |
| ROBERT DERECTOR ASSOCIATES | 32 | 07/09/2026 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 2 | 07/07/2026 |
| DORIC CONSULTANTS PC | 8 | 05/11/2026 |
| GENSLER | 3 | 05/05/2026 |
| BRINJAC ENGINEERING, INC., P.,C. | 5 | 04/02/2026 |
| AMA CONSULTING ENGINEERS, PC | 12 | 03/27/2026 |
| FRANCIS CAUFFMAN ARCHITECTS | 2 | 03/27/2026 |
| TPG ARCHITECTURE, LLP | 1 | 02/24/2026 |
| NELSON ARCHITECTURE &INTERIORS, INC | 4 | 02/18/2026 |
| FL&M ENGINEERING DESIGN &INSPECTION | 1 | 12/17/2025 |
| S/L/A/M ARCHITECTS, LANDSCAPE ARCHI | 2 | 12/11/2025 |
| BALA CONSULTING ENGINEERS | 5 | 12/03/2025 |
| EDG | 1 | 11/05/2025 |
| HOK | 1 | 10/09/2025 |
| NEWTEC ENGINEERING | 1 | 08/06/2025 |
| VOCON | 6 | 07/31/2025 |
| THORNTON TOMASETTI | 1 | 07/16/2025 |
| PIRO STUDIO LLC | 1 | 07/01/2025 |
| WARE MALCOMB | 1 | 06/23/2025 |
| GILSANZ MURRAY STEFICEK LLP | 4 | 06/11/2025 |
| MICHAEL ZENREICH ARCHITECT PC | 7 | 04/22/2025 |
| CANNONDESIGN | 2 | 04/30/2024 |
| CALLISONRTKL ARCHITECTS, P.C. | 4 | 02/06/2024 |
| HNY CONSULTING ENGINEERS LLC | 4 | 02/06/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| NASIR J. KHANZADA LLC | 8 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 59 | 03/21/2026 |
| MICHAEL ZENREICH ARCHITECT | 46 | 03/21/2026 |
| OUTSOURCE CONSULTANTS, INC. | 12 | 03/21/2026 |
| RIZZO GROUP | 9 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 10 | 03/21/2026 |
| LMS-ACE SERVICES | 1 | 03/21/2026 |
| CONVERSANO ASSOCIATES, INC. | 4 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| STRUCTURE TONE, LLC | General Contractor | 34 | 07/14/2026 |
| KALIKOW CONSTR SVCS LLC | General Contractor | 20 | 08/06/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 16 | 08/20/2026 |
| PAR PLUMBING CO., INC | Plumbing | 13 | 08/26/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 12 | 07/08/2026 |
| WOLF CONSTRUCTION CORP 20 | General Contractor | 11 | 07/08/2026 |
| MANHATTAN D ENTERPRISES | General Contractor | 7 | 07/08/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 7 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 5 | 07/08/2026 |
| LAB PLBG & HTG CO INC | Plumbing | 5 | 07/08/2026 |
| BENCHMARK BUILDERS LLC | General Contractor | 4 | 07/08/2026 |
| PREFERRED MECHANICAL INC | Plumbing | 4 | 07/08/2026 |
| LAWRENCE J. LEVINE | Fire Protection | 4 | 03/21/2026 |
| SCHIMENTI CONSTRUCTION CO | General Contractor | 3 | 07/08/2026 |
| DENKO MECHANICAL INC | Fire Protection | 3 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 3 | 03/21/2026 |
| ICON INTERIORS INC | General Contractor | 2 | 03/21/2026 |
| Z-CAR-D | Scaffold | 2 | 07/08/2026 |
| JOHN FOLEY | Electrical | 2 | 03/21/2026 |
| FOLEY JOHN | Electrical | 2 | 03/21/2026 |
| TURNER CONSTRUCTION COMPANY | General Contractor | 2 | 07/08/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 2 | 07/08/2026 |
| KLEINKNECHT ELEC. CO.,INC | Electrical | 1 | 03/22/2026 |
| DONNELLY MECHANICAL CORP | General Contractor | 1 | 04/09/2026 |
| EVOS LLC | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| WILLIAM LEGGIO ARCHITECT | 6848 | 6 | 07/21/2026 |
| OUTSOURCE SPECIAL INSPECT | 2827 | 14 | 07/09/2026 |
| DORIC PROF. ENGINEERING C | 1537 | 7 | 05/11/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 23 | 05/05/2026 |
| SOCOTEC ENGINEERING | 4983 | 8 | 04/02/2026 |
| KEYOWNER ENGINEERING, P.C | 4817 | 1 | 02/20/2026 |
| CROSSCHECK INSPECTION SER | 544 | 7 | 12/11/2025 |
| EDG | 2578 | 1 | 11/05/2025 |
| OBAID MIAN | 849 | 1 | 08/06/2025 |
| SAG ENGINEERING & CONSULT | 608 | 17 | 08/05/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 08/19/2026 |
| DOB NOW | Standpipe | Permit Issued | PAR FIRE PROTECTION LLC | 08/19/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 08/19/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 08/17/2026 |
| DOB NOW | General Construction | Signed-off | KALIKOW CONSTR SVCS LLC | 08/05/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 07/13/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 07/10/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 06/29/2026 |
| DOB NOW | General Construction | Signed-off | EVOS LLC | 05/11/2026 |
| DOB NOW | Plumbing | Permit Issued | LAB PLBG & HTG CO INC | 04/07/2026 |
| DOB NOW | General Construction | Permit Issued | BENCHMARK BUILDERS LLC | 04/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | AGGRESSIVE FIRE PROT LLC | 04/03/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | BENCHMARK BUILDERS LLC | 04/01/2026 |
| DOB NOW | Structural | Signed-off | KALIKOW CONSTR SVCS | 03/23/2026 |
| DOB NOW | Sprinklers | Signed-off | S. TIEGER PLBG. CO., INC | 03/20/2026 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 03/06/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 03/04/2026 |
| DOB NOW | Plumbing | Permit Issued | LAWRENCE J. LEVINE | 03/04/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | BENCHMARK BUILDERS LLC | 03/04/2026 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 03/04/2026 |
| DOB NOW | Sprinklers | Permit Issued | AGGRESSIVE FIRE PROT LLC | 02/26/2026 |
| DOB NOW | Plumbing | Permit Issued | LAB PLBG & HTG CO INC | 02/26/2026 |
| DOB NOW | Sprinklers | Permit Issued | LAWRENCE J. LEVINE | 02/24/2026 |
| DOB NOW | General Construction | Permit Issued | BENCHMARK BUILDERS LLC | 02/20/2026 |
| DOB NOW | Structural | Permit Issued | KALIKOW CONSTR SVCS | 01/07/2026 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 12/18/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 12/18/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | EXTERIOR WALL & BUILDING | 12/17/2025 |
| DOB NOW | Plumbing | Signed-off | ABCO-PEERLESS SPRKLR CORP | 10/20/2025 |
| DOB NOW | Plumbing | Signed-off | ABCO-PEERLESS SPRKLR CORP | 10/20/2025 |
| DOB NOW | Mechanical Systems | Signed-off | TURNER CONSTRUCTION COMPANY | 10/16/2025 |
| DOB NOW | General Construction | Signed-off | TURNER CONSTRUCTION COMPANY | 10/15/2025 |
| DOB NOW | Sprinklers | Permit Issued | LAB PLBG & HTG CO INC | 10/15/2025 |
| DOB NOW | Sprinklers | Signed-off | LAWRENCE J. LEVINE | 09/10/2025 |
| DOB NOW | Standpipe | Permit Issued | LAWRENCE J. LEVINE | 09/10/2025 |
| DOB NOW | Plumbing | Signed-off | PAR PLUMBING CO., INC | 08/29/2025 |
| DOB NOW | Mechanical Systems | Signed-off | DONNELLY MECHANICAL CORP | 08/06/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 08/05/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 08/01/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 07/31/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/09/2026 | Permit Issued | STRUCTURE TONE, LLC | Air Conditioning Systems | Cooling Above Air MCW-007 1,000 CFM · Wshp ×1 |
| 03/27/2026 | Permit Issued | BENCHMARK BUILDERS LLC | Air Conditioning Systems | Cooling Hartell KL-1DG-115 1 kW · Pump ×1 |
| 02/24/2026 | Permit Issued | BENCHMARK BUILDERS LLC | Air Conditioning Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/09/2026 | Permit Issued | PAR FIRE PROTECTION LLC | — |
| 04/30/2026 | Signed-off | PAR FIRE PROTECTION LLC | 413 heads |
| 03/27/2026 | Permit Issued | AGGRESSIVE FIRE PROT LLC | 11 heads |
| 02/24/2026 | Permit Issued | AGGRESSIVE FIRE PROT LLC | — |
| 12/03/2025 | Permit Issued | PAR FIRE PROTECTION LLC | 13 heads |
| 07/29/2025 | Permit Issued | PAR FIRE PROTECTION LLC | 1 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/09/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 04/30/2026 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 04/02/2026 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 03/27/2026 | Permit Issued | LAB PLBG & HTG CO INC | Water/Sanitary |
| 02/24/2026 | Permit Issued | LAB PLBG & HTG CO INC | Water/Sanitary |
| 12/03/2025 | — | — | — |
| 07/29/2025 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/03/2026 | Permit Issued | FOREST ELECTRIC CORP. | General Wiring |
| 06/17/2026 | Permit Issued | UNI-LITE ELECTRIC, LLC | General Wiring |
| 06/12/2026 | Permit Issued | CAMPBELL & DAWES LTD ELEC | General Wiring |
| 05/15/2026 | Permit Issued | KLEINKNECHT ELEC. CO.,INC | General Wiring |
| 03/02/2026 | Permit Issued | CAMPBELL & DAWES LTD ELEC | General Wiring |
| 03/02/2026 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 01/27/2026 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 12/17/2025 | Complete | 5 J'S ELECTL CONTS CORP | — |
| 10/02/2025 | Permit Issued | FOREST ELECTRIC CORP. | General Wiring |
| 09/12/2025 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 09/09/2025 | Complete | STRIANO ELECTRIC CO., INC | General Wiring |
| 09/08/2025 | Complete | ROBERT B SAMUELS, INC | General Wiring |
| 07/09/2025 | Complete | POLO ELECTRIC CORP. D/B/A | General Wiring |
| 07/01/2025 | Complete | BIGMAN BROS., INC. | General Wiring, Lighting |
| 01/31/2025 | Complete | UNI-LITE ELECTRIC, LLC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/21/2026 | Signed-off | KALIKOW CONSTR SVCS LLC | 1 scope_items |
| 05/11/2026 | Signed-off | KALIKOW CONSTR SVCS LLC | Steel, Concrete |
| 11/05/2025 | Permit Issued | KALIKOW CONSTR SVCS LLC | Concrete |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/07/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/07/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/08/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/29/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/18/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/14/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/14/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 04/21/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/14/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/30/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/19/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/16/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/16/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/16/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/04/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/04/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/04/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/04/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 12/11/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/05/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/05/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/31/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/29/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/12/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 08/26/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/15/2026 | Fire-Resistance Rated Construction | William Leggio | progress |
| 07/15/2026 | Fire-Resistant Penetrations and Joints | William Leggio | special |
| 07/15/2026 | Final | William Leggio | progress |
| 07/07/2026 | Duct leakage testing, insulation and design | JONAR MADRIAGA | energy_progress |
| 07/07/2026 | Interior lighting power | JONAR MADRIAGA | energy_progress |
| 07/07/2026 | HVAC-R and service water heating system controls | JONAR MADRIAGA | energy_progress |
| 07/07/2026 | Electrical motors and elevators | JONAR MADRIAGA | energy_progress |
| 07/07/2026 | HVAC-R and service water piping design and insulation | JONAR MADRIAGA | energy_progress |
| 07/07/2026 | Maintenance information | JONAR MADRIAGA | energy_progress |
| 07/07/2026 | HVAC-R and service water heating equipment | JONAR MADRIAGA | energy_progress |
| 07/07/2026 | Lighting controls | JONAR MADRIAGA | energy_progress |
| 06/30/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 06/30/2026 | Post-installed Anchors | JONAR MADRIAGA | special |
| 06/25/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 06/25/2026 | Sprayed fire-resistant materials | JONAR MADRIAGA | special |
| 06/25/2026 | Mastic and Intumescent Fire-resistant Coatings | JONAR MADRIAGA | special |
| 06/25/2026 | Fire-Resistance Rated Construction | JONAR MADRIAGA | progress |
| 06/18/2026 | Energy Code Compliance Inspections | JONAR MADRIAGA | progress |
| 06/18/2026 | Mechanical Systems | JONAR MADRIAGA | special |
| 06/18/2026 | Final | JONAR MADRIAGA | progress |
| 06/18/2026 | Final | JONAR MADRIAGA | progress |
| 06/15/2026 | Final | JONAR MADRIAGA | progress |
| 05/13/2026 | Post-installed Anchors | Sokwon Im | special |
| 05/13/2026 | Structural Steel - High Strength Bolting | Sokwon Im | special |
| 05/13/2026 | Structural Steel - Details | Sokwon Im | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Cipher Digital | Office | — | Project M01419359 |
| Sills Cummis & Gross | Office | Floor 35 | Project M01393788 |
| Quantinno | Office | Floor 20 | Project M01356075 Project M01356054 |
| Fox Rothschild | Office | Floor 10 | Project M01352288 |
| Tata Consultancy Services TCS | Office | Floor 23 | Project M01214326 |
| RELX | Office | Floor 21 | Project M01286043 |
| Corient Holdings | Office | Floors 26–31 | Project M01257168 Project M01257174 Project M00914075 Project M00924735 Project M00914007 |
| Robert Half | Office | Floor 29 | Project M01249195 Project M01249184 Project M01249190 Project M01249180 |
| Alliant Insurance | Office | Floors 11, 19 | Project M01220087 Project M01220068 Project M00341825 Project M00341829 Project M00342563 |
| TCS Studio | Office | Floor 26 | Project M01084400 |
| Incline Equity Partners | Office | Floor 46 | Project M01118692 Project M00866330 |
| Customers Bank | Office | Floor 27 | Project M01148563 Project M01148578 Project M01148586 Project M01148675 |
| Nippon Life Global Investors Americas | Office | Floor 33 | Project M01040017 Project M00356642 |
| Five Iron Golf | Fitness / Recreation | — | Project M00810255 |
| Wendel Group | Office | Floor 43 | Project M00695346 |
| EY Plan Nlgia & NY Rep Office | Office | Floor 33 | Project M00356641 |
| The AKC Museum of the Dog | Other | Floors 1–5 | Project M00106159 |