← Back
BuildNYC
Elevator cooperative
Warwick Arms
101 WEST 80TH STREET · Name © OpenStreetMap contributors · BIN 1031975
💬 Discuss this project
1898Year Built
10Stories
D4Building Class
C1-8AZoning
47,487 sfGross Floor Area
62Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMP
Elevator cooperative · Owner of record: 101 W 80 Owners · 5,117 sf lot · 9.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsAkam Associates, INC.2 filings
RoofAkam Associates, INC.Under Construction6p · 2 filings · 14 docs
Floor 9Unit 9D1 filing · 8 docs
Floor 8
Floor 7Unit 7D1p · 1 filing · 4 docs
Floor 6Unit 6F1 filing · 8 docs
Floor 5
Floor 4
Floor 3Unit 3E1 filing · 8 docs
Floor 2
Floor 1Blank StreetCoffeeUnder Construction13p · 8 filings · 20 docs
CellarBlank StreetCoffeeUnder Construction14p · 6 filings · 20 docs
Site & exteriorInstallation of sidewalk shed1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
101 West 80th Owners5503/22/2026
J.A. Jennings103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New Approach Consulting203/21/2026
SNR Expediting Design203/21/2026
EA Design Group2003/21/2026
Construction Permit Services203/21/2026
Big Orange Expediting203/21/2026
E-Z Safety NY203/21/2026
EC Expediting and Services803/21/2026
Willoughby Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JTJ StudioGeneral Contractor903/21/2026
Muhan SpaceGeneral Contractor807/08/2026
Muhan SpaceScaffold303/21/2026
Kings Group NYScaffold303/21/2026
Exo IndustriesScaffold307/08/2026
Squan Construction ServicesGeneral Contractor203/21/2026
RomanovGeneral Contractor207/08/2026
Alliance Elevator CompanyElectrical203/21/2026
Approved ElectricElectrical103/21/2026
Ductwork Define and Desspecialty_contractor104/09/2026
Exo IndustriesGeneral Contractor107/08/2026
Kayafas Contracting CoGeneral Contractor107/08/2026
King Rose of NYGeneral Contractor107/08/2026
TristruxGeneral Contractor107/08/2026
A.M.NPlumbing107/08/2026
Crocitto, Jr., WilliamElectrical103/21/2026
AP Plumbing & HVACPlumbing107/08/2026
Atlas Electric ContractorsElectrical103/21/2026
KYL ElectricElectrical103/22/2026
Soleire Electrical SoltnsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Outsource Special Inspection2827601/07/2026
MEP Inspections1102204/11/2025
Metric Consulting and Ins1803104/11/2025
AG Engineering8899101/15/2025
Christian L. Martos Engineering5965103/25/2024
Alan Margolin & Associates423101/24/2024
Scherer Design Group7921110/03/2023
KMB Design Group513106/12/2023
Building Lifecycle
All (174)Filed (24)Permit Issued (25)Signed Off (9)Facade (FISP) (13)Violation (46)Inspection (5)Objection (22)Special Inspection (30)
06/04/2026
Signed off — Alteration
M01148627-I1
05/29/2026
Signed off — Alteration
Herewith filing for Facade repairs as per the drawings. No change in use, egress or occupancy.
M01200259-I1
04/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/09/2026
Objection raised — Scope
04/07/2026
Objection raised — Scope
03/24/2026
Filed — Alteration
Renovation of existing kitchen and bathroom. No change in use, occupancy, egress or location of the fixtures.
M01376060-S1
03/24/2026
Filed — Alteration
Renovation of existing kitchen and bathroom. No change in use, occupancy, egress or location of the fixtures.
M01376060-I1
03/21/2026
Special inspection requirement — Final
03/16/2026
Permit issued — Sidewalk Shed
M01148627-I1-SH
03/09/2026
Permit issued — Mechanical Systems
M00932065-I1-MS
02/24/2026
Objection resolved — Addressed
02/19/2026
Permit issued — Suspended Scaffold
M01156429-I1-SC
02/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/30/2026
Filed — Alteration
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS IN THE CELLAR AND 1ST FLOOR (BLANK STREET) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00932071-P2
01/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/13/2026
Objection raised — Scope
01/12/2026
Permit issued — Plumbing
M00932071-I1-PL
01/07/2026
Filed — Alteration
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS IN THE CELLAR AND 1ST FLOOR (BLANK STREET COFFEE) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00932065-I1
12/22/2025
Objection resolved — Addressed
12/05/2025
Permit issued — Sidewalk Shed
M01148627-I1-SH
12/01/2025
Permit issued — General Construction
M00986990-I1-GC
10/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
10/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
10/31/2025
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
10/31/2025
Special inspection requirement — Final
Winter D'Angelillo
10/29/2025
Objection resolved — Addressed
10/21/2025
Objection raised — Admin
09/29/2025
Filed — Alteration
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS IN THE CELLAR AND 1ST FLOOR (BLANK STREET) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00932071-P1
07/22/2025
Objection raised — Scope
07/10/2025
Filed — Alteration
APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES IN THE CELLAR AND 1ST FLOOR (BLANK STREET) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00986990-P1
07/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JONAR MADRIAGA
06/30/2025
Special inspection requirement — Post-installed Anchors
JONAR MADRIAGA
06/30/2025
Special inspection requirement — Final
Winter D'Angelillo
06/16/2025
Permit issued — General Construction
M01200259-I1-GC
04/11/2025
Filed — Alteration
Herewith filing for Facade repairs as per the drawings. No change in use, egress or occupancy.
M01200259-I1
03/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
03/27/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
03/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
Nicolas Crosetto
03/25/2025
Special inspection requirement — Final
Cosmo Veneziale
03/06/2025
Permit issued — Construction Fence
M01183110-I1-FN
02/28/2025
Objection raised — Other
02/28/2025
Objection resolved — Addressed
02/26/2025
Filed — Alteration
APPLICATION FILED FOR INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE ON THE 1ST FLOOR EXTERIOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01183110-I1
02/25/2025
Permit issued — Suspended Scaffold
M01156429-I1-SC
01/29/2025
Permit issued — Suspended Scaffold
M01156429-I1-SC
01/19/2025
Objection resolved — Addressed
01/19/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ARIEL GOLSHAN
01/16/2025
Objection raised — Other
01/16/2025
Objection raised — Other
01/16/2025
Objection resolved — Addressed
01/15/2025
Filed — Alteration
FACADE INSPECTIONS AND REPAIRS
M01156429-I1
01/15/2025
Special inspection requirement — Post-installed Anchors
ARIEL GOLSHAN
12/05/2024
Permit issued — Sidewalk Shed
M01148627-I1-SH
12/04/2024
Filed — Alteration
M01148627-I1
09/11/2024
Permit issued — Structural
M01007565-I1-GC-CX
09/11/2024
Permit issued — General Construction
M00928582-I1-GC
09/11/2024
Permit issued — Structural
M01007565-I1-ST
08/12/2024
Permit issued — General Construction
M00850209-I1-GC
Latest 60 of 174 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offExo Industries03/16/2026
DOB NOWMechanical SystemsPermit IssuedDuctwork Define Des03/09/2026
DOB NOWSuspended ScaffoldPermit IssuedExo Industries02/19/2026
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating01/12/2026
DOB NOWSidewalk ShedSigned-offExo Industries12/05/2025
DOB NOWGeneral ConstructionPermit IssuedMuhan Space12/01/2025
DOB NOWGeneral ConstructionSigned-offExo Industries06/16/2025
DOB NOWConstruction FencePermit IssuedMuhan Space03/06/2025
DOB NOWSuspended ScaffoldPermit IssuedExo Industries02/25/2025
DOB NOWSuspended ScaffoldPermit IssuedExo Industries01/29/2025
DOB NOWSidewalk ShedSigned-offExo Industries12/05/2024
DOB NOWStructuralPermit IssuedMuhan Space09/11/2024
DOB NOWGeneral ConstructionPermit IssuedMuhan Space09/11/2024
DOB NOWStructuralPermit IssuedMuhan Space09/11/2024
DOB NOWGeneral ConstructionPermit IssuedKayafas Contracting Co08/12/2024
DOB NOWStructuralPermit IssuedJTJ Studio04/05/2024
DOB NOWStructuralPermit IssuedJTJ Studio04/05/2024
DOB NOWGeneral ConstructionSigned-offKing Rose of NY01/31/2024
DOB NOWGeneral ConstructionPermit IssuedJTJ Studio12/14/2023
DOB NOWAntennaSigned-offTristrux11/21/2023
DOB NOWAntennaSigned-offSquan Construction Services09/26/2023
DOB NOWPlumbingSigned-offA.M.N09/22/2023
DOB NOWGeneral ConstructionSigned-offRomanov08/27/2021
DOB NOWGeneral ConstructionSigned-offRomanov07/23/2021
DOB NOWSidewalk ShedSigned-offKings Group NY07/02/2020
BISOTISSUEDApa Group02/23/2021
BISOTISSUEDApa Group03/24/2020
BISOTISSUEDRC3 Electric08/01/2016
BISOTISSUEDSquan Construction Services01/14/2016
BISSPISSUEDCopper Services11/18/2015
BISMHISSUEDFire Zone Ventilation & S10/09/2015
BISFPISSUEDFire Zone Vent & Supp10/09/2015
BISOTISSUEDSquan Construction Services07/29/2015
BISFPISSUEDFire Zone Vent & Supp06/03/2015
BISOTISSUEDFire Zone Ventilation & S05/04/2015
BISSPISSUEDCopper Services11/24/2014
BISSPISSUEDCopper Services03/03/2014
BISPLISSUEDCopper III Heating & Plumbing01/30/2014
BISMHISSUEDJ.A. Jennings01/15/2014
BISEQISSUEDJ.A. Jennings01/15/2014
+ 27 more permits on file
1 project · most recent 01/07/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/07/2026Permit IssuedDuctwork Define and DesHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PLFY-P12NFMU-E 12,000 BTU · Vrf Indoor ×2
PEFY-P54NMAU-E4 54,000 BTU · Vrf Indoor ×1
PLFY-P08NFMU-E 8,000 BTU · Vrf Indoor ×1
PURY-P96TNU-A 96,000 BTU · Vrf Outdoor ×1
Ventilation
Greenheck CSP-A510-VG 350 CFM · Exhaust Fan ×1
2 projects · most recent 03/24/2026
Water/Sanitary
FiledStatusContractorScope
03/24/2026——Water/Sanitary
01/30/2026Signed-offCrossfield Plumbing & HeatingWater/Sanitary
9 projects · most recent 12/05/2024
General Wiring
FiledStatusContractorScope
12/05/2024CompleteRichard Neu—
03/16/2024Permit IssuedKYL ElectricGeneral Wiring
02/22/2024CompleteSoleire Electrical SoltnsGeneral Wiring
01/17/2023CompleteGRX Euro ElectricGeneral Wiring
11/25/2021CompleteGRX Euro ElectricGeneral Wiring
08/19/2020Permit IssuedWCK Electric—
07/09/2020Permit IssuedRichard Neu—
07/02/2020Permit IssuedAccurate ElectricalGeneral Wiring
02/05/2020CompleteApollo Electric NYG—
1 project · most recent 03/25/2024
FiledStatusContractorScope
03/25/2024Permit IssuedMuhan Space1 scope_items
1 project · most recent 02/26/2025
Fence
FiledStatusContractorScope
02/26/2025Permit IssuedMuhan SpaceFence
1 project · most recent 01/15/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
01/15/2025Permit IssuedExo IndustriesSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
03/21/2026Final—progress
01/23/2026Tenant Protection Plan Compliance—special
10/31/2025Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
10/31/2025Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
10/31/2025Post-installed AnchorsJONAR MADRIAGAspecial
10/31/2025FinalWinter D'Angelilloprogress
07/08/2025Tenant Protection Plan Compliance—special
06/30/2025Tenant Protection Plan Compliance—special
06/30/2025Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
06/30/2025Post-installed AnchorsJONAR MADRIAGAspecial
06/30/2025FinalWinter D'Angelilloprogress
03/27/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
03/27/2025MasonrySAMI HAJJAR P.Especial
03/26/2025Tenant Protection Plan ComplianceNicolas Crosettospecial
03/25/2025FinalCosmo Venezialeprogress
01/19/2025Alternative Materials - OTCR Buildings Bulletin NumberARIEL GOLSHANspecial
01/15/2025Post-installed AnchorsARIEL GOLSHANspecial
03/22/2024Structural Steel - WeldingChristian Martosspecial
03/22/2024Concrete - Cast-In-PlaceChristian Martosspecial
03/22/2024MasonryChristian Martosspecial
03/22/2024Post-installed AnchorsChristian Martosspecial
03/18/2024Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
03/18/2024Structural Steel - DetailsChristian Martosspecial
03/18/2024Structural Stability – Alterations of existing buildingsChristian Martosspecial
02/19/2024Footing and FoundationChristian Martosprogress
Latest 25 of 46.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Blank StreetCoffeeRestaurant / Food ServiceCellar, Floor 1
Project M00932065 Alteration · Permit Entire · 01/07/2026
Project M00932071 Alteration · Permit Entire · 02/16/2024
Project M00986990 Alteration · Permit Entire · 02/16/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 319 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch25
09/03/2026M00555193-P1Request digital key ↗
09/03/2026M00555193-I1Request digital key ↗
09/03/2026M00555082-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00365605-I1Request digital key ↗
▸Applications & Permits57
▸BISWORK PERMIT APPLICATION25
03/26/2020123793902Open ↗
03/18/2020123793902Open ↗
08/09/2016122204033Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWLPC Approval/Permit18
08/22/2026M00986990-P2Open ↗
08/20/2026M00932065-P1Open ↗
08/13/2026M00986990-P1Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION14
01/22/2020123793902Open ↗
08/10/2016122204033Open ↗
05/19/2016121775828Open ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications102
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
01/22/2020123793902Open ↗
06/17/2016121775828Open ↗
06/17/2016121775828Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/03/2026M00555082-P1Open ↗
09/03/2026M00555082-I1Open ↗
08/30/2026M00880979-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/20/2026M00932065-I1Open ↗
09/20/2026M00932065-I1Open ↗
08/27/2026M01156429-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/20/2026M00932065-I1Open ↗
09/02/2026M00555193-I1Open ↗
09/02/2026M00555193-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
01/22/2020123793902Open ↗
11/04/2015121775828Open ↗
06/10/2015122410042Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
01/22/2020123793902Open ↗
06/10/2015122410042Open ↗
02/13/2014121919807Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/22/2009120190541Open ↗
06/19/2008110203556Open ↗
▸Trade Schedules & Equipment14
▸BISSELF-CERT PLUMBING NOTICE8
04/04/2014121919807Open ↗
03/13/2014121775828Open ↗
02/24/2014121775828Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
02/13/2014121919807Open ↗
01/10/2014121775828Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
04/01/2016122410042Open ↗
▸BISSCHEDULE B - PLUMBING1
06/19/2008110203556Open ↗
▸BISEQUIPMENT USE PERMITS1
05/26/2016121775828Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
05/26/2016121775828Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
01/22/2020123793902Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00365605-I1Open ↗
▸Environmental & Asbestos31
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
09/03/2026M00555082-I1Open ↗
09/03/2026M00555082-P1Open ↗
08/30/2026M00880979-I1Open ↗
Showing 3 of 22 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
01/22/2020123793902Open ↗
03/23/2015122340252Open ↗
12/05/2014122204033Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
08/18/2010120434173Open ↗
06/20/2008110203556Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
10/22/2009120190541Open ↗
12/02/2008110403493Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
01/22/2020123793902Open ↗
07/11/2016121775828Open ↗
03/23/2015122340252Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
07/11/2016121775828Open ↗
05/05/2014121694112Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00555193-I1Open ↗
08/13/2026M00555082-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/19/2021123793902Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/19/2021123793902Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/19/2021123793902Open ↗
▸Approvals, Objections & Sign-offs27
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
03/19/2021123793902Open ↗
07/11/2016121775828Open ↗
06/17/2016121775828Open ↗
Showing 3 of 10 on file for this type
▸BISLANDMARKS APPROVAL7
01/22/2020123793902Open ↗
09/18/2015122204033Open ↗
04/13/2015122340252Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
08/09/2010120434173Open ↗
10/22/2009120190541Open ↗
12/02/2008110403493Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/01/2016122410042Open ↗
08/26/2009110203556Open ↗
▸BISSUPERSEDING LETTER1
08/09/2016122204033Open ↗
▸BISLANDMARKS SIGNOFF1
03/19/2021123793902Open ↗
▸DOB NOWLandmark Approval1
08/13/2026M00850209-I1Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT16
01/22/2020123793902Open ↗
07/11/2016121775828Open ↗
06/08/2016121919807Open ↗
Showing 3 of 16 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/19/2021123793902Open ↗
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET10
01/22/2020123793902Open ↗
06/10/2015122410042Open ↗
03/23/2015122340252Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION3
08/10/2016122204033Open ↗
01/08/2014121694112Open ↗
12/07/2009120190541Open ↗
▸BISBOROUGH INTAKE FORM1
03/26/2020123793902Open ↗
▸Other Documents16
▸DOB NOWProof of Historic Building11
08/22/2026M00986990-P2Open ↗
08/20/2026M00932065-P1Open ↗
08/19/2026M00932071-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWCalculations2
08/13/2026M01156429-I1Open ↗
08/13/2026M01156429-P1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01156429-I1Open ↗
08/13/2026M01156429-P1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/26/2011120190541Open ↗