| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X01424654 | 634 WEST 256 STREET BRONX | New Job Filing | Job in process | 06/30/2026 | 06/29/2026 | — | Taking over Permit Y167730 to close out. |
| M01414953 | 1192 PARK AVENUE MANHATTAN | New Job Filing | Job in process | 06/10/2026 | 06/10/2026 | — | Apt #8a. Lights and Power. no new circuits/feeders or panels |
| M01385359 | 222 CENTRAL PARK SOUTH MANHATTAN | New Job Filing | Job in process | 04/09/2026 | 04/09/2026 | — | Light and power. New Panel, No new feeders. |
| M01381387 | 600 5 AVENUE MANHATTAN | New Job Filing | Job in process | 04/03/2026 | 04/03/2026 | — | Provide light & Power - 2 New Panels & Feeders |
| M01381389 | 461 5 AVENUE MANHATTAN | New Job Filing | Job in process | 04/03/2026 | 04/03/2026 | — | Lighting & Power on 4th & 5th Floors. No new panels or feeders |
| Q01379756 | 79-31 68 ROAD QUEENS | New Job Filing | Job in process | 03/29/2026 | 03/29/2026 | — | LIGHT, HEAT & POWER. 3 PANELS. 1 NEW METER |
| Name | Projects together | Most recent |
|---|---|---|
| Soleire Electrical Contracting | 31 | — |
| New York | 18 | — |
| Cushman Wakefield | 3 | — |
| Citizenm Hotel | 1 | — |
| J.A.B. Madison Holdings Llc | 1 | — |
| Soleire Electrical Solutions | 1 | — |
| Soleire | 1 | — |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X01424654 | 634 WEST 256 STREET BRONX | New Job Filing | Job in process | 06/30/2026 | 06/29/2026 | — | Taking over Permit Y167730 to close out. |
| M01414953 | 1192 PARK AVENUE MANHATTAN | New Job Filing | Job in process | 06/10/2026 | 06/10/2026 | — | Apt #8a. Lights and Power. no new circuits/feeders or panels |
| M01385359 | 222 CENTRAL PARK SOUTH MANHATTAN | New Job Filing | Job in process | 04/09/2026 | 04/09/2026 | — | Light and power. New Panel, No new feeders. |
| M01381387 | 600 5 AVENUE MANHATTAN | New Job Filing | Job in process | 04/03/2026 | 04/03/2026 | — | Provide light & Power - 2 New Panels & Feeders |
| M01381389 | 461 5 AVENUE MANHATTAN | New Job Filing | Job in process | 04/03/2026 | 04/03/2026 | — | Lighting & Power on 4th & 5th Floors. No new panels or feeders |
| Q01379756 | 79-31 68 ROAD QUEENS | New Job Filing | Job in process | 03/29/2026 | 03/29/2026 | — | LIGHT, HEAT & POWER. 3 PANELS. 1 NEW METER |
| Q01379899 | 79-31 68 ROAD QUEENS | New Job Filing | Job in process | 03/29/2026 | 03/29/2026 | — | Temp Lighting |
| M01360564 | 120 WOOSTER STREET MANHATTAN | New Job Filing | Job in process | 02/16/2026 | 02/16/2026 | — | Install Light & Power. No new panels or feeders |
| M01334362 | 152 WEST 57 STREET MANHATTAN | New Job Filing | Job in process | 12/15/2025 | 12/16/2025 | — | Lighting & Power on 21st Floor. |
| M01312492 | 12 EAST 88 STREET MANHATTAN | New Job Filing | Complete | 11/03/2025 | 11/03/2025 | — | Lights & Outlet. No new feeders or Panels |
| B01310053 | 138 8 STREET BROOKLYN | New Job Filing | Job in process | 10/28/2025 | 10/28/2025 | — | Light & Power . No new feeders or panels |
| B01310058 | 138 8 STREET BROOKLYN | New Job Filing | Job in process | 10/28/2025 | 10/28/2025 | — | Temp Power |
| M01309935 | 152 WEST 57 STREET MANHATTAN | New Job Filing | Job in process | 10/28/2025 | 10/28/2025 | — | Light & Power. No new panels or feeders. ADD VAV'S |
| M01309946 | 152 WEST 57 STREET MANHATTAN | New Job Filing | Complete | 10/28/2025 | 10/28/2025 | — | Temp lighting & Power |
| M01259887 | 44 EAST 2 STREET MANHATTAN | New Job Filing | Job in process | 07/22/2025 | 07/22/2025 | — | Install Emergency Temp Generator for school |
| M01257151 | 44 EAST 2 STREET MANHATTAN | New Job Filing | Job in process | 07/16/2025 | 07/16/2025 | — | Per Inspection report - amend app add 12 devices 5th floor total 18, remove 2nd 3rd and 4th floors |
| B01254408 | 271 BROOKLYN AVENUE BROOKLYN | New Job Filing | Job in process | 07/11/2025 | 07/11/2025 | — | swap out panel for new. New receptacles |
| M01242974 | 44 EAST 2 STREET MANHATTAN | New Job Filing | Job in process | 06/18/2025 | 06/18/2025 | — | Install new service end box, panel, feeders and branch circuits |
| M01231694 | 152 WEST 57 STREET MANHATTAN | New Job Filing | Complete | 05/27/2025 | 05/27/2025 | — | Lighting & Power on 22nd & 23rd Floors |
| M01231718 | 152 WEST 57 STREET MANHATTAN | New Job Filing | Job in process | 05/27/2025 | 05/27/2025 | — | Light & Power on 60th Floor - Adding 4 HVAC Units (for a total of 5) to Permit per Inspection |
| M01216188 | 485 LEXINGTON AVENUE MANHATTAN | New Job Filing | Job in process | 04/25/2025 | 04/25/2025 | — | New Lighting, HWH & Power. No new panels or feeders |
| M01216324 | 485 LEXINGTON AVENUE MANHATTAN | New Job Filing | Complete | 04/25/2025 | 04/25/2025 | — | Demo & Temps on 9th Floor |
| M01198968 | 485 LEXINGTON AVENUE MANHATTAN | New Job Filing | Complete | 03/21/2025 | 03/21/2025 | — | New lights and power. No new panels or feeders |
| M01169773 | 100 PARK AVENUE MANHATTAN | New Job Filing | Job in process | 01/21/2025 | 01/21/2025 | — | Adding Panel & Feeder |
| B01168466 | 75 LIVINGSTON STREET BROOKLYN | New Job Filing | Job in process | 01/17/2025 | 01/17/2025 | — | Outlets and lights in Apt. 13D |
| M01157824 | 87 GREENWICH AVENUE MANHATTAN | New Job Filing | Job in process | 12/18/2024 | 12/18/2024 | — | Lights and Power. No new panels or feeders |
| X01153207 | MORRIS PARK AVENUE BRONX | New Job Filing | Complete | 12/09/2024 | 12/09/2024 | — | Lights & Outlets in Patio area. |
| M01141103 | 40 WEST 67 STREET MANHATTAN | New Job Filing | Cancelled | 11/12/2024 | 11/12/2024 | — | Upgrade Panel. No new feeders. Add/Change outlets and lights |
| B01106344 | 7501 5 AVENUE BROOKLYN | New Job Filing | Complete | 09/04/2024 | 09/04/2024 | — | WONDER RESTARAUNT - Light, Heat & Power for Fast dining Restaurant. |
| M01070001 | 65 WEST 96 STREET MANHATTAN | New Job Filing | Job in process | 06/20/2024 | 06/20/2024 | — | Install light heat & power. Adding items in PAA |
| X01062993 | MORRIS PARK AVENUE BRONX | New Job Filing | Complete | 06/07/2024 | 06/07/2024 | — | Install lights and outlets. No Mechanical work. No new panels or feeders. |
| B01035393 | 206 KENT AVENUE BROOKLYN | New Job Filing | Complete | 04/13/2024 | 04/13/2024 | — | INSTALL LIGHT, HEAT & POWER |
| M01009545 | 418 COLUMBUS AVENUE MANHATTAN | New Job Filing | Complete | 02/22/2024 | 02/22/2024 | — | Install Lights and receptacles on 1st Floor |
| M01006575 | 120 EAST 86 STREET MANHATTAN | New Job Filing | Complete | 02/15/2024 | 02/15/2024 | — | Install 400kva Emergency back up generator for building |
| M00991075 | 767 3 AVENUE MANHATTAN | New Job Filing | Cancelled | 01/16/2024 | 01/16/2024 | — | Light & Power on 31st and 33rd floors. New Panel on 31. New Panels & Transformer on 33 |
| M00988741 | 120 EAST 86 STREET MANHATTAN | New Job Filing | Job in process | 01/10/2024 | 01/10/2024 | — | Remove & replace damaged service end box and wiring. Updated to add switches & Feeders |
| M00920884 | 120 EAST 86 STREET MANHATTAN | New Job Filing | Job in process | 08/17/2023 | 08/17/2023 | — | Cellar & Ground floor. ALL PANELS AND FEEDERS ARE EXISTING. RAN ONLY NEW BRANCH CIRCUITS |
| M00870418 | 180 MAIDEN LANE MANHATTAN | New Job Filing | Job in process | 05/04/2023 | 05/04/2023 | — | Install outlets for workstations using existing circuitry- changing device counts from floor from 9th floor to 10th floor |
| M00841482 | 180 MAIDEN LANE MANHATTAN | New Job Filing | Complete | 03/09/2023 | 03/09/2023 | — | Install of lighting & power outlets. no new Switchgear, Panels or Mechanical equipment |
| M08036063 | 60 BROAD STREET MANHATTAN | New Job Filing | Complete | 11/07/2022 | 11/08/2022 | — | install light, heat and power |
| M00790461 | 300 PARK AVENUE MANHATTAN | New Job Filing | Complete | 08/09/2022 | 08/15/2022 | — | INSTALL LIGHT, HEAT & POWER 18TH FLOOR |
| M00781039 | 600 5 AVENUE MANHATTAN | New Job Filing | Complete | 07/25/2022 | 07/26/2022 | — | INSTALL LIGHT, HEAT & POWER 24TH FLOOR |
| M00714414 | 152 WEST 57 STREET MANHATTAN | New Job Filing | Complete | 06/22/2022 | 06/24/2022 | — | INSTALL LIGHT, HEAT & POWER |
| M00762371 | 300 PARK AVENUE MANHATTAN | New Job Filing | Complete | 06/22/2022 | 06/23/2022 | — | INSTALL LIGHT, HEAT & POWER 22ND FL |
| M00733380 | 180 MAIDEN LANE MANHATTAN | New Job Filing | Complete | 05/06/2022 | 05/07/2022 | — | INSTALL HEAT, POWER & LIGHT 25TH FLOOR |
| M00731642 | 180 MAIDEN LANE MANHATTAN | New Job Filing | Complete | 05/04/2022 | 05/05/2022 | — | INSTALL LIGHT, HEAT & POWER - 1ST FL |
| M00715741 | 657 GREENWICH STREET MANHATTAN | New Job Filing | Job in process | 04/08/2022 | 04/08/2022 | — | Install light heat and power |
| M00659698 | 600 5 AVENUE MANHATTAN | New Job Filing | Complete | 01/10/2022 | 01/10/2022 | — | Electrical work on 25th Floor |
| M00636633 | 205 WEST 19 STREET MANHATTAN | New Job Filing | Job in process | 12/16/2021 | 12/17/2021 | — | 9TH FLOOR - adding outlet swap-out to application |
| M00636256 | 374 2 AVENUE MANHATTAN | New Job Filing | Job in process | 11/23/2021 | 11/24/2021 | — | install light, heat and power |
| M00618578 | 850 PARK AVENUE MANHATTAN | New Job Filing | Complete | 10/26/2021 | 10/26/2021 | — | Apartment 6C- Minor electrical work including replacement of existing light fixtures and relocating outlets |
| M00598685 | 180 MAIDEN LANE MANHATTAN | New Job Filing | Job in process | 09/22/2021 | 09/22/2021 | — | Install Outlets on floor for workstations. Circuits filed under separate application #M00494120. Adding Locations named Suites E & D |
| M00573570 | 156 WILLIAM STREET MANHATTAN | New Job Filing | Complete | 08/09/2021 | 08/10/2021 | — | Install Light, Heat and Power. |
| X00490400 | 1511 FULTON AVENUE BRONX | New Job Filing | Job in process | 04/06/2021 | 04/06/2021 | — | Install of Light, Heat and Power & New Service - Per Inspection Objection - removal of (2) Elevators from Application for total of zero. |
| M00494120 | 180 MAIDEN LANE MANHATTAN | New Job Filing | Complete | 03/28/2021 | 03/28/2021 | — | Install of light, heat and power on 11th Floor. AC's existing. |
| M00451413 | 425 PARK AVENUE MANHATTAN | New Job Filing | Complete | 01/11/2021 | 01/11/2021 | — | Electric light heat power on 20th Fl |
| M00441923 | 111 EAST 59 STREET MANHATTAN | New Job Filing | Complete | 12/16/2020 | 12/16/2020 | — | Install 60a Panel at Generator on 5th floor to feed 2 fuel oil pump circuits in Cellar Feeder for Panel by tenant |
| M00416761 | 366 MADISON AVENUE MANHATTAN | New Job Filing | Complete | 10/21/2020 | 10/21/2020 | — | Install power for water heater |
| M00116199 | 1713 MADISON AVENUE MANHATTAN | New Job Filing | Job in process | 01/16/2019 | 09/23/2020 | — | Install lighting Heat Power and Generator (adding Approval for Plan Review Job MN00805A2 ) |
| X00384836 | 1511 FULTON AVENUE BRONX | New Job Filing | Complete | 08/13/2020 | 08/13/2020 | — | Temporary power |
| M00361012 | 1260 AVENUE OF THE AMER MANHATTAN | New Job Filing | Job in process | 06/22/2020 | 06/22/2020 | — | Add (3) panels to Original application. (2) 200a and (1) 800a |
| M00360338 | 36 EAST 57 STREET MANHATTAN | New Job Filing | Job in process | 06/19/2020 | 06/19/2020 | — | Adding EPR Approval #MN00899A to this application. Also adding HVAC equipment, |
| Q00358719 | 10-95 IRVING AVENUE QUEENS | New Job Filing | Job in process | 06/16/2020 | 06/16/2020 | — | Install of Light Heat and Power. Adding EPR number QN01150A1, approved on 09/10/2021 |
| M00286721 | 299 HENRY STREET MANHATTAN | New Job Filing | Complete | 02/18/2020 | 02/19/2020 | — | Electrical work on 4th Floor |
| M00312926 | 1713 MADISON AVENUE MANHATTAN | New Job Filing | Cancelled | 02/17/2020 | 02/17/2020 | — | Taking over permit M188221 for 1723 Madison that was filed in April 2000 which covered boiler/burner wiring. . That building no longer exist… |
| X00294375 | 349 EAST 149 STREET BRONX | New Job Filing | Job in process | 01/11/2020 | 01/11/2020 | — | Electrical work on 3rd and partial 4th floors & Switchgear in Cellar & 2nd floor roof. REMOVE 800A SERVICE SWITCH FROM APPLICATION |
| M00286706 | 809 WASHINGTON STREET MANHATTAN | New Job Filing | Job in process | 12/23/2019 | 12/23/2019 | — | Electrical work for Store |
| M00278052 | 902 BROADWAY MANHATTAN | New Job Filing | Job in process | 12/11/2019 | 12/11/2019 | — | Electrical work on 14th Floor |
| M00271404 | BIN 1083339 | New Job Filing | Complete | 11/26/2019 | 11/26/2019 | — | Electrical work in suite 606 |
| M00226108 | 420 LEXINGTON AVENUE MANHATTAN | New Job Filing | Complete | 09/17/2019 | 09/17/2019 | — | Electrical work 17th Floor |
| B00218683 | 75 NORTH 7 STREET BROOKLYN | New Job Filing | Complete | 08/28/2019 | 08/28/2019 | — | Electrical work on 2nd & 3rd Floor |
| M00178880 | 477 MADISON AVENUE MANHATTAN | New Job Filing | Job in process | 06/13/2019 | 06/13/2019 | — | Install of risers & disconnects for future use. Floor Cellar, 2-7, 10-12, 14-21 & 23 |
| M00163948 | 183 MADISON AVENUE MANHATTAN | New Job Filing | Complete | 05/10/2019 | 05/10/2019 | — | Electrical work on 9th & 10th floors |
| M00154154 | 120 CHURCH STREET MANHATTAN | New Job Filing | Job in process | 04/15/2019 | 04/15/2019 | — | Install 16 outlets, 2 light fixtures and 4 switches |
| M00136212 | 139 LUDLOW STREET MANHATTAN | New Job Filing | Complete | 03/04/2019 | 03/04/2019 | — | Sub Panel, 3 x lights, 1 x switch, receptacles and extractor fans |
| M00130002 | 28 WEST 57 STREET MANHATTAN | New Job Filing | Complete | 02/26/2019 | 02/26/2019 | — | Electrical work in Lobby & partial 2nd floor |
| M00133289 | 148 LAFAYETTE STREET MANHATTAN | New Job Filing | Job in process | 02/20/2019 | 02/21/2019 | — | Install power for workstations & Install 2 sub feeders for 2 panels to accommodate new circuitry. Install 2 HVAC units. Install 1 additiona… |
| Q00121310 | 60-02 WOODSIDE AVENUE QUEENS | New Job Filing | Complete | 01/24/2019 | 01/25/2019 | — | Remove (1) 200a Panel & (1) 150a disconnect and consolidate in to (1) 400a Panel. Remove 1 meter and consolidate this load on to existing me… |
| M00111750 | 366 MADISON AVENUE MANHATTAN | New Job Filing | Complete | 12/27/2018 | 12/27/2018 | — | Take over permit #M250377 and remove any violations in order to close this permit out. 100a panel installed in basement. |
| M00111746 | 366 MADISON AVENUE MANHATTAN | New Job Filing | Job in process | 12/21/2018 | 12/21/2018 | — | Remove any violations issued to Permit M391104 |
| M00111747 | 366 MADISON AVENUE MANHATTAN | New Job Filing | Job in process | 12/21/2018 | 12/21/2018 | — | Remove any violations issued to Permit M345028 |
| M00111749 | 366 MADISON AVENUE MANHATTAN | New Job Filing | Job in process | 12/21/2018 | 12/21/2018 | — | Remove any violations issued to Permit M323866 |
| M00111494 | 366 MADISON AVENUE MANHATTAN | New Job Filing | Complete | 12/18/2018 | 12/18/2018 | — | Take over permit #M253535 and remove any violations in order to close this permit out. The 15KW DC rectifier is no longer installed. |
| M00111505 | 366 MADISON AVENUE MANHATTAN | New Job Filing | Job in process | 12/18/2018 | 12/18/2018 | — | Take over permit #M272793 and remove any violations to close this permit out. Related to Fire pump installation which was never completed at… |
| M00111509 | 366 MADISON AVENUE MANHATTAN | New Job Filing | Complete | 12/18/2018 | 12/18/2018 | — | Take over permit #M334735 and remove any violations in order to close this permit out. |
| M00100548 | 63 WALL STREET MANHATTAN | New Job Filing | Complete | 11/26/2018 | 11/27/2018 | — | RETAIL SPACE ON GROUND FLOOR |
| M00100741 | 125 BROAD STREET MANHATTAN | New Job Filing | Complete | 11/16/2018 | 11/16/2018 | — | Electrical work |
| M00097238 | 203 10 AVENUE MANHATTAN | New Job Filing | Job in process | 11/07/2018 | 11/07/2018 | — | As per email from Thomas Schuler 9/21/19, 8:11am. Soleire would like to get inspected for the work they carried out in this building. Soleir… |
| M00097244 | 205 10 AVENUE MANHATTAN | New Job Filing | Job in process | 11/07/2018 | 11/07/2018 | — | As per email from Thomas Schuler 9/21/19, 8:11am. Soleire would like to get inspected for the work they carried out in this building. Soleir… |
| M00083391 | 420 LEXINGTON AVENUE MANHATTAN | New Job Filing | Job in process | 09/28/2018 | 11/05/2018 | — | Suite 2024 - Install Light & Power |
| M00074925 | 511 BROADWAY MANHATTAN | New Job Filing | Complete | 08/29/2018 | 08/29/2018 | — | 3rd Floor |
| M00070692 | BIN 1015656 | New Job Filing | Job in process | 08/14/2018 | 08/14/2018 | — | Install light, Heat and Power |
| B00066930 | 384 BRIDGE STREET BROOKLYN | New Job Filing | Complete | 08/01/2018 | 08/01/2018 | — | Lights, outlets and meter |
| M00062419 | 110 EAST 42 STREET MANHATTAN | New Job Filing | Complete | 07/17/2018 | 07/17/2018 | — | ELECTRICAL WORK |
| M00062431 | 110 EAST 42 STREET MANHATTAN | New Job Filing | Complete | 07/17/2018 | 07/17/2018 | — | ELECTRICAL WORK |
| Q00059490 | 33-53 62 STREET QUEENS | New Job Filing | Complete | 07/06/2018 | 07/06/2018 | — | Electrical work |
| M00056535 | 67 WALL STREET MANHATTAN | New Job Filing | Complete | 06/26/2018 | 06/27/2018 | — | New permit to supersede permit # M397708 (6/23/2017) as scope of work has been changed. Unable to change on DOB NOW Build as this job was fi… |
| M00056547 | 63 WALL STREET MANHATTAN | New Job Filing | Complete | 06/26/2018 | 06/27/2018 | — | Install light, heat & power on 2nd & 3rd floors |
| M00053442 | 130 WEST 42 STREET MANHATTAN | New Job Filing | Job in process | 06/19/2018 | 06/19/2018 | — | Electrical work |
| M00051360 | 242 PARK AVENUE SOUTH MANHATTAN | New Job Filing | Complete | 06/08/2018 | 06/08/2018 | — | Electrical work on 6th Floor |