← Back
Over six families without stores
Reid Park Rock
104 TAPSCOTT STREET · BIN 3081191
💬 Discuss this project
1925Year Built
4Stories
C1Building Class
R6Zoning
36,000 sfGross Floor Area
32Units
LL97 CoveredRent Stabilized25 Open Violations 23 unresolved · 2 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 10,000 sf lot · 3.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof3p · 2 filings · 17 docs
Floor 41p · 1 filing · 5 docs
Floor 32p · 2 filings · 17 docs
Floor 21p · 1 filing · 5 docs
Floor 19p · 3 filings · 20 docs
Cellar9p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA1107/08/2026
NEW YORK CITY HOUSING AUTHORITY807/08/2026
NYC PACT PRESERVATION PARTNERS503/22/2026
N.Y.C. HOUSING AUTHORITY303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC2203/21/2026
KD DESIGNS103/21/2026
AK CONSULTING SERVICES203/21/2026
DANICO SERVICES803/21/2026
RYBAK DEVELOPMENT203/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
BK CONSTRUCTIONDBA SRT CONSTRUCTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMA SCAFFOLDING INCGeneral Contractor1107/08/2026
DUAL FUEL COMPANY LLCGeneral Contractor903/21/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor704/09/2026
BK CONSTRUCTION SVCS INCGeneral Contractor608/01/2026
FSC D&C LLCGeneral Contractor607/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor304/09/2026
DUAL FUEL PLUBING & HTINGPlumbing207/08/2026
PREMIER CONSTRUCTION INCGeneral Contractor203/21/2026
NAUM VAYNERMANElectrical103/21/2026
A & E PLUMBING CORPPlumbing107/08/2026
HYLAN DATACOM & ELECL LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS18031212/02/2025
NEW AGE ENGINEERING PLLC7746110/11/2024
Building Lifecycle
All (61)Filed (21)Permit Issued (29)Signed Off (11)
08/06/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00930343-I1
07/31/2026
Permit issued — Sidewalk Shed
B01105610-I1-SH
07/22/2026
Signed off — Alteration
INSTALL NEW CHIMNEY LINER AS PER PLANS. FILED IN CONJUNCTION WITH LAA # B01121073-I1. NO CHANGE IN USE OCCUPANCY OR EGRESS
B01120830-I1
07/13/2026
Signed off — Alteration
B00918187-I1
05/11/2026
Signed off — Alteration
B00951957-I1
05/07/2026
Permit issued — Sidewalk Shed
B01105610-I1-SH
04/30/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping. Replacement of 1 burner with an existing 1 boiler.
B00951688-I1
04/30/2026
Signed off — Alteration
Structural Work including sistering existing floor joists from 1st to 3rd floor, fire escape repairs at 5 fire escapes as needed.
B00911110-I1
03/19/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed. Also includes replacement and/or addition of piping and master venting system in cellar.
B00979843-I1
03/17/2026
Permit issued — General Construction
B00918187-I1-GC
03/11/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00978752-I1
02/05/2026
Permit issued — Sidewalk Shed
B01105610-I1-SH
02/04/2026
Filed — Alteration
B01105610-P1
02/01/2026
Signed off — Alteration
INSTALL DEBRIS CHUTE AS PER PLANS IN ORDER TO PERFORM FACADE REPAIR. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DEBRIS CHUTE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
B01035527-I1
01/12/2026
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00964605-I1
12/18/2025
Filed — Alteration
Installation of plumbing fixtures along with related piping. Replacement of 1 burner with an existing 1 boiler.
B00951688-P2
12/08/2025
Permit issued — General Construction
B00918187-I1-GC
12/02/2025
Filed — Alteration
Structural Work including sistering existing floor joists from 1st to 3rd floor, fire escape repairs at 5 fire escapes as needed.
B00911110-P2
11/20/2025
Permit issued — Structural
B00911110-I1-ST
11/06/2025
Permit issued — Sidewalk Shed
B00964605-I1-SH
09/25/2025
Filed — Alteration
Installation of plumbing fixtures along with related piping. Replacement of 1 burner with an existing 1 boiler.
B00951688-P1
07/28/2025
Permit issued — Mechanical Systems
B00951957-I1-MS
07/02/2025
Permit issued — Plumbing
B00951688-I1-PL
06/25/2025
Permit issued — General Construction
B00918187-I1-GC
05/07/2025
Filed — Alteration
B01105857-P1
03/26/2025
Filed — Alteration
INSTALL DEBRIS CHUTE AS PER PLANS IN ORDER TO PERFORM FACADE REPAIR. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DEBRIS CHUTE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
B01035527-P1
03/07/2025
Permit issued — General Construction
B00930343-I1-GC
11/22/2024
Permit issued — Mechanical Systems
B00979843-I1-MS
11/20/2024
Permit issued — Sidewalk Shed
B00964605-I1-SH
11/08/2024
Permit issued — Structural
B00911110-I1-ST
10/22/2024
Permit issued — Mechanical Systems
B01120830-I1-MS
10/11/2024
Filed — Alteration
INSTALL NEW CHIMNEY LINER AS PER PLANS. FILED IN CONJUNCTION WITH LAA # B01121073-I1. NO CHANGE IN USE OCCUPANCY OR EGRESS
B01120830-I1
09/26/2024
Permit issued — Sidewalk Shed
B01105610-I1-SH
09/25/2024
Filed — Alteration
B01105610-I1
09/13/2024
Permit issued — Suspended Scaffold
B01105857-I1-SC
09/09/2024
Filed — Alteration
B01105857-I1
08/02/2024
Permit issued — Mechanical Systems
B00951957-I1-MS
07/18/2024
Filed — Alteration
Structural Work including sistering existing floor joists from 1st to 3rd floor, fire escape repairs at 5 fire escapes as needed.
B00911110-P1
07/16/2024
Filed — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed. Also includes replacement and/or addition of piping and master venting system in cellar.
B00979843-I1
07/11/2024
Permit issued — Plumbing
B00951688-I1-PL
07/08/2024
Permit issued — Mechanical Systems
B00951957-I1-MS
07/03/2024
Permit issued — Plumbing
B00978752-I1-PL
07/02/2024
Permit issued — General Construction
B00918187-I1-GC
06/18/2024
Filed — Alteration
B00918187-I1
06/18/2024
Filed — Alteration
B00951957-I1
06/18/2024
Filed — Alteration
Installation of plumbing fixtures along with related piping. Replacement of 1 burner with an existing 1 boiler.
B00951688-I1
06/18/2024
Filed — Alteration
Installation of plumbing fixtures along with related piping.
B00978752-I1
04/29/2024
Permit issued — Protection and Mechanical Methods
B01035527-I1-PMM
04/27/2024
Filed — Alteration
INSTALL DEBRIS CHUTE AS PER PLANS IN ORDER TO PERFORM FACADE REPAIR. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DEBRIS CHUTE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
B01035527-I1
04/25/2024
Filed — Alteration
Facade repairs. No change in egress, use or occupancy.
B00930343-P1
02/16/2024
Filed — Alteration
Facade repairs. No change in egress, use or occupancy.
B00930343-I1
12/18/2023
Signed off — Alteration
B00148157-I1
11/20/2023
Permit issued — Sidewalk Shed
B00964605-I1-SH
11/18/2023
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00964605-I1
08/31/2023
Filed — Alteration
Structural Work including sistering existing floor joists from 1st to 3rd floor, fire escape repairs at 5 fire escapes as needed.
B00911110-I1
05/10/2023
Permit issued — Sidewalk Shed
B00148157-I1-SH
05/11/2022
Permit issued — Sidewalk Shed
B00148157-I1-SH
05/19/2021
Permit issued — Sidewalk Shed
B00148157-I1-SH
05/14/2020
Permit issued — Sidewalk Shed
B00148157-I1-SH
04/05/2019
Permit issued — Sidewalk Shed
B00148157-I1-SH
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedBK CONSTRUCTION SVCS INC07/31/2026
DOB NOWSidewalk ShedPermit IssuedBK CONSTRUCTION SVCS INC05/07/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/17/2026
DOB NOWSidewalk ShedPermit IssuedBK CONSTRUCTION SVCS INC02/05/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC12/08/2025
DOB NOWStructuralSigned-offFSC D&C LLC11/20/2025
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC11/06/2025
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC07/28/2025
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING07/02/2025
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC06/25/2025
DOB NOWGeneral ConstructionSigned-offPYRAMID ETC COMPANIES, LL03/07/2025
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL11/22/2024
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC11/20/2024
DOB NOWStructuralSigned-offFSC D&C LLC11/08/2024
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC10/22/2024
DOB NOWSidewalk ShedPermit IssuedBK CONSTRUCTION SVCS INC09/26/2024
DOB NOWSuspended ScaffoldPermit IssuedPREMIER CONSTRUCTION INC09/13/2024
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC08/02/2024
DOB NOWPlumbingSigned-offDUAL FUEL PLUBING & HTING07/11/2024
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL07/08/2024
DOB NOWPlumbingSigned-offA & E PLUMBING CORP07/03/2024
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC07/02/2024
DOB NOWProtection and Mechanical MethodsSigned-offPREMIER CONSTRUCTION INC04/29/2024
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC11/20/2023
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC05/10/2023
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC05/11/2022
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC05/19/2021
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC05/14/2020
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC04/05/2019
BISBLISSUEDP.H. WORKS INC05/29/2019
BISPLISSUEDP.H. WORKS INC05/23/2019
BISPLISSUEDP.H. WORKS INC03/06/2018
BISBLISSUEDP.H. WORKS INC03/06/2018
BISBLISSUEDVALENTINI VITO05/24/1996
BISPLISSUEDTOWN COOLING INC05/24/1996
1 project · most recent 10/11/2024
Others
FiledStatusContractorScopeMake / Model / Capacity
10/11/2024Signed-offDUAL FUEL COMPANY LLCOthers
Other
Lifetime Chimney Supply XUL 1 BTU · Chimney ×1
1 project · most recent 12/18/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/18/2025Signed-offDUAL FUEL PLUBING & HTINGGas, Water/Sanitary
8 projects · most recent 06/15/2026
General Wiring
FiledStatusContractorScope
06/15/2026CompleteATLAS-ACON ELEC. SERVICEGeneral Wiring
01/26/2025Permit IssuedZENA ELECTRIC INC—
09/26/2024Permit IssuedHIGH QUALITY ELECTRIC OF—
12/21/2023CompleteLAURA ELEC'L LIGHTING &—
12/02/2023CompleteNASH ELECTRIC SERVICES IN—
04/29/2021CompleteHYLAN DATACOM & ELECL LLC—
09/21/2020CompleteAMIN ELECTRICAL CORP—
03/19/2019CompleteUSA ELECT'L SERVICES CORP—
1 project · most recent 12/02/2025
Steel Concrete Wood
FiledStatusContractorScope
12/02/2025Signed-offFSC D&C LLCSteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/30/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/07/2024Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
12/18/2025Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
12/18/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
12/18/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
12/18/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
12/18/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
12/18/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
12/17/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
12/17/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
12/17/2025Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
12/17/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
12/17/2025Tenant Protection Plan Compliance—special
12/17/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
11/17/2025Structural Wood Frame—progress
11/17/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
11/17/2025Wood – Seismic ResistanceSAMI HAJJAR P.Especial
10/07/2025Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
10/07/2025Structural Steel - DetailsSAMI HAJJAR P.Especial
10/07/2025Structural Steel - WeldingSAMI HAJJAR P.Especial
10/07/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
10/07/2025FinalSAMI HAJJAR P.Eprogress
05/20/2024HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
05/20/2024HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
05/20/2024HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
05/20/2024Maintenance informationSAMI HAJJAR P.Eenergy_progress
04/28/2024MasonrySAMI HAJJAR P.Especial
Latest 25 of 47.
▾Documents — 112 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch21
09/03/2026B00951679-I1Request digital key ↗
08/26/2026B00964605-I1Request digital key ↗
08/25/2026B00930343-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00148157-I1Request digital key ↗
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION3
06/03/2019340588064Open ↗
03/05/2018340588064Open ↗
03/05/2018340588064Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
03/05/2018340588064Open ↗
▸Seals & Professional Certifications40
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/02/2026B00148157-I1Open ↗
08/25/2026B01035527-I1Open ↗
08/24/2026B00951688-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/29/2026B00979843-I1Open ↗
08/28/2026B00978752-I1Open ↗
08/28/2026B00911110-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026B00979843-I1Open ↗
08/28/2026B00911110-P2Open ↗
08/26/2026B00951688-P2Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/05/2018340588064Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/05/2018340588064Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/05/2018340588064Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
08/07/2019340588064Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
03/05/2018340588064Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/05/2018340588064Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
03/05/2018340588064Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/03/2026B00951679-I1Open ↗
08/24/2026B00951688-P1Open ↗
08/24/2026B00951688-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/24/2026B00918187-I1Open ↗
08/24/2026B00978752-I1Open ↗
08/13/2026B00930343-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/05/2018340588064Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/05/2018340588064Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/07/2019340588064Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/07/2019340588064Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/24/2026B00951688-I1Open ↗
▸Approvals, Objections & Sign-offs20
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
09/03/2026B00951679-I1Open ↗
09/02/2026B00148157-I1Open ↗
08/25/2026B01035527-I1Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/07/2019340588064Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/07/2019340588064Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/07/2019340588064Open ↗
03/05/2018340588064Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
03/05/2018340588064Open ↗
▸BISBOROUGH INTAKE FORM1
08/07/2019340588064Open ↗
▸Other Documents4
▸DOB NOWManufacturer's Specifications2
08/13/2026B01105857-P1Open ↗
08/13/2026B01105857-I1Open ↗
▸DOB NOWCalculations2
08/13/2026B01105857-I1Open ↗
08/13/2026B01105857-P1Open ↗