| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| B01214210 ↗ | 710 EAST NEW YORK AVENUE BROOKLYN | Alteration CO | Permit Issued | 11/13/2025 | 09/29/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | Herewith filing ALT1 to correct the existing CoO to include; Conversion of maintenance shop and super's office to a community room, convert … |
| B00911841 ↗ | 1630 PARK PLACE BROOKLYN | Alteration | Signed-off | 09/24/2023 | 07/01/2026 | Filer METROPOLIS GROUP INC | structural work for repair of corroded steel columns in cellar and repairs at rear fire escape all levels as needed. |
| B00911143 ↗ | 1144 LENOX ROAD BROOKLYN | Alteration | Permit Issued | 08/30/2023 | 06/01/2026 | Filer METROPOLIS GROUP INC | STRUCTURAL WORK INCLUDING SISTERING/REPLACE EXISTING WOOD JOIST AT 1ST, 3RD AND 4TH FLOOR, NEW STEEL BEAM AT 1ST FLOOR, STEEL STAIR REPAIR F… |
| 123778233BIS | 321 COLUMBUS AVENUE MANHATTAN | — | ISSUED | 06/28/2019 | 03/24/2026 | — | OT |
| 123811054BIS | 321 COLUMBUS AVENUE MANHATTAN | — | ISSUED | 08/09/2019 | 03/24/2026 | — | OT, PL |
| B00911924 ↗ | 1598 STERLING PLACE BROOKLYN | Alteration | Signed-off | 09/26/2023 | 03/20/2026 | Filer METROPOLIS GROUP INC | STRUCTURAL WORK FOR REPAIR OF BRICK POCKET IN CELLAR AND STRUCTURAL REPAIRS TO ALL EXISTING FIRE ESCAPES AT MULTIPLE LANDING LOCATIONS AS NE… |
| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| B01214210 ↗ | 710 EAST NEW YORK AVENUE BROOKLYN | Alteration CO | Permit Issued | 11/13/2025 | 09/29/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | Herewith filing ALT1 to correct the existing CoO to include; Conversion of maintenance shop and super's office to a community room, convert … |
| B00911841 ↗ | 1630 PARK PLACE BROOKLYN | Alteration | Signed-off | 09/24/2023 | 07/01/2026 | Filer METROPOLIS GROUP INC | structural work for repair of corroded steel columns in cellar and repairs at rear fire escape all levels as needed. |
| B00911143 ↗ | 1144 LENOX ROAD BROOKLYN | Alteration | Permit Issued | 08/30/2023 | 06/01/2026 | Filer METROPOLIS GROUP INC | STRUCTURAL WORK INCLUDING SISTERING/REPLACE EXISTING WOOD JOIST AT 1ST, 3RD AND 4TH FLOOR, NEW STEEL BEAM AT 1ST FLOOR, STEEL STAIR REPAIR F… |
| 123778233BIS | 321 COLUMBUS AVENUE MANHATTAN | — | ISSUED | 06/28/2019 | 03/24/2026 | — | OT |
| 123811054BIS | 321 COLUMBUS AVENUE MANHATTAN | — | ISSUED | 08/09/2019 | 03/24/2026 | — | OT, PL |
| B00911924 ↗ | 1598 STERLING PLACE BROOKLYN | Alteration | Signed-off | 09/26/2023 | 03/20/2026 | Filer METROPOLIS GROUP INC | STRUCTURAL WORK FOR REPAIR OF BRICK POCKET IN CELLAR AND STRUCTURAL REPAIRS TO ALL EXISTING FIRE ESCAPES AT MULTIPLE LANDING LOCATIONS AS NE… |
| B00911144 ↗ | 1145 LENOX ROAD BROOKLYN | Alteration | Signed-off | 08/30/2023 | 03/18/2026 | Filer METROPOLIS GROUP INC | structural work for existing fire escape structural repairs as needed. |
| B00918297 ↗ | 1206 EAST NEW YORK AVENUE BROOKLYN | Alteration | Signed-off | 12/27/2023 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918303 ↗ | 664 RALPH AVENUE BROOKLYN | Alteration | Signed-off | 01/25/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918304 ↗ | 674 RALPH AVENUE BROOKLYN | Alteration | Signed-off | 02/01/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918306 ↗ | 684 RALPH AVENUE BROOKLYN | Alteration | Signed-off | 01/16/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918308 ↗ | 694 RALPH AVENUE BROOKLYN | Alteration | Signed-off | 10/31/2023 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918311 ↗ | 710 EAST NEW YORK AVENUE BROOKLYN | Alteration | Permit Issued | 09/03/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918315 ↗ | 955 RUTLAND ROAD BROOKLYN | Alteration | Signed-off | 03/12/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES AS PER PLANS. … |
| B00918320 ↗ | 2069 UNION STREET BROOKLYN | Alteration | Permit Issued | 03/08/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00918321 ↗ | 2045 UNION STREET BROOKLYN | Alteration | Permit Issued | 03/13/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00918322 ↗ | 2058 UNION STREET BROOKLYN | Alteration | Permit Issued | 03/12/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918338 ↗ | 725 HOWARD AVENUE BROOKLYN | Alteration | Signed-off | 11/02/2023 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00918343 ↗ | 728 HOWARD AVENUE BROOKLYN | Alteration | Signed-off | 07/16/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00918348 ↗ | 170 TAPSCOTT STREET BROOKLYN | Alteration | Signed-off | 06/14/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00918350 ↗ | 175 TAPSCOTT STREET BROOKLYN | Alteration | Signed-off | 07/16/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00918353 ↗ | 184 TAPSCOTT STREET BROOKLYN | Alteration | Permit Issued | 11/01/2023 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00918354 ↗ | 187 TAPSCOTT STREET BROOKLYN | Alteration | Signed-off | 07/16/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00918356 ↗ | 190 TAPSCOTT STREET BROOKLYN | Alteration | Signed-off | 10/31/2023 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00918357 ↗ | 199 TAPSCOTT STREET BROOKLYN | Alteration | Signed-off | 07/16/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00918755 ↗ | 1630 PARK PLACE BROOKLYN | Alteration | Signed-off | 09/13/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918806 ↗ | 1764 STERLING PLACE BROOKLYN | Alteration | Signed-off | 11/13/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918813 ↗ | 537 RALPH AVENUE BROOKLYN | Alteration | Permit Issued | 10/31/2023 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW Sashes. |
| B00919089 ↗ | 234 ROCHESTER AVENUE BROOKLYN | Alteration | Signed-off | 07/16/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00919095 ↗ | 1491 ST JOHNS PLACE BROOKLYN | Alteration | Permit Issued | 09/10/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL GR… |
| B00919099 ↗ | 1506 STERLING PLACE BROOKLYN | Alteration | Permit Issued | 10/31/2023 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00919102 ↗ | 1511 STERLING PLACE BROOKLYN | Alteration | Permit Issued | 09/10/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00919103 ↗ | 1640 STERLING PLACE BROOKLYN | Alteration | Signed-off | 09/10/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00919117 ↗ | 1448 UTICA AVENUE BROOKLYN | Alteration | Permit Issued | 10/31/2023 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00919118 ↗ | 1452 STERLING PLACE BROOKLYN | Alteration | Permit Issued | 10/31/2023 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00919121 ↗ | 1568 STERLING PLACE BROOKLYN | Alteration | Signed-off | 11/13/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00919124 ↗ | 1588 STERLING PLACE BROOKLYN | Alteration | Permit Issued | 11/13/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00919127 ↗ | 1598 STERLING PLACE BROOKLYN | Alteration | Signed-off | 10/10/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00919130 ↗ | 225 BUFFALO AVENUE BROOKLYN | Alteration | Signed-off | 10/10/2024 | 03/18/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918187 ↗ | 104 TAPSCOTT STREET BROOKLYN | Alteration | Signed-off | 06/18/2024 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918189 ↗ | 726 FENIMORE STREET BROOKLYN | Alteration | Signed-off | 01/27/2025 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918192 ↗ | 334 LEFFERTS AVENUE BROOKLYN | Alteration | Signed-off | 01/27/2025 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918286 ↗ | 334 ROCKAWAY PARKWAY BROOKLYN | Alteration | Signed-off | 03/06/2025 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, sink undercoating, DOORS AND WINDOW SA… |
| B00918289 ↗ | 1144 LENOX ROAD BROOKLYN | Alteration | Signed-off | 03/06/2025 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00918292 ↗ | 1145 LENOX ROAD BROOKLYN | Alteration | Signed-off | 03/06/2025 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, sink undercoating, DOORS AND WINDOW SA… |
| B00918749 ↗ | 1624 STERLING PLACE BROOKLYN | Alteration | Permit Issued | 09/13/2024 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918751 ↗ | 1367 ST MARKS AVENUE BROOKLYN | Alteration | Permit Issued | 09/13/2024 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918752 ↗ | 1373 ST MARKS AVENUE BROOKLYN | Alteration | Permit Issued | 10/31/2023 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918754 ↗ | 1629 PARK PLACE BROOKLYN | Alteration | Signed-off | 09/13/2024 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918757 ↗ | 1636 PARK PLACE BROOKLYN | Alteration | Signed-off | 09/13/2024 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00918759 ↗ | 1640 PARK PLACE BROOKLYN | Alteration | Signed-off | 09/13/2024 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00918760 ↗ | 1646 PARK PLACE BROOKLYN | Alteration | Signed-off | 11/13/2023 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00918785 ↗ | 625 GRAFTON STREET BROOKLYN | Alteration | Signed-off | 11/14/2023 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918787 ↗ | 619 HOWARD AVENUE BROOKLYN | Alteration | Permit Issued | 01/22/2024 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918788 ↗ | 25 TAPSCOTT STREET BROOKLYN | Alteration | Permit Issued | 10/31/2023 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918790 ↗ | 25 TAPSCOTT STREET BROOKLYN | Alteration | Signed-off | 03/08/2024 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918791 ↗ | 598 HOWARD AVENUE BROOKLYN | Alteration | Signed-off | 03/08/2024 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918804 ↗ | 1763 STERLING PLACE BROOKLYN | Alteration | Signed-off | 10/31/2023 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918807 ↗ | 504 HOWARD AVENUE BROOKLYN | Alteration | Signed-off | 10/31/2023 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW sashes |
| B00918897 ↗ | 537 RALPH AVENUE BROOKLYN | Alteration | Signed-off | 11/13/2024 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918905 ↗ | 1790 STERLING PLACE BROOKLYN | Alteration | Signed-off | 11/09/2023 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918908 ↗ | 497 HOWARD AVENUE BROOKLYN | Alteration | Signed-off | 11/13/2024 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00918928 ↗ | 2041 PACIFIC STREET BROOKLYN | Alteration | Signed-off | 02/24/2025 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00918929 ↗ | 330 HOWARD AVENUE BROOKLYN | Alteration | Signed-off | 02/24/2025 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00918930 ↗ | 324 HOWARD AVENUE BROOKLYN | Alteration | Signed-off | 02/24/2025 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00918932 ↗ | 333 HOWARD AVENUE BROOKLYN | Alteration | Signed-off | 02/24/2025 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00918937 ↗ | 353 HOWARD AVENUE BROOKLYN | Alteration | Signed-off | 11/08/2023 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00919063 ↗ | 1474 PARK PLACE BROOKLYN | Alteration | Signed-off | 07/16/2024 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. NO WORK IN A… |
| B00919064 ↗ | 1468 PARK PLACE BROOKLYN | Alteration | Signed-off | 07/16/2024 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00919068 ↗ | 1480 PARK PLACE BROOKLYN | Alteration | Signed-off | 07/16/2024 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00919072 ↗ | 208 ROCHESTER AVENUE BROOKLYN | Alteration | Signed-off | 07/16/2024 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00919075 ↗ | 218 ROCHESTER AVENUE BROOKLYN | Alteration | Signed-off | 07/16/2024 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00919079 ↗ | 1521 STERLING PLACE BROOKLYN | Alteration | Signed-off | 07/16/2024 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00919081 ↗ | 1522 STERLING PLACE BROOKLYN | Alteration | Permit Issued | 10/31/2023 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECTREPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00919084 ↗ | 230 ROCHESTER AVENUE BROOKLYN | Alteration | Signed-off | 10/31/2023 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00919094 ↗ | 1463 ST JOHNS PLACE BROOKLYN | Alteration | Permit Issued | 09/23/2024 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL G… |
| B00919237 ↗ | 1685 ST JOHNS PLACE BROOKLYN | Alteration | Signed-off | 11/01/2023 | 03/17/2026 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW sashes. |
| B00911158 ↗ | 684 RALPH AVENUE BROOKLYN | Alteration | Permit Issued | 09/04/2023 | 01/13/2026 | Filer METROPOLIS GROUP INC | Structural work for new interior cold formed steel ramp and repair of existing concrete slab and wood joist as needed at first floor. Front… |
| B00911828 ↗ | 1373 ST MARKS AVENUE BROOKLYN | Alteration | Signed-off | 09/05/2023 | 12/15/2025 | Filer METROPOLIS GROUP INC | Structural work for existing stair repairs at side courtyard repair of corroded steel columns in cellar as needed. |
| B01101681 ↗ | 710 EAST NEW YORK AVENUE BROOKLYN | Alteration | Permit Issued | 11/13/2024 | 12/15/2025 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE REMOVAL OF PARTITIONS, REPLACEMENT OF FINISHES & FIXTURES, INSTALLATION OF PARTITIONS, AS PER PLANS. |
| B01116664 ↗ | 710 EAST NEW YORK AVENUE BROOKLYN | Alteration | Permit Issued | 11/13/2024 | 12/15/2025 | Design SLM ARCHITECTURE, P.C. | WORK SHALL INCLUDE REMOVAL OF PARTITIONS, REPLACEMENT OF FINISHES & FIXTURES, INSTALLATION OF PARTITIONS, AS PER PLANS. |
| B00912928 ↗ | 208 ROCHESTER AVENUE BROOKLYN | Alteration | Signed-off | 09/27/2023 | 11/24/2025 | Filer METROPOLIS GROUP INC | STRUCTURAL WORK FOR REPAIR OF SLAB AT STAIRS IN CELLAR AS NEEDED AND REPAIR OF FACADE BEAMS AT SECOND FLOOR. |
| B00919122 ↗ | 1578 STERLING PLACE BROOKLYN | Alteration | Permit Issued | 11/13/2024 | 11/21/2025 | Design SLM ARCHITECTURE, P.C. Filer METROPOLIS GROUP INC | WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. |
| B00911110 ↗ | 104 TAPSCOTT STREET BROOKLYN | Alteration | Signed-off | 08/31/2023 | 11/20/2025 | Filer METROPOLIS GROUP INC | Structural Work including sistering existing floor joists from 1st to 3rd floor, fire escape repairs at 5 fire escapes as needed. |
| B00911176 ↗ | 955 RUTLAND ROAD BROOKLYN | Alteration | Signed-off | 09/05/2023 | 11/20/2025 | Filer METROPOLIS GROUP INC | Concrete / steel repairs at front fire escapes and balconies, all levels. concrete / steel repairs at parking garage roof slab and new wall… |
| B00911153 ↗ | 674 RALPH AVENUE BROOKLYN | Alteration | Permit Issued | 08/31/2023 | 08/06/2025 | Filer METROPOLIS GROUP INC | structural work for new interior cold formed steel ramp at first floor common area. |
| B00911162 ↗ | 694 RALPH AVENUE BROOKLYN | Alteration | Signed-off | 09/04/2023 | 08/06/2025 | Filer METROPOLIS GROUP INC | Structural work for existing interior ramp extension at first floor and repair of existing fire escape at 2nd floor level as needed. |
| B00911151 ↗ | 664 RALPH AVENUE BROOKLYN | Alteration | Signed-off | 08/30/2023 | 08/05/2025 | Filer METROPOLIS GROUP INC | structural work for new interior cold formed steel ramp and reframing/reinforcing of existing wood joists as needed at first floor common ar… |
| B00911214 ↗ | 2069 UNION STREET BROOKLYN | Alteration | Signed-off | 09/04/2023 | 08/01/2025 | Filer METROPOLIS GROUP INC | structural work for repair of corroded steel columns and brick pocket in cellar as needed. |
| B00911215 ↗ | 2058 UNION STREET BROOKLYN | Alteration | Signed-off | 09/04/2023 | 08/01/2025 | Filer METROPOLIS GROUP INC | Structural work for repair of corroded steel columns in cellar and concrete slab at first floor as needed. |
| B00911248 ↗ | 725 HOWARD AVENUE BROOKLYN | Alteration | Signed-off | 09/04/2023 | 07/31/2025 | Filer METROPOLIS GROUP INC | structural work for fire escape repairs including existing front fire escape at 2nd floor level , all east and west fire escape at all level… |
| B00911812 ↗ | 199 TAPSCOTT STREET BROOKLYN | Alteration | Signed-off | 09/04/2023 | 07/31/2025 | Filer METROPOLIS GROUP INC | Structural work including reinforcing existing wood joists, steel beam repairs at first floor slab and replacing exterior steel stair at rea… |
| B00911825 ↗ | 1367 ST MARKS AVENUE BROOKLYN | Alteration | Signed-off | 09/04/2023 | 07/31/2025 | Filer METROPOLIS GROUP INC | Structural work for existing stairs repairs at side courtyard. |
| B00911824 ↗ | 1624 STERLING PLACE BROOKLYN | Alteration | Signed-off | 09/04/2023 | 07/01/2025 | Structural work for repairs/reinforcing first floor framing. Repairs at rear and south existing fire escape at 4th floor level as needed. | |
| B00911175 ↗ | 710 EAST NEW YORK AVENUE BROOKLYN | Alteration | Signed-off | 09/04/2023 | 03/24/2025 | Filer METROPOLIS GROUP INC | structural work for reinforcement of structural slab below first floor and new ramp in cellar. |
| B00931085 ↗ | 625 GRAFTON STREET BROOKLYN | Alteration | Signed-off | 10/27/2023 | 03/11/2025 | Design SOCOTEC, INC. | Facade repairs. No change in egress, use or occupancy. |
| B00931090 ↗ | 619 HOWARD AVENUE BROOKLYN | Alteration | Signed-off | 10/27/2023 | 03/11/2025 | Design SOCOTEC, INC. | Facade repairs. No change in egress, use or occupancy. |
| B00931126 ↗ | 25 TAPSCOTT STREET BROOKLYN | Alteration | Signed-off | 10/27/2023 | 03/11/2025 | Design SOCOTEC, INC. | Facade repairs. No change in egress, use or occupancy. |
| B00931201 ↗ | 25 TAPSCOTT STREET BROOKLYN | Alteration | Signed-off | 10/27/2023 | 03/11/2025 | Design SOCOTEC, INC. | Facade repairs. No change in egress, use or occupancy. |
| B00931206 ↗ | 598 HOWARD AVENUE BROOKLYN | Alteration | Signed-off | 10/27/2023 | 03/11/2025 | Design SOCOTEC, INC. | Facade repairs. No change in egress, use or occupancy. |
| Name | Jobs together | Most recent |
|---|---|---|
| SLM ARCHITECTURE, P.C. | 74 | 09/16/2026 |
| MADSEN CONSULTING ENGINEERING | 20 | 05/12/2026 |
| SOCOTEC, INC. | 5 | 10/27/2023 |
| CES ENGINEERING LLC | 2 | 12/14/2022 |
| BFS ARCHITECT PC | 1 | 03/20/2020 |
| NY RESTORATION TECHNOLOGY CORP | 1 | 12/07/2022 |
| PROJECT TACTICAL SOLUTIONS, LLC | 1 | 04/26/2023 |
| SKYLINE ENGINEERING, LLC | 1 | 04/26/2023 |
| Name | Jobs together | Most recent |
|---|---|---|
| PYRAMID ETC COMPANIES, LL | 5 | 10/27/2023 |
| BUNA HOME IMPROVEMENT INC | 1 | 04/26/2023 |
| HUDSON PLBG AND HTG CO IN | 1 | 04/26/2023 |
| Name | Jobs together | Most recent |
|---|---|---|
| NYC PACT PRESERVATION PARTNERS | 90 | 09/16/2026 |
| GFB MANAGEMENT | 2 | 11/06/2020 |
| NEW YORK CITY HOUSING AUTHORITY | 2 | 07/09/2025 |
| Name | Jobs together | Most recent |
|---|---|---|
| METROPOLIS GROUP INC | 85 | 09/16/2026 |
| CONVERSANO ASSOCIATES, INC. | 5 | 10/27/2023 |
| KNA CONSULTING INC | 2 | 04/26/2023 |
| QUICK FILING OF NY INC | 1 | 04/26/2023 |