Elevator co-op, conversion from loft/warehouse
Fine Arts
105 HUDSON STREET · BIN 1083366
💬 Discuss this project
1920Year Built
11Stories
D0Building Class
C6-2AZoning
77,635 sfGross Floor Area
40Units
LL97 CoveredRent Stabilized3 Open Violations ▸FISP: SAFE
Elevator co-op, conversion from loft/warehouse · Owner of record: FINE ARTS HOUSING INC · 7,587 sf lot · 10.23 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof2p · 2 filings · 9 docs
Bulkhead1p · 1 filing · 4 docs
Floor 161p · 1 filing · 18 docs
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 1019p · 3 filings · 20 docs
Floor 929p · 1 filing · 20 docs
Floor 8Under Construction37p · 2 filings · 20 docs
Floor 729p · 1 filing · 20 docs
Floor 629p · 1 filing · 20 docs
Floor 5Under Construction43p · 4 filings · 20 docs
Floor 430p · 2 filings · 20 docs
Floor 329p · 1 filing · 20 docs
Floor 229p · 1 filing · 20 docs
Floor 140p · 3 filings · 20 docs
Cellar40p · 4 filings · 20 docs
Sub-Cellar30p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FINE ARTS HOUSING23109/13/2026
BRAS AL CONSTRUCTION1003/22/2026
KYL ELECTRIC LLC203/22/2026
BRASAL CONSTRUCT CORP103/22/2026
JTJ STUDIO203/22/2026
OWNER OF 105 HUDSON ST1103/22/2026
OWNER OF 105 HUDSON103/22/2026
GENE ANDREW BUILDING CORP203/22/2026
OWNER OF 105 HUDSON AVE203/22/2026
GENE ANDREWS BUILD CORP103/22/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHOENIX SUTTON STR INCGeneral Contractor1207/08/2026
INTERIORS BY AJ LTDGeneral Contractor807/08/2026
JTJ STUDIO CORPGeneral Contractor507/08/2026
JRR CONTRACTING INCGeneral Contractor507/08/2026
AERIAL DESIGN BUILD SVCSGeneral Contractor407/08/2026
MUHAN SPACE CORPGeneral Contractor303/21/2026
C/ZONE, INCGeneral Contractor303/21/2026
ARCON PLBG SOLUTIONSPlumbing307/08/2026
FREEDOM GS INCGeneral Contractor307/08/2026
LICO CONTRACTING INCGeneral Contractor307/08/2026
FORTE EXPRESS P & H INCPlumbing207/08/2026
CADOGAN, JOELElectrical203/21/2026
CLIFFORD, NICHOLASElectrical203/21/2026
EDSON HTNG & COOLING LLCGeneral Contractor207/08/2026
HEADWATER CONTRACTING LTDGeneral Contractor203/21/2026
ACCURATE MECHANICAL INCPlumbing209/13/2026
BABICH, ETTOREElectrical203/21/2026
CROSSFIELD PLBG.&HTG.CORPFire Protection107/08/2026
HAMILTON AIR COMPANY, INC.General Contractor107/08/2026
BEK PLBG & HTG LLCPlumbing106/28/2026
WARREN OSTROFFElectrical103/21/2026
JC HI TECH INCGeneral Contractor107/08/2026
SOOKDEO, SEECHANDElectrical103/21/2026
SCHWARTZ, IRVINGElectrical103/21/2026
JOSEPH SGROIElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JMV CONSULTING ENGINEERIN804505/12/2026
SKYLINE ENGINEERING, PLLC267709/25/2025
ALL CITY ENGINEERING PC7115103/27/2025
ANDREW GOODRICH, P.E., PL965112/11/2024
METROSPEC SIA6420109/12/2024
CATALPA SPECIAL INSPECTIO20041305/29/2024
GEORGE J. XERAKIAS, PE1658204/08/2024
MEP INSPECTIONS, INC1102401/17/2024
VICTOR SUBEN6672111/29/2023
ENTHINK ENGINEERS LLC6247108/23/2023
Building Lifecycle
All (300)Filed (47)Permit Issued (50)Signed Off (23)Facade (FISP) (16)Violation (29)Inspection (26)Objection (79)Special Inspection (30)
09/11/2026
Permit issued — Plumbing
M01016237-S1-PL
08/25/2026
Filed — Alteration
Gas work to include relocation of 1 gas range . Plumbing work to include : relocation of 1 kitchen sink, 1 DW, 1 washer/dryer, 2 toilets, 2 lavs, 1 tub and 1 shower; Addition of: 1 toilet, 1 lav , 1 tub , 1 shower
M01016237-P2
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
08/25/2026
Special inspection requirement — Final
Matthew Wavro
08/25/2026
Special inspection requirement — Mechanical Systems
Matthew Wavro
05/29/2026
Permit issued — Mechanical Systems
M01109132-I1-MS
05/26/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
05/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Vuto
05/14/2026
Signed off — Alteration
Renovation of apartment 5N. Architectural work as per plans. Mechanical and plumbing work filed separately. No change of use, occupancy or egress.
M01109126-I1
05/12/2026
Filed — Alteration
Plumbing work filed in conjunction with the renovation of an existing apartment. Architectural and mechanical work filed under separate applications. No change of use, occupancy or egress.
M01109141-P1
05/06/2026
Permit issued — General Construction
M01109126-I1-GC
04/13/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Vuto
02/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/07/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
12/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/31/2025
Objection resolved — Addressed
10/28/2025
Objection raised — Structural
10/28/2025
Objection raised — Mechanical
09/25/2025
Filed — Alteration
M00447296-P1
09/23/2025
Filed — Alteration
Plumbing work as shown on plans for Unit #305 (3rd floor)
M01236711-S1
09/23/2025
Filed — Alteration
Plumbing work as shown on plans for Unit #305 (3rd floor)
M01236711-I1
09/02/2025
Permit issued — General Construction
M01109126-I1-GC
08/19/2025
Special inspection requirement — Final
Joseph Vuto
08/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Vuto
08/19/2025
Special inspection requirement — Mechanical Systems
Joseph Vuto
08/06/2025
Filed — Alteration
Mechanical work filed in conjunction with the renovation of an existing apartment. Architectural and plumbing work filed under separate applications. No change in use, occupancy or egress.
M01109132-P1
08/01/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/24/2025
Signed off — Alteration
MODIFY EXISTING MECHANICAL SYSTEM FOR RESTAURANT. NO CHANGE OF EGRESS, USE AND OCCUPANCY.
M01189265-I1
06/16/2025
Signed off — Alteration
M00776757-I1
06/03/2025
Permit issued — Mechanical Systems
M01189265-I1-MS
05/23/2025
Permit issued — Mechanical Systems
M01109132-I1-MS
05/02/2025
Signed off — Alteration
M01097484-I1
04/10/2025
Objection resolved — Addressed
04/10/2025
Objection resolved — Addressed
04/10/2025
Objection resolved — Addressed
04/09/2025
Objection raised — Zoning
04/09/2025
Objection raised — Scope
04/09/2025
Objection raised — Other
03/27/2025
Filed — Alteration
MODIFY EXISTING MECHANICAL SYSTEM FOR RESTAURANT. NO CHANGE OF EGRESS, USE AND OCCUPANCY.
M01189265-I1
03/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
Zhao Deng
03/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Zhao Deng
03/19/2025
Special inspection requirement — Post-installed Anchors
Zhao Deng
03/14/2025
Permit issued — Plumbing
M01109141-I1-PL
03/12/2025
Permit issued — General Construction
M01109126-I1-GC
03/05/2025
Permit issued — Mechanical Systems
M01109132-I1-MS
03/04/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M08037011-I1
03/03/2025
Special inspection requirement — Mechanical Systems
Zhao Deng
03/03/2025
Special inspection requirement — Final
Zhao Deng
02/24/2025
Objection raised — Scope
02/24/2025
Objection resolved — Addressed
02/21/2025
Objection resolved — Addressed
02/11/2025
Objection resolved — Addressed
02/09/2025
Objection raised — Scope
02/06/2025
Objection raised — Scope
02/05/2025
Permit issued — General Construction
M01097484-I1-GC
02/04/2025
Filed — Alteration
Renovation of apartment 5N. Architectural work as per plans. Mechanical and plumbing work filed separately. No change of use, occupancy or egress.
M01109126-I1
02/04/2025
Filed — Alteration
Mechanical work filed in conjunction with the renovation of an existing apartment. Architectural and plumbing work filed under separate applications. No change in use, occupancy or egress.
M01109132-I1
02/04/2025
Filed — Alteration
Plumbing work filed in conjunction with the renovation of an existing apartment. Architectural and mechanical work filed under separate applications. No change of use, occupancy or egress.
M01109141-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedACCURATE MECHANICAL INC09/11/2026
DOB NOWMechanical SystemsPermit IssuedINTERIORS BY AJ LTD05/29/2026
DOB NOWGeneral ConstructionSigned-offINTERIORS BY AJ LTD05/06/2026
DOB NOWGeneral ConstructionSigned-offINTERIORS BY AJ09/02/2025
DOB NOWMechanical SystemsSigned-offDNJ INDUSTRIES INC06/03/2025
DOB NOWMechanical SystemsPermit IssuedINTERIORS BY AJ05/23/2025
DOB NOWPlumbingSigned-offBEK PLBG & HTG LLC03/14/2025
DOB NOWGeneral ConstructionPermit IssuedINTERIORS BY AJ03/12/2025
DOB NOWMechanical SystemsPermit IssuedINTERIORS BY AJ03/05/2025
DOB NOWGeneral ConstructionSigned-offDELPHI CONSTRUCTION CORP02/05/2025
DOB NOWMechanical SystemsSigned-offJC HI TECH INC12/18/2024
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC12/09/2024
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC11/06/2024
DOB NOWGeneral ConstructionPermit IssuedFREEDOM GS10/28/2024
DOB NOWGeneral ConstructionSigned-offJRR CONTRACTING INC10/02/2024
DOB NOWProtection and Mechanical MethodsSigned-offPHOENIX SUTTON STR INC09/17/2024
DOB NOWGeneral ConstructionSigned-offJRR CONTRACTING INC07/29/2024
DOB NOWGeneral ConstructionSigned-offJTJ STUDIO CORP05/02/2024
DOB NOWGeneral ConstructionPermit IssuedFREEDOM GS04/09/2024
DOB NOWPlumbingPermit IssuedANTHONY DISABATO04/09/2024
DOB NOWSuspended ScaffoldSigned-offJRR CONTRACTING INC03/25/2024
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC12/12/2023
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC11/15/2023
DOB NOWMechanical SystemsSigned-offEDSON HTNG & COOLING LLC10/11/2023
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS10/03/2023
DOB NOWStructuralSigned-offJRR CONTRACTING INC09/19/2023
DOB NOWProtection and Mechanical MethodsSigned-offPHOENIX SUTTON STR INC09/19/2023
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG.CORP09/06/2023
DOB NOWGeneral ConstructionSigned-offJRR CONTRACTING INC08/18/2023
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG08/18/2023
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC08/14/2023
DOB NOWGeneral ConstructionPermit IssuedJTJ STUDIO CORP08/03/2023
DOB NOWGeneral ConstructionSigned-offJRR CONTRACTING INC08/02/2023
DOB NOWStructuralSigned-offMUHAN SPACE CORP07/14/2023
DOB NOWMechanical SystemsSigned-offEDSON HTNG & COOLING LLC07/14/2023
DOB NOWPlumbingSigned-offDOUG'S PLBG & HTG SERV CO05/17/2023
DOB NOWSprinklersSigned-offDOUG'S PLBG & HTG SERV CO04/21/2023
DOB NOWGeneral ConstructionSigned-offJTJ STUDIO CORP01/19/2023
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC11/18/2022
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS10/14/2022
+ 60 more permits on file
2 projects · most recent 08/06/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/06/2025Permit IssuedINTERIORS BY AJ LTDAir Conditioning Systems, Ventilation Systems
Cooling
Carrier FV4CNF003 28,200 BTU · Fan Coil Indoor ×8
RH2-M 494 CFM ×2
National Comfort NCP4303000B 27,000 BTU · Condensing Unit ×6
Ventilation
Greenheck CSP-A125 75 CFM · Exhaust Fan ×2
CSP-A200 50 CFM · Exhaust Fan ×2
CSP-A250 50 CFM · Exhaust Fan ×2
05/29/2024Signed-offEDSON HTNG & COOLING LLCAir Conditioning Systems, Ventilation Systems
Cooling
Sigma SDSH120C2 120,000 BTU · Wshp ×4
SDSH024C2 24,500 BTU · Wshp ×1
Ventilation
Econ-Air EA4-D.1000-30D 8,000 CFM · Makeup Air ×1
1 project · most recent 05/29/2024
Sprinkler System
FiledStatusContractorScope
05/29/2024Signed-offCROSSFIELD PLBG.&HTG.CORPSprinkler System
4 projects · most recent 08/25/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/25/2026Permit IssuedACCURATE MECHANICAL INCGas, Water/Sanitary
05/12/2026Signed-offBEK PLBG & HTG LLCGas, Water/Sanitary
09/23/2025——Water/Sanitary
05/29/2024Signed-offAP PLUMBING & HVAC LLCGas, Water/Sanitary
13 projects · most recent 05/29/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
05/29/2026CompleteE & M ELECTRICAL NY CORPGeneral Wiring
03/14/2025CompleteNY CITY ELECTRIC INCGeneral Wiring
05/01/2024CompleteKYL ELECTRIC LLC1 meters
02/28/2024CompleteKYL ELECTRIC LLCGeneral Wiring
05/16/2023Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
03/12/2023CompleteKYL ELECTRIC LLC—
11/08/2022CompleteELPO ELECTRICAL CONTG INC—
10/20/2022CompleteJOSEPH SGROI & SONS, INC.General Wiring
12/24/2021CompleteBANNER ELECTRIC INCGeneral Wiring
12/05/2021Permit IssuedAE ELECTRIC INCGeneral Wiring
08/20/2021CompleteATTRACTIVE LIGHTING ELECLGeneral Wiring
08/24/2019CompleteJ & F ELECL CONTNG INCHVAC Wiring
05/23/2018Permit IssuedEIS ELECTRIC CORP DBAGeneral Wiring
1 project · most recent 05/29/2024
Steel
FiledStatusContractorScope
05/29/2024Signed-offEDSON HTNG & COOLING LLCSteel
▾Field Inspections (DOB CAP) — 26
DateTypeResultReport
05/26/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
04/13/2026Fail-Final General Construction Non-Directive 14FailView ↗
02/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/07/2026Pass-Final PL - UndergroundPassView ↗
12/30/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/01/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/29/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/30/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/24/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/11/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/13/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/08/2023Fail-Final CND-Occupancy InspectionFailView ↗
09/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/09/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/05/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/07/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
Latest 25 of 26.
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
08/25/2026Fire-Resistant Penetrations and JointsMatthew Wavrospecial
08/25/2026FinalMatthew Wavroprogress
08/25/2026Mechanical SystemsMatthew Wavrospecial
05/26/2026Fire-Resistant Penetrations and JointsJoseph Vutospecial
03/31/2026Fire-Resistant Penetrations and JointsJoseph Vutospecial
08/19/2025Fire-Resistant Penetrations and JointsJoseph Vutospecial
08/19/2025Mechanical SystemsJoseph Vutospecial
08/19/2025FinalJoseph Vutoprogress
03/27/2025Tenant Protection Plan ComplianceZhao Dengspecial
03/19/2025Post-installed AnchorsZhao Dengspecial
03/19/2025Fire-Resistant Penetrations and JointsZhao Dengspecial
03/03/2025Mechanical SystemsZhao Dengspecial
03/03/2025FinalZhao Dengprogress
02/03/2025Fire-Resistance Rated ConstructionDanielle Albertprogress
02/03/2025FinalDanielle Albertprogress
02/03/2025Post-installed AnchorsJoseph Vutospecial
12/04/2024Duct leakage testing, insulation and designANDREW GOODRICHenergy_progress
12/04/2024Maintenance informationANDREW GOODRICHenergy_progress
12/04/2024Fire-Resistant Penetrations and JointsANDREW GOODRICHspecial
12/04/2024Energy Code Compliance InspectionsANDREW GOODRICHprogress
12/04/2024Fire-Resistance Rated ConstructionANDREW GOODRICHprogress
12/04/2024HVAC-R and service water heating system controlsANDREW GOODRICHenergy_progress
12/04/2024HVAC-R and service water heating equipmentANDREW GOODRICHenergy_progress
12/04/2024HVAC-R and service water piping design and insulationANDREW GOODRICHenergy_progress
11/26/2024FinalANDREW GOODRICHprogress
Latest 25 of 79.
▾Documents — 802 on file (BIS + DOB NOW)
▸Plans & Drawings39
▸DOB NOWPlans/Sketch31
09/02/2026M00642205-I1Request digital key ↗
09/02/2026M00642204-I1Request digital key ↗
09/02/2026M00703433-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/03/2026M00447296-P1Request digital key ↗
09/03/2026M00447296-I1Request digital key ↗
08/21/2026M00447296-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/03/2026M00447290-P1Request digital key ↗
08/14/2026M00447290-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/29/2026M00923754-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/14/2026M00447279-I1Request digital key ↗
▸Applications & Permits165
▸BISWORK PERMIT APPLICATION68
06/04/2019123228854Open ↗
01/11/2019123417640Open ↗
01/11/2019123417640Open ↗
Showing 3 of 68 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION68
04/06/2021123228854Open ↗
03/24/2021123228854Open ↗
03/17/2021123228854Open ↗
Showing 3 of 68 on file for this type
▸DOB NOWLPC Approval/Permit29
09/02/2026M00539519-P1Open ↗
09/02/2026M00539519-I1Open ↗
08/27/2026M01016237-P2Open ↗
Showing 3 of 29 on file for this type
▸Seals & Professional Certifications206
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION86
08/15/2019121232709Open ↗
08/15/2019121232709Open ↗
08/15/2019121232709Open ↗
Showing 3 of 86 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature37
09/02/2026M07996421-I1Open ↗
09/02/2026M07996421-I1Open ↗
09/01/2026M01109126-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature35
09/03/2026M00447279-I1Open ↗
09/02/2026M00642203-I1Open ↗
09/02/2026M00642205-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/02/2026M07996421-I1Open ↗
09/01/2026M01109126-I1Open ↗
09/01/2026M01109126-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
03/17/2021123228854Open ↗
01/07/2019123417640Open ↗
01/17/2018123228854Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
01/07/2019123417640Open ↗
01/17/2018123228854Open ↗
11/13/2017140715796Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/13/2017140715796Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/13/2017140715796Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment44
▸BISSCHEDULE B - PLUMBING14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSELF-CERT PLUMBING NOTICE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
01/07/2019123417640Open ↗
11/08/2018123228854Open ↗
11/05/2018123228854Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS4
08/06/2021123228854Open ↗
Showing 1 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT2
08/06/2021123228854Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/07/2019123417640Open ↗
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes8
01/07/2019123417640Open ↗
08/29/2017121232709Open ↗
07/27/2017123348653Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWStreet Tree Checklist2
08/13/2026M07996421-I1Open ↗
08/13/2026M07996421-P7Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos60
▸DOB NOWDEP ACP-5: Asbestos Assessment Report26
09/02/2026M00642205-I1Open ↗
09/02/2026M00539519-P1Open ↗
09/02/2026M00539519-I1Open ↗
Showing 3 of 26 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
01/07/2019123417640Open ↗
08/09/2018121704977Open ↗
08/02/2018121704977Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/31/2026M00838170-I1Open ↗
08/13/2026M00846310-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
09/01/2017121232709Open ↗
▸Energy Compliance36
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
02/21/2018123228854Open ↗
06/30/2017121231611Open ↗
06/27/2017121231602Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
11/13/2020121704977Open ↗
05/16/2017121785434Open ↗
Showing 2 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/02/2026M00539519-I1Open ↗
08/13/2026M00703433-I1Open ↗
Showing 2 of 3 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE2
01/07/2019123417640Open ↗
07/26/2017121231602Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/25/2021123228854Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY7
06/25/2021123228854Open ↗
01/07/2021121704977Open ↗
01/07/2021121704977Open ↗
Showing 3 of 7 on file for this type
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
04/04/2018123348653Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs82
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST29
06/25/2021123228854Open ↗
04/27/2021121704977Open ↗
08/15/2019121232709Open ↗
Showing 3 of 29 on file for this type
▸BISLANDMARKS APPROVAL20
01/08/2019123417640Open ↗
01/17/2018123228854Open ↗
11/13/2017140715796Open ↗
Showing 3 of 20 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWLandmark Approval3
08/13/2026M07996421-P7Open ↗
08/13/2026M07996421-S5Open ↗
08/13/2026M07996421-S1Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
07/05/2017121231611Open ↗
06/30/2017121231611Open ↗
▸BISLANDMARKS SIGNOFF1
12/05/2018121232709Open ↗
▸BISThird Party Electrical Signoff Compliance Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEMERGENCY RESPONSE AGENCY NOTIFICATION PRIOR TO APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership52
▸BISCOST AFFIDAVIT49
06/25/2021123228854Open ↗
04/27/2021121704977Open ↗
08/15/2019121232709Open ↗
Showing 3 of 49 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTEEL AFFIDAVIT- FINAL1
06/30/2017121231611Open ↗
▸Filing & Intake Forms66
▸BISEFILING COVER SHEET30
01/07/2019123417640Open ↗
01/17/2018123228854Open ↗
01/17/2018123228854Open ↗
Showing 3 of 30 on file for this type
▸BISADDITIONAL INFORMATION17
04/06/2021123228854Open ↗
03/17/2021123228854Open ↗
06/17/2019123228854Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM16
08/15/2019121232709Open ↗
11/08/2018123228854Open ↗
11/05/2018123228854Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
11/13/2017140715796Open ↗
Showing 1 of 3 on file for this type
▸Other Documents30
▸DOB NOWProof of Historic Building16
08/14/2026M00642203-I1Open ↗
08/13/2026M00776757-I1Open ↗
08/13/2026M00838170-I1Open ↗
Showing 3 of 16 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
01/17/2018123228854Open ↗
01/17/2018123228854Open ↗
12/13/2017140583820Open ↗
Showing 3 of 7 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
08/13/2026M01023864-I1Open ↗
08/13/2026M01023864-P1Open ↗
▸BISPLOT DIAGRAM1
06/30/2017121231611Open ↗