← Back
BuildNYC
Elevator cooperative
Inwood Tower
11 FORT GEORGE HILL · BIN 1064066
💬 Discuss this project
1963Year Built
21Stories
D4Building Class
R7-2Zoning
201,206 sfGross Floor Area
169Units
LL97 CoveredRent Stabilized13 Active Violations 12 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: Inwood Towers · 61,675 sf lot · 3.26 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsMetro Management Dev.2 filings
Floor 1Metro Management1 filing · 2 docs
CellarMetro Management4p · 2 filings · 2 docs
Site & exteriorIPNA facade repairs3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Inwood Tower1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Lawless & Mangione1202/16/2024
Mohammad Ahead, PE102/14/2022
Baileys Engineering108/13/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingGeneral Contractor303/21/2026
Dynamix Scaffold GroupScaffold307/08/2026
National Mechanical Services PlumbingPlumbing207/08/2026
Systems 2000 Plumbing ServicesPlumbing207/08/2026
AM&G Waterproofingspecialty_contractor207/08/2026
The Metro Group ElectricElectrical303/22/2026
Proto Construction DevlmntGeneral Contractor203/21/2026
Galicia ContractingGeneral Contractor203/21/2026
Universal Fire SprinklerFire Protection107/08/2026
Rockledge ScaffoldGeneral Contractor103/21/2026
Galicia ContractingScaffold107/08/2026
Emg Industrial Chimneyspecialty_contractor107/08/2026
Arco SpacesGeneral Contractor306/23/2021
CC Controlled PlumbingPlumbing112/16/2016
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Special Testing & Consulting16881002/16/2024
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
09/29/2026
Elevator Category 1 inspection report filed
09/15/2026
Closed: Failed to file FISP cycle 9B technical report by 2/21/2023
DOB violation · closed on the city's record
01/14/2026
Boiler inspection report filed
Initial · no defects · Accepted
06/02/2025
§ 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of…
HPD violation · closed
217 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSystems 2000 Plumbing Services11/06/2023
DOB NOWPlumbingSigned-offNational Mechanical Services Plumbing08/01/2023
DOB NOWSprinklersSigned-offUniversal Fire Sprinkler07/08/2023
DOB NOWGeneral ConstructionSigned-offAM&G Waterproofing03/13/2023
DOB NOWSidewalk ShedSigned-offDynamix Scaffold Group02/13/2023
DOB NOWBoiler EquipmentSigned-offRichard Mortman09/30/2022
DOB NOWMechanical SystemsSigned-offEmg Industrial Chimney08/04/2022
DOB NOWBoiler EquipmentSigned-offRichard Mortman08/02/2022
DOB NOWPlumbingSigned-offSystems 2000 Plumbing Services07/28/2022
DOB NOWPlumbingSigned-offNational Mechanical Services Plumbing07/05/2022
DOB NOWGeneral ConstructionSigned-offAM&G Waterproofing04/12/2022
DOB NOWSidewalk ShedSigned-offDynamix Scaffold Group02/15/2022
DOB NOWConstruction FencePermit IssuedGalicia Contracting08/23/2018
BISOTISSUEDGalicia Contracting11/22/2022
BISOTISSUEDGalicia Contracting07/20/2021
BISOTISSUEDArco Spaces06/23/2021
BISOTISSUEDGalicia Contracting12/09/2020
BISOTISSUEDArco Spaces11/12/2020
BISOTISSUEDArco Spaces06/14/2019
BISOTISSUEDGalicia Contracting07/20/2018
BISPLISSUEDCC Controlled Plumbing12/16/2016
BISFBISSUEDC C Controlled Combustion12/16/2016
BISOTISSUEDGalicia Contracting07/28/2015
BISOTISSUEDGalicia Contracting03/13/2015
BISEQISSUEDSpring Scaffolding01/13/2015
BISOTISSUEDGalicia Contracting12/15/2014
BISEQISSUEDSpring Scaffolding10/23/2014
BISOTISSUEDGalicia Contracting07/18/2014
BISEQISSUEDGalicia Contracting05/16/2014
BISOTISSUEDGalicia Contracting03/18/2014
BISEQISSUEDSpring Scaffolding01/03/2014
BISEQISSUEDSpring Scaffolding01/18/2013
BISEQISSUEDSpring Scaffolding05/09/2012
BISEQISSUEDRockledge Scaffold03/30/2004
BISOTISSUEDProto Construction & Devlmnt03/19/2001
BISEQISSUEDProto Construction & Devlmnt01/04/2001
BISEQISSUEDProto Construction & Devlmnt07/27/2000
BISFSISSUEDDouglas Simmons09/12/1997
BIS—ISSUEDSummit Waterproffing06/12/1992
BIS—ISSUEDSummit Waterproffing10/29/1991
+ 1 more permits on file
10 projects · most recent 04/10/2025
General Wiring
FiledStatusContractorScope
04/10/2025CompleteThe Metro Group ElectricGeneral Wiring
01/31/2024CompleteStar Electrical Contractors—
10/18/2023CompleteThe Metro Group ElectricGeneral Wiring
10/31/2022CompleteThe Metro Group Electric—
10/06/2022CompleteThe Metro Group Electric—
08/10/2022CompleteThe Metro Group Electric—
08/10/2022CompleteThe Metro Group Electric—
03/22/2022CompleteHigh Quality Electric—
03/15/2022CompleteResponse Electric—
03/14/2022CompleteResponse Electric—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/26/2023Pass-Final Boiler Equipment InspectionPassView ↗
07/25/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/21/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/21/2023Certified Sprinkler - SP - RoughingCertifiedView ↗
01/18/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/03/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
12/20/2022Pass-Final PL - More than 10 Requested FloorsPassView ↗
11/23/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
02/16/2024Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
02/13/2024Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
09/06/2023Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
08/10/2023Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
06/20/2023HVAC-R and service water piping design and insulationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
06/20/2023Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
06/20/2023Heating SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
06/20/2023HVAC-R and service water heating equipmentSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
06/20/2023HVAC-R and service water heating system controlsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
06/20/2023Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
06/28/2022Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
02/10/2022Fenestration air leakageWilliam Struthenergy_progress
11/10/2021Structural Stability – Alterations of existing buildingsSEBASTIAN SETTEDUCATE JR., P.Especial
11/10/2021MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
11/10/2021FinalWilliam Struthprogress
11/10/2021Energy Code Compliance InspectionsWilliam Struthprogress
11/10/2021Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
169 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account