← Back
Office, 20+ stories, with or without commercial
80 Pine Street
110 MAIDEN LANE · BIN 1000880
💬 Discuss this project
1961Year Built
38Stories
O4Building Class
C5-5Zoning
1,104,184 sfGross Floor Area
70Units
LL97 Covered5 Open Violations ▸FISP: SAFEFDNY Report ↗
Office, 20+ stories, with or without commercial · Owner of record: PINE RE LLC · 48,946 sf lot · 22.56 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof3p · 2 filings · 20 docs
Bulkhead7p · 4 filings · 20 docs
Floor 385p · 2 filings · 20 docs
Floor 37
Floor 367p · 2 filings · 9 docs
Floor 356p · 4 filings · 20 docs
Floor 343p · 2 filings · 13 docs
Floor 33
Floor 325p · 3 filings · 9 docs
Floor 31Under Construction6p · 4 filings · 19 docs
Floor 308p · 4 filings · 20 docs
Floor 29
Floor 28
Floor 27
Floor 265p · 4 filings · 20 docs
Floor 25
Floor 24
Floor 23Under Construction13p · 8 filings · 20 docs
Floor 2210p · 7 filings · 20 docs
Floor 2110p · 7 filings · 20 docs
Floor 2013p · 8 filings · 20 docs
Floor 1915p · 10 filings · 20 docs
Floor 18Under Construction11p · 9 filings · 20 docs
Floor 17Under Construction13p · 10 filings · 20 docs
Floor 16Under Construction80p · 5 filings · 20 docs
Floor 15Under Construction86p · 6 filings · 20 docs
Floor 14Under Construction86p · 6 filings · 20 docs
Floor 13Under Construction92p · 9 filings · 20 docs
Floor 12Under Construction51p · 4 filings · 20 docs
Floor 11Under Construction70p · 11 filings · 20 docs
Floor 10Under Construction67p · 10 filings · 20 docs
Floor 9Under Construction65p · 7 filings · 20 docs
Floor 8Under Construction93p · 10 filings · 20 docs
Floor 7Under Construction68p · 9 filings · 20 docs
Floor 6Under Construction107p · 10 filings · 20 docs
Floor 5Under Construction107p · 9 filings · 20 docs
Floor 4Under Construction89p · 9 filings · 20 docs
Floor 3Under Construction164p · 13 filings · 20 docs
Floor 2Under Construction156p · 13 filings · 20 docs
Floor 1Under Construction91p · 7 filings · 20 docs
Mezzanine21p · 1 filing · 13 docs
Cellar22p · 2 filings · 20 docs
Basement9p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP809/01/2026
BUSHBURG BUILDERS7007/17/2026
RUDIN MANAGEMENT71507/08/2026
110 WALL STREET1707/08/2026
PINE RE LLC103/22/2026
TARGET CONSTRUCTION103/22/2026
80 PINE10003/22/2026
JRM CONSTRUCTION MGMT503/22/2026
BENCHMARK BUILDERS103/22/2026
RUDDIN MANAGEMENT CORP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/06/2024$160.0M—80 PINE LLC → PINE RE LLC$145/sf building
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DVA Advisors4903/21/2026
WILLIAM VITACCO ASSOCIATES2003/21/2026
GREEN LIGHT EXPEDITING LLC6803/21/2026
JM ZONING, LLC.3203/21/2026
AE DESIGN SOLUTION603/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
RIZZO GROUP803/21/2026
LOUIS STRIAR1203/21/2026
WILLIAM VITTACO ASSOCIATES1103/21/2026
JAM CONSULTANTS, INC.1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRM CONSTRUCTION MGMT LLCGeneral Contractor4607/08/2026
TARGET CONSTRUCTION LLCGeneral Contractor1707/08/2026
JAMES E FITZGERALD INCGeneral Contractor1607/08/2026
SAFWAY ATLANTIC, LLCGeneral Contractor807/08/2026
RETAIL PROJECT MANGEMENTGeneral Contractor707/08/2026
COGEN ELEC'L SERVICES,INCElectrical703/22/2026
TOWER FIRE PROTECTION INCFire Protection707/08/2026
A + SPRINKLER CORPFire Protection607/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor609/01/2026
CLUNE CONSTRUCTION CO LPGeneral Contractor607/08/2026
A PLUS PLUMBING CORPPlumbing607/08/2026
ON-TRAC CONSTRUCTION ASSOGeneral Contractor404/09/2026
HUNTER ROBERTS CONSTRUCTIONGeneral Contractor407/08/2026
A & M WARSHAW PLBG & HTGPlumbing407/08/2026
BENCHMARK BUILDERS LLCGeneral Contractor404/09/2026
SAFETY FIRE SPRINKLER CORPFire Protection407/17/2026
TEAM ELECTRIC, INCElectrical303/22/2026
CHARLES TRILIVASElectrical303/21/2026
SIRINA FIRE PROT CORPFire Protection307/08/2026
TRISTATE PLBG SVCS CORPPlumbing307/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor307/08/2026
PAR PLUMBING CO., INCPlumbing307/08/2026
ALLSTATE SPRINKLER LLCFire Protection207/08/2026
THOMPSON MICHAELElectrical203/21/2026
MARLIN MECHANICAL INCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91681607/10/2026
YOU GAO9407207/10/2026
PROJECT TACTICAL SOLUTION5859105/28/2026
BIG APPLE GROUP NY, LLC1258205/08/2025
SOCOTEC ENGINEERING4983106/05/2024
CROSSCHECK INSPECTION SER54411010/03/2023
ETI CONSULTANTS LLC7694202/01/2022
LORING CONSULTING ENGINEE3311509/01/2020
Building Lifecycle
All (300)Filed (70)Permit Issued (80)Signed Off (36)Violation (10)Inspection (60)Objection (14)Special Inspection (30)
08/31/2026
Permit issued — Sidewalk Shed
M01192583-I1-SH
08/24/2026
Permit issued — Sign
M01428411-I1-SG
07/28/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/16/2026
Permit issued — Sprinklers
M01110829-S6-EW-SP
07/15/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SOORJBALLY HARILALL
07/15/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
SOORJBALLY HARILALL
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
07/15/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
SOORJBALLY HARILALL
07/15/2026
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
07/15/2026
Special inspection requirement — Sprayed fire-resistant materials
SOORJBALLY HARILALL
07/15/2026
Special inspection requirement — Luminous Exit Path Markings
SOORJBALLY HARILALL
07/10/2026
Filed — Alteration
ERECT AN NON-ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01428411-P1
07/10/2026
Filed — Alteration
ERECT AN NON-ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01428411-I1
07/10/2026
Filed — Alteration CO
Structural work for Alt CO as per plans filed.
M01110829-P9
07/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
You Gao
07/10/2026
Special inspection requirement — Final
You Gao
07/09/2026
Objection raised — Cost
07/09/2026
Objection raised — Inspections
07/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/24/2026
Permit issued — General Construction
M01376401-I1-GC
06/17/2026
Filed — Alteration
EXTERIOR WINDOW REMOVAL AND REPLACEMENT ON FLOORS 17, 18 AND 19 ONLY. NO CHANGE IN OCCUPANCY, USE OR EGRESS. EXISTING CURTAIN WALL SYSTEM AND SPANDREL GLASS TO REMAIN.
M01412641-I1
06/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/17/2026
Special inspection requirement — Air barrier - visual inspection
06/17/2026
Special inspection requirement — Fenestration air leakage
06/17/2026
Special inspection requirement — Fenestration areas
06/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/15/2026
Special inspection requirement — Preliminary
06/15/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
06/08/2026
Permit issued — Sidewalk Shed
M01192583-I1-SH
06/01/2026
Permit issued — General Construction
M01398143-I1-GC
05/28/2026
Filed — Alteration
INTERIOR RENOVATION OF OFFICE SPACE ON THE 31ST FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01398143-I1
05/26/2026
Permit issued — Construction Fence
M01205272-I1-FN
05/15/2026
Permit issued — Structural
M01110829-S1-ST
05/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/06/2026
Inspection — Pass CND-Occupancy Inspection
Pass
View inspection ↗
05/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
05/06/2026
Special inspection requirement — Final
Max Lee
05/05/2026
Permit issued — Sprinklers
M01110829-S5-EW-SP
04/29/2026
Permit issued — Mechanical Systems
M01110829-S2-MS
04/01/2026
Permit issued — General Construction
M01103383-I1-GC
03/27/2026
Filed — Alteration CO
M01376401-I1
03/23/2026
Special inspection requirement — Sprayed fire-resistant materials
SOORJBALLY HARILALL
03/23/2026
Special inspection requirement — Fenestration areas
SOORJBALLY HARILALL
03/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SOORJBALLY HARILALL
03/23/2026
Special inspection requirement — Chimneys and vents
SOORJBALLY HARILALL
03/23/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SOORJBALLY HARILALL
03/23/2026
Special inspection requirement — Luminous Exit Path Markings
SOORJBALLY HARILALL
03/23/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
SOORJBALLY HARILALL
03/23/2026
Special inspection requirement — Fenestration air leakage
SOORJBALLY HARILALL
03/23/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
SOORJBALLY HARILALL
03/23/2026
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
03/10/2026
Permit issued — Sidewalk Shed
M01192583-I1-SH
02/20/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/11/2026
Permit issued — General Construction
M01110829-I1-GC
02/10/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/09/2026
Permit issued — Plumbing
M01107088-I1-PL
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC.08/31/2026
DOB NOWSignPermit IssuedNEPTUNE SIGNS&AWNINGS INC08/24/2026
DOB NOWSprinklersPermit IssuedSAFETY FIRE SPRINKLER CORP07/16/2026
DOB NOWGeneral ConstructionPermit IssuedTARGET CONSTRUCTION LLC06/24/2026
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC.06/08/2026
DOB NOWGeneral ConstructionPermit IssuedDESIMONE BUILDERS LLC06/01/2026
DOB NOWConstruction FencePermit IssuedTARGET CONSTRUCTION LLC05/26/2026
DOB NOWStructuralPermit IssuedTARGET CONSTRUCTION LLC05/15/2026
DOB NOWSprinklersPermit IssuedSAFETY FIRE SPRINKLER CORP05/05/2026
DOB NOWMechanical SystemsPermit IssuedTARGET CONSTRUCTION LLC04/29/2026
DOB NOWGeneral ConstructionPermit IssuedTARGET CONSTRUCTION LLC04/01/2026
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC03/10/2026
DOB NOWGeneral ConstructionPermit IssuedTARGET CONSTRUCTION LLC02/11/2026
DOB NOWPlumbingSigned-offYG SERVICES INC02/09/2026
DOB NOWGeneral ConstructionPermit IssuedTARGET CONSTRUCTION LLC06/26/2025
DOB NOWStructuralPermit IssuedTARGET CONSTRUCTION LLC05/30/2025
DOB NOWSprinklersPermit IssuedSAFETY FIRE SPRINKLER CORP05/12/2025
DOB NOWGeneral ConstructionPermit IssuedTARGET CONSTRUCTION LLC05/05/2025
DOB NOWConstruction FencePermit IssuedTARGET CONSTRUCTION LLC04/09/2025
DOB NOWPlumbingPermit IssuedYG SERVICES INC03/18/2025
DOB NOWGeneral ConstructionPermit IssuedTARGET CONSTRUCTION LLC03/14/2025
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC03/11/2025
DOB NOWSprinklersPermit IssuedSAFETY FIRE SPRINKLER CORP03/06/2025
DOB NOWStructuralPermit IssuedTARGET CONSTRUCTION LLC03/05/2025
DOB NOWMechanical SystemsPermit IssuedTARGET CONSTRUCTION LLC03/04/2025
DOB NOWGeneral ConstructionPermit IssuedTARGET CONSTRUCTION LLC02/28/2025
DOB NOWMechanical SystemsPermit IssuedTARGET CONSTRUCTION LLC02/18/2025
DOB NOWSidewalk ShedPermit IssuedGWT ENTERPRISES INC01/21/2025
DOB NOWSidewalk ShedPermit IssuedGWT ENTERPRISES INC01/21/2025
DOB NOWMechanical SystemsSigned-offSTAR COMPANIESS LLC11/18/2024
DOB NOWGeneral ConstructionSigned-offSTAR COMPANIESS LLC11/18/2024
DOB NOWPlumbingSigned-offMICHAEL ITSKOVICH11/15/2024
DOB NOWGeneral ConstructionPermit IssuedATLANTIC CONSTRUCTION SER06/10/2024
DOB NOWMechanical SystemsPermit IssuedATLANTIC CONSTRUCTION SER06/07/2024
DOB NOWStructuralSigned-offBENCHMARK BUILDERS LLC06/16/2023
DOB NOWGeneral ConstructionSigned-offBENCHMARK BUILDERS LLC06/16/2023
DOB NOWStructuralSigned-offBENCHMARK BUILDERS LLC05/26/2023
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC04/14/2023
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC04/10/2023
DOB NOWMechanical SystemsSigned-offMARLIN MECHANICAL INC04/10/2023
+ 60 more permits on file
2 projects · most recent 07/10/2026
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/10/2026Permit IssuedTARGET CONSTRUCTION LLCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PQRY-P120YLMU-A2 135,000 BTU · Vrf Outdoor ×1
PQRY-P144YLMU-A2 160,000 BTU · Vrf Outdoor ×1
PQRY-P96YLMU-A2 108,000 BTU · Vrf Outdoor ×1
01/16/2025Permit IssuedTARGET CONSTRUCTION LLCAir Conditioning Systems
Cooling
Trane GEVK0604 50,250 BTU · Wshp ×2
1 project · most recent 07/10/2026
Sprinkler System
FiledStatusContractorScope
07/10/2026Permit IssuedSAFETY FIRE SPRINKLER CORSprinkler System
1 project · most recent 07/10/2026
Water/Sanitary
FiledStatusContractorScope
07/10/2026Permit IssuedMPI PLUMBING CORPWater/Sanitary
25 projects · most recent 09/23/2026
General Wiring
FiledStatusContractorScope
09/23/2026Permit IssuedTFK ELECTRIC CORPGeneral Wiring
05/04/2026CompleteGREEN APPLE ELECL SVCS LL—
05/01/2026CompleteGREEN APPLE ELECL SVCS LL—
04/24/2026Permit IssuedNEE ELECTRICAL, LLC—
11/26/2025Permit IssuedTFK ELECTRIC CORPGeneral Wiring
11/24/2025Permit IssuedMAN POWER ELECTRIC INC—
11/24/2025Permit IssuedTFK ELECTRIC CORPGeneral Wiring
04/17/2025Permit IssuedSOLAS ELECTRICAL CORP—
03/06/2025Permit IssuedMAN POWER ELECTRIC INC—
01/21/2025Permit IssuedRICHARD NEU—
06/07/2024CompleteBIGMAN BROS., INC.General Wiring
02/27/2024CompleteCOGEN ELEC'L SERVICES,INC—
02/01/2024CompleteCOGEN ELEC'L SERVICES,INCGeneral Wiring
12/20/2023CompleteCOGEN ELEC'L SERVICES,INCGeneral Wiring
12/05/2023CompleteCOGEN ELEC'L SERVICES,INCGeneral Wiring
1 project · most recent 07/10/2026
Steel Concrete
FiledStatusContractorScope
07/10/2026Permit IssuedSAFETY FIRE SPRINKLER CORSteel, Concrete
2 projects · most recent 05/14/2025
Sidewalk Shed Fence
FiledStatusContractorScope
05/14/2025Permit IssuedCORE SCAFFOLD SYSTEMS INCSidewalk Shed
01/21/2025Permit IssuedGWT ENTERPRISES INCFence, Sidewalk Shed
▾Field Inspections (DOB CAP) — 108
DateTypeResultReport
07/28/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2026Pass CND-Occupancy InspectionPassView ↗
02/20/2026Pass-Final PL - UndergroundPassView ↗
02/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/06/2026Fail-Final CND-Occupancy InspectionFailView ↗
12/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/08/2025Fail-Final CND-Occupancy InspectionFailView ↗
08/06/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/06/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/06/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/16/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
05/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/20/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
Latest 25 of 108.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/15/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
07/15/2026Luminous Exit Path MarkingsSOORJBALLY HARILALLspecial
07/15/2026Mastic and Intumescent Fire-resistant CoatingsSOORJBALLY HARILALLspecial
07/15/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)SOORJBALLY HARILALLspecial
07/15/2026Energy Code Compliance InspectionsSOORJBALLY HARILALLprogress
07/15/2026Sprayed fire-resistant materialsSOORJBALLY HARILALLspecial
07/15/2026Wall Panels, Curtain Walls, and VeneersSOORJBALLY HARILALLspecial
07/10/2026FinalYou Gaoprogress
07/10/2026Structural Stability – Alterations of existing buildingsYou Gaospecial
06/17/2026Air barrier - visual inspection—energy_progress
06/17/2026Fenestration and door U-factor and product ratings—energy_progress
06/17/2026Fenestration areas—energy_progress
06/17/2026Fenestration air leakage—energy_progress
06/15/2026Tenant Protection Plan Compliance—special
06/15/2026Energy Code Compliance Inspections—progress
06/15/2026Wall Panels, Curtain Walls, and Veneers—special
06/15/2026Preliminary—progress
05/06/2026FinalMax Leeprogress
05/06/2026Fire-Resistant Penetrations and JointsMax Leespecial
03/23/2026Energy Code Compliance InspectionsSOORJBALLY HARILALLprogress
03/23/2026Fenestration areasSOORJBALLY HARILALLenergy_progress
03/23/2026Sprayed fire-resistant materialsSOORJBALLY HARILALLspecial
03/23/2026Mastic and Intumescent Fire-resistant CoatingsSOORJBALLY HARILALLspecial
03/23/2026Chimneys and ventsSOORJBALLY HARILALLspecial
03/23/2026Fire-Resistance Rated ConstructionSOORJBALLY HARILALLprogress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
VibrantOfficeFloors 18, 19
Project M00826137 Alteration · LOC Issued · 03/03/2023
Project M00822918 Alteration · LOC Issued · 02/22/2023
Elefterakis, Elefterakis & PanekOfficeFloors 36, 38
Project M08009174 Alteration · LOC Issued · 10/21/2022
Project M08009168 Alteration · LOC Issued · 10/17/2022
Project M00481512 Alteration · LOC Issued · 03/18/2021
CureMD & InfoproOfficeFloor 21
Project M00736843 Alteration · LOC Issued · 05/13/2022
AccuWeatherOfficeFloor 26
Project M00706592 Alteration · LOC Issued · 04/14/2022
NYPIUAOfficeFloor 31
Project M00690716 Alteration · LOC Issued · 04/07/2022
Cure MDOfficeFloor 21
Project M00646721 Alteration · LOC Issued · 02/03/2022
Project M00646623 Alteration · LOC Issued · 01/28/2022
Pranary DigitalOfficeFloor 30
Project M00669044 Alteration · LOC Issued · 02/02/2022
January DigitalOfficeFloor 30
Project M00667849 Alteration · LOC Issued · 01/31/2022
Lactalis American GroupOfficeFloor 35
Project M00499295 Alteration · LOC Issued · 05/18/2021
Project M00499287 Alteration · LOC Issued · 05/11/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 4,683 on file (BIS + DOB NOW)
▸Plans & Drawings173
▸DOB NOWPlans/Sketch139
09/06/2026M00002012-I1Request digital key ↗
09/06/2026M00002004-I1Request digital key ↗
09/04/2026M00484836-I1Request digital key ↗
Showing 3 of 139 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems11
09/05/2026M00208246-P1Request digital key ↗
09/05/2026M00208246-I1Request digital key ↗
09/05/2026M00238951-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler8
09/05/2026M00208334-I1Request digital key ↗
09/05/2026M00238959-I1Request digital key ↗
09/04/2026M00372708-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00238957-I1Request digital key ↗
09/04/2026M00351951-I1Request digital key ↗
09/03/2026M00277471-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - Sign2
09/04/2026M00407023-I1Request digital key ↗
09/04/2026M00448360-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/05/2026M00208269-P1Request digital key ↗
09/05/2026M00208269-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
09/04/2026M00418181-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00276515-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00269756-I1Request digital key ↗
▸Applications & Permits738
▸BISPLAN / WORK APPROVAL APPLICATION441
12/04/2023140890659Open ↗
01/20/2022123773693Open ↗
12/01/2021123773693Open ↗
Showing 3 of 441 on file for this type
▸BISWORK PERMIT APPLICATION287
08/24/2020140920993Open ↗
08/14/2020140927585Open ↗
03/10/2020140890659Open ↗
Showing 3 of 287 on file for this type
▸BISPLACE OF ASSEMBLY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1132
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZoning Exhibit form (1-5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFLOOD ZONE DESIGN CERTIFICATION3
07/23/2020140927585Open ↗
07/14/2020140920993Open ↗
Showing 2 of 3 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION1
04/16/2025121254150Open ↗
▸Seals & Professional Certifications1,344
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION582
05/27/2020123812776Open ↗
05/27/2020123812776Open ↗
03/10/2020123694289Open ↗
Showing 3 of 582 on file for this type
▸DOB NOWProgress Inspector Seal & Signature182
09/28/2026M00706592-I1Open ↗
09/28/2026M00706592-I1Open ↗
09/28/2026M00706592-I1Open ↗
Showing 3 of 182 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature171
09/06/2026M00002012-I1Open ↗
09/05/2026M00208334-I1Open ↗
09/05/2026M00238959-I1Open ↗
Showing 3 of 171 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature125
09/28/2026M00706592-I1Open ↗
09/25/2026M01110829-I1Open ↗
09/25/2026M00730965-I1Open ↗
Showing 3 of 125 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST114
02/03/2020123703260Open ↗
Showing 1 of 114 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT76
07/23/2020140927585Open ↗
07/14/2020140920993Open ↗
03/10/2020140890659Open ↗
Showing 3 of 76 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM73
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 73 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
07/23/2020140927585Open ↗
07/14/2020140920993Open ↗
03/10/2020140890659Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
07/23/2020140927585Open ↗
07/14/2020140920993Open ↗
03/10/2020140890659Open ↗
Showing 3 of 8 on file for this type
▸BISPC FULL REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Trade Schedules & Equipment471
▸BISSELF-CERT PLUMBING NOTICE168
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 168 on file for this type
▸BISSCHEDULE B - PLUMBING84
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 84 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA78
05/25/2021123682675Open ↗
Showing 1 of 78 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE61
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 61 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8524
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISEQUIPMENT USE PERMITS24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸DOB NOWFDNY: Letter of No Objection5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos363
▸DOB NOWDEP ACP-5: Asbestos Assessment Report142
09/06/2026M00002012-I1Open ↗
09/05/2026M00208334-I1Open ↗
09/05/2026M00238959-I1Open ↗
Showing 3 of 142 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)116
07/23/2020140927585Open ↗
07/14/2020140920993Open ↗
02/03/2020123703260Open ↗
Showing 3 of 116 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'81
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 81 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
09/04/2026M00484836-I1Open ↗
09/04/2026M00481553-I1Open ↗
Showing 2 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS INSPECTION REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance230
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS114
02/03/2020140830171Open ↗
02/03/2020123703260Open ↗
12/12/2019122748679Open ↗
Showing 3 of 114 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS50
05/13/2021123703260Open ↗
01/27/2021140927585Open ↗
05/18/2020123822239Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.21
09/04/2026M00484836-I1Open ↗
09/03/2026M00503356-I1Open ↗
09/02/2026M00646724-I1Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: ENERGY17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISTR8: Energy Code Progress Inspections12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
02/04/2022123773693Open ↗
05/13/2021123703260Open ↗
01/27/2021140927585Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
07/23/2020140927585Open ↗
07/14/2020140920993Open ↗
Showing 2 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
02/07/2024123342668Open ↗
02/04/2022123773693Open ↗
06/11/2021140920993Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports37
▸BISTECHNICAL REPORT: RESPONSIBILITY23
02/04/2022123773693Open ↗
09/08/2021140880063Open ↗
09/08/2021140880072Open ↗
Showing 3 of 23 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Approvals, Objections & Sign-offs354
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST203
12/05/2023140890659Open ↗
02/07/2022123773693Open ↗
09/08/2021140880063Open ↗
Showing 3 of 203 on file for this type
▸BISADMINISTRATIVE OBJECTIONS96
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 96 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION37
04/16/2025121254150Open ↗
04/16/2025121254150Open ↗
04/16/2025121254150Open ↗
Showing 3 of 37 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWDEP Variance (V5) letter4
09/04/2026M00484836-I1Open ↗
09/04/2026M00481553-I1Open ↗
Showing 2 of 4 on file for this type
▸BISCCD1-Construction Code Determination2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership478
▸BISCOST AFFIDAVIT476
06/04/2021123682675Open ↗
05/13/2021123703260Open ↗
01/27/2021140927585Open ↗
Showing 3 of 476 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/04/2022123773693Open ↗
06/11/2021140920993Open ↗
▸Filing & Intake Forms430
▸BISEFILING COVER SHEET246
02/03/2020123703260Open ↗
Showing 1 of 246 on file for this type
▸BISBOROUGH INTAKE FORM95
09/14/2020123703260Open ↗
05/27/2020123812776Open ↗
03/10/2020123694289Open ↗
Showing 3 of 95 on file for this type
▸BISADDITIONAL INFORMATION78
01/20/2022123773693Open ↗
06/10/2021123799602Open ↗
10/29/2020123799602Open ↗
Showing 3 of 78 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET11
07/23/2020140927585Open ↗
07/14/2020140920993Open ↗
03/10/2020140890659Open ↗
Showing 3 of 11 on file for this type
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWProperty Ownership Certification7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS3
07/23/2020140927585Open ↗
07/14/2020140920993Open ↗
Showing 2 of 3 on file for this type
▸BISPLOT DIAGRAM2
04/16/2025121254150Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type