RoofUnder Construction24p · 11 filings · 20 docs
ArchitectureCivilMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
Herewith filing for LL11/98 facade repairs and restoration on the north and east elevations as indicated on plans. Repairs to EIFS filed under BIS ALT 2 application #122996295. No change in use, occupancy, or egress.
On file for this project
5 documents · 1 drawing sheet
Herewith filing for modifications to existing mechanical systems on the 33rd floor and roof as indicated plans. No change in use, occupancy, or egress.
On file for this project
6 documents · 1 drawing sheet
Herewith filing for modifications to existing mechanical systems on the 9th, 10th, 12th, 18th, and 25th floors as indicated on plans. No change in use, occupancy, or egress.
On file for this project
21 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 336p · 1 filing · 6 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Herewith filing for modifications to existing mechanical systems on the 33rd floor and roof as indicated plans. No change in use, occupancy, or egress.
On file for this project
6 documents · 2 drawing sheets
Floor 32
Floor 31
Floor 3021p · 11 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing
Herewith filing for the removal of existing plumbing fixtures and associated piping on the 27th thru 30th floors as indicated plans.
On file for this project
6 documents · 1 drawing sheet
Herewith filing for minor architectural work on the cellar level and change in use, occupancy and egress on floors Cellar, 1, 2, 3, 4, 6, 11, 12, 14, 18, 28, 30.
On file for this project
10 documents · 1 drawing sheet
Herewith filing modifications to existing sprinkler system and piping on the 26th to 30th floors as indicated on plans.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2910p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Plumbing
Herewith filing for the removal of existing plumbing fixtures and associated piping on the 27th thru 30th floors as indicated plans.
On file for this project
6 documents · 1 drawing sheet
Herewith filing for modifications to existing plumbing systems on the 26th, 27th, 28th, 29th, & 30th floors as indicated on plans.
On file for this project
6 documents · 1 drawing sheet
Herewith filing modifications to existing sprinkler system and piping on the 26th to 30th floors as indicated on plans.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2820p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
Herewith filing for the removal of existing plumbing fixtures and associated piping on the 27th thru 30th floors as indicated plans.
On file for this project
6 documents · 1 drawing sheet
Herewith filing for minor architectural work on the cellar level and change in use, occupancy and egress on floors Cellar, 1, 2, 3, 4, 6, 11, 12, 14, 18, 28, 30.
On file for this project
10 documents · 1 drawing sheet
Herewith filing modifications to existing sprinkler system and piping on the 26th to 30th floors as indicated on plans.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2710p · 9 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Plumbing
Herewith filing for the removal of existing plumbing fixtures and associated piping on the 27th thru 30th floors as indicated plans.
On file for this project
6 documents · 1 drawing sheet
Herewith filing for modifications to existing plumbing systems on the 26th, 27th, 28th, 29th, & 30th floors as indicated on plans.
On file for this project
6 documents · 1 drawing sheet
Herewith filing modifications to existing sprinkler system and piping on the 26th to 30th floors as indicated on plans.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 26Under Construction8p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Plumbing
Herewith filing for modifications to existing plumbing system, fixtures and associated piping in bathrooms on floors 25 to 30 as indicated on plans. No change in use, occupancy, or egress.
On file for this project
5 documents · 1 drawing sheet
Herewith filing for the removal of existing plumbing fixtures and associated piping on the 12TH, 25TH, 26TH floors as indicated plans.
On file for this project
6 documents · 1 drawing sheet
Herewith filing for modifications to existing plumbing systems on the 26th, 27th, 28th, 29th, & 30th floors as indicated on plans.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2510p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
Plumbing
Herewith filing for the removal of existing plumbing fixtures and associated piping on the 12TH, 25TH, 26TH floors as indicated plans.
On file for this project
6 documents · 1 drawing sheet
Herewith filing for modifications to existing plumbing fixtures and piping on the 9th, 10th, 12th, 18th, 25th floors as indicated on plans.
On file for this project
9 documents · 1 drawing sheet
Herewith filing for interior fit outs on the 9th, 10th, 12th, 18th, and 25th floors as indicated on plans. No change in use, occupancy, or egress.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 24
Floor 236p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Herewith filing for removal of existing sprinkler system, heads and associated piping and installation of temporary loop sprinkler system on the cellar, 1st, 18th, and 23rd floors as indicated on plans.
On file for this project
4 documents · 1 drawing sheet
Herewith filing for interior fit-outs of non-load bearing partitions and finishes on floors sub-cellar, 1 thru 5, 18 & 23. No change to use, egress, or occupancy.
On file for this project
11 documents · 1 drawing sheet
Herewith filing for modifications to existing mechanical systems on 3rd, 4th, 5th, & 23rd floors as per plans.
On file for this project
9 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 226p · 6 filings · 20 docs
ArchitectureElectricalFire ProtectionPlumbing
Herewith filing for modifications to the existing plumbing fixtures and piping on the 14th, 17th, 21st, and 22nd floors as per plans. No change to use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Herewith filing for interior fit-outs of non-load bearing partitions and finishes on the 14th, 17th, 21st, 22nd floors as per plans. No change to use, occupancy, or egress.
On file for this project
8 documents · 1 drawing sheet
Herewith filing for modifications to existing mechanical systems on the 14th, 17th, 21st, and 22nd floors as per plans. No change to use, occupancy, or egress.
On file for this project
18 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 2112p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems
Herewith filing for modifications to the existing plumbing fixtures and piping on the 14th, 17th, 21st, and 22nd floors as per plans. No change to use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Herewith filing for interior fit-outs of non-load bearing partitions and finishes on the 14th, 17th, 21st, 22nd floors as per plans. No change to use, occupancy, or egress.
On file for this project
8 documents · 1 drawing sheet
Herewith filing for modifications to existing mechanical systems on the 14th, 17th, 21st, and 22nd floors as per plans. No change to use, occupancy, or egress.
On file for this project
18 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 201p · 1 filing · 6 docs
Plumbing
PLUMBING MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents · 1 drawing sheet
Floor 1920p · 8 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructuralOther
Project M01335620Signed-off · 01/23/2026
Sprinklers modification as per plans filed herewith. no change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Project M01334408Signed-off · 01/16/2026
MECHANICAL MODIFICATIONS TO INCLUDE REPLACEMENT OF DUCTWORK ANDAIR OUTLETS. NO CHANGE OF USE, OCCUPANCY OR EGRESS.
On file for this project
5 documents · 2 drawing sheets
Plumbing modifications (Pacific College) as per plans. No change in use, egress or occupancy
On file for this project
27 documents · 9 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 1812p · 13 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Herewith filing for the removal of existing plumbing fixtures and associated piping on the 27th thru 30th floors as indicated plans.
On file for this project
6 documents · 1 drawing sheet
Herewith filing for removal of existing sprinkler system, heads, and associated piping and installation of a temporary loop sprinkler system on the 27th thru 30th floors as indicated on plans.
On file for this project
10 documents · 1 drawing sheet
Herewith filing for interior removals of non-load bearing partitions and finishes on floors 18, 27, 28, 29, & 30. No change in use, occupancy, or egress.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 174p · 4 filings · 20 docs
ArchitectureDMFire ProtectionPlumbing
Herewith filing for interior fit-outs of non-load bearing partitions and finishes on the 14th, 17th, 21st, 22nd floors as per plans. No change to use, occupancy, or egress.
On file for this project
8 documents · 1 drawing sheet
Herewith filing for the removal of existing plumbing fixtures and associated piping on the 11th, 14th,17th, 21st, 22nd floors as indicated plans.
On file for this project
3 documents · 1 drawing sheet
Herewith filing for removal of existing sprinkler system, heads, and associated piping and installation of a temporary loop sprinkler system on the 11TH, 14TH, 17TH, 21ST, 22ND floors as indicated on plans.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 161p · 1 filing · 3 docs
Electrical
INTERIOR RENOVATION WORK TO INCLUDE PARTITIONS, DOORS AND CEILING MODIFICATIONS & RELATED CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Floor 151p · 1 filing · 3 docs
Structural
Herewith filing for structural work on the 6th, 7th, & 15th floors as indicated on plans.
On file for this project
3 documents · 1 drawing sheet
Floor 149p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Herewith filing for modifications to the existing plumbing fixtures and piping on the 14th, 17th, 21st, and 22nd floors as per plans. No change to use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Herewith filing for modifications to the existing sprinkler system on the 14th, 17th, 21st, and 22nd floors as per plans.
On file for this project
7 documents · 1 drawing sheet
Herewith filing for interior fit-outs of non-load bearing partitions and finishes on the 14th, 17th, 21st, 22nd floors as per plans. No change to use, occupancy, or egress.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 131p · 1 filing · 6 docs
Plumbing
PLUMBING MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents · 1 drawing sheet
Floor 1216p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction
Herewith filing for the removal of existing plumbing fixtures and associated piping on the 12TH, 25TH, 26TH floors as indicated plans.
On file for this project
6 documents · 1 drawing sheet
Herewith filing for minor architectural work on the cellar level and change in use, occupancy and egress on floors Cellar, 1, 2, 3, 4, 6, 11, 12, 14, 18, 28, 30.
On file for this project
10 documents · 1 drawing sheet
Herewith filing for modifications to existing plumbing fixtures and piping on the 9th, 10th, 12th, 18th, 25th floors as indicated on plans.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 115p · 5 filings · 18 docs
ArchitectureDMFire ProtectionPlumbing
Herewith filing for modifications to the existing plumbing fixtures and piping on the 6th thru 8th and 11th floors as per plans. No change to use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Herewith filing for interior fit-outs of non-load bearing partitions and finishes on the 6th thru 8th and 11th floors as per plans. No change to use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Herewith filing for the removal of existing plumbing fixtures and associated piping on the 11th, 14th,17th, 21st, 22nd floors as indicated plans.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 103p · 3 filings · 9 docs
DMFire ProtectionPlumbing
Herewith filing for the removal of existing plumbing fixtures and associated piping on the 6TH- 10TH floors as indicated plans.
On file for this project
3 documents · 1 drawing sheet
Herewith filing for removal of existing sprinkler system, heads, and associated piping and installation of a temporary loop sprinkler system on floors 6 thru 10 as indicated on plans.
On file for this project
3 documents · 1 drawing sheet
Herewith filing for interior removals of existing non-load bearing partitions and finishes as indicated on plans for 6th thru 10th floors. No change in use, occupancy, or egress.
On file for this project
3 documents · 1 drawing sheet
Floor 99p · 7 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Plumbing modifications (Pacific College) as per plans. No change in use, egress or occupancy
On file for this project
27 documents · 3 drawing sheets
Herewith filing for modifications to existing plumbing fixtures and piping on the 9th, 10th, 12th, 18th, 25th floors as indicated on plans.
On file for this project
9 documents · 1 drawing sheet
Herewith filing for interior fit outs on the 9th, 10th, 12th, 18th, and 25th floors as indicated on plans. No change in use, occupancy, or egress.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 89p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Herewith filing for modifications to existing mechanical systems on floors 6 thru 8 and 11th floor as per plans. No change to use, egress, or occupancy.
On file for this project
12 documents · 2 drawing sheets
Herewith filing for interior fit-outs of non-load bearing partitions and finishes on the 6th thru 8th and 11th floors as per plans. No change to use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Herewith filing for the removal of existing plumbing fixtures and associated piping on the 6TH- 10TH floors as indicated plans.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 710p · 11 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Herewith filing for interior fit-outs of non-load bearing partitions and finishes on the 6th thru 8th and 11th floors as per plans. No change to use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Herewith filing for the removal of existing plumbing fixtures and associated piping on the 6TH- 10TH floors as indicated plans.
On file for this project
3 documents · 1 drawing sheet
Herewith filing for removal of existing sprinkler system, heads, and associated piping and installation of a temporary loop sprinkler system on floors 6 thru 10 as indicated on plans.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 615p · 13 filings · 20 docs
ArchitectureDMElectricalFire ProtectionLandscapeMechanicalPlumbingStructural
Herewith filing for interior removals of existing non-load bearing partitions and finishes as indicated on plans for 6th thru 10th floors. No change in use, occupancy, or egress.
On file for this project
3 documents · 1 drawing sheet
PLUMBING MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this project
3 documents · 1 drawing sheet
SPRINKLER MODIFICATIONS AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 57p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Herewith filing for modifications to the existing sprinkler systems on 3rd, 4th, 5th, & 23rd floors as per plans.
On file for this project
7 documents · 2 drawing sheets
Herewith filing for modifications to the existing plumbing fixtures and piping on the 3rd, 4th, 5th, & 23rd floors as per plans.
On file for this project
12 documents · 1 drawing sheet
Herewith filing for interior fit-outs of non-load bearing partitions and finishes on floors sub-cellar, 1 thru 5, 18 & 23. No change to use, egress, or occupancy.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 49p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Herewith filing for modifications to the existing sprinkler systems on 3rd, 4th, 5th, & 23rd floors as per plans.
On file for this project
7 documents · 1 drawing sheet
Herewith filing for modifications to the existing plumbing fixtures and piping on the 3rd, 4th, 5th, & 23rd floors as per plans.
On file for this project
12 documents · 1 drawing sheet
Herewith filing for interior fit-outs of non-load bearing partitions and finishes on floors sub-cellar, 1 thru 5, 18 & 23. No change to use, egress, or occupancy.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 318p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction
Herewith filing for modifications to the existing sprinkler systems on 3rd, 4th, 5th, & 23rd floors as per plans.
On file for this project
7 documents · 1 drawing sheet
Herewith filing for modifications to the existing plumbing fixtures and piping on the 3rd, 4th, 5th, & 23rd floors as per plans.
On file for this project
12 documents · 1 drawing sheet
Herewith filing for interior fit-outs of non-load bearing partitions and finishes on floors sub-cellar, 1 thru 5, 18 & 23. No change to use, egress, or occupancy.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 218p · 8 filings · 20 docs
ArchitectureDMFire ProtectionPlumbingStructural
Issued Permit Scope
General Construction
Herewith filing for minor architectural work on the cellar level and change in use, occupancy and egress on floors Cellar, 1, 2, 3, 4, 6, 11, 12, 14, 18, 28, 30.
On file for this project
10 documents · 2 drawing sheets
Herewith filing for structural work on sub-cellar, cellar, 1st, 2nd & 3rd floors as per plans. no change to use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Herewith filing for interior fit-outs of non-load bearing partitions and finishes on floors sub-cellar, 1 thru 5, 18 & 23. No change to use, egress, or occupancy.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 123p · 9 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction
Project M01334408Signed-off · 01/16/2026
MECHANICAL MODIFICATIONS TO INCLUDE REPLACEMENT OF DUCTWORK ANDAIR OUTLETS. NO CHANGE OF USE, OCCUPANCY OR EGRESS.
On file for this project
5 documents · 2 drawing sheets
Plumbing modifications (Pacific College) as per plans. No change in use, egress or occupancy
On file for this project
27 documents · 5 drawing sheets
Herewith filing for minor architectural work on the cellar level and change in use, occupancy and egress on floors Cellar, 1, 2, 3, 4, 6, 11, 12, 14, 18, 28, 30.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Cellar27p · 10 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Herewith filing for structural work on sub-cellar, cellar, 1st, 2nd & 3rd floors as per plans. no change to use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Herewith filing for removal of existing sprinkler system, heads and associated piping and installation of temporary loop sprinkler system on the cellar, 1st, 18th, and 23rd floors as indicated on plans.
On file for this project
4 documents · 1 drawing sheet
Herewith filing for modifications to the existing sprinkler system as per plans. no change to use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Sub-Cellar7p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralPlumbingStructural
Herewith filing for structural work on sub-cellar, cellar, 1st, 2nd & 3rd floors as per plans. no change to use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Herewith filing for modifications to the existing sprinkler system as per plans. no change to use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Herewith filing for interior fit-outs of non-load bearing partitions and finishes on floors sub-cellar, 1 thru 5, 18 & 23. No change to use, egress, or occupancy.
On file for this project
11 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.