Office with commercial, 7-19 stories
1115 BROADWAY
MANHATTAN · BIN 1015604
💬 Discuss this project
1914Year Built
12Stories
O6Building Class
C5-2Zoning
259,749 sfGross Floor Area
50Units
LL97 Covered4 Open Violations 2 unresolved · 2 paperwork only ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: 16 MADISON SQUARE WEST LLC · 22,188 sf lot · 11.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionLandscapeGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction38p · 7 filings · 20 docs
Bulkhead14p · 4 filings · 20 docs
Floor 142p · 3 filings · 20 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 922p · 4 filings · 20 docs
Floor 8
Floor 7
Floor 661p · 7 filings · 20 docs
Floor 513p · 7 filings · 20 docs
Floor 4
Floor 313p · 2 filings · 17 docs
Floor 2Under Construction97p · 5 filings · 20 docs
Floor 1Under Construction113p · 5 filings · 20 docs
MezzanineUnder Construction21p · 4 filings · 20 docs
CellarUnder Construction27p · 5 filings · 20 docs
Basement1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
16 MADISON SQUARE WEST LLC603/22/2026
ADAMS & CO2603/22/2026
ADAMS REAL ESTATTE CO.14203/22/2026
ADAMS REALTY703/22/2026
ELEVEN FIFTEEN ASSOC C/O ADAMS7003/21/2026
ARCADE BUILDING ASSOC. C/O ADAMS103/21/2026
TWENTY-THREE RP ASSOCIATES403/21/2026
ELEVEN FIFTEEN ASSOC C O ADAMS1603/21/2026
PRIME CONTRACTORS103/21/2026
ELEVEN FIFTEEN ASSOCIATES C O AD203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/14/2023$43.6M—— → —$168/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LOWVOLT TECH ENTERPRISESGeneral Contractor1507/08/2026
NATIONAL WALL CORPGeneral Contractor1007/08/2026
W5 GROUP LLCGeneral Contractor707/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor707/08/2026
STELLMAR PLBG & MECH.CORPPlumbing607/08/2026
CORE FOUR CONSTRUCTION INGeneral Contractor607/08/2026
POFI CONSTRUCTION CORPGeneral Contractor603/21/2026
SKY CONSTRUCTION MGMT LLCGeneral Contractor507/08/2026
BAR CONSTRUCTION SERVICESGeneral Contractor507/08/2026
SC CONTRACTING MANAGEMENTGeneral Contractor507/08/2026
IDK COOLING CORPGeneral Contractor407/08/2026
METRO FIRE PROTECTION INCFire Protection307/08/2026
M&T PLBG AND HTG CO., INCPlumbing307/08/2026
NPF CONSTRUCTION CORPGeneral Contractor307/08/2026
BELLIS CONSTRUCTION CORPGeneral Contractor303/21/2026
EDUARD BERGMANElectrical203/21/2026
MATROS AUTOMATED ELEC'L CElectrical203/22/2026
GEORGE BRESLAW PLBNG LLCPlumbing207/08/2026
SEAN COAKLEY P & H INCFire Protection107/08/2026
FULL CAPACITY FIRE CORPFire Protection107/08/2026
LAREDO ELECTRIC, INC.Electrical103/22/2026
A&A PLUMBING CORPPlumbing107/08/2026
M&T PLBG AND HTG CO., INCFire Protection107/08/2026
SKYLINE FIRE SPRINKLER COFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JACK GREEN ASSOCIATES4221001/20/2026
ALAN D MARCUS, PE1761307/17/2025
CODEGREEN5101509/17/2024
MILROSE CONSULTANTS LLC2003308/07/2024
HANSEN ENGINEERING PC8174804/24/2024
THE EIPEL ENGINEERING GRO2714604/23/2024
ASDA ARCHITECTURE + DESIG2015504/09/2024
SHAHRISH SHUVO ENGINEERIN8524109/13/2023
PARADIGM ARCHITECTURE5931111/18/2021
BECKER ENGINEERING, PC633210/19/2020
Building Lifecycle
All (300)Filed (59)Permit Issued (67)Signed Off (26)Facade (FISP) (9)Violation (8)Inspection (53)Objection (48)Special Inspection (30)
06/08/2026
Permit issued — General Construction
M00921216-I1-GC
05/27/2026
Permit issued — General Construction
M00921216-I1-GC
04/24/2026
Signed off — Alteration
Application for the installation and use of suspended scaffold for facade repair and inspection as per plans filed herein. No change in egress, use, or occupancy.
M01365574-I1
04/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/16/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
04/16/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
04/13/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
04/01/2026
Signed off — Alteration
Application for the installation and use of suspended scaffold for facade repair and inspection as per plans filed herein. No change in egress, use, or occupancy.
M01257338-I1
03/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/17/2026
Filed — Alteration
Application for the installation and use of suspended scaffold for facade repair and inspection as per plans filed herein. No change in egress, use, or occupancy.
M01365574-P1
03/12/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/06/2026
Permit issued — Suspended Scaffold
M01365574-I1-SC
03/05/2026
Filed — Alteration
Application for the installation and use of suspended scaffold for facade repair and inspection as per plans filed herein. No change in egress, use, or occupancy.
M01365574-I1
02/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/02/2026
Permit issued — Plumbing
M00921216-S1-EW-SP
01/30/2026
Permit issued — Plumbing
M00921216-S1-PL
01/20/2026
Filed — Alteration
MH work as per plans filed.
M00921216-P3
12/22/2025
Special inspection requirement — Mechanical Systems
LAWRENCE GREEN
12/22/2025
Special inspection requirement — Shutoff dampers
LAWRENCE GREEN
12/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
LAWRENCE GREEN
12/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
LAWRENCE GREEN
12/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
LAWRENCE GREEN
12/22/2025
Special inspection requirement — Maintenance information
LAWRENCE GREEN
12/22/2025
Special inspection requirement — Final
LAWRENCE GREEN
12/22/2025
Special inspection requirement — Duct leakage testing, insulation and design
LAWRENCE GREEN
12/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LAWRENCE GREEN
12/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/12/2025
Permit issued — Structural
M00921216-S3-ST
12/12/2025
Permit issued — Mechanical Systems
M00921216-S2-MS
12/12/2025
Permit issued — General Construction
M00921216-I1-GC
12/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
LAWRENCE GREEN
12/03/2025
Special inspection requirement — Sprinkler Systems
LAWRENCE GREEN
12/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
LAWRENCE GREEN
12/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
LAWRENCE GREEN
12/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
12/02/2025
Special inspection requirement — Sprinkler Systems
JACK GREEN
09/17/2025
Permit issued — General Construction
M00921216-I1-GC
09/10/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00660681-I1
09/05/2025
Permit issued — Sprinklers
M00921216-S1-PL
09/04/2025
Permit issued — Plumbing
M00921216-S1-EW-SP
08/11/2025
Signed off — Alteration
Mechanical work on the 1st floor (West 25th lobby and storefront) as indicated on drawings
M00790374-I1
07/23/2025
Permit issued — Suspended Scaffold
M01257338-I1-SC
07/21/2025
Objection raised — Scope
07/21/2025
Objection resolved — Addressed
07/17/2025
Filed — Alteration
Application for the installation and use of suspended scaffold for facade repair and inspection as per plans filed herein. No change in egress, use, or occupancy.
M01257338-I1
07/17/2025
Filed — Alteration
Mechanical work on the 1st floor (West 25th lobby and storefront) as indicated on drawings
M00790374-P1
07/16/2025
Permit issued — Structural
M00921216-S3-ST
07/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/07/2025
Signed off — Alteration
Sprinkler work on the 1st floor (W 25th lobby) as indicated on drawings
M00998239-I1
06/18/2025
Filed — Alteration
Sprinkler work on the 1st floor (W 25th lobby) as indicated on drawings
M00998239-P1
06/18/2025
Special inspection requirement — Sprinkler Systems
JACK GREEN
05/29/2025
Signed off — Alteration
Plumbing work on the 5th floor (6th floor CO) (The Lab) as indicated on drawings
M01141837-I1
05/15/2025
Permit issued — Mechanical Systems
M00921216-S2-MS
04/30/2025
Objection resolved — Addressed
04/23/2025
Cycle 10 facade report signed — SAFE
03/28/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/21/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/19/2025
Signed off — Alteration
M01020707-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSKY CONSTRUCTION MGMT LLC06/08/2026
DOB NOWGeneral ConstructionPermit IssuedSKY CONSTRUCTION MGMT LLC05/27/2026
DOB NOWSuspended ScaffoldSigned-offSKYTRAC ACCESS GROUP LLC03/06/2026
DOB NOWPlumbingPermit IssuedSTELLMAR PLBG & MECH.CORP02/02/2026
DOB NOWPlumbingPermit IssuedSTELLMAR PLBG & MECH.CORP01/30/2026
DOB NOWStructuralPermit IssuedSKY CONSTRUCTION MGMT LLC12/12/2025
DOB NOWMechanical SystemsPermit IssuedSKY CONSTRUCTION MGMT LLC12/12/2025
DOB NOWGeneral ConstructionPermit IssuedSKY CONSTRUCTION MGMT LLC12/12/2025
DOB NOWGeneral ConstructionPermit IssuedLOWVOLT TECH ENTERPRISES09/17/2025
DOB NOWSprinklersPermit IssuedSTELLMAR PLBG & MECH.CORP09/05/2025
DOB NOWPlumbingPermit IssuedSTELLMAR PLBG & MECH.CORP09/04/2025
DOB NOWSuspended ScaffoldSigned-offSKYTRAC ACCESS GROUP LLC07/23/2025
DOB NOWStructuralPermit IssuedLOWVOLT TECH ENTERPRISES07/16/2025
DOB NOWMechanical SystemsPermit IssuedLOWVOLT TECH ENTERPRISES05/15/2025
DOB NOWSprinklersPermit IssuedMETRO FIRE PROTECTION INC02/07/2025
DOB NOWPlumbingSigned-offGEORGE BRESLAW PLBNG LLC02/06/2025
DOB NOWMechanical SystemsSigned-offIDK COOLING CORP01/16/2025
DOB NOWGeneral ConstructionPermit IssuedSC CONTRACTING MANAGEMENT01/09/2025
DOB NOWGeneral ConstructionPermit IssuedLOWVOLT TECH ENTERPRISES09/20/2024
DOB NOWGeneral ConstructionSigned-offBAR CONSTRUCTION SERVICES09/11/2024
DOB NOWGeneral ConstructionSigned-offBELLIS CONSTRUCTION CORP08/20/2024
DOB NOWSprinklersPermit IssuedSTELLMAR PLBG & MECH.CORP08/16/2024
DOB NOWSprinklersPermit IssuedSTELLMAR PLBG & MECH.CORP08/15/2024
DOB NOWMechanical SystemsSigned-offIDK COOLING CORP08/14/2024
DOB NOWGeneral ConstructionSigned-offPOFI CONSTRUCTION CORP08/12/2024
DOB NOWSprinklersSigned-offM&T PLBG AND HTG CO., INC08/09/2024
DOB NOWSprinklersPermit IssuedM&T PLBG AND HTG CO., INC08/09/2024
DOB NOWStructuralPermit IssuedLOWVOLT TECH ENTERPRISES07/16/2024
DOB NOWSprinklersPermit IssuedMETRO FIRE PROTECTION INC07/05/2024
DOB NOWMechanical SystemsSigned-offBAR CONSTRUCTION SERVICES06/05/2024
DOB NOWMechanical SystemsPermit IssuedLOWVOLT TECH ENTERPRISES05/15/2024
DOB NOWSprinklersSigned-offMETRO FIRE PROTECTION INC05/03/2024
DOB NOWPlumbingSigned-offGEORGE BRESLAW PLBNG LLC04/29/2024
DOB NOWGeneral ConstructionPermit IssuedSC CONTRACTING MANAGEMENT04/26/2024
DOB NOWMechanical SystemsPermit IssuedIDK COOLING CORP04/26/2024
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC04/22/2024
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC04/19/2024
DOB NOWGeneral ConstructionSigned-offW5 GROUP LLC04/10/2024
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP01/23/2024
DOB NOWSuspended ScaffoldSigned-offC.C.C. RENOVATION INC01/18/2024
+ 60 more permits on file
2 projects · most recent 10/19/2020
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/19/2020——Air Conditioning Systems
Cooling
Lg ARUN060GSS4 1 tons · Vrf Outdoor ×1
09/11/2020——Air Conditioning Systems
Cooling
Lg ARUN060GSS4 5 tons · Vrf Outdoor ×1
2 projects · most recent 01/20/2026
Sprinkler System
FiledStatusContractorScope
01/20/2026——Sprinkler System
08/07/2024Permit IssuedM&T PLBG AND HTG CO., INC233 heads
3 projects · most recent 01/20/2026
Water/Sanitary Gas
FiledStatusContractorScope
01/20/2026Permit IssuedSTELLMAR PLBG & MECH.CORPGas, Water/Sanitary
08/07/2024Signed-offM&T PLBG AND HTG CO., INCWater/Sanitary
04/24/2024Signed-offGEORGE BRESLAW PLBNG LLCWater/Sanitary
25 projects · most recent 06/12/2026
General Wiring
FiledStatusContractorScope
06/12/2026Permit IssuedF & F ELECTRICAL CORP.General Wiring
12/19/2025Permit IssuedEMPIRE STATE ELECTL CORPGeneral Wiring
12/19/2025Permit IssuedEMPIRE STATE ELECTL CORP—
01/06/2025Permit IssuedEMPIRE STATE ELECTL CORPGeneral Wiring
01/06/2025Permit IssuedEMPIRE STATE ELECTL CORP—
12/13/2024Permit IssuedEMPIRE STATE ELECTL CORPGeneral Wiring
12/13/2024Permit IssuedEMPIRE STATE ELECTL CORP—
12/04/2024Permit IssuedDMMP ELECTRIC CONSTR. INCGeneral Wiring
10/28/2024Permit IssuedMATROS AUTOMATED ELEC'L CGeneral Wiring
08/15/2024Permit IssuedC.FALCO ELETL CONT CORPGeneral Wiring
06/20/2024Permit IssuedLAREDO ELECTRIC, INC.General Wiring
10/25/2023Permit IssuedMATROS AUTOMATED ELEC'L CGeneral Wiring
08/30/2023Permit IssuedMATROS AUTOMATED ELEC'L C—
08/10/2023CompleteMATROS AUTOMATED ELEC'L C1 meters, 1 new_meters
05/17/2023CompleteMATROS AUTOMATED ELEC'L C—
1 project · most recent 01/20/2026
Steel Concrete
FiledStatusContractorScope
01/20/2026Permit IssuedSKY CONSTRUCTION MGMT LLCSteel, Concrete
1 project · most recent 09/12/2018
Fence
FiledStatusContractorScope
09/12/2018Permit IssuedNATIONAL WALL CORPFence
▾Field Inspections (DOB CAP) — 53
DateTypeResultReport
04/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/16/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
04/16/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/13/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/12/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/18/2025Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
02/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/14/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/12/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/07/2025Fail-Final General Construction Non-Directive 14FailView ↗
Latest 25 of 53.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
12/22/2025Shutoff dampersLAWRENCE GREENenergy_progress
12/22/2025Fire-Resistant Penetrations and JointsLAWRENCE GREENspecial
12/22/2025Mechanical SystemsLAWRENCE GREENspecial
12/22/2025FinalLAWRENCE GREENprogress
12/22/2025HVAC-R and service water piping design and insulationLAWRENCE GREENenergy_progress
12/22/2025HVAC-R and service water heating equipmentLAWRENCE GREENenergy_progress
12/22/2025HVAC-R and service water heating system controlsLAWRENCE GREENenergy_progress
12/22/2025Duct leakage testing, insulation and designLAWRENCE GREENenergy_progress
12/22/2025Maintenance informationLAWRENCE GREENenergy_progress
12/03/2025Fire-Resistant Penetrations and JointsLAWRENCE GREENspecial
12/03/2025Sprinkler SystemsLAWRENCE GREENspecial
12/03/2025HVAC-R and service water heating equipmentLAWRENCE GREENenergy_progress
12/03/2025HVAC-R and service water heating system controlsLAWRENCE GREENenergy_progress
12/02/2025Sprinkler SystemsJACK GREENspecial
12/02/2025Fire-Resistant Penetrations and JointsJACK GREENspecial
06/18/2025Sprinkler SystemsJACK GREENspecial
01/13/2025Sprinkler SystemsJACK GREENspecial
11/27/2024Energy Code Compliance InspectionsJACK GREENprogress
11/27/2024Interior lighting powerJACK GREENenergy_progress
11/27/2024Lighting controlsJACK GREENenergy_progress
11/17/2024Fire-Resistant Penetrations and JointsLAWRENCE GREENspecial
11/17/2024HVAC-R and service water heating system controlsLAWRENCE GREENenergy_progress
11/17/2024Sprinkler SystemsLAWRENCE GREENspecial
11/17/2024HVAC-R and service water heating equipmentLAWRENCE GREENenergy_progress
11/13/2024FinalJACK GREENprogress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
thelabOfficeFloor 5
Project M01141833 Alteration · Permit Entire · 01/08/2025
Project M01141837 Alteration · LOC Issued · 01/08/2025
Project M01141824 Alteration · Permit Entire · 12/19/2024
Select Office SuitesOfficeFloor 9
Project M01086895 Alteration · Permit Entire · 08/07/2024
CantinaRestaurant / Food ServiceFloor 1, Mezzanine
Project M00921216 Alteration · Permit Entire · 09/13/2023
COR ShowroomOfficeFloor 6
Project M08025207 Alteration · Permit Entire · 03/29/2023
Project M08025223 Alteration · Permit Entire · 03/28/2023
Project M08025219 Alteration · LOC Issued · 03/27/2023
COROfficeFloor 6
Project M08025201 Alteration · Permit Entire · 03/28/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,928 on file (BIS + DOB NOW)
▸Plans & Drawings73
▸DOB NOWPlans/Sketch66
09/06/2026M00078319-I1Request digital key ↗
09/04/2026M00465328-I1Request digital key ↗
09/03/2026M00621167-I1Request digital key ↗
Showing 3 of 66 on file for this type
▸DOB NOWPlans/Sketch - Structural4
09/04/2026M00328690-P1Request digital key ↗
09/04/2026M00328690-I1Request digital key ↗
09/04/2026M00328673-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00328665-I1Request digital key ↗
09/04/2026M00328685-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00465328-I1Request digital key ↗
▸Applications & Permits319
▸BISPLAN / WORK APPROVAL APPLICATION198
03/03/2026121585597Open ↗
09/19/2024121585597Open ↗
05/21/2024140948946Open ↗
Showing 3 of 198 on file for this type
▸BISWORK PERMIT APPLICATION119
09/01/2023120762512Open ↗
08/29/2022140948928Open ↗
10/30/2020123697339Open ↗
Showing 3 of 119 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records5
▸BISZONING DIAGRAM3
04/20/2022121585597Open ↗
12/10/2019121585597Open ↗
Showing 2 of 3 on file for this type
▸BISZONING RESOLUTION DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications489
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION189
12/10/2019121585597Open ↗
11/04/2019123697339Open ↗
Showing 2 of 189 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature70
09/04/2026M00328685-I1Open ↗
09/04/2026M00328673-P1Open ↗
09/04/2026M00328673-I1Open ↗
Showing 3 of 70 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST55
11/04/2019123697339Open ↗
Showing 1 of 55 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature49
09/23/2026M01086895-S2Open ↗
09/02/2026M00837912-P3Open ↗
09/02/2026M00998239-P1Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWProgress Inspector Seal & Signature43
09/01/2026M00837841-P2Open ↗
09/01/2026M00837841-P2Open ↗
09/01/2026M08025207-I1Open ↗
Showing 3 of 43 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT39
10/21/2020140948946Open ↗
09/28/2020140948928Open ↗
11/04/2019123697339Open ↗
Showing 3 of 39 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
10/21/2020140948946Open ↗
09/28/2020140948928Open ↗
Showing 2 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
10/21/2020140948946Open ↗
09/28/2020140948928Open ↗
Showing 2 of 6 on file for this type
▸Trade Schedules & Equipment132
▸BISSCHEDULE B - PLUMBING30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISSELF-CERT PLUMBING NOTICE27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISEQUIPMENT USE PERMITS26
05/25/2023120797557Open ↗
09/23/2022122943903Open ↗
09/23/2022122943903Open ↗
Showing 3 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA14
07/08/2025123072762Open ↗
12/31/2020123806854Open ↗
03/05/2020122870606Open ↗
Showing 3 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
04/14/2023120797557Open ↗
09/23/2022122943903Open ↗
08/31/2022122943903Open ↗
Showing 3 of 11 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
12/10/2019121585597Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos219
▸DOB NOWDEP ACP-5: Asbestos Assessment Report64
09/04/2026M00328685-I1Open ↗
09/04/2026M00328673-P1Open ↗
09/04/2026M00328673-I1Open ↗
Showing 3 of 64 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)44
10/21/2020140948946Open ↗
09/28/2020140948928Open ↗
11/04/2019123697339Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWOER: Notice to Proceed34
09/03/2026M00621167-I1Open ↗
Showing 1 of 34 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸DOB NOWOER: Notice of Satisfaction25
09/03/2026M00621167-I1Open ↗
Showing 1 of 25 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED12
10/21/2020140948946Open ↗
09/28/2020140948928Open ↗
11/19/2019123697339Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
08/29/2022140948928Open ↗
11/15/2021123697339Open ↗
08/28/2020122844280Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance81
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS36
12/10/2019121585597Open ↗
Showing 1 of 36 on file for this type
▸BISTECHNICAL REPORT: ENERGY14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
08/31/2022122943903Open ↗
11/10/2020123763864Open ↗
10/21/2020120898555Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
05/24/2023121585597Open ↗
08/31/2022122943903Open ↗
04/08/2022121585597Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
10/21/2020140948946Open ↗
09/28/2020140948928Open ↗
Showing 2 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00621167-I1Open ↗
▸Inspections & Test Reports26
▸BISTECHNICAL REPORT: RESPONSIBILITY24
08/22/2023122004721Open ↗
08/31/2022122943903Open ↗
08/31/2022122943903Open ↗
Showing 3 of 24 on file for this type
▸BISMECHANICAL SYSTEMS2
08/22/2023122004721Open ↗
05/25/2023120797557Open ↗
▸Approvals, Objections & Sign-offs184
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST90
12/15/2023122144517Open ↗
10/26/2023122144517Open ↗
08/23/2023122004721Open ↗
Showing 3 of 90 on file for this type
▸BISADMINISTRATIVE OBJECTIONS38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION34
09/01/2023120762512Open ↗
11/10/2020123763864Open ↗
10/30/2020123697339Open ↗
Showing 3 of 34 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE16
10/13/2022103801414Open ↗
08/17/2022103801414Open ↗
12/10/2019121585597Open ↗
Showing 3 of 16 on file for this type
▸BISFINAL2
08/22/2023122004721Open ↗
11/30/2020123813043Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership152
▸BISCOST AFFIDAVIT148
08/31/2022122943903Open ↗
08/30/2022140948928Open ↗
11/15/2021123697339Open ↗
Showing 3 of 148 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
08/22/2023122004721Open ↗
08/30/2022140948928Open ↗
10/14/2020120797566Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms177
▸BISEFILING COVER SHEET77
11/04/2019123697339Open ↗
Showing 1 of 77 on file for this type
▸BISADDITIONAL INFORMATION54
10/14/2022103801414Open ↗
04/20/2022121585597Open ↗
11/06/2020123763864Open ↗
Showing 3 of 54 on file for this type
▸BISBOROUGH INTAKE FORM38
09/01/2023120762512Open ↗
10/30/2020123697339Open ↗
09/10/2020123697339Open ↗
Showing 3 of 38 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
10/21/2020140948946Open ↗
09/28/2020140948928Open ↗
Showing 2 of 8 on file for this type
▸Other Documents41
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISENVIRONMENTAL 'E' DEP NOTICE TO PROCEED9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWCalculations4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWManufacturer's Specifications4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BIS* ENVIRONMENTAL 'E' DEP NOTICE OF SATISFACTION3
08/22/2023122004721Open ↗
04/14/2023120797557Open ↗
10/14/2020120797566Open ↗
▸BISPlot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type