← Back
Over six families without stores
Reid Park Rock
1145 LENOX ROAD · BIN 3101290
💬 Discuss this project
1924Year Built
4Stories
C1Building Class
R6Zoning
21,668 sfGross Floor Area
24Units
Rent Stabilized12 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 7,000 sf lot · 3.1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof4p · 2 filings · 20 docs
Floor 18p · 2 filings · 17 docs
Cellar4p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC PACT PRESERVATION PARTNERS309/13/2026
J G CONSTRUCTION SRVCS407/08/2026
FAIRSTEAD MANAGEMENT507/08/2026
NEW YORK CITY HOUSING AUT103/22/2026
NYC HOUSING AUTHORITY703/21/2026
NYCHA403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SLM ARCHITECTURE, P.C.207/08/2026
SOCOTEC, INC.406/03/2025
DAGHER ENGINEERING PLLC203/13/2025
ASHRAF CORP111/20/2024
MADSEN CONSULTING ENGINEERING, PLLC108/30/2023
HAIDER ENGINEERING, P.E.110/28/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN203/21/2026
KD DESIGNS103/21/2026
RIGGING CONSULTANTS403/21/2026
METROPOLIS GROUP INC803/21/2026
RYBAK DEVELOPMENT603/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FSC D&C LLCGeneral Contractor607/08/2026
LS GENERAL CORPGeneral Contractor407/08/2026
TREDENT CONTRACTING SERVIGeneral Contractor303/21/2026
ARSENAL SCAFFOLD INCGeneral Contractor203/21/2026
J & G CONSTRUCTION SVCSGeneral Contractor107/08/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor104/09/2026
A & E PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803907/08/2026
Building Lifecycle
All (103)Filed (13)Permit Issued (12)Signed Off (6)Violation (34)Inspection (2)Objection (6)Special Inspection (30)
07/27/2026
Signed off — Alteration
structural work for existing fire escape structural repairs as needed.
B00911144-I1
07/13/2026
Signed off — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, sink undercoating, DOORS AND WINDOW SASHES. ADDITIONAL GROUND LEVEL HARDSCAPE REPAIRS AND IMPROVEMENTS AS NEEDED PER PLANS.
B00918292-I1
07/08/2026
Filed — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, sink undercoating, DOORS AND WINDOW SASHES. ADDITIONAL GROUND LEVEL HARDSCAPE REPAIRS AND IMPROVEMENTS AS NEEDED PER PLANS.
B00918292-P1
06/24/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00930749-I1
06/12/2026
Violation issued (HPD, open)
B
06/12/2026
Violation issued (HPD, open)
B
06/12/2026
Violation issued (HPD, open)
B
06/12/2026
Violation issued (HPD, open)
B
04/12/2026
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Vestibules
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
03/19/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00923573-I1
03/18/2026
Permit issued — Structural
B00911144-I1-ST
03/17/2026
Permit issued — General Construction
B00918292-I1-GC
03/11/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00948997-I1
12/13/2025
Violation issued (HPD, open)
C
12/13/2025
Violation issued (HPD, open)
C
12/13/2025
Violation issued (HPD, closed)
B
12/13/2025
Violation issued (HPD, open)
C
12/13/2025
Violation issued (HPD, open)
C
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/04/2025
Signed off — Alteration
B01145087-I1
09/23/2025
Violation issued (HPD, open)
A
09/08/2025
Permit issued — Structural
B00911144-I1-ST
08/28/2025
Violation issued (HPD, closed)
C
08/04/2025
Objection resolved — Addressed
08/01/2025
Objection raised — Other
07/31/2025
Filed — Alteration
Facade Restoration
B01180343-P1
07/31/2025
Permit issued — General Construction
B00930749-I1-GC
07/31/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
07/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/27/2025
Violation issued (ECB, closed)
Construction
06/27/2025
Violation issued (ECB, closed)
Unknown
06/27/2025
Violation issued (ECB, closed)
Site Safety
06/05/2025
Permit issued — General Construction
B00930749-I1-GC
06/04/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
06/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
06/04/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
06/03/2025
Filed — Alteration
Facade repairs. No change in egress, use or occupancy.
B00930749-P3
05/28/2025
Permit issued — Suspended Scaffold
B01180343-I1-SC
05/22/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
05/22/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
05/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
05/13/2025
Violation issued (FDNY_NOV, closed)
04/16/2025
Filed — Alteration
Facade repairs. No change in egress, use or occupancy.
B00930749-P2
04/16/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
04/16/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
04/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
03/31/2025
Permit issued — Plumbing
B00948997-I1-PL
03/31/2025
Permit issued — Mechanical Systems
B00923573-I1-MS
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offFSC D&C LLC03/18/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/17/2026
DOB NOWStructuralSigned-offFSC D&C LLC09/08/2025
DOB NOWGeneral ConstructionSigned-offTREDENT CONTRACTING SERVI07/31/2025
DOB NOWGeneral ConstructionSigned-offLS GENERAL CORP06/05/2025
DOB NOWSuspended ScaffoldPermit IssuedLUAN SELA05/28/2025
DOB NOWPlumbingSigned-offA & E PLUMBING CORP03/31/2025
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL03/31/2025
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/17/2025
DOB NOWSuspended ScaffoldPermit IssuedLS GENERAL CORP02/27/2025
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC11/21/2024
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS11/14/2019
BISOTISSUEDMARIC PLUMBING & HEATING05/03/2011
BISPLISSUEDMARIC PLBG & HTG INC03/04/2011
BISOTISSUEDMARIC PLUMBING & HEATING03/04/2011
BISEQISSUEDDIONTECH CONSULTING INC03/23/2007
BISEQISSUEDNAV-TECH CONST CORP01/17/2007
BISEQISSUEDOUTDOOR INSTALLATIONS LLC11/17/2006
BISEQISSUEDNAV-TECH CONST CORP01/06/2006
BISEQISSUEDNAV-TECH CONST CORP10/13/2005
2 projects · most recent 06/25/2026
General Wiring
FiledStatusContractorScope
06/25/2026CompleteATLAS-ACON ELEC. SERVICEGeneral Wiring
10/29/2019Permit IssuedRICHARD NEU—
1 project · most recent 08/30/2023
Steel
FiledStatusContractorScope
08/30/2023Signed-offFSC D&C LLCSteel
1 project · most recent 07/31/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/31/2025Permit IssuedLS GENERAL CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
04/12/2026Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
04/12/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
04/12/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
04/12/2026Interior lighting powerSAMI HAJJAR P.Eenergy_progress
04/12/2026Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
04/12/2026Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
04/12/2026Lighting controlsSAMI HAJJAR P.Eenergy_progress
04/12/2026VestibulesSAMI HAJJAR P.Eenergy_progress
04/12/2026Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
04/12/2026FinalSAMI HAJJAR P.Eprogress
04/12/2026Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
07/31/2025Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
06/04/2025MasonrySAMI HAJJAR P.Especial
06/04/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
06/04/2025FinalSAMI HAJJAR P.Eprogress
05/22/2025MasonrySAMI HAJJAR P.Especial
05/22/2025FinalSAMI HAJJAR P.Eprogress
05/22/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
04/16/2025FinalSAMI HAJJAR P.Eprogress
04/16/2025MasonrySAMI HAJJAR P.Especial
04/16/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
03/03/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
03/03/2025Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
03/03/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
09/12/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
Latest 25 of 32.
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch12
08/26/2026B00911144-I1Request digital key ↗
08/23/2026B01145087-I1Request digital key ↗
08/22/2026B00918292-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00252472-I1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION4
05/06/2011320224413Open ↗
03/08/2011320224413Open ↗
03/08/2011320224413Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
10/25/2010320224413Open ↗
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/26/2026B00911144-I1Open ↗
08/23/2026B01145087-I1Open ↗
08/22/2026B00918292-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026B00948997-I1Open ↗
09/01/2026B00918292-P1Open ↗
09/01/2026B00918292-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B01180343-P1Open ↗
09/01/2026B00948997-I1Open ↗
09/01/2026B00918292-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/27/2011320224413Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
08/29/2011320224413Open ↗
10/25/2010320224413Open ↗
▸BISSCHEDULE B - PLUMBING1
10/25/2010320224413Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026B00252472-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026B00911144-I1Open ↗
08/21/2026B00930749-I1Open ↗
08/21/2026B00930749-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/22/2026B00918292-I1Open ↗
08/13/2026B00948997-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/25/2010320224413Open ↗
▸Inspections & Test Reports1
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
01/12/2012320224413Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/21/2026B00930749-I1Open ↗
08/21/2026B00930749-P1Open ↗
08/21/2026B00930749-P2Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
10/13/2010320224413Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B00252472-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
10/25/2010320224413Open ↗
10/25/2010320224413Open ↗
10/25/2010320224413Open ↗
▸Other Documents4
▸DOB NOWManufacturer's Specifications2
08/13/2026B01180343-P1Open ↗
08/13/2026B01180343-I1Open ↗
▸DOB NOWCalculations2
08/13/2026B01180343-P1Open ↗
08/13/2026B01180343-I1Open ↗