Elevator cooperative
115 EAST 90TH STREET
MANHATTAN · BIN 1048247
💬 Discuss this project
1923Year Built
9Stories
D4Building Class
R8BZoning
49,555 sfGross Floor Area
44Units
LL97 CoveredRent Stabilized0 Active Violations 2 likely answered ▸FISP: SWARMP
Elevator cooperative · Owner of record: 115 Tenants · 7,550 sf lot · 6.56 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSuspended scaffold for facade inspection and repairUnder Construction3p · 2 filings · 9 docs
PenthouseCharles H. Greenthal Management\3p · 1 filing · 4 docs
Floor 9Unit 9A, Unit 9BUnder Construction6p · 2 filings · 7 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorExterior masonry repairsUnder Construction8p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
115 Tenants6303/22/2026
Orsid NY210/16/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Anastasia Amelchakova201/06/2026
Rigid Structural Design212/23/2025
Cta Architects112/23/2025
Fifield Piaker Elman Architects111/11/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Noel Building Consulting403/21/2026
Rigid Structural Design603/21/2026
Municipal Building Consultants103/21/2026
Support Buildings of New York103/21/2026
Support Buildings103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Joseph Weinstein ElectricElectrical203/22/2026
King Construction GPGeneral Contractor207/08/2026
Argon ElectricalElectrical203/21/2026
K & G Electric CoElectrical103/21/2026
Update Systems ElectricalElectrical103/21/2026
P & Z ElectricElectrical103/21/2026
New Amsterdam Restorationspecialty_contractor106/27/2026
New Amsterdam RestorationScaffold104/09/2026
Accurate MechanicalPlumbing107/08/2026
Altec E & M, Inc. ElectricalElectrical103/21/2026
Stephen Foy Mechanical ServicePlumbing107/08/2026
All City ElectricalElectrical103/21/2026
Argon ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Urban Integrations7993109/23/2026
Ryan Special Engineering2018201/06/2026
Catalpa Special Inspectio2004112/23/2025
Metric Consulting and Ins1803112/23/2025
Building Lifecycle
All (85)Filed (7)Permit Issued (8)Signed Off (1)Facade (FISP) (18)Violation (40)Objection (4)Special Inspection (7)
10/15/2026
Permit issued — Suspended Scaffold
M01463762-I1-SC
09/23/2026
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
M01463762-I1
09/23/2026
Special inspection requirement — Post-installed Anchors
DANNY TRUJILLO
09/23/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
DANNY TRUJILLO
09/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
DANNY TRUJILLO
07/06/2026
Permit issued — General Construction
M01329127-I1-GC
07/01/2026
Cycle 9 facade report signed — SWARMP
06/24/2026
Permit issued — General Construction
M01315710-I1-GC
06/18/2026
Cycle 9 facade inspection completed
02/19/2026
Permit issued — Plumbing
M01329155-I1-PL
02/09/2026
Permit issued — General Construction
M01329127-I1-GC
01/27/2026
Objection resolved — Addressed
01/13/2026
Objection resolved — Addressed
01/07/2026
Permit issued — Suspended Scaffold
M01323148-I1-SC
01/06/2026
Filed — Alteration
Replace and install plumbing fixtures. No change of use, egress, or occupancy under this application.
M01329155-I1
01/06/2026
Filed — Alteration
M01329127-I1
01/06/2026
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
M01323148-I1
12/31/2025
Cycle 9 facade report submitted
12/30/2025
Objection raised — Scope
12/30/2025
Objection raised — Cost
12/23/2025
Filed — Alteration
M01333237-I1
12/23/2025
Filed — Alteration
LOCALIZED MASONRY REPAIRS AND ASSOCIATED FLASHING AT THE SOUTH ELEVATION. AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01315710-I1
12/23/2025
Permit issued — Sidewalk Shed
M01333237-I1-SH
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
11/07/2025
Special inspection requirement — Final
Christa Waring
11/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
11/07/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2022
Cycle 9 facade report signed — SWARMP
02/16/2022
Cycle 9 facade report submitted
02/14/2022
Cycle 9 facade inspection completed
09/03/2020
Signed off — Alteration
PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00255180-I1
11/18/2019
Permit issued — Plumbing
M00255180-I1-PL
11/11/2019
Filed — Alteration
PLUMBING MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00255180-I1
05/26/2019
Cycle 8 facade report signed — SAFE
05/09/2019
Cycle 8 facade inspection completed
12/31/2018
Violation issued (ECB, closed)
Construction
12/31/2018
Violation issued (ECB, closed)
Construction
12/18/2018
Cycle 8 facade report submitted
10/17/2017
Violation issued (ECB, closed)
Elevators
10/17/2017
Violation issued (ECB, closed)
Elevators
06/28/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/28/2017
Violation issued (ECB, closed)
Construction
02/15/2017
Cycle 8 facade report submitted
02/15/2017
Cycle 8 facade report signed — UNSAFE
02/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/01/2017
Cycle 8 facade inspection completed
10/12/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/12/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/02/2015
Violation issued (HPD, closed)
I
10/16/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/16/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/11/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/11/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/21/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/21/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/15/2012
Cycle 7 facade report submitted
02/13/2012
Cycle 7 facade report signed — SWARMP
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedNew Amsterdam Restoration10/15/2026
DOB NOWGeneral ConstructionPermit IssuedKing Construction GP07/06/2026
DOB NOWGeneral ConstructionPermit IssuedNew Amsterdam Restoration06/24/2026
DOB NOWPlumbingPermit IssuedAnthony Disabato02/19/2026
DOB NOWGeneral ConstructionPermit IssuedKing Construction GP02/09/2026
DOB NOWSuspended ScaffoldPermit IssuedNew Amsterdam Restoration01/07/2026
DOB NOWSidewalk ShedPermit IssuedNew Amsterdam Restoration12/23/2025
DOB NOWPlumbingSigned-offFoy Mechanical and Sons11/18/2019
BISOTISSUEDElysium Construction01/24/2022
BISOTISSUEDElysium Construction06/22/2021
BISOTISSUEDElysium Construction02/04/2021
BISPLISSUEDOrbit Plumbing & Heating06/20/2019
BISOTISSUEDJ Balaz & Associates06/17/2019
BISOTISSUEDJ Balaz & Associates06/12/2019
BISPLISSUEDG. & S. Plumbing & Heating Co03/14/2019
BISOTISSUEDFpa Construction02/07/2019
BISOTISSUEDEdras Group12/13/2017
BISOTISSUEDPrecise Renovation10/04/2017
BISOTISSUEDEdras Group08/01/2017
BISOTISSUEDHamilton Air Company07/13/2017
BISPLISSUEDOrbit Plumbing & Heating06/15/2017
BISOTISSUEDPrecise Renovation06/14/2017
BISPLISSUEDTesterman Plumbing & Heating03/27/2017
BISOTISSUEDKenway Management03/17/2017
BISOTISSUEDA.M.K. Contracting12/15/2016
BISPLISSUEDReyvin Plumbing & Heating12/15/2016
BISPLISSUEDA.M.N05/05/2015
BISOTISSUEDUnison Construction04/29/2015
BISPLISSUEDCC Controlled Plumbing Co01/13/2014
BISFSISSUEDC C Controlled Combustion01/13/2014
BISFSISSUEDC C Controlled Combustion12/04/2013
BISFBISSUEDC C Controlled Combustion07/16/2012
BISPLISSUEDCC Controlled Plumbing Co07/16/2012
BISPLISSUEDSparaco's P&H02/13/2012
BISPLISSUEDMega Plumbing10/27/2011
BISMHISSUEDCotel Contracting and Renovation10/07/2011
BISPLISSUEDPremier Flow Plumbing and Heating05/20/2010
BISOTISSUEDAW Group05/13/2010
BISPLISSUEDP.S.I. Mechanical10/01/2009
BISOTISSUEDCarrara Marble09/23/2009
+ 18 more permits on file
1 project · most recent 01/06/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/06/2026Permit IssuedAccurate MechanicalGas, Water/Sanitary
9 projects · most recent 06/16/2026
General Wiring
FiledStatusContractorScope
06/16/2026Permit IssuedGlendale Electl Contng—
05/05/2026CompleteCresco Electrical—
02/17/2026Permit IssuedP & Z ElectricGeneral Wiring
12/19/2025CompleteArgon ElectricalGeneral Wiring
09/23/2025Permit IssuedJoseph Weinstein ElectricGeneral Wiring
07/09/2025CancelledJoseph Weinstein ElectricGeneral Wiring
02/26/2021CompleteCentury ElectricGeneral Wiring
06/10/2020Permit IssuedK & G Electric CoGeneral Wiring
11/14/2019CompleteCavan Electric—
2 projects · most recent 09/23/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
09/23/2026Permit IssuedNew Amsterdam RestorationSuspended Scaffold (SC)
01/06/2026Permit IssuedNew Amsterdam RestorationSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
09/23/2026Post-installed AnchorsDANNY TRUJILLOspecial
09/23/2026Alternative Materials - OTCR Buildings Bulletin NumberDANNY TRUJILLOspecial
09/23/2026Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
12/04/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
11/07/2025FinalChrista Waringprogress
11/07/2025Tenant Protection Plan ComplianceERIC BERLENTspecial
11/07/2025MasonrySAMI HAJJAR P.Especial
▾Documents — 346 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
10/04/2026M01463762-I1Request digital key ↗
09/06/2026M01323087-I1Request digital key ↗
08/20/2026M01333237-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00255180-I1Request digital key ↗
▸Applications & Permits60
▸BISPLAN / WORK APPROVAL APPLICATION30
09/24/2025103108799Open ↗
09/22/2025103108799Open ↗
12/27/2020140987476Open ↗
Showing 3 of 30 on file for this type
▸BISWORK PERMIT APPLICATION30
02/04/2021140987476Open ↗
06/21/2019123898924Open ↗
06/17/2019123898924Open ↗
Showing 3 of 30 on file for this type
▸Seals & Professional Certifications64
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION38
10/30/2019123035777Open ↗
10/30/2019123035777Open ↗
07/15/2019123898924Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/06/2026M01323087-I1Open ↗
09/05/2026M00255180-I1Open ↗
08/20/2026M01333237-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
10/05/2026M01463762-I1Open ↗
10/05/2026M01463762-I1Open ↗
10/05/2026M01463762-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/10/2019123898924Open ↗
11/01/2017123277319Open ↗
Showing 2 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
12/27/2020140987476Open ↗
06/10/2019123898924Open ↗
11/01/2017123277319Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/27/2020140987476Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/27/2020140987476Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026M01315710-I1Open ↗
▸Trade Schedules & Equipment29
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
08/10/2020102042521Open ↗
01/30/2020123156397Open ↗
06/10/2019123898924Open ↗
Showing 3 of 14 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection13
▸BISTenant Protection Plan and Notes8
06/10/2019123898924Open ↗
12/26/2018123156397Open ↗
11/01/2017123277319Open ↗
Showing 3 of 8 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
07/25/2017123296085Open ↗
05/26/2017123095505Open ↗
Showing 2 of 3 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
01/21/2021140987476Open ↗
▸DOB NOWTenant Protection Plan1
09/05/2026M00255180-I1Open ↗
▸Environmental & Asbestos22
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
12/27/2020140987476Open ↗
06/10/2019123898924Open ↗
01/31/2019123156397Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
12/14/2017123277319Open ↗
08/07/2017123312281Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/05/2026M00255180-I1Open ↗
08/13/2026M01315710-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/20/2026M01329155-I1Open ↗
08/20/2026M01329127-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/10/2020102042521Open ↗
▸Energy Compliance36
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
07/15/2019123898924Open ↗
06/10/2019123898924Open ↗
12/26/2018123156397Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
05/21/2020123156397Open ↗
10/30/2019123035777Open ↗
07/15/2019123898924Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/25/2021140987476Open ↗
12/27/2020140987476Open ↗
05/21/2020123156397Open ↗
▸BISLIGHTING CONTROLS1
02/09/2022140987476Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/27/2020140987476Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/09/2022140987476Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/09/2022140987476Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY6
01/25/2021140987476Open ↗
12/27/2020140987476Open ↗
08/07/2020102042521Open ↗
Showing 3 of 6 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
09/30/2025103108799Open ↗
09/30/2025103108799Open ↗
▸Approvals, Objections & Sign-offs22
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
10/01/2025103108799Open ↗
02/09/2022140987476Open ↗
05/21/2020123156397Open ↗
Showing 3 of 15 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/19/2017123296085Open ↗
Showing 1 of 2 on file for this type
▸BISFINAL1
02/09/2022140987476Open ↗
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT30
12/27/2020140987476Open ↗
05/21/2020123156397Open ↗
10/30/2019123035777Open ↗
Showing 3 of 30 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/09/2022140987476Open ↗
▸Filing & Intake Forms40
▸BISBOROUGH INTAKE FORM17
01/30/2020123156397Open ↗
10/30/2019123035777Open ↗
08/02/2019102068281Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING COVER SHEET12
06/10/2019123898924Open ↗
06/10/2019123898924Open ↗
12/26/2018123156397Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION10
08/09/2019123156397Open ↗
05/08/2019123156397Open ↗
02/26/2019123156397Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
12/27/2020140987476Open ↗
▸Other Documents13
▸BISSupporting Document: Fee Exempt3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/31/2017121841025Open ↗
Showing 1 of 2 on file for this type
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7792
09/30/2025103108799Open ↗
09/30/2025103108799Open ↗
▸BIS* FIRE STOPS 27-3452
09/30/2025103108799Open ↗
09/30/2025103108799Open ↗
▸DOB NOWManufacturer's Specifications2
10/04/2026M01463762-I1Open ↗
08/13/2026M01323148-I1Open ↗
▸DOB NOWCalculations2
10/04/2026M01463762-I1Open ↗
08/13/2026M01323148-I1Open ↗