← Back
Gas or electric utility
1165 RICHMOND TERRACE
STATEN ISLAND · BIN 5106568
💬 Discuss this project
0Year Built
—Stories
U2Building Class
M1-1Zoning
0 sfGross Floor Area
0Units
1 Open Violation ▸FDNY Report ↗
Gas or electric utility · Owner of record: CONSOLIDATED EDISON CO.OF N.Y.,INC. · 96,501 sf lot · 0 FAR built · Flood zone X500
Locations of Work
MechanicalGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 5 docs
Floor 21p · 1 filing · 6 docs
Floor 11p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONSOLIDATED EDISON COMPANY2909/13/2026
CONSOLITADED EDISON CO2307/08/2026
CONSOLITADED EDISON CO OF NY1803/22/2026
CON EDISON603/22/2026
CONSOLIDATED EDISON CO OF NY803/21/2026
CONSOLIDATED EDISON OF NEW YORK103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.603/21/2026
METROPOLIS GROUP INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D'ONOFRIO GENERAL CONTRACTORSGeneral Contractor707/08/2026
ACME INDUSTRIAL INCGeneral Contractor307/08/2026
C.A.C. INDUSTRIES, INCGeneral Contractor307/08/2026
IDEAL BUILDERS AND PROPERGeneral Contractor303/21/2026
MEHMOOD GENERAL CONTRACTINGGeneral Contractor303/21/2026
IRA KATZElectrical103/21/2026
AFGO MECHANICAL SVCS INCGeneral Contractor107/17/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VINCENT J. LIOTTA P. E.1974107/16/2026
TECTONIC ENGINEERING CONS106612/12/2024
CATALPA SPECIAL INSPECTIO2004208/04/2020
Building Lifecycle
All (68)Filed (10)Permit Issued (15)Signed Off (6)Violation (15)Special Inspection (22)
07/16/2026
Filed — Alteration
REPLACMENT OF TWO ROOFTOP CONDENSING UNITS WITH A TOTAL CAPACITY OF 10 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
S01419087-I1
07/16/2026
Permit issued — Mechanical Systems
S01419087-I1-MS
06/18/2026
Special inspection requirement — Mechanical Systems
Vincent Liotta
06/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
06/18/2026
Special inspection requirement — Maintenance information
Vincent Liotta
06/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
06/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
06/18/2026
Special inspection requirement — Final
Vincent Liotta
12/12/2025
Permit issued — Structural
S00892115-I1-ST
02/24/2025
Signed off — Alteration
BUILDING FACADE UPGRADES WHICH INCLUDE: BRICK VENEER REPAIRS/REPLACEMENT, BRICK REPOINTING AND CRACK REPAIRS, STEEL LINTEL REPLACEMENT/REPAIR, CLEAN/PAINT EXISTING STEEL, COSMETIC STUCCO & CEMENTITIOUS COATINGS REPAIR, ROOF GUARDRAIL REMOVE/REINSTALL
S00921780-I1
02/20/2025
Signed off — Alteration
BUILDING FACADE UPGRADES WHICH INCLUDE: BRICK VENEER REPAIRS/REPLACEMENT, BRICK REPOINTING AND CRACK REPAIRS, STEEL LINTEL REPLACEMENT/REPAIR, CLEAN/PAINT EXISTING STEEL, COSMETIC STUCCO & CEMENTITIOUS COATINGS
S00935830-I1
12/12/2024
Filed — Alteration
BUILDING FACADE UPGRADES WHICH INCLUDE: BRICK VENEER REPAIRS/REPLACEMENT, BRICK REPOINTING AND CRACK REPAIRS, STEEL LINTEL REPLACEMENT/REPAIR, CLEAN/PAINT EXISTING STEEL, COSMETIC STUCCO & CEMENTITIOUS COATINGS
S00935830-P1
12/12/2024
Special inspection requirement — Masonry
GEORGE GHEBRYAL
12/12/2024
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
12/12/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
12/10/2024
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
12/10/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
12/10/2024
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
12/10/2024
Special inspection requirement — Masonry
GEORGE GHEBRYAL
11/25/2024
Permit issued — Structural
S00892115-I1-ST
10/30/2024
Signed off — Alteration
S00802201-I1
09/08/2024
Signed off — Alteration
Filing for temporary sidewalk shed. No change in use, egress or occupancy.
S00980318-I1
07/11/2024
Permit issued — General Construction
S00921780-I1-GC-CX
07/11/2024
Permit issued — General Construction
S00935830-I1-GC-CX
06/11/2024
Permit issued — General Construction
S00935830-I1-GC-CX
03/22/2024
Filed — Alteration
BUILDING FACADE UPGRADES WHICH INCLUDE: BRICK VENEER REPAIRS/REPLACEMENT, BRICK REPOINTING AND CRACK REPAIRS, STEEL LINTEL REPLACEMENT/REPAIR, CLEAN/PAINT EXISTING STEEL, COSMETIC STUCCO & CEMENTITIOUS COATINGS
S00935830-I1
03/11/2024
Permit issued — General Construction
S00802201-I1-GC
03/11/2024
Permit issued — Structural
S00921780-I1-GC-CX
01/08/2024
Permit issued — Sidewalk Shed
S00980318-I1-SH
12/22/2023
Permit issued — Sidewalk Shed
S00980318-I1-SH
12/20/2023
Filed — Alteration
Filing for temporary sidewalk shed. No change in use, egress or occupancy.
S00980318-I1
12/19/2023
Permit issued — General Construction
S00802201-I1-GC
12/08/2023
Permit issued — Structural
S00892115-I1-ST
10/23/2023
Permit issued — Structural
S00921780-I1-GC-CX
10/05/2023
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
10/05/2023
Special inspection requirement — Masonry
GEORGE GHEBRYAL
10/05/2023
Special inspection requirement — Final
GEORGE GHEBRYAL
10/04/2023
Filed — Alteration
S00892115-I1
10/02/2023
Filed — Alteration
BUILDING FACADE UPGRADES WHICH INCLUDE: BRICK VENEER REPAIRS/REPLACEMENT, BRICK REPOINTING AND CRACK REPAIRS, STEEL LINTEL REPLACEMENT/REPAIR, CLEAN/PAINT EXISTING STEEL, COSMETIC STUCCO & CEMENTITIOUS COATINGS REPAIR, ROOF GUARDRAIL REMOVE/REINSTALL
S00921780-P1
09/28/2023
Special inspection requirement — Final
GEORGE GHEBRYAL
09/28/2023
Special inspection requirement — Masonry
GEORGE GHEBRYAL
09/28/2023
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
09/27/2023
Filed — Alteration
BUILDING FACADE UPGRADES WHICH INCLUDE: BRICK VENEER REPAIRS/REPLACEMENT, BRICK REPOINTING AND CRACK REPAIRS, STEEL LINTEL REPLACEMENT/REPAIR, CLEAN/PAINT EXISTING STEEL, COSMETIC STUCCO & CEMENTITIOUS COATINGS REPAIR, ROOF GUARDRAIL REMOVE/REINSTALL
S00921780-I1
08/18/2023
Filed — Alteration
S00802201-I1
08/17/2020
Signed off — Alteration
S00372212-I1
08/04/2020
Filed — Alteration
S00372212-I1
08/04/2020
Permit issued — Mechanical Systems
S00372212-I1-MS
05/01/2020
Signed off — Alteration
Replace 2 existing AC units, 1 on roof and 1 on 1st floor exterior wall. New units to be installed on existing dunnage. Install 2 air handlers, 1 in 2nd floor telecom room and 1 in 1st floor conference room.
S00313660-I1
03/04/2020
Permit issued — Mechanical Systems
S00313660-I1-MS
02/28/2020
Filed — Alteration
Replace 2 existing AC units, 1 on roof and 1 on 1st floor exterior wall. New units to be installed on existing dunnage. Install 2 air handlers, 1 in 2nd floor telecom room and 1 in 1st floor conference room.
S00313660-I1
02/18/2020
Special inspection requirement — HVAC and service water heating equipment
Sanford Berger
02/11/2020
Special inspection requirement — Mechanical Systems
Sanford Berger
02/11/2020
Special inspection requirement — Final
Sanford Berger
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/05/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/01/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedAFGO MECHANICAL SVCS INC07/16/2026
DOB NOWStructuralPermit IssuedC.A.C. INDUSTRIES, INC12/12/2025
DOB NOWStructuralPermit IssuedC.A.C. INDUSTRIES, INC11/25/2024
DOB NOWGeneral ConstructionSigned-offD'ONOFRIO GENERAL CONTRAC07/11/2024
DOB NOWGeneral ConstructionSigned-offD'ONOFRIO GENERAL CONTRAC07/11/2024
DOB NOWGeneral ConstructionSigned-offD'ONOFRIO GENERAL CONTRAC06/11/2024
DOB NOWGeneral ConstructionSigned-offD'ONOFRIO GENERAL CONTRAC03/11/2024
DOB NOWStructuralSigned-offD'ONOFRIO GENERAL CONTRAC03/11/2024
DOB NOWSidewalk ShedSigned-offIDEAL BUILDERS AND PROPER01/08/2024
DOB NOWSidewalk ShedSigned-offMEHMOOD GENERAL CONTRACTI12/22/2023
DOB NOWGeneral ConstructionSigned-offD'ONOFRIO GENERAL CONTRAC12/19/2023
DOB NOWStructuralPermit IssuedC.A.C. INDUSTRIES, INC12/08/2023
DOB NOWStructuralSigned-offD'ONOFRIO GENERAL CONTRAC10/23/2023
DOB NOWMechanical SystemsSigned-offACME INDUSTRIAL INC08/04/2020
DOB NOWMechanical SystemsSigned-offACME INDUSTRIAL INC03/04/2020
BISOTISSUEDVERDE ELECTRIC CORP01/25/2022
BISOTISSUEDATTRI ENTERPRISES INC11/17/2017
BISOTISSUEDAIRMONT INC03/18/2016
BISMHISSUEDAIRMONT INC12/14/2015
BISOTISSUEDO'LEARY CONSTRUCTION INC05/20/2014
BISPLISSUEDRICHMOND P & H CO., INC05/20/2014
BISOTISSUEDO'LEARY CONSTRUCTION INC05/07/2014
BISOTISSUEDNATIONAL MICROWAVE CONTRA12/22/2011
BISOTISSUEDNATIONAL MICROWAVE CONTRA04/21/2011
BISOTISSUEDSWIFT CONTRACTING & MAINT05/20/2010
BISOTISSUEDSWIFT CONTRACTING & MAINT05/10/2010
BISMHISSUEDS. DI GIACOMO & SON INC05/28/2009
BISOTISSUEDS. DI GIACOMO & SON INC05/28/2009
BISMHISSUEDHOLT CONSTRUCTION CORP02/05/2009
BISOTISSUEDATTRI ENTERPRISES INC11/24/2008
BISMHISSUEDHOLT CONSTRUCTION CORP10/31/2008
BISMHISSUEDARIMONT INC03/26/2007
BISOTISSUEDMONARCH CONSTRUCTION05/09/2006
BISMHISSUEDCON EDISON COMPANY INC02/17/2006
BISOTISSUEDPROFESSIONAL ENVIROMENTAL SYSTEM11/10/2004
BISOTISSUEDSALOMONE BROS OF NEW YORK,INC08/21/1998
BISPLISSUEDBROOK PLUMBING & HTG CORP12/24/1996
BISMHISSUEDJT & T AIRCONDITIONING CORP.04/11/1996
BISOTISSUEDMONARCH CONSTRUCTION CORP.10/24/1995
BISEQISSUEDMONARCH CONSTRUCTION CORP.04/06/1993
+ 5 more permits on file
1 project · most recent 07/16/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/16/2026Permit IssuedAFGO MECHANICAL SVCS INCAir Conditioning Systems
Cooling
Vertiv CUL211 5 tons · Rooftop Unit ×2
25 projects · most recent 05/16/2024
General Wiring Lighting
FiledStatusContractorScope
05/16/2024CompleteCONSOLIDATED EDISON COGeneral Wiring
05/16/2024CompleteCONSOLIDATED EDISON CO—
03/18/2024CompleteCONSOLIDATED EDISON COGeneral Wiring
03/15/2024CompleteCONSOLIDATED EDISON COGeneral Wiring
02/23/2024CompleteSTANCO SYSTEM ELEC'L CONTGeneral Wiring
02/12/2024CompleteCONSOLIDATED EDISON CO—
01/17/2024CompleteSTANCO SYSTEM ELEC'L CONT—
11/01/2023Permit IssuedJAVELIN ELECTRIC INC1 meters, 1 new_meters
10/25/2023CompleteCONSOLIDATED EDISON CO—
05/11/2023CompleteCONSOLIDATED EDISON CO—
09/14/2022CompleteCONSOLIDATED EDISON CO—
02/13/2022CompleteCONSOLIDATED EDISON COGeneral Wiring
01/21/2022CompleteCONSOLIDATED EDISON COGeneral Wiring
12/07/2021CompleteCONSOLIDATED EDISON COGeneral Wiring
06/15/2021CompleteVERDE ELECTRIC CORP.General Wiring
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
06/18/2026Mechanical SystemsVincent Liottaspecial
06/18/2026HVAC-R and service water heating equipmentVincent Liottaenergy_progress
06/18/2026Maintenance informationVincent Liottaenergy_progress
06/18/2026HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
06/18/2026HVAC-R and service water heating system controlsVincent Liottaenergy_progress
06/18/2026FinalVincent Liottaprogress
12/12/2024MasonryGEORGE GHEBRYALspecial
12/12/2024Structural Steel - DetailsGEORGE GHEBRYALspecial
12/12/2024FinalGEORGE GHEBRYALprogress
12/10/2024Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
12/10/2024FinalGEORGE GHEBRYALprogress
12/10/2024Structural Steel - DetailsGEORGE GHEBRYALspecial
12/10/2024MasonryGEORGE GHEBRYALspecial
10/05/2023Structural Steel - DetailsGEORGE GHEBRYALspecial
10/05/2023MasonryGEORGE GHEBRYALspecial
10/05/2023FinalGEORGE GHEBRYALprogress
09/28/2023FinalGEORGE GHEBRYALprogress
09/28/2023MasonryGEORGE GHEBRYALspecial
09/28/2023Structural Steel - DetailsGEORGE GHEBRYALspecial
02/18/2020HVAC and service water heating equipment Sanford Bergerenergy_progress
02/11/2020Mechanical SystemsSanford Bergerspecial
02/11/2020FinalSanford Bergerprogress
▾Documents — 232 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch8
08/22/2026S00802201-I1Request digital key ↗
08/22/2026S00921780-I1Request digital key ↗
08/22/2026S00921780-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/26/2026S00313660-I1Request digital key ↗
08/26/2026S00372212-I1Request digital key ↗
▸Applications & Permits44
▸BISPLAN / WORK APPROVAL APPLICATION24
02/04/2021540184049Open ↗
04/08/2020520450486Open ↗
03/03/2020520450486Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION20
01/25/2022540184049Open ↗
05/03/2021520450486Open ↗
11/17/2017520301021Open ↗
Showing 3 of 20 on file for this type
▸Seals & Professional Certifications68
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
03/03/2020520450486Open ↗
03/03/2020520450486Open ↗
11/20/2017520301021Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026S00372212-I1Open ↗
08/22/2026S00802201-I1Open ↗
08/22/2026S00921780-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026S00313660-I1Open ↗
09/01/2026S00313660-I1Open ↗
08/28/2026S00935830-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
04/08/2020520450486Open ↗
03/03/2020520450486Open ↗
11/20/2017520301021Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026S00313660-I1Open ↗
08/28/2026S00935830-I1Open ↗
08/26/2026S00921780-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
03/03/2020520450486Open ↗
11/20/2017520301021Open ↗
09/21/2015520255009Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/12/2012520110727Open ↗
09/25/2008510055299Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/04/2021540184049Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/04/2021540184049Open ↗
▸Trade Schedules & Equipment21
▸BISEQUIPMENT USE APPLICATION/PERMIT8
08/19/2016520255009Open ↗
05/06/2010520005262Open ↗
11/25/2009510055299Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
08/01/2014520190383Open ↗
08/01/2014520190383Open ↗
01/27/2010520005262Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS3
08/22/2016520255009Open ↗
05/06/2010520005262Open ↗
11/25/2009510055299Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
08/01/2014520190383Open ↗
08/01/2014520190383Open ↗
▸BISSCHEDULE B - PLUMBING2
11/19/2009520005262Open ↗
05/22/2009520005262Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/14/2014520190383Open ↗
▸Environmental & Asbestos19
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
11/04/2011520082801Open ↗
03/10/2011520061021Open ↗
03/04/2010520030305Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026S00372212-I1Open ↗
08/22/2026S00802201-I1Open ↗
08/22/2026S00921780-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
04/08/2020520450486Open ↗
11/20/2017520301021Open ↗
09/21/2015520255009Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/08/2021540184049Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026S00935830-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/03/2020520450486Open ↗
11/20/2017520301021Open ↗
04/14/2014520190383Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
06/06/2024540184049Open ↗
05/24/2021520450486Open ↗
07/30/2012520082801Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/04/2021540184049Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/31/2025540184049Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/24/2021520450486Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/28/2024540184049Open ↗
▸BISTECHNICAL REPORT: ENERGY1
11/04/2011520082801Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/24/2021520450486Open ↗
02/08/2021540184049Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/28/2024540184049Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
04/14/2014520190383Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
05/08/2014520190383Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/28/2024540184049Open ↗
▸Approvals, Objections & Sign-offs19
▸BISADMINISTRATIVE OBJECTIONS12
03/03/2020520450486Open ↗
05/24/2017520301021Open ↗
09/21/2015520255009Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
05/24/2021520450486Open ↗
08/09/2016520255009Open ↗
07/30/2012520082801Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL1
02/28/2024540184049Open ↗
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT22
06/06/2024540184049Open ↗
05/24/2021520450486Open ↗
02/04/2021540184049Open ↗
Showing 3 of 22 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/31/2025540184049Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION5
08/05/2016520255009Open ↗
06/27/2012520082801Open ↗
06/25/2012520082801Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
03/03/2020520450486Open ↗
11/20/2017520301021Open ↗
09/21/2015520255009Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
02/04/2021540184049Open ↗
▸BISBOROUGH INTAKE FORM1
04/08/2020520450486Open ↗