1199 PARK AVENUE · BIN 1048412
💬 Discuss this project
1961Year Built
18Stories
D4Building Class
R10Zoning
210,988 sfGross Floor Area
149Units
LL97 CoveredRent Stabilized0 Active Violations 1 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: Park Hill Tenants · 17,616 sf lot · 11.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 18Unit 18D10p · 2 filings · 17 docs
Floor 17
Floor 16
Floor 15Unit 15AUnder Construction3p · 1 filing · 3 docs
Floor 14Unit 14C8p · 1 filing · 3 docs
Floor 13Unit 14E9p · 1 filing · 8 docs
Floor 12Unit 12H1p · 1 filing · 3 docs
Floor 11
Floor 10
Floor 9
Floor 8Herkimer Partners1 filing · 2 docs
Floor 7Unit 7E, Unit 7F8p · 2 filings · 6 docs
Floor 6
Floor 5Unit 5H, Unit 5J, Unit 5FGE19p · 4 filings · 20 docs
Floor 4Unit 4A, Unit 4B17p · 3 filings · 20 docs
Floor 3Unit 3D, Unit 3E, Unit 3H +1Under Construction15p · 4 filings · 20 docs
Floor 2Unit 2F8p · 1 filing · 7 docs
Floor 1Unit 1B, Unit 2F14p · 4 filings · 20 docs
CellarParking garage repairs14p · 2 filings · 20 docs
Sub-CellarParking garage repairs9p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Park Hill Tenants7503/22/2026
70 East 96th St603/21/2026
Brown, Harris, Stevens403/21/2026
Floorever Carpets203/21/2026
Edelman103/21/2026
Herkimer Partners103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
East Coast Expediting303/21/2026
A+ Expediting203/21/2026
Idm Associates1003/21/2026
Jenny Flores Expediting203/21/2026
Robert Papazian Architect203/21/2026
Robert R Bisaccia203/21/2026
Anthony Morali Architect403/21/2026
BMB Building Consulting403/21/2026
Code403/21/2026
Mark Montoya203/21/2026
Resolution Expediting403/21/2026
KM Associates of New York303/21/2026
MJB Consultants203/21/2026
K & M Associates303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Alan ConstructionGeneral Contractor407/08/2026
Nail on the HeadGeneral Contractor403/21/2026
Apollo Plumbing & HeatingPlumbing307/08/2026
SSL ConstructionGeneral Contractor303/21/2026
Rambal ContractorsGeneral Contractor303/21/2026
Tap PlumbingPlumbing208/21/2026
Ari GroupGeneral Contractor203/21/2026
Design RenovateGeneral Contractor207/08/2026
Hamilton Air CompanyGeneral Contractor203/21/2026
Schnellbacher-Sendon Group*General Contractor207/08/2026
SJB InteriorsGeneral Contractor203/21/2026
WaxtelGeneral Contractor207/08/2026
A & M Warshaw Plumbing & HeatingPlumbing207/08/2026
DP FLYNN Plumbing & HeatingPlumbing207/08/2026
Aqueduct MechanicalPlumbing107/08/2026
Artur KalajGeneral Contractor107/03/2026
Azm Home ImprovementsGeneral Contractor104/09/2026
Craft Design ConstructionGeneral Contractor104/09/2026
DonatoPlumbing107/08/2026
Century Electric CoElectrical103/22/2026
H & D Maintenance CoGeneral Contractor107/08/2026
M&C Design GroupGeneral Contractor107/08/2026
Jorden-Ash ElectricElectrical103/22/2026
Inner City Electrical ContractorsElectrical103/21/2026
DPH Plumbing & HeatingPlumbing107/08/2026
Express PL SWR & WTR APlumbing107/08/2026
Everbright ElectricElectrical103/22/2026
Genesis Plumbing and HeatingPlumbing107/08/2026
Gregg NY PlumbingPlumbing107/08/2026
Magnetic Electrical ConsElectrical103/21/2026
Ket ElectricElectrical103/21/2026
Lens ElectricElectrical103/21/2026
WCK ElectricElectrical103/21/2026
New Century Electrical ContractingElectrical103/21/2026
Update Systems ElectricalElectrical103/22/2026
Vertex ElectricElectrical103/22/2026
Joseph Weinstein ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519608/13/2026
New Line Construction7226201/15/2026
The Vilnits Group1223101/10/2026
Ryan Special Engineering2018101/02/2026
M.G. McLaren Engineering2999312/06/2024
Robert Papazian Architect3491105/14/2024
Fsi Architecture354201/23/2024
AR Architect1171101/12/2024
IP Group2542110/30/2023
Jock Deboer, AIA - Sia7008110/06/2023
Ayuso Architecture7720203/13/2023
Jack Green Associates422109/07/2022
Katz Engineering238112/08/2021
Crosscheck Inspection Services544301/11/2021
Building Lifecycle
All (259)Filed (39)Permit Issued (35)Signed Off (23)Facade (FISP) (12)Violation (58)Inspection (20)Objection (42)Special Inspection (30)
10/16/2026
Signed off — Alteration
INTERIOR RENOVATION OF APT #2F PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01333622-I1
10/14/2026
Signed off — Alteration
INTERIOR RENOVATION OF APT #2F PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01333622-S1
08/27/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/20/2026
Permit issued — Plumbing
M01379396-S1-PL
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
08/13/2026
Filed — Alteration
Combination of two residential units including demolition and reconfiguration as per TPPN 3/97.. Removal of one kitchen and addition of one powder room. Installation of new fixtures and finishes. Filed to supersede Alt M01340858 which (see comments)
M01379396-P4
08/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/13/2026
Special inspection requirement — Final
NAVEEN KUMAR
08/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
08/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
JEFFREY BELL
08/06/2026
Filed — Alteration
Combination of two residential units including demolition and reconfiguration as per TPPN 3/97.. Removal of one kitchen and addition of one powder room. Installation of new fixtures and finishes. Filed to supersede Alt M01340858 which (see comments)
M01379396-P3
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
07/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/08/2026
Signed off — Alteration
Proposed filing to renovate existing apartment unit 14C, no change in use, egress or occupancy.
M01307749-I1
05/29/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/07/2026
Permit issued — General Construction
M01379396-I1-GC
04/27/2026
Permit issued — General Construction
M01333091-I1-GC
04/23/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/20/2026
Filed — Alteration
Combination of two residential units including demolition and reconfiguration as per TPPN 3/97.. Removal of one kitchen and addition of one powder room. Installation of new fixtures and finishes. Filed to supersede Alt M01340858 which (see comments)
M01379396-S1
04/14/2026
Filed — Alteration
Combination of two residential units including demolition and reconfiguration as per TPPN 3/97.. Removal of one kitchen and addition of one powder room. Installation of new fixtures and finishes. Filed to supersede Alt M01340858 which (see comments)
M01379396-I1
03/20/2026
Permit issued — Plumbing
M01340858-S1-PL
03/18/2026
Permit issued — General Construction
M01340858-I1-GC
02/12/2026
Permit issued — Plumbing
M01333622-S1-PL
02/03/2026
Permit issued — General Construction
M01333622-I1-GC
01/15/2026
Filed — Alteration
Combination of two residential units including demolition and reconfiguration. Removal of one kitchen and addition of one powder room. Installation of new fixtures and finishes.
M01340858-S1
01/15/2026
Filed — Alteration
Combination of two residential units including demolition and reconfiguration. Removal of one kitchen and addition of one powder room. Installation of new fixtures and finishes.
M01340858-I1
01/10/2026
Filed — Alteration
RENOVATION OF APT 15A. INTERIOR PARTITION REMOVAL AND CONSTRUCTION RELATED TO RENOVATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.V
M01333091-I1
01/02/2026
Filed — Alteration
INTERIOR RENOVATION OF APT #2F PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01333622-S1
12/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AUGUSTINE OKUNDAYE
12/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
12/19/2025
Filed — Alteration
INTERIOR RENOVATION OF APT #2F PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01333622-I1
12/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
11/24/2025
Permit issued — General Construction
M01307749-I1-GC
11/12/2025
Objection resolved — Addressed
11/07/2025
Objection raised — Scope
10/30/2025
Filed — Alteration
Proposed filing to renovate existing apartment unit 14C, no change in use, egress or occupancy.
M01307749-I1
06/24/2025
Signed off — Alteration
Filing herewith plans showing partial renovation work in Apt 2F. No change in Use, Egress or Occupancy under this application.
M01179611-I1
06/04/2025
Violation issued (HPD, closed)
A
05/07/2025
Signed off — Alteration
Structural work associated with garage restoration work. No change in occupancy, use or egress.
M00892368-I1
03/18/2025
Signed off — Alteration
M00897366-I1
03/03/2025
Permit issued — General Construction
M01179611-I1-GC
02/26/2025
Signed off — Alteration
HEREBY FILING FOR THE RENOVATION/COMBINATION OF UNITS 5H AND 5J (REMOVAL/INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00967362-S1
02/26/2025
Signed off — Alteration
HEREBY FILING FOR THE RENOVATION/COMBINATION OF UNITS 5H AND 5J (REMOVAL/INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00967362-I1
02/19/2025
Filed — Alteration
Filing herewith plans showing partial renovation work in Apt 2F. No change in Use, Egress or Occupancy under this application.
M01179611-I1
02/11/2025
Special inspection requirement — Final
Jillian Sheedy
02/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
Howard Bader
01/09/2025
Permit issued — General Construction
M00897366-I1-GC
12/11/2024
Special inspection requirement — Concrete - Cast-In-Place
Jeremy Billig
12/11/2024
Special inspection requirement — Final
SPIRO ANXHARA
12/11/2024
Special inspection requirement — Structural Steel - Welding
Jeremy Billig
12/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jeremy Billig
12/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
James Cicalo
12/06/2024
Filed — Alteration
Structural work associated with garage restoration work. No change in occupancy, use or egress.
M00892368-P2
12/02/2024
Signed off — Alteration
M01034696-I1
11/22/2024
Violation issued (HPD, closed)
I
10/30/2024
Violation issued (ECB, closed)
Construction
10/15/2024
Signed off — Alteration
M00739668-I1
Latest 60 of 259 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTap Plumbing08/20/2026
DOB NOWGeneral ConstructionPermit IssuedDesign Renovate05/07/2026
DOB NOWGeneral ConstructionPermit IssuedArtur Kalaj04/27/2026
DOB NOWPlumbingPermit IssuedTap Plumbing03/20/2026
DOB NOWGeneral ConstructionPermit IssuedDesign Renovate03/18/2026
DOB NOWPlumbingSigned-offGregg NY Plumbing02/12/2026
DOB NOWGeneral ConstructionSigned-offAzm Home Improvements02/03/2026
DOB NOWGeneral ConstructionSigned-offCraft Design Construction11/24/2025
DOB NOWGeneral ConstructionSigned-offH & D Maintenance Co03/03/2025
DOB NOWGeneral ConstructionSigned-offWaxtel01/09/2025
DOB NOWGeneral ConstructionSigned-offWaxtel10/15/2024
DOB NOWGeneral ConstructionSigned-offRambal Contractors05/31/2024
DOB NOWStructuralSigned-offSchnellbacher-Sendon Group*05/22/2024
DOB NOWPlumbingSigned-offApollo Plumbing & Heating04/18/2024
DOB NOWGeneral ConstructionSigned-offAlan Construction04/17/2024
DOB NOWPlumbingSigned-offExpress Plumbing SWR & WTR Ma12/14/2023
DOB NOWGeneral ConstructionSigned-offSSL Construction12/13/2023
DOB NOWStructuralSigned-offSchnellbacher-Sendon Group*08/03/2023
DOB NOWGeneral ConstructionSigned-offNail on the Head05/04/2023
DOB NOWPlumbingSigned-offDonato05/04/2023
DOB NOWGeneral ConstructionSigned-offM&C Design Group01/19/2023
DOB NOWPlumbingSigned-offDPH Plumbing & Heating10/20/2022
DOB NOWPlumbingSigned-offAqueduct Mechanical10/19/2022
DOB NOWGeneral ConstructionSigned-offNail on the Head10/18/2022
DOB NOWMechanical SystemsPermit IssuedHamilton Air Company10/14/2022
DOB NOWGeneral ConstructionSigned-offAri Group09/30/2022
DOB NOWPlumbingSigned-offApollo Plumbing & Heating03/31/2022
DOB NOWPlumbingSigned-offDP FLYNN Plumbing & Heating03/28/2022
DOB NOWPlumbingSigned-offApollo Plumbing & Heating03/04/2022
DOB NOWGeneral ConstructionSigned-offAlan Construction02/18/2022
DOB NOWPlumbingSigned-offA & M Warshaw Plumbing & Heating09/14/2021
DOB NOWPlumbingSigned-offDP FLYNN Plumbing & Heating09/13/2021
DOB NOWGeneral ConstructionSigned-offSJB Interiors08/17/2021
DOB NOWPlumbingSigned-offA & M Warshaw Plumbing & Heating09/21/2020
DOB NOWPlumbingSigned-offGenesis Plumbing and Heating07/09/2020
BISOTISSUEDJbuild09/03/2020
BISOTISSUEDIdc Construction07/16/2020
BISPLRE-ISSUEDHydrokinetic Plumbing & Heating I06/14/2019
BISOTISSUEDHudson Green Craft06/11/2019
BISOTISSUEDStandard Environmental03/15/2019
+ 45 more permits on file
3 projects · most recent 08/13/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/13/2026Permit IssuedTap PlumbingGas, Water/Sanitary
01/15/2026Permit IssuedTap PlumbingGas, Water/Sanitary
07/08/2021Signed-offDP FLYNN Plumbing & HeatingWater/Sanitary
25 projects · most recent 09/11/2026
General Wiring
FiledStatusContractorScope
09/11/2026CompletePK Electric—
05/13/2026CompleteTesta Electric CoGeneral Wiring
05/06/2026Permit IssuedTitanium ElectricalGeneral Wiring
03/26/2026Permit IssuedKet ElectricGeneral Wiring
02/04/2026CompleteLens ElectricGeneral Wiring
01/06/2026CompleteKet ElectricGeneral Wiring
12/12/2025CompleteV Electric NYGeneral Wiring
09/17/2025CompletePrudent ElectricGeneral Wiring
08/18/2025CompleteTesta Electric CoGeneral Wiring
07/07/2025CompletePower Surge ElectricGeneral Wiring
04/23/2025CompleteHorsepower ElectricGeneral Wiring
01/06/2025CompleteErrigal ElectricalGeneral Wiring
11/18/2024CompleteHorsepower ElectricGeneral Wiring
10/25/2024CompleteJoseph Weinstein ElectricGeneral Wiring
07/30/2024CompleteDenmar Electric—
2 projects · most recent 01/15/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
01/15/2026Permit IssuedTap PlumbingTenant Protection Plan 72 Hour
01/02/2026Signed-offGregg NY PlumbingTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
08/27/2026Fail-Final General Construction Non-Directive 14FailView ↗
07/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/23/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/17/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/26/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/26/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/08/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/05/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
08/18/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/18/2026Tenant Protection Plan ComplianceYounes Abouyaalaspecial
08/13/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/13/2026FinalNAVEEN KUMARprogress
08/13/2026Tenant Protection Plan ComplianceYounes Abouyaalaspecial
08/13/2026Fire-Resistance Rated ConstructionJEFFREY BELLprogress
07/30/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/30/2026Tenant Protection Plan ComplianceYounes Abouyaalaspecial
12/30/2025Fire-Resistant Penetrations and JointsAUGUSTINE OKUNDAYEspecial
12/30/2025Tenant Protection Plan ComplianceYounes Abouyaalaspecial
12/19/2025Fire-Resistant Penetrations and JointsWilliam Ryanspecial
02/11/2025FinalJillian Sheedyprogress
02/11/2025Fire-Resistance Rated ConstructionHoward Baderprogress
12/11/2024Concrete - Cast-In-PlaceJeremy Billigspecial
12/11/2024FinalSPIRO ANXHARAprogress
12/11/2024Structural Steel - WeldingJeremy Billigspecial
12/11/2024Structural Stability – Alterations of existing buildingsJeremy Billigspecial
12/11/2024Tenant Protection Plan ComplianceJames Cicalospecial
01/23/2024Structural Stability – Alterations of existing buildingsJeremy Billigspecial
01/23/2024Structural Steel - WeldingJeremy Billigspecial
01/23/2024Concrete - Cast-In-PlaceJeremy Billigspecial
01/23/2024Tenant Protection Plan ComplianceJames Cicalospecial
01/18/2024FinalSPIRO ANXHARAprogress
11/26/2023Interior lighting powerANGEL ROJASenergy_progress
11/26/2023Fire-Resistant Penetrations and JointsANGEL ROJASspecial
Latest 25 of 51.
▾Documents — 676 on file (BIS + DOB NOW)
▸Plans & Drawings40
▸DOB NOWPlans/Sketch34
09/06/2026M01379396-S1Request digital key ↗
09/03/2026M00552086-I1Request digital key ↗
09/03/2026M00631350-I1Request digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00223857-I1Request digital key ↗
09/05/2026M00311724-P1Request digital key ↗
09/05/2026M00311724-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits108
▸BISWORK PERMIT APPLICATION55
09/03/2020140907446Open ↗
07/16/2020123911936Open ↗
06/17/2019123687171Open ↗
Showing 3 of 55 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION53
08/23/2021140907446Open ↗
01/26/2021140907446Open ↗
07/06/2020123911936Open ↗
Showing 3 of 53 on file for this type
▸Seals & Professional Certifications158
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION61
10/15/2019121851479Open ↗
06/24/2019123362191Open ↗
05/31/2019123687171Open ↗
Showing 3 of 61 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature39
09/05/2026M00311724-I1Open ↗
09/05/2026M00311724-P2Open ↗
09/05/2026M00311724-P1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
10/07/2026M00631347-I1Open ↗
10/07/2026M00631347-I1Open ↗
10/07/2026M00631347-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
10/07/2026M01379396-S1Open ↗
10/07/2026M01379396-S1Open ↗
10/07/2026M00631347-I1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/19/2020140907446Open ↗
▸Trade Schedules & Equipment53
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE22
11/12/2019123687171Open ↗
05/31/2019123687171Open ↗
05/01/2019121851479Open ↗
Showing 3 of 22 on file for this type
▸BISSELF-CERT PLUMBING NOTICE18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISSCHEDULE B - PLUMBING13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸Safety & Tenant Protection19
▸BISTenant Protection Plan and Notes11
07/08/2020123911936Open ↗
09/06/2019121851479Open ↗
09/06/2019121851479Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWTenant Protection Plan5
08/13/2026M00311724-P2Open ↗
08/13/2026M00311724-I1Open ↗
08/13/2026M00311724-P1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST3
04/10/2017122671992Open ↗
Showing 1 of 3 on file for this type
▸Environmental & Asbestos70
▸DOB NOWDEP ACP-5: Asbestos Assessment Report36
09/06/2026M01379396-S1Open ↗
09/05/2026M00311724-I1Open ↗
09/05/2026M00311724-P2Open ↗
Showing 3 of 36 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)21
07/08/2020123911936Open ↗
06/19/2020140907446Open ↗
05/31/2019123687171Open ↗
Showing 3 of 21 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/28/2026M00967362-S1Open ↗
08/27/2026M00897366-I1Open ↗
08/15/2026M00967362-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance62
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS31
06/24/2019123362191Open ↗
05/31/2019123687171Open ↗
05/01/2019121851479Open ↗
Showing 3 of 31 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
06/24/2019123362191Open ↗
11/21/2018123207270Open ↗
03/22/2018123346067Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
02/04/2021123911936Open ↗
09/15/2020123687171Open ↗
07/10/2020123911936Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis4
08/13/2026M00727579-I1Open ↗
08/13/2026M00631347-I1Open ↗
08/13/2026M00739668-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
05/05/2022140907446Open ↗
02/04/2021123911936Open ↗
▸BISLIGHTING IN DWELLING UNITS1
05/04/2022140907446Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY7
02/04/2021123911936Open ↗
09/15/2020123687171Open ↗
08/07/2020140907446Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs41
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST22
05/20/2022140907446Open ↗
02/04/2021123911936Open ↗
09/15/2020123687171Open ↗
Showing 3 of 22 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLANDMARKS APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
05/04/2022140907446Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership52
▸BISCOST AFFIDAVIT50
09/15/2020123687171Open ↗
06/19/2020140907446Open ↗
05/08/2020123911936Open ↗
Showing 3 of 50 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
05/19/2022140907446Open ↗
02/04/2021123911936Open ↗
▸Filing & Intake Forms58
▸BISEFILING COVER SHEET26
05/08/2020123911936Open ↗
05/31/2019123687171Open ↗
02/20/2018123362191Open ↗
Showing 3 of 26 on file for this type
▸BISBOROUGH INTAKE FORM15
11/12/2019123687171Open ↗
06/24/2019123362191Open ↗
03/21/2019121851479Open ↗
Showing 3 of 15 on file for this type
▸BISADDITIONAL INFORMATION14
08/23/2021140907446Open ↗
07/08/2020123911936Open ↗
03/16/2020123687171Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
06/19/2020140907446Open ↗
Showing 1 of 3 on file for this type
▸Other Documents8
▸BISDepartment of Consumer Affairs (DCA) Form5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type