Office with commercial, 7-19 stories
12 EAST 52 STREET
MANHATTAN · BIN 1035477
💬 Discuss this project
1930Year Built
7Stories
O6Building Class
C5-2.5Zoning
20,210 sfGross Floor Area
4Units
9 Open Violations 8 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Office with commercial, 7-19 stories · Owner of record: RAM HQ II, LLC · 3,015 sf lot · 6.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction61p · 5 filings · 20 docs
Floor 7Under Construction48p · 3 filings · 20 docs
Floor 6Under Construction44p · 3 filings · 20 docs
Floor 5Under Construction54p · 6 filings · 20 docs
Floor 4Under Construction45p · 3 filings · 20 docs
Floor 3Under Construction46p · 3 filings · 20 docs
Floor 2Under Construction44p · 3 filings · 20 docs
Floor 1Under Construction55p · 3 filings · 20 docs
CellarUnder Construction61p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RAM HQ II, LLC103/22/2026
52ND STREET BARRACUDA ACQUISITIO403/22/2026
12 EAST 52ND STREET DEVCO103/22/2026
12 EAST STREET DEVCO LLC103/22/2026
GTAM SPECIAL REALTY LLC103/22/2026
LBS BANK NY103/22/2026
ALBA CONSTRUCTION103/22/2026
HERITAGE REALTY SERVICES,LLC1203/21/2026
C O HERITAGE REALTY SERVICES LL203/21/2026
AXIUM NEW YORK HOLDINGS203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/09/2025$14.8M—— → —$734/sf building
02/05/2016$32.0M—— → —$1,583/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC1403/21/2026
HS DESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALBA GROUP INCGeneral Contractor507/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor407/01/2026
STALWART PLUMBING CORPFire Protection307/08/2026
I G H RESTORATION LLCGeneral Contractor204/09/2026
STALWART PLUMBING CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544704/08/2026
KOENIGSBERG ENGINEERING,2247110/10/2025
Building Lifecycle
All (112)Filed (15)Permit Issued (18)Signed Off (2)Facade (FISP) (12)Violation (44)Inspection (5)Special Inspection (16)
08/25/2026
Cycle 10 facade report signed — SAFE
08/18/2026
Cycle 10 facade inspection completed
08/05/2026
Violation issued (ECB, open)
Construction
06/29/2026
Permit issued — Sidewalk Shed
M01218240-I1-SH
06/08/2026
Violation issued (ECB, closed)
Construction
05/13/2026
Permit issued — General Construction
M01338887-I1-GC
05/05/2026
Cycle 10 facade report submitted
05/04/2026
Signed off — Alteration
EXTERIOR RESTORATION TO FACADE AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY..
M01248260-I1
04/27/2026
Permit issued — Sprinklers
M01338887-S3-EW-SP
04/27/2026
Permit issued — Plumbing
M01338887-S2-PL
04/21/2026
Signed off — Alteration
M01218242-I1
04/21/2026
Permit issued — Mechanical Systems
M01338887-S1-MS
04/21/2026
Permit issued — Structural
M01338887-S4-ST
04/08/2026
Filed — Alteration
MODIFICATION TO EXISTING SPRINKLER SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01338887-S2
04/08/2026
Filed — Alteration
MODIFICATION TO EXISTING SPRINKLER SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01338887-S4
04/08/2026
Filed — Alteration
MODIFICATION TO EXISTING SPRINKLER SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01338887-I1
04/08/2026
Filed — Alteration
MODIFICATION TO EXISTING SPRINKLER SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01338887-S1
04/08/2026
Filed — Alteration
MODIFICATION TO EXISTING SPRINKLER SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01338887-S3
04/06/2026
Special inspection requirement — Concrete - Cast-In-Place
EUGENE BIFULCO
04/01/2026
Permit issued — Sidewalk Shed
M01218240-I1-SH
03/10/2026
Special inspection requirement — Final
EUGENE BIFULCO
03/10/2026
Special inspection requirement — Post-installed anchors in masonry
EUGENE BIFULCO
03/10/2026
Special inspection requirement — Structural Steel - High Strength Bolting
EUGENE BIFULCO
03/10/2026
Special inspection requirement — Structural Steel - Details
EUGENE BIFULCO
03/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
03/10/2026
Special inspection requirement — Structural Steel - Welding
EUGENE BIFULCO
01/05/2026
Permit issued — Suspended Scaffold
M01284138-I1-SC
01/05/2026
Permit issued — General Construction
M01248260-I1-GC
12/22/2025
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/13/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/12/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/12/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
10/23/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/20/2025
Permit issued — General Construction
M01248260-I1-GC
10/20/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/10/2025
Filed — Alteration
EXTERIOR RESTORATION TO FACADE AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY..
M01248260-I1
09/24/2025
Permit issued — Suspended Scaffold
M01284138-I1-SC
09/22/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT.
M01284138-I1
09/22/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
George Xerakias
09/19/2025
Permit issued — Plumbing
M01248239-I1-PL
09/19/2025
Permit issued — Sprinklers
M01248246-I1-EW-SP
09/19/2025
Permit issued — Sprinklers
M01248256-I1-EW-SP
08/25/2025
Special inspection requirement — Final
ISTVAN JUHASZ
08/20/2025
Filed — Alteration
REMOVAL OF PARTITIONS, WALLS, DOORS, FLOOR FINISHES & CEILINGS . NO CHANGE TO USE, EGRESS OR OCCUPANCY.S SHOW ON DRAWING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01233146-P1
08/20/2025
Permit issued — General Construction
M01233146-I1-GC
08/20/2025
Permit issued — Mechanical Systems
M01248234-I1-MS
08/20/2025
Special inspection requirement — Final
ISTVAN JUHASZ
08/13/2025
Filed — Alteration
REMOVAL OF A/C UNITS AND ASSOCIATED MECHANICAL PIPING & DUCT WORK AS SHOWN ON DRAWING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01248234-I1
08/13/2025
Filed — Alteration
REMOVAL OF PARTITIONS, WALLS, DOORS, FLOOR FINISHES & CEILINGS . NO CHANGE TO USE, EGRESS OR OCCUPANCY.S SHOW ON DRAWING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01233146-I1
08/13/2025
Filed — Alteration
REMOVAL OF PLUMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01248239-I1
08/13/2025
Filed — Alteration
INSTALLATION AND REMOVAL OF SPRINKLER TEMP. LOOP AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01248256-I1
08/13/2025
Filed — Alteration
REMOVAL OF SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUANCY.
M01248246-I1
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
08/13/2025
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
08/13/2025
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
06/27/2025
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
06/27/2025
Special inspection requirement — Sprinkler Systems
EUGENE BIFULCO
05/21/2025
Cycle 10 facade report submitted
05/20/2025
Cycle 10 facade report signed — UNSAFE
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC06/29/2026
DOB NOWGeneral ConstructionPermit IssuedALBA GROUP INC05/13/2026
DOB NOWSprinklersPermit IssuedSTALWART PLUMBING CORP04/27/2026
DOB NOWPlumbingPermit IssuedSTALWART PLUMBING CORP04/27/2026
DOB NOWMechanical SystemsPermit IssuedALBA GROUP INC04/21/2026
DOB NOWStructuralPermit IssuedALBA GROUP INC04/21/2026
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC04/01/2026
DOB NOWSuspended ScaffoldPermit IssuedIGH RESTORATION LLC01/05/2026
DOB NOWGeneral ConstructionSigned-offI G H RESTORATION01/05/2026
DOB NOWGeneral ConstructionSigned-offI G H RESTORATION10/20/2025
DOB NOWSuspended ScaffoldPermit IssuedIGH RESTORATION LLC09/24/2025
DOB NOWPlumbingSigned-offSTALWART PLUMBING CORP09/19/2025
DOB NOWSprinklersSigned-offSTALWART PLUMBING CORP09/19/2025
DOB NOWSprinklersPermit IssuedSTALWART PLUMBING CORP09/19/2025
DOB NOWGeneral ConstructionSigned-offALBA GROUP INC08/20/2025
DOB NOWMechanical SystemsPermit IssuedALBA GROUP INC08/20/2025
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC05/07/2025
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC05/02/2025
BISPLISSUEDADVANCED PLBG LLC04/27/2015
BISOTISSUEDSWEET CONSTRUCTION CORP04/24/2015
BISOTISSUEDSWEET CONSTRUCTION CORP04/24/2015
BISMHISSUEDSWEET CONSTRUCTION CORP04/24/2015
BISOTISSUEDJERRICK ASSOCIATES INC03/20/2014
BISEQISSUEDJERRICK ASSOCIATES INC03/11/2014
BISEQISSUEDEVEREST SCAFFOLDING INC10/17/2013
BIS—ISSUEDGOING SIGN & SVCNG CO,INC06/06/2012
BIS—ISSUEDGOING SIGN & SVCNG CO,INC06/06/2012
BIS—ISSUEDGOING SIGN & SVCNG CO,INC06/06/2012
BISOTISSUEDTNT INDUSTRIES INC03/19/2012
BISEQISSUEDEVEREST SCAFFOLDING INC04/09/2008
BISEQISSUEDJ AND D WATERPROOFING07/12/2002
BISSDISSUEDPILATO BROS & P&H CO INC11/01/1996
BISPLISSUEDRICHARD LYNES PLUMBING AND HTG08/04/1995
BISSPISSUEDPILATO BROS & P&H CO INC04/17/1995
BISPLISSUEDPILATO BROS PLBG & HTG CO07/22/1994
BISEQISSUEDREGIONAL SCAFFOLD & HOISTING07/05/1994
BIS—ISSUEDCOMPUSITE TURNKEY CONST INC04/27/1994
BISEQISSUEDCOMPUSITE TURNKEY CONST INC04/27/1994
BISMHISSUEDRED BALL RECYCLING INC01/31/1994
1 project · most recent 04/08/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/08/2026Permit IssuedALBA GROUP INCAir Conditioning Systems
Cooling
— ZRUM216BTE6 216 BTU ×1
ZRUM241DTE6 270 BTU ×1
Lg ZRUM192DTE6 192 BTU · Vrf Outdoor ×1
3 projects · most recent 04/08/2026
FiledStatusContractorScope
04/08/2026Permit IssuedSTALWART PLUMBING CORP—
08/13/2025Signed-offSTALWART PLUMBING CORP222 heads
08/13/2025Permit IssuedSTALWART PLUMBING CORP33 heads
4 projects · most recent 04/08/2026
Water/Sanitary
FiledStatusContractorScope
04/08/2026Permit IssuedSTALWART PLUMBING CORPWater/Sanitary
08/13/2025———
08/13/2025———
08/13/2025Signed-offSTALWART PLUMBING CORPWater/Sanitary
3 projects · most recent 07/15/2026
General Wiring
FiledStatusContractorScope
07/15/2026Permit IssuedALLSTATE ELECTRIC CORPGeneral Wiring
08/25/2025Permit IssuedALLSTATE ELECTRIC CORP—
05/07/2025Permit IssuedBOROWIDE ELECT'L CONTR'S—
1 project · most recent 04/08/2026
Steel
FiledStatusContractorScope
04/08/2026Permit IssuedALBA GROUP INCSteel
1 project · most recent 05/02/2025
Sidewalk Shed
FiledStatusContractorScope
05/02/2025Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
1 project · most recent 09/22/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/22/2025Permit IssuedIGH RESTORATION LLCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/13/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/12/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/12/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
10/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/20/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/20/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
04/06/2026Concrete - Cast-In-PlaceEUGENE BIFULCOspecial
03/10/2026FinalEUGENE BIFULCOprogress
03/10/2026Post-installed anchors in masonryEUGENE BIFULCOspecial
03/10/2026Structural Steel - High Strength BoltingEUGENE BIFULCOspecial
03/10/2026Structural Steel - DetailsEUGENE BIFULCOspecial
03/10/2026Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
03/10/2026Structural Steel - WeldingEUGENE BIFULCOspecial
12/22/2025Sprinkler SystemsEUGENE BIFULCOspecial
09/22/2025Alternative Materials - OTCR Buildings Bulletin NumberGeorge Xerakiasspecial
08/25/2025FinalISTVAN JUHASZprogress
08/20/2025FinalISTVAN JUHASZprogress
08/13/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
08/13/2025Post-installed AnchorsEUGENE BIFULCOspecial
08/13/2025Post-installed AnchorsEUGENE BIFULCOspecial
06/27/2025Sprinkler SystemsEUGENE BIFULCOspecial
06/27/2025Sprinkler SystemsEUGENE BIFULCOspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ramirez Asset ManagementOfficeCellar, Floor 7
Project M01233146 Alteration · Permit Entire · 08/13/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 197 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
09/06/2026M01338887-P1Request digital key ↗
08/23/2026M01218242-I1Request digital key ↗
08/23/2026M01218240-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION16
04/04/2025123157804Open ↗
04/09/2019123157804Open ↗
04/06/2016122246676Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION11
05/05/2015122246676Open ↗
05/05/2015122246676Open ↗
05/05/2015122246676Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications68
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION24
05/23/2016122246676Open ↗
05/23/2016122246676Open ↗
05/23/2016122246676Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/06/2026M01338887-P1Open ↗
08/23/2026M01218242-I1Open ↗
08/22/2026M01248246-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/29/2026M01338887-S3Open ↗
09/23/2026M01248246-I1Open ↗
09/23/2026M01248256-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
06/08/2012121073658Open ↗
06/07/2012121073667Open ↗
06/07/2012121073649Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/08/2012121073658Open ↗
06/07/2012121073667Open ↗
06/07/2012121073649Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M01233146-P1Open ↗
08/28/2026M01233146-I1Open ↗
08/24/2026M01338887-S4Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
03/11/2014140171061Open ↗
10/17/2013140125727Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/11/2014140171061Open ↗
10/17/2013140125727Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/11/2014140171061Open ↗
10/17/2013140125727Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
04/06/2016122246676Open ↗
04/05/2016122246676Open ↗
01/28/2015122246676Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
01/05/2016122246676Open ↗
12/30/2015122246676Open ↗
11/19/2015122246676Open ↗
▸BISSCHEDULE B - PLUMBING1
03/23/2012121015935Open ↗
▸Safety & Tenant Protection1
▸BISDS1-Demolition Submittal Certification Form1
03/23/2012121015935Open ↗
▸Environmental & Asbestos30
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/06/2026M01338887-P1Open ↗
08/22/2026M01248246-I1Open ↗
08/22/2026M01248256-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWOER: Notice to Proceed7
08/13/2026M01233146-I1Open ↗
08/13/2026M01233146-P1Open ↗
08/13/2026M01248260-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
05/05/2015122246676Open ↗
03/27/2014121870537Open ↗
03/11/2014140171061Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/09/2008110134658Open ↗
▸BISTHIS IS NOT AN ASBESTOS PROJECT1
06/07/2012121073649Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/21/2026M01248260-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
05/23/2016122246676Open ↗
05/23/2016122246676Open ↗
01/28/2015122246676Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
05/23/2016122246676Open ↗
06/27/2014121870537Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/17/2013140125727Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/11/2014140171061Open ↗
10/17/2013140125727Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
05/23/2016122246676Open ↗
03/26/2015140171061Open ↗
08/19/2014110134658Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
06/08/2012121073658Open ↗
06/07/2012121073667Open ↗
06/07/2012121073649Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/13/2014110134658Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
05/23/2016122246676Open ↗
01/28/2015122246676Open ↗
06/27/2014121870537Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET9
04/09/2019123157804Open ↗
01/28/2015122246676Open ↗
01/28/2015122246676Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
03/11/2014140171061Open ↗
10/17/2013140125727Open ↗
03/23/2012121015935Open ↗
▸BISADDITIONAL INFORMATION2
05/19/2016122246676Open ↗
03/14/2014140171061Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026M01284138-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01284138-I1Open ↗