| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01233146 ↗ | 12 EAST 52 STREET MANHATTAN | Alteration | Signed-off | 08/13/2025 | 08/20/2025 | Design THE SWITZER GROUP Contractor ALBA GROUP INC Filer METROPOLIS GROUP INC | REMOVAL OF PARTITIONS, WALLS, DOORS, FLOOR FINISHES & CEILINGS . NO CHANGE TO USE, EGRESS OR OCCUPANCY.S SHOW ON DRAWING. NO CHANGE TO USE, … |
| Name | Projects together | Most recent |
|---|---|---|
| THE SWITZER GROUP | 1 | 08/20/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| ALBA GROUP INC | 1 | 08/20/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| METROPOLIS GROUP INC | 1 | 08/20/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01233146 ↗ | 12 EAST 52 STREET MANHATTAN | Alteration | Signed-off | 08/13/2025 | 08/20/2025 | Design THE SWITZER GROUP Contractor ALBA GROUP INC Filer METROPOLIS GROUP INC | REMOVAL OF PARTITIONS, WALLS, DOORS, FLOOR FINISHES & CEILINGS . NO CHANGE TO USE, EGRESS OR OCCUPANCY.S SHOW ON DRAWING. NO CHANGE TO USE, … |
| Building | Filings | Most Recent |
|---|---|---|
| 12 EAST 52 STREET ↗ | 1 | 08/20/2025 |