Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof120 East End Avenue Corp.Under Construction29p · 4 filings · 20 docs
ArchitectureElectricalMechanicalStructural
Issued Permit Scope
General Construction · Structural · Supported Scaffold
Facade restoration as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
7 documents · 3 drawing sheets
INSTALL (1) NEW 10 GAGE 304 STAINLESS STEEL CHIMNEY LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
facade repairs as per plans filed herewith. no change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Bulkhead120 East End Avenue Corp.1p · 1 filing · 10 docs
Architecture
facade repairs as per plans filed herewith. no change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
PenthouseUnder Construction17p · 2 filings · 16 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Renovation of an existing apartment#PH17 on the Penthouse level. Work include non-structural demolition and general construction as per plans filed herewith.
On file for this project
12 documents
BRICK INFILL FOR THROUGH-WALL A/C AREA.
On file for this project
4 documents
Floor 15120 East End Avenue Corp.2p · 2 filings · 13 docs
Architecture
Issued Permit Scope
General Construction
Removal and replacement of drop ceiling as per plans filed herewith. No change in use, occupancy, egress.
On file for this project
3 documents
facade repairs as per plans filed herewith. no change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Floor 14Unit 14C7p · 2 filings · 20 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Removal and replacement of drop ceiling as per plans filed herewith. No change in use, occupancy, egress.
On file for this project
3 documents · 1 drawing sheet
Mechanical work filed herewith for installation of multizone AC system on 13 & 14th floor with air handlers, ductwork and associated 2 condensing units. No Change in Use, Egress or Occupancy.
On file for this project
17 documents
Floor 13Interior repairs6p · 2 filings · 20 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Removal and replacement of drop ceiling as per plans filed herewith. No change in use, occupancy, egress.
On file for this project
3 documents
Mechanical work filed herewith for installation of multizone AC system on 13 & 14th floor with air handlers, ductwork and associated 2 condensing units. No Change in Use, Egress or Occupancy.
On file for this project
17 documents
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6Unit 6BUnder Construction9p · 1 filing · 13 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
install condensing units at windows, air handlers, ductwork, no change to use, exits or occupancy
On file for this project
13 documents · 4 drawing sheets
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1VRF heat pump system installation23p · 2 filings · 20 docs
ArchitectureElectricalGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
relocation of bldg managers office. Package rm, bike storage & lavatory on ground floor level & the staff break rm & bldg. storage cellar level. The renovation of mens locker rm & lavatories along w/ addition of new womens locker rm, tenant laundry.
On file for this project
22 documents · 1 drawing sheet
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
2 documents
CellarInstall new stainless steel chimney liner22p · 3 filings · 20 docs
ArchitectureGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
INSTALL (1) NEW 10 GAGE 304 STAINLESS STEEL CHIMNEY LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
On file for this project
6 documents
relocation of bldg managers office. Package rm, bike storage & lavatory on ground floor level & the staff break rm & bldg. storage cellar level. The renovation of mens locker rm & lavatories along w/ addition of new womens locker rm, tenant laundry.
On file for this project
22 documents · 4 drawing sheets
THE SCOPE OF WORK INCLUDES THE REMOVAL OF EXISTING TENANT STORAGE BINS, BUILDING FACILITY STORAGE & MAIL ROOMIN THE CELLAR LEVEL AND THE ADDITION OF A NEW OPEN STORAGE AREA & CORRIDOR.
On file for this project
7 documents
Site & exterior120 East End Avenue Corp.Under Construction73p · 10 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sidewalk Shed · Structural · Supported Scaffold
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF NYC BUILDING CODE. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLIACTION.
On file for this project
6 documents · 7 drawing sheets
INSTALLATION OF 300 PSF SIDEWALK SHED AND STORAGE MATERIALS ON TOP AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents · 12 drawing sheets
INSTALLATION OF MATERIAL ONLY HOISTS AS PER DRAWINGS. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
4 documents · 8 drawing sheets
Latest 3 of 10 filings on this floor.