Office, 20+ stories, with or without commercial
Belmont Hotel
118 PARK AVENUE · BIN 1035334
💬 Discuss this project
1981Year Built
26Stories
O4Building Class
C5-3Zoning
600,000 sfGross Floor Area
4Units
LL97 Covered4 Open Violations 2 unresolved · 2 paperwork only ▸FISP: SWARMP
Office, 20+ stories, with or without commercial · Owner of record: 120 PARK AVENUE ASSOCIATES LLC · 20,737 sf lot · 28.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 8 docs
Floor 26Under Construction1p · 1 filing · 5 docs
Floor 252p · 1 filing · 8 docs
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 137p · 1 filing · 19 docs
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7Under Construction77p · 7 filings · 20 docs
Floor 6Under Construction10p · 5 filings · 20 docs
Floor 5Under Construction12p · 6 filings · 20 docs
Floor 42p · 1 filing · 20 docs
Floor 32p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 1Under Construction2p · 2 filings · 20 docs
Cellar1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
120 PARK AVENUE ASSOCIATES33009/30/2026
GLOBAL HOLDINGS MANAGEMENT GROUP6307/08/2026
GLOBAL HOLDINGS907/08/2026
CBRE1207/08/2026
GLOBAL HOLDINGS MANAGEMENT1407/03/2026
CUSTOM METALCRAFTERS, INC.503/22/2026
EASTGATE REALTY303/22/2026
TURNER CONSTRUCTION203/22/2026
PHILLIP MORRIS COMPANIES, INC.5903/22/2026
THE SHORENSTEIN CO.803/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.2503/21/2026
CROWN DESIGN CONSULTING2403/21/2026
LMS-ACE SERVICES103/21/2026
PATUXENT ENGINEERING1003/21/2026
SYNERGY BUILDING CONSULTANTS303/21/2026
A1 EXPEDITING SERVICE203/21/2026
HOWARD I SHAPIRO ASSOCIATES203/21/2026
GARO GUMUSYAN203/21/2026
RIZZO GROUP403/21/2026
LOMBARDO BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TURNER CONSTRUCTION COMPANYGeneral Contractor2509/30/2026
TITAN CONSTRUCTION SERVICGeneral Contractor1203/21/2026
ARSENAL SCAFFOLD INCGeneral Contractor907/08/2026
LAWRENCE J. LEVINEFire Protection803/21/2026
VERSATILE SERVICES LLCGeneral Contractor407/08/2026
STRUCTURE TONE, LLCGeneral Contractor404/09/2026
REIDY CONTRACTING GROUPGeneral Contractor403/21/2026
TITAN INDUSTRIAL SVC CORPGeneral Contractor303/21/2026
V. CLOUD PAINTING AND CONElectrical303/21/2026
PAR FIRE PROTECTION LLCFire Protection307/08/2026
SWINERTON BUILDERSGeneral Contractor307/03/2026
VEZANDIO CONTRACTING CORPGeneral Contractor303/21/2026
A&A PLUMBING CORPPlumbing307/08/2026
OMARA ORGANIZATION INCGeneral Contractor203/21/2026
DOUGHERTY, EDWARDElectrical203/21/2026
KEMRAJ, DEVANANDElectrical203/21/2026
SAFWAY ATLANTIC, LLCGeneral Contractor207/11/2026
SIRINA FIRE PROT CORPFire Protection207/08/2026
CUSTOM METALCRAFTERS INCGeneral Contractor203/21/2026
RALPH OCCHIPINTIElectrical103/21/2026
PACE PLUMBING CORPFire Protection107/08/2026
LAB PLBG & HTG CO INCPlumbing107/08/2026
MOLINA, WILSONElectrical103/21/2026
KATZEN, BARRYElectrical103/21/2026
MAC FELDER INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G. BLINN CONSULTING, LLC2894107/09/2026
PROJECT TACTICAL SOLUTION58591503/31/2026
MILROSE CONSULTANTS LLC20031610/23/2025
ALAN MARGOLIN & ASSOC423304/07/2025
GILSANZ MURRAY STEFICEK240604/01/2025
SARO GUMUSYAN ARCHITECT6437302/12/2025
KZ ENGINEERING, P.C.4665101/04/2024
FOCAL POINT ARCHITECTURE/787105/01/2023
BRENT M. PORTER, ARCHITEC4140110/01/2019
Building Lifecycle
All (300)Filed (60)Permit Issued (62)Signed Off (25)Facade (FISP) (14)Violation (60)Inspection (47)Objection (2)Special Inspection (30)
09/29/2026
Permit issued — General Construction
M01437289-I1-GC
08/28/2026
Signed off — Alteration
M00835374-I1
08/24/2026
Filed — Alteration
Lobby renovation as per plans filed herewith. No change in use, egress or occupancy under this application.
M01437289-I1
08/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Benjamin Plotnick
08/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/28/2026
Special inspection requirement — Final
Michael Zaborski
07/28/2026
Special inspection requirement — Lighting controls
Benjamin Plotnick
07/28/2026
Special inspection requirement — Interior lighting power
Benjamin Plotnick
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Benjamin Plotnick
07/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/10/2026
Permit issued — Supported Scaffold
M01428128-I1-SF
07/10/2026
Permit issued — Protection and Mechanical Methods
M01428128-S1-PMM
07/09/2026
Filed — Alteration
TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01428128-I1
07/09/2026
Filed — Alteration
TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01428128-S1
07/09/2026
Special inspection requirement — Post-installed Anchors
GREG BLINN
07/07/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
05/29/2026
Signed off — Alteration
Mechanical work associated with renovation of Lower Level C (Sub-Cellar #2 per CO). No change in use, egress or occupancy.
M01282037-S1
05/29/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/26/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/26/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/22/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/21/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/19/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/18/2026
Permit issued — Plumbing
M01277439-I1-EW-SP
05/08/2026
Signed off — Alteration
Mechanical work associated with renovation of Lower Level C (Sub-Cellar #2 per CO). No change in use, egress or occupancy.
M01282037-S2
05/08/2026
Signed off — Alteration
Mechanical work associated with renovation of Lower Level C (Sub-Cellar #2 per CO). No change in use, egress or occupancy.
M01282037-S4
05/08/2026
Signed off — Alteration
Mechanical work associated with renovation of Lower Level C (Sub-Cellar #2 per CO). No change in use, egress or occupancy.
M01282037-S3
05/08/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/06/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/20/2026
Signed off — Alteration
Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
M00835289-I1
04/17/2026
Permit issued — Structural
M01332486-S4-ST
04/08/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/08/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
03/31/2026
Filed — Alteration
Mechanical modifications taking place on the 7th floor as indicated on the drawings.
M01332486-S4
03/27/2026
Permit issued — General Construction
M01176300-I1-GC
03/27/2026
Permit issued — Plumbing
M01332486-S2-PL
03/19/2026
Permit issued — Sprinklers
M01332486-S3-EW-SP
03/19/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/19/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/18/2026
Permit issued — Mechanical Systems
M01332486-S1-MS
03/18/2026
Permit issued — General Construction
M01332486-I1-GC
02/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/25/2026
Special inspection requirement — Final
Max Lee
02/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Max Lee
02/25/2026
Special inspection requirement — Structural Steel - Details
Max Lee
02/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/16/2026
Filed — Alteration
Mechanical modifications taking place on the 7th floor as indicated on the drawings.
M01332486-I1
01/16/2026
Filed — Alteration
Mechanical modifications taking place on the 7th floor as indicated on the drawings.
M01332486-S3
01/16/2026
Filed — Alteration
Mechanical modifications taking place on the 7th floor as indicated on the drawings.
M01332486-S2
01/16/2026
Filed — Alteration
Mechanical modifications taking place on the 7th floor as indicated on the drawings.
M01332486-S1
01/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTURNER CONSTRUCTION COMPANY09/29/2026
DOB NOWSupported ScaffoldPermit IssuedSAFWAY ATLANTIC, LLC07/10/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC07/10/2026
DOB NOWPlumbingPermit IssuedARCHER CONSULTANTS GROUP05/18/2026
DOB NOWStructuralPermit IssuedSWINERTON BUILDERS04/17/2026
DOB NOWGeneral ConstructionPermit IssuedVERSATILE SERVICES LLC03/27/2026
DOB NOWPlumbingPermit IssuedLAB PLBG & HTG CO INC03/27/2026
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP03/19/2026
DOB NOWMechanical SystemsPermit IssuedSWINERTON BUILDERS03/18/2026
DOB NOWGeneral ConstructionPermit IssuedSWINERTON BUILDERS03/18/2026
DOB NOWSprinklersSigned-offLAWRENCE J. LEVINE01/06/2026
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC01/06/2026
DOB NOWStandpipeSigned-offLAWRENCE J. LEVINE01/06/2026
DOB NOWGeneral ConstructionSigned-offSTRUCTURE TONE, LLC12/19/2025
DOB NOWMechanical SystemsSigned-offSTRUCTURE TONE, LLC12/19/2025
DOB NOWPlumbingPermit IssuedMANENGEERING BUREAU, INC12/12/2025
DOB NOWPlumbingPermit IssuedA&A PLUMBING CORP11/19/2025
DOB NOWGeneral ConstructionSigned-offTURNER CONSTRUCTION COMPANY11/07/2025
DOB NOWMechanical SystemsSigned-offTURNER CONSTRUCTION COMPANY11/05/2025
DOB NOWPlumbingSigned-offA&A PLUMBING CORP07/21/2025
DOB NOWStructuralSigned-offTITAN CONSTRUCTION SERVIC06/24/2025
DOB NOWGeneral ConstructionSigned-offTURNER CONSTRUCTION COMPANY03/21/2025
DOB NOWStructuralSigned-offTURNER CONSTRUCTION COMPANY03/21/2025
DOB NOWGeneral ConstructionSigned-offTURNER CONSTRUCTION COMPANY03/21/2025
DOB NOWPlumbingSigned-offMAC FELDER INC02/25/2025
DOB NOWGeneral ConstructionPermit IssuedVERSATILE SERVICES LLC02/18/2025
DOB NOWMechanical SystemsSigned-offTURNER CONSTRUCTION COMPANY02/13/2025
DOB NOWMechanical SystemsSigned-offTURNER CONSTRUCTION COMPANY02/13/2025
DOB NOWSprinklersSigned-offLAWRENCE J. LEVINE02/10/2025
DOB NOWGeneral ConstructionSigned-offTURNER CONSTRUCTION COMPANY02/10/2025
DOB NOWGeneral ConstructionSigned-offTURNER CONSTRUCTION COMPANY02/10/2025
DOB NOWStructuralSigned-offTURNER CONSTRUCTION COMPANY02/10/2025
DOB NOWGeneral ConstructionSigned-offTURNER CONSTRUCTION COMPANY02/05/2025
DOB NOWGeneral ConstructionSigned-offREIDY CONTRACTING GROUP02/03/2025
DOB NOWMechanical SystemsSigned-offREIDY CONTRACTING GROUP02/03/2025
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP01/15/2025
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC01/15/2025
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC12/10/2024
DOB NOWGeneral ConstructionSigned-offSTRUCTURE TONE, LLC11/14/2024
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC11/04/2024
+ 60 more permits on file
2 projects · most recent 03/31/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/31/2026Permit IssuedSWINERTON BUILDERSAir Conditioning Systems
Cooling
Nortek G350VLE 320,000 BTU · Packaged Unit ×1
12/17/2025Signed-offSTRUCTURE TONE, LLCVentilation Systems
Ventilation
Greenheck CSP-A700-VG 550 CFM · Exhaust Fan ×1
2 projects · most recent 03/31/2026
Sprinkler System
FiledStatusContractorScope
03/31/2026Permit IssuedABCO-PEERLESS SPRKLR CORP408 heads
12/17/2025Signed-offPAR FIRE PROTECTION LLCSprinkler System
2 projects · most recent 03/31/2026
Water/Sanitary
FiledStatusContractorScope
03/31/2026Permit IssuedLAB PLBG & HTG CO INCWater/Sanitary
12/17/2025Signed-offPAR PLUMBING CO., INCWater/Sanitary
17 projects · most recent 04/20/2026
General Wiring
FiledStatusContractorScope
04/20/2026Permit IssuedECNY ELEC'L CONTR'S, INCGeneral Wiring
04/20/2026Permit IssuedECNY ELEC'L CONTR'S, INCGeneral Wiring
04/01/2026Permit IssuedFOREST ELECTRIC CORP.General Wiring
01/09/2026Permit IssuedFIVE BOROUGH ELECTRIC INC1 meters
12/11/2025Pending PaymentFOREST ELECTRIC CORP.General Wiring
10/24/2025Permit IssuedRX ELECTRIC INCGeneral Wiring
10/24/2025Permit IssuedRX ELECTRIC INC—
03/10/2025CompleteATLAS-ACON ELEC. SERVICEGeneral Wiring
09/16/2024CompleteFIVE BOROUGH ELECTRIC INC1 meters
01/09/2024Permit IssuedRX ELECTRIC INC—
01/09/2024Permit IssuedRX ELECTRIC INCGeneral Wiring
12/29/2023CompleteSOLAS ELECTRICAL CORP—
10/30/2023CompleteNASH ELECTRIC SERVICES IN—
06/08/2023CompleteFOREST ELECTRIC CORP.General Wiring
06/30/2022CompleteARCADIA ELECT'L CO. INC.1 meters
1 project · most recent 03/31/2026
Steel
FiledStatusContractorScope
03/31/2026Permit IssuedSWINERTON BUILDERSSteel
2 projects · most recent 07/09/2026
Scaffold
FiledStatusContractorScope
07/09/2026Permit IssuedSAFWAY ATLANTIC, LLCScaffold
01/03/2024Permit IssuedTITAN CONSTRUCTION SERVICScaffold
▾Field Inspections (DOB CAP) — 47
DateTypeResultReport
08/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
05/29/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/26/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/22/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/21/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/08/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/08/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/06/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/08/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/08/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/19/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 47.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/17/2026Energy Code Compliance InspectionsBenjamin Plotnickprogress
07/28/2026Lighting controlsBenjamin Plotnickenergy_progress
07/28/2026Fire-Resistant Penetrations and JointsBenjamin Plotnickspecial
07/28/2026FinalMichael Zaborskiprogress
07/28/2026Interior lighting powerBenjamin Plotnickenergy_progress
07/09/2026Post-installed AnchorsGREG BLINNspecial
02/25/2026FinalMax Leeprogress
02/25/2026Structural Stability – Alterations of existing buildingsMax Leespecial
02/25/2026Structural Steel - DetailsMax Leespecial
12/15/2025Fire-Resistant Penetrations and JointsMax Leespecial
12/15/2025Sprayed fire-resistant materialsMax Leespecial
12/15/2025Energy Code Compliance InspectionsMax Leeprogress
12/15/2025FinalMax Leeprogress
12/15/2025Fire-Resistance Rated ConstructionMax Leeprogress
12/11/2025Mastic and Intumescent Fire-resistant CoatingsMax Leespecial
12/11/2025Fire-Resistant Penetrations and JointsMax Leespecial
12/11/2025FinalMax Leeprogress
12/11/2025Sprinkler SystemsMax Leespecial
12/11/2025Fire-Resistant Penetrations and JointsMax Leespecial
12/11/2025Post-installed AnchorsMax Leespecial
12/11/2025FinalMax Leeprogress
12/11/2025Mechanical SystemsMax Leespecial
12/11/2025Duct leakage testing, insulation and designMax Leeenergy_progress
12/11/2025HVAC-R and service water heating system controlsMax Leeenergy_progress
12/11/2025Maintenance informationMax Leeenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
BloombergOfficeFloor 7
Project M01332486 Alteration · Permit Entire · 01/16/2026
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 2,464 on file (BIS + DOB NOW)
▸Plans & Drawings58
▸DOB NOWPlans/Sketch57
09/03/2026M00604131-P1Request digital key ↗
09/03/2026M00604131-I1Request digital key ↗
08/31/2026M00828205-I1Request digital key ↗
Showing 3 of 57 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00231999-I1Request digital key ↗
▸Applications & Permits447
▸BISPLAN / WORK APPROVAL APPLICATION266
08/16/2022121235868Open ↗
03/05/2019103529031Open ↗
03/05/2019103966059Open ↗
Showing 3 of 266 on file for this type
▸BISWORK PERMIT APPLICATION170
08/21/2019123491373Open ↗
11/08/2018123493718Open ↗
09/05/2017123326490Open ↗
Showing 3 of 170 on file for this type
▸BISPLACE OF ASSEMBLY10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications530
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION288
03/06/2020123491373Open ↗
03/06/2020123491373Open ↗
02/21/2020123493718Open ↗
Showing 3 of 288 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature60
09/03/2026M00604131-I1Open ↗
08/31/2026M00828205-I1Open ↗
08/31/2026M00828205-P1Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWProgress Inspector Seal & Signature55
09/23/2026M01437289-I1Open ↗
09/23/2026M01437289-I1Open ↗
09/23/2026M01437289-I1Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature39
09/23/2026M01437289-I1Open ↗
09/23/2026M01332486-S3Open ↗
09/23/2026M01282037-S1Open ↗
Showing 3 of 39 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST33
10/31/2018123491373Open ↗
10/25/2018123493718Open ↗
Showing 2 of 33 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISPC FULL REPORT20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
10/31/2018123491373Open ↗
10/25/2018123493718Open ↗
09/05/2017140690205Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/05/2017140690205Open ↗
▸Trade Schedules & Equipment321
▸BISSELF-CERT PLUMBING NOTICE90
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 90 on file for this type
▸BISSCHEDULE B - PLUMBING73
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 73 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA71
10/09/2018123310871Open ↗
Showing 1 of 71 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE24
11/14/2018123326490Open ↗
10/25/2018123493718Open ↗
07/17/2017123326490Open ↗
Showing 3 of 24 on file for this type
▸BISEQUIPMENT USE PERMITS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8518
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROVIDE COPY OF FDNY LETTER OF NOTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos188
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'59
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 59 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)59
10/31/2018123491373Open ↗
10/25/2018123493718Open ↗
07/17/2017123326490Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report47
09/03/2026M00604131-I1Open ↗
08/31/2026M00828205-I1Open ↗
08/31/2026M00828205-P1Open ↗
Showing 3 of 47 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance77
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS35
03/06/2020123491373Open ↗
10/31/2018123491373Open ↗
09/25/2018123326472Open ↗
Showing 3 of 35 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS18
03/06/2020123491373Open ↗
09/25/2018123097576Open ↗
09/25/2018123326472Open ↗
Showing 3 of 18 on file for this type
▸BISTR8: Energy Code Progress Inspections13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Inspections & Test Reports26
▸BISTECHNICAL REPORT: RESPONSIBILITY15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS6
07/11/2017123097567Open ↗
Showing 1 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs278
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST151
01/05/2021121235868Open ↗
12/22/2020100371688Open ↗
10/15/2020121235868Open ↗
Showing 3 of 151 on file for this type
▸BISADMINISTRATIVE OBJECTIONS76
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 76 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION25
07/21/2017123097567Open ↗
Showing 1 of 25 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE17
08/16/2022121235868Open ↗
Showing 1 of 17 on file for this type
▸BISSUPERSEDING LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA LETTER OF DEFECT : FD-FALD2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership252
▸BISCOST AFFIDAVIT252
03/06/2020123491373Open ↗
02/21/2020123493718Open ↗
10/21/2019123310871Open ↗
Showing 3 of 252 on file for this type
▸Filing & Intake Forms242
▸BISEFILING COVER SHEET111
10/31/2018123491373Open ↗
10/25/2018123493718Open ↗
07/17/2017123326490Open ↗
Showing 3 of 111 on file for this type
▸BISADDITIONAL INFORMATION80
01/28/2019123326490Open ↗
08/02/2017123326472Open ↗
08/02/2017123326472Open ↗
Showing 3 of 80 on file for this type
▸BISBOROUGH INTAKE FORM44
04/27/2020100371688Open ↗
04/13/2020100371688Open ↗
04/13/2020121235868Open ↗
Showing 3 of 44 on file for this type
▸BISeFiling Job Application Cover Sheet7
09/05/2017140690205Open ↗
Showing 1 of 7 on file for this type
▸Other Documents30
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION25
09/05/2017140690205Open ↗
09/05/2017140690205Open ↗
07/17/2017123326490Open ↗
Showing 3 of 25 on file for this type
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProperty Ownership Certification1
08/27/2026M01005035-I1Open ↗
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type