← Back
Over six families without stores
Reid Park Rock
1206 EAST NEW YORK AVENUE · Brownsville · BIN 3080787
💬 Discuss this project
1930Year Built
4Stories
C1Building Class
R6Zoning
21,000 sfGross Floor Area
20Units
Rent Stabilized11 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: NYC PACT PRESERVATION PARTNERS LLC · 6,088 sf lot · 3.45 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof3p · 2 filings · 15 docs
Floor 41p · 1 filing · 5 docs
Floor 31p · 1 filing · 5 docs
Floor 21p · 1 filing · 5 docs
Floor 16p · 2 filings · 16 docs
Cellar7p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC PACT PRESERVATION PARTNERS309/13/2026
FAIRSTEAD MANAGEMENT404/09/2026
NYC HOUSING AUTHORITY503/21/2026
NEW YORK CITY HOUSING AUTHORITY1403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SLM ARCHITECTURE, P.C.207/08/2026
DAGHER ENGINEERING PLLC603/05/2026
G3 ARCHITECTURE INTERIORS PLANNING105/13/2025
ASHRAF CORP104/03/2025
SOCOTEC, INC.103/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIGGING CONSULTANTS203/21/2026
METROPOLIS GROUP INC1403/21/2026
CONVERSANO ASSOCIATES, INC.103/21/2026
BARNWELL CONSULTANTS103/21/2026
KD DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FSC D&C LLCGeneral Contractor607/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor307/08/2026
LS GENERAL CORPGeneral Contractor204/09/2026
DUAL FUEL PLUBING & HTINGPlumbing206/28/2026
DUAL FUEL COMPANY LLCGeneral Contractor104/09/2026
PYRAMID ETC COMPANIES, LLGeneral Contractor104/09/2026
A & E PLUMBING CORPPlumbing107/08/2026
SUPREME MECH NYC LLCPlumbing107/08/2026
LET IT GROW, INCORPORATEDGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS18031007/08/2026
Building Lifecycle
All (103)Filed (12)Permit Issued (17)Signed Off (6)Violation (28)Inspection (10)Special Inspection (30)
08/18/2026
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01204516-I1
07/13/2026
Signed off — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES.
B00918297-I1
07/08/2026
Filed — Alteration
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES.
B00918297-P1
06/09/2026
Permit issued — Sidewalk Shed
B01204516-I1-SH
05/27/2026
Signed off — Alteration
Scope of work includes the replacement of gas boilers and associated piping and ductwork.
B00968226-I1
04/13/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Vestibules
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Final
SAMI HAJJAR P.E
04/12/2026
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
03/26/2026
Signed off — Alteration
MECHANICAL WORK INCLUDES INSTALLATION OF NEW GAS VENT DUCT IN BOILER ROOM - CELLAR LEVEL.
B00988361-I1
03/26/2026
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
03/19/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00966697-I1
03/18/2026
Permit issued — General Construction
B00918297-I1-GC
03/11/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00966625-I1
03/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
03/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
03/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
03/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
03/06/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
03/06/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
03/05/2026
Filed — Alteration
Scope of work includes the replacement of gas boilers and associated piping and ductwork.
B00968226-P1
03/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
03/03/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
03/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
03/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
03/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
03/03/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
02/10/2026
Permit issued — General Construction
B00930754-I1-GC
02/10/2026
Permit issued — Suspended Scaffold
B01332159-I1-SC
01/24/2026
Violation issued (HPD, closed)
C
01/24/2026
Violation issued (HPD, closed)
C
01/06/2026
Permit issued — Suspended Scaffold
B01332159-I1-SC
12/16/2025
Filed — Alteration
B01332159-I1
12/15/2025
Permit issued — General Construction
B00930754-I1-GC
12/09/2025
Violation issued (HPD, open)
C
12/09/2025
Violation issued (HPD, open)
C
12/09/2025
Violation issued (HPD, open)
C
12/09/2025
Violation issued (HPD, open)
C
12/09/2025
Violation issued (HPD, open)
C
12/09/2025
Violation issued (HPD, closed)
B
12/09/2025
Violation issued (HPD, closed)
C
12/09/2025
Violation issued (HPD, closed)
A
12/09/2025
Violation issued (HPD, open)
C
12/07/2025
Violation issued (HPD, closed)
B
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/22/2025
Permit issued — Boiler Equipment
B00968226-I1-BE
06/17/2025
Permit issued — General Construction
B01184967-I1-GC-CX
05/13/2025
Filed — Alteration
GENERAL LANDSCAPING WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01184967-I1
04/04/2025
Permit issued — Sidewalk Shed
B01204516-I1-SH
04/03/2025
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01204516-I1
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC06/09/2026
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/18/2026
DOB NOWGeneral ConstructionSigned-offLS GENERAL CORP02/10/2026
DOB NOWSuspended ScaffoldPermit IssuedLUAN SELA02/10/2026
DOB NOWSuspended ScaffoldPermit IssuedLUAN SELA01/06/2026
DOB NOWGeneral ConstructionSigned-offLS GENERAL CORP12/15/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING07/22/2025
DOB NOWGeneral ConstructionPermit IssuedLET IT GROW, INCORPORATED06/17/2025
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC04/04/2025
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/17/2025
DOB NOWBoiler EquipmentSigned-offSUPREME MECH NYC LLC03/07/2025
DOB NOWMechanical SystemsSigned-offDUAL FUEL COMPANY LLC01/22/2025
DOB NOWBoiler EquipmentSigned-offDUAL FUEL PLUBING & HTING01/16/2025
DOB NOWPlumbingSigned-offA & E PLUMBING CORP04/01/2024
DOB NOWMechanical SystemsSigned-offPYRAMID ETC COMPANIES, LL03/29/2024
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC03/22/2024
DOB NOWGeneral ConstructionSigned-offFSC D&C LLC01/17/2024
BISBLISSUEDACE CONTRACTING, INC04/04/2017
BISPLISSUEDACE CONTRACTING, INC10/28/2016
BISBLISSUEDACE CONTRACTING, INC10/28/2016
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING04/05/2007
BISOTISSUEDBRI-DEN CONST CO INC04/04/2007
BISEQISSUEDBRI-DEN CONST CO INC04/04/2007
BISEQISSUEDBRI-DEN CONST CO INC01/11/2007
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING01/06/2007
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING04/13/2006
BISEQISSUEDBRI-DEN CONST CO INC01/23/2006
BISOTISSUEDBRI-DEN CONST CO INC01/23/2006
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING01/18/2006
BISEQISSUEDBRI-DEN CONST CORP01/12/2006
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING12/27/2005
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/10/2003
BISEQISSUEDROCKLEDGE SCAFFOLD CORP06/28/2002
3 projects · most recent 06/05/2026
General Wiring
FiledStatusContractorScope
06/05/2026CompleteSOLAS ELECTRICAL CORP—
12/20/2025CompleteATLAS-ACON ELEC. SERVICEGeneral Wiring
01/26/2025Permit IssuedITKIN ELECTRIC CORP.—
1 project · most recent 05/13/2025
FiledStatusContractorScope
05/13/2025Permit IssuedLET IT GROW, INCORPORATED1 scope_items
1 project · most recent 04/03/2025
Sidewalk Shed
FiledStatusContractorScope
04/03/2025Signed-offARSENAL SCAFFOLD INCSidewalk Shed
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/13/2026Pass-Final Boiler Equipment InspectionPassView ↗
03/26/2026No Access-Final Boiler Equipment InspectionNo AccessView ↗
06/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/10/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/08/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
04/12/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
04/12/2026Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
04/12/2026Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
04/12/2026Lighting controlsSAMI HAJJAR P.Eenergy_progress
04/12/2026VestibulesSAMI HAJJAR P.Eenergy_progress
04/12/2026Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
04/12/2026Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
04/12/2026Interior lighting powerSAMI HAJJAR P.Eenergy_progress
04/12/2026Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
04/12/2026FinalSAMI HAJJAR P.Eprogress
04/12/2026Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
03/06/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
03/06/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
03/06/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
03/06/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
03/06/2026Heating SystemsSAMI HAJJAR P.Especial
03/06/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
03/03/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
03/03/2026Heating SystemsSAMI HAJJAR P.Especial
03/03/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
03/03/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
03/03/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
03/03/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
02/21/2025FinalSAMI HAJJAR P.Eprogress
02/21/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
Latest 25 of 38.
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/26/2026B00918297-I1Request digital key ↗
08/26/2026B00918297-P1Request digital key ↗
08/26/2026B00966625-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
10/28/2016321472358Open ↗
10/28/2016321472358Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/28/2016321472358Open ↗
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/26/2026B00918297-P1Open ↗
08/26/2026B00918297-I1Open ↗
08/25/2026B00930754-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
10/01/2026B00918297-P1Open ↗
09/23/2026B00968226-I1Open ↗
09/23/2026B00968226-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
10/01/2026B00918297-P1Open ↗
10/01/2026B00918297-P1Open ↗
09/23/2026B00968226-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
07/19/2017321472358Open ↗
10/28/2016321472358Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/28/2016321472358Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/28/2016321472358Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
10/28/2016321472358Open ↗
10/28/2016321472358Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/28/2016321472358Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
10/28/2016321472358Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/26/2026B00918297-I1Open ↗
08/26/2026B00918297-P1Open ↗
08/25/2026B00930754-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/28/2016321472358Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
08/09/2017321472358Open ↗
07/19/2017321472358Open ↗
10/28/2016321472358Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/19/2017321472358Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/18/2026B00968226-I1Open ↗
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/26/2026B00918297-I1Open ↗
08/26/2026B00918297-P1Open ↗
08/25/2026B00988361-I1Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
08/09/2017321472358Open ↗
08/09/2017321472358Open ↗
07/19/2017321472358Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
08/09/2017321472358Open ↗
07/19/2017321472358Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/22/2026B01204516-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/19/2017321472358Open ↗
10/28/2016321472358Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/28/2016321472358Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026B01332159-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01332159-I1Open ↗