← Back
Elevator cooperative
1210 3 AVENUE
MANHATTAN · BIN 1042739
💬 Discuss this project
1959Year Built
20Stories
D4Building Class
C1-9Zoning
117,958 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized24 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 179 E 70TH ST CORP · 8,797 sf lot · 13.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 3 docs
Floor 11Under Construction8p · 1 filing · 11 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 33p · 1 filing · 20 docs
Floor 2
Floor 17p · 3 filings · 20 docs
Cellar3p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOUGLAS ELLIMAN2707/08/2026
179 E 70TH ST CORP103/22/2026
DAPOLITO DESIGN AND CONSTRUCTION IN103/22/2026
DOUGLAS ELLIMAN PROPERTY MGMT1203/21/2026
PHOENIX103/21/2026
179 EAST 70 ST903/21/2026
179 E 70TH ST CORP C-O DEPM703/21/2026
179 EAST 70TH STREET7203/21/2026
PHOENIX BRIDGING INC DBA PHOENIX203/21/2026
DOUGLAS ELLIMAN PROPERTY MNGMT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GESTURE INK ARCHITECTURE208/25/2026
AAXD211/25/2025
EP ENGINEERING LLC410/17/2025
DORIC CONSULTANTS PC105/16/2025
C&P DESIGN CONSULTANTS104/08/2025
CTA ARCHITECTS104/01/2025
MURRAY ENGINEERING PC103/26/2025
HUNT ARCHITECTS103/25/2025
WONG ARCHITECT209/05/2024
JOSEPH K. BLUM CO. LLP110/18/2023
JOSHUA BRANDFONBRENER ARCHITECT205/12/2023
SGM ENGINEERING101/13/2021
ARCHETYPE ARCHITECTURE406/25/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HUNT ARCHITECTS503/21/2026
WEST AZE403/21/2026
NEXUS CONSULTING NYC, INC403/21/2026
METROPOLIS GROUP INC403/21/2026
KATARIA BUILDERS203/21/2026
DI DIO ARCHITECTURE, PC203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DNA PLUMBING CONTR. INCPlumbing507/08/2026
LINDI CONSTRUCTION GROUPGeneral Contractor507/08/2026
WHARTON SMITH CONSTRUCTI*General Contractor407/08/2026
FORTE GC INCGeneral Contractor303/21/2026
PA AVALANCHE CONSTRUCTIONGeneral Contractor303/21/2026
OZ AIR CONDITIONING, INCGeneral Contractor303/21/2026
NY SHEET METAL INCGeneral Contractor303/21/2026
N Y SIGN ARTScaffold207/08/2026
CARPIO, DANNYElectrical203/21/2026
SALCEDO, PEDROElectrical203/21/2026
MERIDIAN CONSTRUCTION GRPGeneral Contractor207/08/2026
NEW AMSTERDAM BUILDERS LLGeneral Contractor208/21/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
A'S ELECTRIC CONTRACTINGElectrical103/22/2026
KRSLOVIC, ANTEElectrical103/21/2026
FLAG ELECTRIC INCElectrical103/22/2026
ELITE ELECTRICAL & WIRINGElectrical103/22/2026
C SCHLOSBERG INCElectrical103/21/2026
CASTILLO JR, JORGEElectrical103/21/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
J&M PLBG OF WESTCHESTER IFire Protection107/08/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM DESIGN STUDIO LLC4413106/18/2026
DI DIO ARCHITECTURE, PC9224610/17/2025
EP INSPECTIONS AND COMMIS7079310/17/2025
DORIC PROF. ENGINEERING C1537105/16/2025
METRIC CONSULTING AND INS1803204/08/2025
KCE CONSULTING ENGINEERIN3712203/26/2025
WONG ARCHITECT1272109/05/2024
LCW ENGINEERING, PC1103109/05/2024
JOSEPH K. BLUM CO. LLP1741110/18/2023
BEYOND ARCH LLC3600205/12/2023
Building Lifecycle
All (171)Filed (23)Permit Issued (24)Signed Off (13)Facade (FISP) (15)Violation (42)Inspection (10)Objection (14)Special Inspection (30)
08/25/2026
Filed — Alteration
Replace two existing PTAC units in existing location. Install new PTAC unit, new kitchen and dryer exhaust as shown on plans.
M01406122-S1
08/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/20/2026
Permit issued — General Construction
M01406122-I1-GC
08/14/2026
Special inspection requirement — Final
08/14/2026
Special inspection requirement — Mechanical Systems
07/06/2026
Permit issued — General Construction
M01406122-I1-GC
06/18/2026
Filed — Alteration
Replace two existing PTAC units in existing location. Install new PTAC unit, new kitchen and dryer exhaust as shown on plans.
M01406122-I1
05/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
ALLENDE MATOS
05/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
ALLENDE MATOS
05/21/2026
Special inspection requirement — Interior lighting power
MEL SARKOR-CLINTON
05/21/2026
Special inspection requirement — Energy Code Compliance Inspections
MEL SARKOR-CLINTON
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLENDE MATOS
05/21/2026
Special inspection requirement — Final
MEL SARKOR-CLINTON
04/20/2026
Cycle 10 facade inspection completed
04/20/2026
Cycle 10 facade report signed — SWARMP
04/07/2026
Violation issued (ECB, open)
Unknown
03/17/2026
Cycle 10 facade report submitted
03/02/2026
Signed off — Alteration
HEREWITH FILING FOR RETAIL RENOVATIONS AT THE CELLAR AND GROUND FLOOR PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01194079-I1
02/27/2026
Signed off — Alteration
HEREWITH FILING FOR RETAIL RENOVATIONS AT THE CELLAR AND GROUND FLOOR PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01194079-S1
12/02/2025
Permit issued — Sign
M01313170-I1-SG
11/25/2025
Filed — Alteration
ILLUMINATED ACCESSORY NON ADVERTISING BUSINESS SIGN ON WALL. SIGN WORDING: SCANDIA HOME
M01313170-I1
11/20/2025
Special inspection requirement — Sprinkler Systems
MOLLY GLENN
11/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel DiDio
11/20/2025
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
11/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
Daniel DiDio
11/12/2025
Signed off — Alteration
M01189853-I1
11/10/2025
Permit issued — Structural
M01189853-I1-ST
11/03/2025
Special inspection requirement — Final
DAMIR RAHMAN
10/29/2025
Signed off — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE NEW HVAC SYSTEM ANDASSOCIATED DUCTWORK. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01192419-S3
10/23/2025
Signed off — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE NEW HVAC SYSTEM ANDASSOCIATED DUCTWORK. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01192419-S2
10/17/2025
Filed — Alteration
MECHANICAL MODIFICATIONS TO INCLUDE NEW HVAC SYSTEM ANDASSOCIATED DUCTWORK. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01192419-P1
09/18/2025
Special inspection requirement — Sprinkler Systems
MOLLY GLENN
09/18/2025
Special inspection requirement — Post-installed Anchors
MOLLY GLENN
09/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel DiDio
09/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
Daniel DiDio
08/19/2025
Permit issued — Sign
M01270788-I1-SG
08/15/2025
Filed — Alteration
ILLUMINATED ACCESSORY NON ADVERTISING BUSINESS SIGN ON WALL. SIGN WORDING: SCANDIA HOME
M01270788-I1
08/13/2025
Special inspection requirement — Final
DAMIR RAHMAN
08/08/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/04/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/04/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/10/2025
Permit issued — Mechanical Systems
M01194079-S1-MS
07/02/2025
Permit issued — Sprinklers
M01192419-S1-EW-SP
06/16/2025
Permit issued — Structural
M01189853-I1-ST
06/12/2025
Signed off — Alteration
Filing sprinkler system within the retail space as per plan. This application is being filed to replace the previous application # 102476465. Once the new application is approved and signed off, the old application will be withdrawn.
M01225847-I1
06/06/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/06/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/03/2025
Objection resolved — Addressed
06/03/2025
Objection resolved — Addressed
06/03/2025
Objection resolved — Addressed
06/03/2025
Objection resolved — Addressed
05/29/2025
Permit issued — Plumbing
M01192419-S3-PL
05/29/2025
Objection resolved — Addressed
05/27/2025
Permit issued — Sprinklers
M01225847-I1-EW-SP
05/23/2025
Permit issued — General Construction
M01194079-I1-GC
05/16/2025
Filed — Alteration
Filing sprinkler system within the retail space as per plan. This application is being filed to replace the previous application # 102476465. Once the new application is approved and signed off, the old application will be withdrawn.
M01225847-I1
05/16/2025
Objection resolved — Addressed
05/14/2025
Permit issued — General Construction
M01192419-I1-GC
Latest 60 of 171 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNEW AMSTERDAM BUILDERS LL08/20/2026
DOB NOWGeneral ConstructionPermit IssuedNEW AMSTERDAM BUILDERS LL07/06/2026
DOB NOWSignPermit IssuedSKANSKA BUILDING INC12/02/2025
DOB NOWStructuralSigned-offLINDI CONSTRUCTION GROUP11/10/2025
DOB NOWSignPermit IssuedSKANSKA BUILDING INC08/19/2025
DOB NOWMechanical SystemsSigned-offMERIDIAN CONSTRUCTION GRP07/10/2025
DOB NOWSprinklersSigned-offAMERICAN STANDARD PLUMBIN07/02/2025
DOB NOWStructuralSigned-offLINDI CONSTRUCTION GROUP06/16/2025
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG05/29/2025
DOB NOWSprinklersSigned-offJ&M PLBG OF WESTCHESTER I05/27/2025
DOB NOWGeneral ConstructionSigned-offMERIDIAN CONSTRUCTION GRP05/23/2025
DOB NOWGeneral ConstructionPermit IssuedLINDI CONSTRUCTION GROUP05/14/2025
DOB NOWMechanical SystemsSigned-offOZ AIR CONDITIONING, INC05/01/2025
DOB NOWConstruction FenceSigned-offWHARTON SMITH CONSTRUCTI*10/16/2024
DOB NOWGeneral ConstructionSigned-offWHARTON SMITH CONSTRUCTI*09/16/2024
DOB NOWGeneral ConstructionSigned-offPA AVALANCHE CONSTRUCTION10/24/2023
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC08/14/2023
DOB NOWGeneral ConstructionSigned-offFORTE GC INC08/03/2023
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC04/02/2021
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC04/01/2021
DOB NOWMechanical SystemsSigned-offNY SHEET METAL INC01/25/2021
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC03/02/2020
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC12/05/2019
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC12/05/2019
BISOTISSUEDFIVE STAR EURO CONSTRUCTI03/09/2020
BISOTISSUEDFIVE STAR EURO CONSTRUCTI10/16/2019
BISOTISSUEDMAJOR RENOVATION MGMT INC09/13/2019
BISOTISSUEDFORTE GC INC09/13/2019
BISPLISSUEDHYDROTAC SERVICES LLC06/20/2019
BISOTISSUEDMAJOR RENOVATION MGMT INC05/30/2019
BISOTISSUEDDAPOLITO DESIGN AND CONST04/30/2018
BISPLISSUEDNEW PLBG & HTG CORP03/08/2018
BISOTISSUEDDAPOLITO DESIGN AND CONST02/23/2018
BISPLISSUEDHYDROTAC SERVICES LLC01/16/2018
BISPLISSUEDPROACTIVE PLBG & MECH. CO10/17/2017
BISOTISSUEDMAJOR RENOVATION MGMT INC03/08/2017
BISMHISSUEDMAJOR RENOVATION MGMT INC02/16/2017
BISPLISSUEDHYDROTAC SERVICES LLC11/15/2016
BISOTISSUEDMAJOR RENOVATION MGMT INC11/10/2016
BISPLISSUEDORBIT PLBG & HTG INC10/21/2016
+ 34 more permits on file
2 projects · most recent 08/25/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/25/2026Permit IssuedNEW AMSTERDAM BUILDERS LLHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
10/17/2025Permit IssuedLINDI CONSTRUCTION GROUPHeating and Air Conditioning Systems
Heat / Cool
Trane TPLFYP008FM140A 66,000 BTU · Vrf Indoor ×2
TPLFYP018FM140A 66,000 BTU · Vrf Indoor ×1
TPLFYP024EM140B 66,000 BTU · Vrf Indoor ×1
Mitsubishi Electric MXZ-SM60NAM2 66,000 BTU · Condensing Unit ×1
1 project · most recent 10/17/2025
Sprinkler System
FiledStatusContractorScope
10/17/2025Signed-offAMERICAN STANDARD PLUMBINSprinkler System
1 project · most recent 10/17/2025
Water/Sanitary
FiledStatusContractorScope
10/17/2025Signed-offJOHN FITZGERALD PLBG &HTGWater/Sanitary
13 projects · most recent 08/03/2026
General Wiring Lighting
FiledStatusContractorScope
08/03/2026Permit IssuedMAC ELECT'L CONTR. INC.General Wiring
07/01/2026Permit IssuedSPECTRUM ON BROADWAY-ELEC—
10/01/2025Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
09/15/2025Permit IssuedSPECTRUM ON BROADWAY-ELEC—
05/29/2025Permit IssuedGRX EURO ELECTRIC CORPGeneral Wiring
11/20/2024Permit IssuedA'S ELECTRIC CONTRACTINGGeneral Wiring
08/14/2023Permit IssuedGLENDALE ELECTL CONTNG INGeneral Wiring
09/23/2021CompleteNORCAL ELECTRIC LLCGeneral Wiring
11/25/2020CompletePAUL'S ELECTRIC INCGeneral Wiring
11/24/2020Permit IssuedPREMIUM ELECTRIC INCGeneral Wiring
11/24/2020Permit IssuedPREMIUM ELECTRIC INCGeneral Wiring
09/11/2020CompleteADA ELECTRIC CORP—
04/25/2018CompleteFLAG ELECTRIC INCGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/04/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/06/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/06/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/25/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
08/25/2026Tenant Protection Plan Compliance—special
08/14/2026Final—progress
08/14/2026Mechanical Systems—special
05/29/2026Tenant Protection Plan ComplianceALLENDE MATOSspecial
05/21/2026Fire-Resistance Rated ConstructionALLENDE MATOSprogress
05/21/2026Energy Code Compliance InspectionsMEL SARKOR-CLINTONprogress
05/21/2026Interior lighting powerMEL SARKOR-CLINTONenergy_progress
05/21/2026FinalMEL SARKOR-CLINTONprogress
05/21/2026Fire-Resistant Penetrations and JointsALLENDE MATOSspecial
11/20/2025Sprinkler SystemsMOLLY GLENNspecial
11/20/2025Fire-Resistant Penetrations and JointsDaniel DiDiospecial
11/20/2025Tenant Protection Plan ComplianceDaniel DiDiospecial
11/20/2025Post-installed AnchorsMOLLY GLENNspecial
11/03/2025FinalDAMIR RAHMANprogress
09/18/2025Fire-Resistant Penetrations and JointsDaniel DiDiospecial
09/18/2025Tenant Protection Plan ComplianceDaniel DiDiospecial
09/18/2025Sprinkler SystemsMOLLY GLENNspecial
09/18/2025Post-installed AnchorsMOLLY GLENNspecial
08/13/2025FinalDAMIR RAHMANprogress
04/02/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
03/26/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
03/26/2025Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
03/26/2025Lighting controlsSAMI HAJJAR P.Eenergy_progress
03/26/2025Interior lighting powerSAMI HAJJAR P.Eenergy_progress
03/26/2025Post-installed AnchorsSAMI HAJJAR P.Especial
Latest 25 of 82.
▾Documents — 705 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch17
08/31/2026M00865113-I1Request digital key ↗
08/31/2026M00865119-I1Request digital key ↗
08/29/2026M00947374-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00187310-I1Request digital key ↗
08/15/2026M00187310-P2Request digital key ↗
08/15/2026M00187310-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00449768-I1Request digital key ↗
▸Applications & Permits134
▸BISWORK PERMIT APPLICATION75
03/10/2020123753517Open ↗
10/17/2019123753517Open ↗
09/13/2019140847564Open ↗
Showing 3 of 75 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION55
07/28/2025102476465Open ↗
05/23/2022123753517Open ↗
09/19/2019123753517Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWState DEC Permit4
08/13/2026M00187310-P3Open ↗
08/13/2026M00187310-I1Open ↗
08/13/2026M00187310-P1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications193
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION67
03/04/2020140847564Open ↗
03/04/2020140847564Open ↗
01/13/2020140847564Open ↗
Showing 3 of 67 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature35
09/02/2026M01192419-I1Open ↗
09/02/2026M01192419-I1Open ↗
09/01/2026M00865113-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
09/02/2026M01192419-I1Open ↗
09/02/2026M01192419-I1Open ↗
09/02/2026M01192419-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/10/2026M01406122-S1Open ↗
09/05/2026M00187310-P1Open ↗
09/05/2026M00187310-P2Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
05/31/2016122757025Open ↗
05/31/2016122715124Open ↗
Showing 2 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
06/08/2016140503042Open ↗
05/31/2016122757025Open ↗
05/31/2016122715124Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/08/2016140503042Open ↗
05/17/2016140492526Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
05/20/2019140847564Open ↗
10/27/2016140562442Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/08/2016140503042Open ↗
05/17/2016140492526Open ↗
▸Trade Schedules & Equipment45
▸BISSELF-CERT PLUMBING NOTICE17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISSCHEDULE B - PLUMBING16
09/17/2019140847564Open ↗
05/20/2019140847564Open ↗
10/27/2016140562442Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
10/25/2018123197637Open ↗
01/17/2018123197637Open ↗
Showing 2 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
12/31/2018121073676Open ↗
03/27/2018140562442Open ↗
Showing 2 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS2
12/31/2018121073676Open ↗
03/27/2018140562442Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection14
▸BISTenant Protection Plan and Notes9
09/19/2019123753517Open ↗
08/14/2019123765274Open ↗
05/20/2019140847564Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWTenant Protection Plan4
08/13/2026M00187310-P1Open ↗
08/13/2026M00187310-P3Open ↗
08/13/2026M00187310-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos53
▸BISASBESTOS: CERTIFICATION (DEP ACP5)17
10/16/2019123753517Open ↗
09/19/2019123753517Open ↗
08/14/2019123765274Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/10/2026M01406122-S1Open ↗
09/05/2026M00187310-P2Open ↗
09/05/2026M00187310-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M01194079-I1Open ↗
08/13/2026M01194079-S1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance71
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS32
03/04/2020140847564Open ↗
03/04/2020140847564Open ↗
01/13/2020140847564Open ↗
Showing 3 of 32 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS16
03/04/2020140847564Open ↗
01/13/2020140847564Open ↗
01/23/2019123197637Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: ENERGY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/22/2021123765274Open ↗
05/20/2019140847564Open ↗
11/01/2016140562442Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/25/2022123753517Open ↗
03/22/2021123765274Open ↗
▸BISLIGHTING CONTROLS2
04/25/2022123753517Open ↗
04/25/2022123753517Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/17/2016140492526Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00449768-I1Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY7
06/03/2022123753517Open ↗
06/03/2022123753517Open ↗
03/22/2021123765274Open ↗
Showing 3 of 7 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
04/25/2022123753517Open ↗
04/25/2022123753517Open ↗
▸BISTECHNICAL REPORT: EXT. WALLS & APPURTS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRO FLOW TEST LETTER1
03/27/2018140562442Open ↗
▸Approvals, Objections & Sign-offs41
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
06/03/2022123753517Open ↗
03/22/2021123765274Open ↗
03/04/2020140847564Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
05/31/2022123753517Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership53
▸BISCOST AFFIDAVIT49
03/04/2020140847564Open ↗
01/13/2020140847564Open ↗
09/19/2019123753517Open ↗
Showing 3 of 49 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
04/25/2022123753517Open ↗
03/22/2021123765274Open ↗
03/22/2021123765274Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms65
▸BISEFILING COVER SHEET30
09/19/2019123753517Open ↗
08/14/2019123765274Open ↗
01/17/2018123197637Open ↗
Showing 3 of 30 on file for this type
▸BISADDITIONAL INFORMATION23
09/26/2019140847564Open ↗
09/17/2019140847564Open ↗
09/17/2019140847564Open ↗
Showing 3 of 23 on file for this type
▸BISBOROUGH INTAKE FORM8
03/04/2020140847564Open ↗
01/13/2020140847564Open ↗
01/23/2019123197637Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
05/20/2019140847564Open ↗
10/27/2016140562442Open ↗
06/08/2016140503042Open ↗
Showing 3 of 4 on file for this type
▸Other Documents3
▸BISDepartment of Consumer Affairs (DCA) Form2
10/29/2018121073676Open ↗
Showing 1 of 2 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type