| Owner | Filings | Most Recent |
|---|---|---|
| NYC ECONOMIC DEVELOPMENT CORP | 357 | 09/13/2026 |
| ADVANCED SCAFFOLD SERVICES | 36 | 07/08/2026 |
| PROPERTY MANAGEMENT AFFILIATES | 18 | 07/08/2026 |
| 14TH AT IRVING | 13 | 07/29/2026 |
| NEW YORK CITY ECONOMIC DEVELOPMENT | 8 | 07/08/2026 |
| TRI BOROUGH SCAFFOLDING | 5 | 07/08/2026 |
| VIK XS SERVICES | 4 | 07/08/2026 |
| BUILD002 | 2 | 03/22/2026 |
| RAL DEVELOPMENT SERVICES | 2 | 03/22/2026 |
| 14TH AT IRVING FEE LLC | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ROBERT DERECTOR ASSOCIATES | 23 | 07/28/2026 |
| INTERIOR ARCHITECTS | 1 | 07/28/2026 |
| IMEG CONSULTING CORP. | 1 | 03/30/2026 |
| DESIGN REPUBLIC | 2 | 03/25/2026 |
| GENSLER | 11 | 10/02/2025 |
| STARK CONSULTING, LLC | 4 | 09/17/2025 |
| EIMER DESIGN | 3 | 08/18/2025 |
| OSPINO ENGINEERING PLLC | 2 | 02/28/2025 |
| HOWARD SHAPIRO & ASSOCIATES, P.C. | 2 | 02/03/2025 |
| MG ENGINEERING D.P.C. | 6 | 01/21/2025 |
| TPG ARCHITECTURE, LLP | 2 | 01/21/2025 |
| CD&A, PLLC | 11 | 04/23/2024 |
| DXU LLC | 4 | 01/29/2024 |
| PATTI & ANTHES CONSULTING ENGINEERS | 30 | 01/19/2024 |
| LILKER ASSOCIATES CONSULTING ENGINE | 4 | 01/19/2024 |
| LOCKWOOD,KESSLER & BARTLETT,INC | 2 | 11/03/2023 |
| AMA CONSULTING ENGINEERS, PC | 6 | 07/11/2023 |
| PERKINS and WILL | 2 | 04/27/2023 |
| TED MOUDIS ASSOCIATES | 1 | 02/14/2023 |
| CASE ENGINEERING, INC. | 8 | 12/13/2022 |
| PATUXENT ENGINEERING LLC | 8 | 05/19/2022 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 1 | 04/05/2022 |
| KENDALL ENGINEERING PC | 3 | 04/22/2021 |
| WSP | 3 | 04/14/2021 |
| SAFWAY ATLANTIC LLC | 2 | 03/26/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| JM ZONING, LLC. | 204 | 03/21/2026 |
| DOMANI CONSULTING | 8 | 03/21/2026 |
| HOWARD I SHAPIRO ASSOCIATES | 4 | 03/21/2026 |
| AO CONSULTING AND DRAFTING | 4 | 03/21/2026 |
| KUSHNER STUDIOS | 3 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 6 | 03/21/2026 |
| AE DESIGN SOLUTION | 4 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 5 | 03/21/2026 |
| PATUXENT ENGINEERING | 16 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SAVCON CONSTRUCTION LLC | General Contractor | 36 | 07/08/2026 |
| CROSS MANAGEMENT CORP | General Contractor | 22 | 07/08/2026 |
| ADVANCED SCAFFOLD SER.LLC | General Contractor | 19 | 07/08/2026 |
| STRUCTURE TONE, LLC | General Contractor | 12 | 07/31/2026 |
| SUFFOLK CONSTRUCTION COMP | General Contractor | 9 | 03/22/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 7 | 07/08/2026 |
| ENOBRAC PLUMBING, INC | Fire Protection | 7 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 6 | 07/08/2026 |
| ADVANCED PLBG, MECH & SPR | Fire Protection | 6 | 07/08/2026 |
| ENOBRAC PLUMBING, INC | Plumbing | 5 | 07/08/2026 |
| ADVANCED PLUMBING MECH | Plumbing | 4 | 07/08/2026 |
| LAB PLBG & HTG CO INC | Plumbing | 4 | 07/08/2026 |
| C&A SENECA CONSTRUCTION L | General Contractor | 4 | 07/08/2026 |
| TRI BOROUGH SCAFFOLDING | General Contractor | 4 | 07/08/2026 |
| METRO-TECH ERECTORS CORP | General Contractor | 3 | 07/08/2026 |
| JAMES E FITZGERALD INC | General Contractor | 3 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 3 | 07/08/2026 |
| BREEZE NATIONAL INC | General Contractor | 3 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 3 | 08/01/2026 |
| METROPOLIS ELECTRIC CORP | Electrical | 2 | 03/22/2026 |
| C C CONTROLLED COMBUSTION | General Contractor | 2 | 03/21/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 2 | 08/04/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 2 | 07/08/2026 |
| PROSTAR PLUMBING AND HEAT | Plumbing | 1 | 07/08/2026 |
| C.M. RICHEY ELEC'L CONTR | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| MILROSE CONSULTANTS LLC | 2003 | 10 | 07/28/2026 |
| ACE STRUCTURAL ENGINEERIN | 496 | 5 | 09/17/2025 |
| CROSSCHECK INSPECTION SER | 544 | 16 | 01/21/2025 |
| FENAGH, INC | 6942 | 15 | 09/16/2024 |
| AK ENGINEERING PC | 678 | 7 | 07/11/2023 |
| DNA CONTROLLED INSPECTION | 554 | 3 | 05/18/2023 |
| HIRANI ENGINEERING & LAND | 679 | 14 | 03/14/2023 |
| ENGINEERING BUILDING SERV | 7303 | 3 | 02/21/2023 |
| DOMANI INSPECTION SERVICE | 843 | 7 | 12/13/2022 |
| KENDALL ENGINEERING PC | 4154 | 3 | 04/22/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | A PLUS PLUMBING CORP | 08/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 08/03/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 07/31/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 07/30/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 07/30/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | METRO-TECH ERECTORS CORP | 07/28/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 04/06/2026 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 04/06/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | AVENUE CONTRACTING INC | 08/13/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | METRO-TECH ERECTORS CORP | 08/08/2025 |
| DOB NOW | Sprinklers | Signed-off | LEGUCI PIPING&HEATING LLC | 08/05/2025 |
| DOB NOW | Plumbing | Signed-off | PROSTAR PLUMBING AND HEAT | 07/18/2025 |
| DOB NOW | Mechanical Systems | Signed-off | C&A SENECA CONSTRUCTION L | 07/16/2025 |
| DOB NOW | General Construction | Signed-off | C&A SENECA CONSTRUCTION L | 06/05/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | METRO-TECH ERECTORS CORP | 02/28/2025 |
| DOB NOW | Plumbing | Signed-off | ADVANCED PLUMBING MECH | 02/24/2025 |
| DOB NOW | Sprinklers | Signed-off | ADVANCED PLBG, MECH & SPR | 02/13/2025 |
| DOB NOW | Sprinklers | Signed-off | ADVANCED PLBG, MECH & SPR | 02/06/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | METRO-TECH ERECTORS CORP | 02/03/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SAVCON CONSTRUCTION LLC | 01/21/2025 |
| DOB NOW | General Construction | Signed-off | SAVCON CONSTRUCTION LLC | 01/21/2025 |
| DOB NOW | Sprinklers | Signed-off | ADVANCED PLBG, MECH & SPR | 10/17/2024 |
| DOB NOW | Sprinklers | Signed-off | ABCO-PEERLESS SPRKLR CORP | 09/26/2024 |
| DOB NOW | General Construction | Signed-off | CROSS MANAGEMENT CORP | 09/25/2024 |
| DOB NOW | Mechanical Systems | Signed-off | CROSS MANAGEMENT CORP | 09/25/2024 |
| DOB NOW | Mechanical Systems | Signed-off | SAVCON CONSTRUCTION LLC | 02/05/2024 |
| DOB NOW | Plumbing | Signed-off | ADVANCED PLUMBING MECH | 01/31/2024 |
| DOB NOW | Sprinklers | Signed-off | ADVANCED PLBG, MECH & SPR | 01/31/2024 |
| DOB NOW | Sprinklers | Signed-off | ENOBRAC PLUMBING, INC | 01/29/2024 |
| DOB NOW | Sprinklers | Signed-off | ENOBRAC PLUMBING, INC | 01/29/2024 |
| DOB NOW | General Construction | Signed-off | SAVCON CONSTRUCTION LLC | 01/24/2024 |
| DOB NOW | Structural | Signed-off | STRUCTURE TONE, LLC | 12/11/2023 |
| DOB NOW | General Construction | Signed-off | CROSS MANAGEMENT CORP | 08/16/2023 |
| DOB NOW | Plumbing | Signed-off | ADVANCED PLUMBING MECH | 08/16/2023 |
| DOB NOW | Mechanical Systems | Signed-off | CROSS MANAGEMENT CORP | 08/16/2023 |
| DOB NOW | General Construction | Signed-off | CROSS MANAGEMENT CORP | 08/16/2023 |
| DOB NOW | Mechanical Systems | Signed-off | CROSS MANAGEMENT CORP | 08/15/2023 |
| DOB NOW | General Construction | Signed-off | CROSS MANAGEMENT CORP | 08/15/2023 |
| DOB NOW | General Construction | Signed-off | CROSS MANAGEMENT CORP | 08/15/2023 |
| DOB NOW | General Construction | Signed-off | SAVCON CONSTRUCTION LLC | 08/08/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/18/2023 | Signed-off | CROSS MANAGEMENT CORP | Air Conditioning Systems, Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Slant-Fin ×3 Lg ARUM456DTE5 3,600 CFM · Vrf Outdoor ×2 Task TGC043HE 1,800 CFM · Packaged Unit ×1 Heat / Cool Slant-Fin ×20 Lg ARNU543M3A4 5 tons · Vrf Indoor ×12 ARNU123SJA4 2 tons · Vrf Indoor ×2 ARNU243SKA4 2 tons · Vrf Indoor ×2 ARNU483M3A4 4 tons · Vrf Indoor ×3 ARNU073M1A4 5 tons · Vrf Indoor ×2 ARNU363M2A4 5 tons · Vrf Indoor ×2 ARNU 483M3A4 5 tons · Vrf Indoor ×1 ARNU123M1A4 1 tons · Vrf Indoor ×1 ARNU243M1A4 2 tons · Vrf Indoor ×1 ARNU543MEA4 5 tons · Vrf Indoor ×1 N/A N/A 5 tons · Fan Coil Indoor ×1 |
| 10/08/2020 | Signed-off | C C CONTROLLED COMBUSTION | Generators | Generators Caterpillar KD 1250-4 Generator ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/28/2026 | Permit Issued | PAR FIRE PROTECTION LLC | 7 heads |
| 01/21/2025 | Signed-off | ADVANCED PLBG, MECH & SPR | Sprinkler System |
| 03/17/2022 | Permit Issued | A PLUS PLUMBING CORP | 232 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/28/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 01/21/2025 | Signed-off | ADVANCED PLUMBING MECH | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/27/2026 | Permit Issued | KLEINKNECHT ELEC. CO.,INC | General Wiring |
| 04/17/2026 | Complete | METROPOLIS ELECTRIC CORP | General Wiring |
| 04/07/2026 | Complete | FREEDOM ELECTRIC & DATA | General Wiring |
| 07/01/2025 | Permit Issued | TEAM ELECTRIC, INC | General Wiring |
| 10/08/2024 | Complete | BIGMAN BROS., INC. | General Wiring, Lighting |
| 05/30/2024 | Complete | BIGMAN BROS., INC. | General Wiring, Lighting |
| 05/30/2024 | Complete | BIGMAN BROS., INC. | General Wiring, Lighting |
| 01/27/2024 | Complete | METROPOLIS ELECTRIC CORP | General Wiring |
| 10/07/2023 | Complete | METROPOLIS ELECTRIC CORP | General Wiring |
| 07/06/2023 | Complete | FREEDOM ELECTRIC & DATA | General Wiring |
| 05/02/2023 | Complete | C.M. RICHEY ELEC'L CONTR | General Wiring |
| 03/21/2023 | Complete | KLEINKNECHT ELEC. CO.,INC | General Wiring |
| 03/15/2023 | Complete | FREEDOM ELECTRIC & DATA | General Wiring |
| 02/09/2023 | Complete | SOLAR ELEC. SYSTEMS, INC. | 4 meters, 4 new_meters |
| 02/09/2023 | Complete | SOLAR ELEC. SYSTEMS, INC. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/03/2023 | Signed-off | STRUCTURE TONE, LLC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/26/2021 | Signed-off | SAFWAY ATLANTIC, LLC | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/07/2025 | Permit Issued | AVENUE CONTRACTING INC | Suspended Scaffold (SC) |
| 02/28/2025 | Signed-off | METRO-TECH ERECTORS CORP | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 04/09/2026 | Certified Sprinkler (SP) - Booster Pump Test | Certified | View ↗ |
| 10/24/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/22/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/23/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/23/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/19/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/02/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/07/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/31/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/18/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/28/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/19/2025 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 01/09/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/09/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/09/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/16/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/01/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/14/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/13/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/13/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/01/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/29/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/27/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/22/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/21/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/14/2026 | Final | Benjamin Plotnick | progress |
| 07/14/2026 | Ventilation and air distribution system | Benjamin Plotnick | energy_progress |
| 07/14/2026 | Mechanical Systems | Benjamin Plotnick | special |
| 02/24/2026 | Mechanical Systems | Christopher Drutjons | special |
| 02/24/2026 | Final | Christopher Drutjons | progress |
| 11/07/2025 | Public Assembly Emergency Lighting | AILANTO DANIEL MINAWI | progress |
| 09/17/2025 | Final | ANTHONY UGBEBOR | progress |
| 09/17/2025 | Mechanical Systems | ANTHONY UGBEBOR | special |
| 09/17/2025 | Maintenance information | ANTHONY UGBEBOR | energy_progress |
| 09/05/2025 | Mechanical Systems | ANTHONY UGBEBOR | special |
| 09/05/2025 | Maintenance information | ANTHONY UGBEBOR | energy_progress |
| 09/05/2025 | Final | ANTHONY UGBEBOR | progress |
| 05/13/2025 | Post-installed Anchors | ANTHONY UGBEBOR | special |
| 05/13/2025 | Fire-Resistant Penetrations and Joints | ANTHONY UGBEBOR | special |
| 05/09/2025 | Public Assembly Emergency Lighting | ANTHONY UGBEBOR | progress |
| 05/06/2025 | Sprinkler Systems | ANTHONY UGBEBOR | special |
| 01/29/2025 | Post-installed Anchors | EUGENE BIFULCO | special |
| 01/29/2025 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 01/29/2025 | Sprinkler Systems | EUGENE BIFULCO | special |
| 01/22/2025 | Final | EUGENE BIFULCO | progress |
| 01/22/2025 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 01/21/2025 | Interior lighting power | EUGENE BIFULCO | energy_progress |
| 01/21/2025 | Ventilation and air distribution system | EUGENE BIFULCO | energy_progress |
| 01/21/2025 | Maintenance information | EUGENE BIFULCO | energy_progress |
| 01/21/2025 | Duct leakage testing, insulation and design | EUGENE BIFULCO | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Sequoia | Office | Floor 18 | Project M01430476 Project M01430497 Project M08032122 |
| Dick's Sporting Goods | Office | Floors 16, 17 | Project M01363739 Project M00922420 |
| Time Out Market | Restaurant / Food Service | Floor 1 | Project M01270477 Project M01223389 Project M01218396 |
| Civic Hall | Unknown | Floor 7 | Project M01081156 |
| The Fedcap Group | Office | Floors 1–7 | Project M00958505 Project M00779827 Project M00779871 Project M00779960 Project M00727637 Project M00727649 Project M00727614 |
| Compass Rose Asset Management | Unknown | Floor 20 | Project M00904603 |
| DSG & Gamechanger | Office | Floors 16, 17 | Project M00879165 |
| Alchemy | Office | Floor 10 | Project M00865676 |
| Zero Irving | Office | Floors 12, 13 | Project M00819232 |
| Civic Hall at Union Square The Fedcap Group | Office | Floors 2, 3 | Project M00779783 |
| Urbanspace | Restaurant / Food Service | Cellar, Floor 1 | Project M00792768 Project M00438121 Project M00438129 |
| Melio | Office | Floors 14, 15 | Project M00689369 Project M00689376 Project M00689383 |