Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofClifton House Owners CorporationUnder Construction17p · 3 filings · 20 docs
ArchitectureElectricalEquipmentGeneralStructural
Issued Permit Scope
General Construction · Solar · Supported Scaffold
INSTALLATION OF SOLAR PV SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
9 documents · 3 drawing sheets
MASONRY RESTORATION AND REPAIR, LINTEL REPLACEMENT, WINDOW RESTORATION, WINDOW SILL REPLACEMENT,WATERPROOFING INSTALLATION, FLASHING REPAIRS.
On file for this project
14 documents · 1 drawing sheet
FILE THE SUPPORTED PIPE SCAFFOLD AS SHOWN ON THE PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
On file for this project
2 documents
BulkheadBulkhead and Exterior Repairs6p · 1 filing · 14 docs
Architecture
MASONRY RESTORATION AND REPAIR, LINTEL REPLACEMENT, WINDOW RESTORATION, WINDOW SILL REPLACEMENT,WATERPROOFING INSTALLATION, FLASHING REPAIRS.
On file for this project
14 documents · 6 drawing sheets
PenthouseBulkhead and Exterior Repairs2p · 1 filing · 14 docs
Architecture
MASONRY RESTORATION AND REPAIR, LINTEL REPLACEMENT, WINDOW RESTORATION, WINDOW SILL REPLACEMENT,WATERPROOFING INSTALLATION, FLASHING REPAIRS.
On file for this project
14 documents · 2 drawing sheets
Floor 16Unit 16B1p · 1 filing · 6 docs
Plumbing
Issued Permit Scope
Plumbing
FILE APPLICATION TO REPLACE EXISTING PLUMBING FIXTURES AT APARTMENT 16B. THERE IS NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
6 documents
Floor 15Unit 15EF, Unit 15FE4p · 1 filing · 5 docs
ArchitectureMechanical
Issued Permit Scope
General Construction
Installation of new thru-wall AC units and associated GC work, as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Floor 14Unit 14B, Unit 14H, Unit 14JUnder Construction28p · 4 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Plumbing application filed in conjunction to GC M01419746-I1
On file for this project
10 documents · 6 drawing sheets
AT APARTMENT 14J, MODIFICATIONS/ADDITIONS TO EXISTING MECHANICAL SYSTEM. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.
On file for this project
13 documents
AT APARTMENT 14J, REPLACEMENT OF PLUBMING FIXTURES IN KITCHEN AND BATHROOM. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.
On file for this project
8 documents
Latest 3 of 4 filings on this floor.
Floor 13
Floor 12
Floor 11Unit 11A, Unit 11C12p · 2 filings · 20 docs
ArchitectureDMPlumbing
Issued Permit Scope
General Construction · Plumbing
SCOPE OF WORK ENTAILS THE RENOVATION OF APT 11C INCLUDING NEW PLUMBING FIXTURES, RELOCATED PLUMBING FIXTURES, SANITARY PIPING, DOMESTIC WATER PIPING, ALL COMPLETED WITH ASSOCIATED ACCESSORIES, INSULATION, AND CONTROLS.
On file for this project
20 documents · 7 drawing sheets
REPLACE EXISTING 3PCS BATHROOM (LAVATORY, TOILET, BATHTUB) AND SINK AT APT. 11A. THERE IS NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
5 documents
Floor 10Unit 10E, Unit 10F, Unit 10J7p · 2 filings · 18 docs
Architecture
Issued Permit Scope
General Construction
Interior renovations and apartment combination to units 10E and 10F per TPPN 3/97, as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
14 documents
INSTALLATION OF HVAC SYSTEM IN APT 10J AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
4 documents
Floor 9Unit 9C5p · 1 filing · 14 docs
Architecture
Issued Permit Scope
General Construction
KITCHENETTE RENOVATION & MINOR INTERIOR NON-BEARING PARTITION REMOVAL & CONSTRUCTION.
On file for this project
14 documents
Floor 8Unit 8A, Unit 8C, Unit 8J44p · 4 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Creating through wall sleeve openings for future A/C units.
On file for this project
7 documents
Plumbing work in conjunction with apartment combination
On file for this project
13 documents · 1 drawing sheet
Modification to existing plumbing fixtures and piping for renovation of apt 8C.
On file for this project
8 documents
Latest 3 of 4 filings on this floor.
Floor 7Unit 7G, Unit 7JUnder Construction11p · 2 filings · 19 docs
ArchitectureDMElectricalMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing
Project M01317904Permit Issued · 03/02/2026
PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
8 documents · 3 drawing sheets
Project M01318069Permit Issued · 03/02/2026
PLUMBING WORK IN APT 7J AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY
On file for this project
11 documents · 3 drawing sheets
Floor 6Unit 6H3p · 1 filing · 6 docs
Architecture
Issued Permit Scope
General Construction
INTERIOR RENOVATION OF APT 6H AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Floor 5
Floor 4Unit 4L, Unit 4GHUnder Construction9p · 2 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Replacement of existing sink, lavatory, and water closet. Removal of bathtub and installation of new shower. Cap and removal of gas range. No change to use, egress, or occupancy.
On file for this project
16 documents · 1 drawing sheet
Mechanical work pursuant to previously approved DOB Job #102552809. Replacement of two bathroom fans. Connection to existing exhaust. No change in use, occupancy, or egress.
On file for this project
7 documents
Floor 3Unit 3C, Unit 3L8p · 4 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Remove existing plumbing fixtures at existing kitchen and install new washer and dryer.
On file for this project
3 documents
Proposed combination of apartments 3C and 3L. Remove existing partitions, closet, kitchen, doors, and wood flooring. Install new partitions, doors, finished floor, ceiling, closet as shown on drawings.
On file for this project
3 documents
PROPOSED GUT RENOVATION TO EXISTING KITCHEN. REMOVE INTERIOR PARTITIONS AND DOORS. INSTALL NEW APPLIANCES AND FIXTURES LAYOUT. ENLARGE BATHROOM. INSTALL NEW TILE FLOORING. ALL AS SHOWN ON DRAWINGS.
On file for this project
15 documents
Latest 3 of 4 filings on this floor.
Floor 2Unit 2AK25p · 1 filing · 20 docs
ArchitectureDMPlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK IN CONJUNCTION W/ GC FILING M01027021-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
34 documents · 3 drawing sheets
Floor 1Clifton House Owners CorporationUnder Construction2p · 1 filing · 4 docs
Architecture
Issued Permit Scope
General Construction
REMOVAL OF NON LOAD BEARING WALL, DOORS AND FLOOR FINISHES AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY
On file for this project
4 documents
Site & exteriorBulkhead and Exterior Repairs16p · 3 filings · 19 docs
ArchitectureElectricalEquipmentGeneralStructural
Issued Permit Scope
General Construction · Sidewalk Shed · Supported Scaffold
MASONRY RESTORATION AND REPAIR, LINTEL REPLACEMENT, WINDOW RESTORATION, WINDOW SILL REPLACEMENT,WATERPROOFING INSTALLATION, FLASHING REPAIRS.
On file for this project
14 documents · 12 drawing sheets
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
On file for this project
2 documents · 4 drawing sheets
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 7 drawing sheets