Roof7p · 6 filings · 20 docs
ArchitectureGeneralMechanicalStructural
Installation of new guardrail at the inside perimeter or the main roof, inboard of the parapet. Removal of aluminum/steel decorative spires as the north face of the Auditorium on the 8th Floor setback roof. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents · 1 drawing sheet
Structural modifications as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Bulkhead1p · 1 filing · 14 docs
MechanicalPlumbing
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
14 documents · 1 drawing sheet
Floor 481p · 1 filing · 20 docs
Plumbing
Modification to existing Plumbing fixtures, Sprinkler, and Standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
24 documents · 1 drawing sheet
Floor 471p · 1 filing · 3 docs
Structural
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents · 1 drawing sheet
Floor 461p · 1 filing · 7 docs
Mechanical
Modifications to the existing HVAC System: Install (2) new AC Units, ductwork, diffusers, and FCU and associated piping on the 45th Floor (CO)/ 46th Floor (Mktg) as per plans (Bessemer Trust.) No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Floor 453p · 2 filings · 15 docs
ArchitectureMechanical
Issued Permit Scope
Mechanical Systems
Modifications to the existing HVAC System: Install (2) new AC Units, ductwork, diffusers, and FCU and associated piping on the 45th Floor (CO)/ 46th Floor (Mktg) as per plans (Bessemer Trust.) No change to use, egress or occupancy.
On file for this project
7 documents
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
8 documents · 1 drawing sheet
Floor 441p · 1 filing · 20 docs
Plumbing
Modification to existing Plumbing fixtures, Sprinkler, and Standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
24 documents · 1 drawing sheet
Floor 43
Floor 421p · 1 filing · 20 docs
Structural
STRUCTURAL DEMOLITION - SLAB OPENING PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
24 documents · 1 drawing sheet
Floor 411p · 1 filing · 20 docs
Structural
STRUCTURAL DEMOLITION - SLAB OPENING PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
24 documents · 1 drawing sheet
Floor 409p · 8 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
SPRINKLER MODIFICATIONS ON 40TH FLOOR (41ST MARKETTING) AS INDICATED ON PLANS FILED HEREWITH.
On file for this project
3 documents · 1 drawing sheet
MECHANICAL DUCT WORK ON 40TH FLOOR ( 41ST MARKETTING) AS INDICATED ON PLANS FILED HEREWITH.
On file for this project
6 documents · 1 drawing sheet
INTERIOR BUILD-OUT ON FLOORS 39 & 40 FOR MECHANICAL WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 395p · 4 filings · 20 docs
Fire ProtectionMechanicalStructural
INTERIOR BUILD-OUT ON FLOORS 39 & 40 FOR MECHANICAL WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
INTERIOR BUILD-OUT ON FLOORS 39 & 40 FOR SPRINKLER/STANDPIPE WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents · 2 drawing sheets
INTERIOR BUILD-OUT ON FLOORS 011,012, 013 & 034, 036 to 040 FOR STRUCTURAL WORK AND STABILIZATION AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 384p · 3 filings · 20 docs
Fire ProtectionStructural
INTERIOR BUILD-OUT ON FLOORS 34, 36-38 SPRINKLER/STANDPIPE WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
21 documents · 2 drawing sheets
INTERIOR BUILD-OUT ON FLOORS 011,012, 013 & 034, 036 to 040 FOR STRUCTURAL WORK AND STABILIZATION AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
STRUCTURAL DEMOLITION - SLAB OPENING PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
24 documents · 1 drawing sheet
Floor 379p · 5 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
INTERIOR BUILD-OUT ON FLOORS 34, 36-38 SPRINKLER/STANDPIPE WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
21 documents · 4 drawing sheets
INTERIOR BUILD-OUT ON FLOORS 34, 36-38 FOR PLUMBING WORK INCLUDING INSTALLATION OF CORE BATHROOM FIXTURES, LAVATORIES AND RELATING PIPING AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents · 1 drawing sheet
INTERIOR BUILD-OUT ON FLOORS 034, 036 THRU 038 FOR MECHANICAL WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 366p · 2 filings · 20 docs
Fire ProtectionMechanicalStructural
INTERIOR BUILD-OUT ON FLOORS 34, 36-38 SPRINKLER/STANDPIPE WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
21 documents · 4 drawing sheets
INTERIOR BUILD-OUT ON FLOORS 034, 036 THRU 038 FOR MECHANICAL WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 2 drawing sheets
Floor 352p · 2 filings · 17 docs
Fire ProtectionStructural
Modifications to the existing Sprinkler System as per plans (Latham & Watkins_Floors 32 & 33 (CO)/ 33 & 34(Marketing) PHASE 1.) No change to use, egress or occupancy.
On file for this project
13 documents · 1 drawing sheet
Installation of structural steel required for floor reinforcement and partition strengthening as per plans (Latham & Watkins, Floors 32 & 33 (CO)/ 33 & 34 (Marketing) PHASE 1.) No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Floor 347p · 3 filings · 20 docs
Fire ProtectionPlumbingStructural
INTERIOR BUILD-OUT ON FLOORS 34, 36-38 SPRINKLER/STANDPIPE WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
21 documents · 4 drawing sheets
Installation of structural steel required for floor reinforcement and partition strengthening as per plans (Latham & Watkins, Floors 32 & 33 (CO)/ 33 & 34 (Marketing) PHASE 1.) No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Installation of plumbing fixtures and associated piping as per plans (Latham & Watkins, 32 & 33 (CO)/ 33 & 34(Mktg)/ PHASE 1.) No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Floor 335p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Modifications to the existing Sprinkler System as per plans (Latham & Watkins_Floors 32 & 33 (CO)/ 33 & 34(Marketing) PHASE 1.) No change to use, egress or occupancy.
On file for this project
13 documents · 1 drawing sheet
Installation of structural steel required for floor reinforcement and partition strengthening as per plans (Latham & Watkins, Floors 32 & 33 (CO)/ 33 & 34 (Marketing) PHASE 1.) No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Installation of plumbing fixtures and associated piping as per plans (Latham & Watkins, 32 & 33 (CO)/ 33 & 34(Mktg)/ PHASE 1.) No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 327p · 7 filings · 20 docs
ElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Modifications to the existing Sprinkler System as per plans (Latham & Watkins_Floors 32 & 33 (CO)/ 33 & 34(Marketing) PHASE 1.) No change to use, egress or occupancy.
On file for this project
13 documents · 1 drawing sheet
Modifications to the existing HVAC system and installation of AC Units and associated ductwork as per plans (Latham & Watkins, Floors 32 & 33 (CO)/ 33 & 34 (marketing) Phase 1.) No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Installation of Structural Steel required for floor reinforcement and partition strengthening as per plans (Latham & Watkins, Floors 28-31 (CO)/ 29-32 (Marketing) PHASE 2.) No change to use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 314p · 3 filings · 20 docs
Fire ProtectionMechanicalStructural
Installation of Structural Steel required for floor reinforcement and partition strengthening as per plans (Latham & Watkins, Floors 28-31 (CO)/ 29-32 (Marketing) PHASE 2.) No change to use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Modifications to the existing HVAC system and installation of two (2) 6-ton AC Units on the 31st Floor as per plans (Latham & Watkins - Floors 28-31 (CO)/ 29-32 (Marketing) PHASE 2.) No change to use, egress or occupancy.
On file for this project
32 documents · 2 drawing sheets
Modifications to the existing Sprinkler System as per plans (Latham & Watkins, Floors 28-31 (CO)/ 29-32 (Marketing) - PHASE 2.) No change to use, egress or occupancy.
On file for this project
24 documents · 1 drawing sheet
Floor 305p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Installation of plumbing fixtures and associated piping as per plans (Latham & Watkins, Floors 28-31 (CO)/ 29-32(Marketing) - PHASE 2.) No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Installation of Structural Steel required for floor reinforcement and partition strengthening as per plans (Latham & Watkins, Floors 28-31 (CO)/ 29-32 (Marketing) PHASE 2.) No change to use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Modifications to the existing HVAC system and installation of two (2) 6-ton AC Units on the 31st Floor as per plans (Latham & Watkins - Floors 28-31 (CO)/ 29-32 (Marketing) PHASE 2.) No change to use, egress or occupancy.
On file for this project
32 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 294p · 3 filings · 20 docs
Fire ProtectionMechanicalStructural
Installation of Structural Steel required for floor reinforcement and partition strengthening as per plans (Latham & Watkins, Floors 28-31 (CO)/ 29-32 (Marketing) PHASE 2.) No change to use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Modifications to the existing HVAC system and installation of two (2) 6-ton AC Units on the 31st Floor as per plans (Latham & Watkins - Floors 28-31 (CO)/ 29-32 (Marketing) PHASE 2.) No change to use, egress or occupancy.
On file for this project
32 documents · 1 drawing sheet
Modifications to the existing Sprinkler System as per plans (Latham & Watkins, Floors 28-31 (CO)/ 29-32 (Marketing) - PHASE 2.) No change to use, egress or occupancy.
On file for this project
24 documents · 2 drawing sheets
Floor 285p · 4 filings · 20 docs
ElectricalFire ProtectionMechanicalStructural
Installation of Structural Steel as required for floor reinforcement and strengthening partitions as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - Phase 3.) No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing HVAC system and installation of two (2) 6-ton AC Units on the 31st Floor as per plans (Latham & Watkins - Floors 28-31 (CO)/ 29-32 (Marketing) PHASE 2.) No change to use, egress or occupancy.
On file for this project
32 documents · 2 drawing sheets
Modifications to the existing Standpipe system, removal of Fire Hose Cabinet/Racks and Installation of new FHC's as per plans (Latham & Watkins - Floors 28-31(CO/ 29-32 (Marketing) - PHASE 2.) No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 275p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Installation of Structural Steel as required for floor reinforcement and strengthening partitions as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - Phase 3.) No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing hvac system as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - PHASE 3.) No change to use, egress or occupancy.
On file for this project
13 documents · 2 drawing sheets
Modifications to the existing Standpipe System, Removal and Installation of new Fire Hose Cabinet/Racks as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - PHASE 3.) No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 264p · 4 filings · 20 docs
ElectricalFire ProtectionMechanicalStructural
Installation of Structural Steel as required for floor reinforcement and strengthening partitions as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - Phase 3.) No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing hvac system as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - PHASE 3.) No change to use, egress or occupancy.
On file for this project
13 documents · 1 drawing sheet
Modifications to the existing Standpipe System, Removal and Installation of new Fire Hose Cabinet/Racks as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - PHASE 3.) No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 255p · 5 filings · 20 docs
Fire ProtectionMechanicalStructural
Installation of Structural Steel as required for floor reinforcement and strengthening partitions as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - Phase 3.) No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing hvac system as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - PHASE 3.) No change to use, egress or occupancy.
On file for this project
13 documents · 1 drawing sheet
Modifications to the existing Standpipe System, Removal and Installation of new Fire Hose Cabinet/Racks as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - PHASE 3.) No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 245p · 4 filings · 20 docs
CivilElectricalFire ProtectionMechanicalStructural
Modifications to the existing hvac system as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - PHASE 3.) No change to use, egress or occupancy.
On file for this project
13 documents · 1 drawing sheet
Modifications to the existing Standpipe System, Removal and Installation of new Fire Hose Cabinet/Racks as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - PHASE 3.) No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Modifications to the existing Sprinkler System as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - PHASE 3.) No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 23Under Construction24p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
Project M01371290Permit Issued · 09/30/2026
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 23rd Floor (CO)/ 24th Floor (Mktg) as per plans (Latham & Watkins.) No change to use, egress or occupancy.
On file for this project
3 documents
Modifications to the existing HVAC system on the 23rd floor (HIG Capital) as per plans. No change to use, egress or occupancy.
On file for this project
7 documents
Removal of existing plumbing fixtures and associated piping on the 23rd floor (HIG Capital) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 22Under Construction23p · 7 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Structural
Structural modifications as per plans filed herewith (New Steel Stairs from 18th Floors to 20th Floor; extending existing stair from 20th & 21st floors down to 18th & 19th floors). No change in use, egress or occupancy under this application.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing plumbing system on the 22nd floor (HIG Capital) as per plans. No change to use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 22nd floor (HIG Capital) as per plans. No change to use, egress or occupancy.
On file for this project
40 documents · 5 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 21Under Construction30p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
Structural modifications as per plans filed herewith (New Steel Stairs from 18th Floors to 20th Floor; extending existing stair from 20th & 21st floors down to 18th & 19th floors). No change in use, egress or occupancy under this application.
On file for this project
4 documents · 1 drawing sheet
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith, extending existing stair from 20th & 21st floors down to 18th & 19th floors. No change in use, egress or occupancy under this application.
On file for this project
4 documents
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents
Latest 3 of 8 filings on this floor.
Floor 20Under Construction30p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
Structural modifications as per plans filed herewith (New Steel Stairs from 18th Floors to 20th Floor; extending existing stair from 20th & 21st floors down to 18th & 19th floors). No change in use, egress or occupancy under this application.
On file for this project
4 documents · 1 drawing sheet
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith, extending existing stair from 20th & 21st floors down to 18th & 19th floors. No change in use, egress or occupancy under this application.
On file for this project
4 documents
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents
Latest 3 of 8 filings on this floor.
Floor 19Under Construction56p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications as per plans filed herewith (New Steel Stairs from 18th Floors to 20th Floor; extending existing stair from 20th & 21st floors down to 18th & 19th floors). No change in use, egress or occupancy under this application.
On file for this project
4 documents
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith, extending existing stair from 20th & 21st floors down to 18th & 19th floors. No change in use, egress or occupancy under this application.
On file for this project
4 documents
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents
Latest 3 of 8 filings on this floor.
Floor 18Under Construction64p · 8 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications as per plans filed herewith (New Steel Stairs from 18th Floors to 20th Floor; extending existing stair from 20th & 21st floors down to 18th & 19th floors). No change in use, egress or occupancy under this application.
On file for this project
4 documents · 1 drawing sheet
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith, extending existing stair from 20th & 21st floors down to 18th & 19th floors. No change in use, egress or occupancy under this application.
On file for this project
4 documents
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 17
Floor 1612p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanical
Modifications to the existing sprinkler system on the 16th floor (Blank Rome) as per plans. No change to use, egress or occupancy
On file for this project
4 documents · 2 drawing sheets
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 16th floor (Blank Rome) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 6 drawing sheets
Modifications to the existing HVAC system on the 16th floor (Blank Rome) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 15
Floor 143p · 2 filings · 20 docs
MechanicalPlumbing
Modifications to the existing plumbing system on the 13th floor (Latham & Watkins- Marketing Floor 14) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 13th floor (Latham & Watkins- Marketing Floor 14) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 2 drawing sheets
Floor 137p · 4 filings · 20 docs
ArchitectureFire ProtectionPlumbing
Modifications to the existing sprinkler system on the 13th floor (Latham & Watkins- Marketing Floor 14) as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Modifications to the existing standpipe system on the 13th floor (Latham & Watkins- Marketing Floor 14) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing plumbing system on the 13th floor (Latham & Watkins- Marketing Floor 14) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 128p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
14 documents · 2 drawing sheets
INTERIOR BUILD-OUT ON FLOORS CELLAR (C3), 11 & 12 FOR SPRINKLER/STANDPIPE WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
28 documents · 2 drawing sheets
INTERIOR BUILD-OUT ON FLOORS 011,012, 013 & 034, 036 to 040 FOR STRUCTURAL WORK AND STABILIZATION AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 115p · 2 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
14 documents · 3 drawing sheets
INTERIOR BUILD-OUT ON FLOORS CELLAR (C3), 11 & 12 FOR SPRINKLER/STANDPIPE WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
28 documents · 2 drawing sheets
Floor 101p · 1 filing · 14 docs
Plumbing
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
14 documents · 1 drawing sheet
Floor 91p · 1 filing · 14 docs
Plumbing
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
14 documents · 1 drawing sheet
Floor 83p · 3 filings · 20 docs
ElectricalMechanical
MECHANICAL WORK AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this project
27 documents · 1 drawing sheet
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents · 1 drawing sheet
Installation of temporary scaffolding to facilitate demolition of auditorium structure, filed separately under Alt1-122618499.
On file for this project
3 documents · 1 drawing sheet
Floor 713p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalStructural
MECHANICAL WORK AT 7TH FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this project
13 documents · 1 drawing sheet
SPRINKLER MODIFCATIONS ON AN EXISTING SYSTEM AS SHOWN ON PLANS FILED HEREWITH.
On file for this project
9 documents · 2 drawing sheets
INTERIOR RENOVATION WORK IN COMMERCIAL OFFICE SPACE TO INCLUDE REMOVAL OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS, DOOR, FINISHES, CEILING AND RELATED CONSTRUCTION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
10 documents · 7 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 612p · 4 filings · 20 docs
ArchitectureDMMechanicalStructural
INTERIOR RENOVATION WORK IN COMMERCIAL OFFICE SPACE TO INCLUDE REMOVAL OF EXISTING & CONSTRUCTION OF NEW PARTITIONS, DOOR, FINISHES, CEILING AND RELATED CONSTRUCTION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
4 documents · 5 drawing sheets
INTERIOR RENOVATION WORK IN COMMERCIAL OFFICE SPACE TO INCLUDE REMOVAL OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS, DOOR, FINISHES, CEILING AND RELATED CONSTRUCTION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
10 documents · 8 drawing sheets
MECHANICAL WORK AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this project
27 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 517p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanical
Filing herewith mechanical work on existing 5th floor space, Meeting Room. No change in use, egress or occupancy.
On file for this project
16 documents · 1 drawing sheet
Filing herewith sprinkler work on existing 5th floor space, Meeting Room. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Filing herewith sprinkler work on existing 5th floor. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 4Under Construction42p · 5 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
10 documents · 8 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
8 documents
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents
Latest 3 of 5 filings on this floor.
Floor 3Under Construction3p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Project M01363338Permit Issued · 09/24/2026
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents
Project M01363347Permit Issued · 04/07/2026
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
1 document
Latest 3 of 5 filings on this floor.
Floor 2Under Construction9p · 9 filings · 20 docs
ArchitectureDMFire ProtectionLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
10 documents · 12 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
8 documents
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents
Latest 3 of 8 filings on this floor.
Floor 152p · 27 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
INSTALLATION OF COMPLETE TOILET ROOMS ON LEVELS CELLAR 2ND LEVEL, CELLAR, GROUND FLOOR AND MEZZANINE AND GAS WORK INCLUDING GAS BOOSTER FOR TENANT SPACE
On file for this project
37 documents · 1 drawing sheet
Removal and disposal of interior partitions, doors, suspended ceilings and finishes (Retail Demo) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents
REALLOCATION OF MEZZANINE FLOOR AREA, PROVIDE NEW STRUCTURE FOR NEW STAIR & NEW STAIR OPENINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
32 documents · 5 drawing sheets
Latest 3 of 8 filings on this floor.
Mezzanine28p · 18 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructuralZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
INSTALLATION OF COMPLETE TOILET ROOMS ON LEVELS CELLAR 2ND LEVEL, CELLAR, GROUND FLOOR AND MEZZANINE AND GAS WORK INCLUDING GAS BOOSTER FOR TENANT SPACE
On file for this project
37 documents · 2 drawing sheets
CHANGE OF USE TO EATING AND DRINKING ESTABLISHMENT PER BIS JOB NUMBER 123906381
On file for this project
19 documents · 6 drawing sheets
INSTALLATION OF MECHANICAL EQUIPMENT AS PER PLANS
On file for this project
29 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Cellar184p · 31 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural work to include framing and concrete as per plans filed herewith. no change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Removal and disposal of interior partitions, doors, suspended ceilings and finishes (Retail Demo) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
14 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Sub-CellarUnder Construction17p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Minor interior demolition of existing partitions. Build new partitions, add new doors and refinish floor on the SC2 (CO)/ C3 (Mktg) Level as per plans (RG - Bike Room.) No change to use, egress or occupancy.
On file for this project
6 documents · 3 drawing sheets
Modifications to the existing HVAC system: Reconfigure existing ductwork, diffusers, VAV's and accessories on the SC2 (CO)/ C3 (Mktg) as per plans (Rock Group - Bike Room Project) No change to use, egress or occupancy.
On file for this project
7 documents
Modifications to the existing HVAC system (Louver & Airduct Replacement) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 6 filings on this floor.
Basement3p · 3 filings · 20 docs
MechanicalPlumbingStructural
Modifications to the existing HVAC system (Louver & Airduct Replacement) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
INTERIOR BUILD-OUT ON FLOORS 39 & 40 FOR SPRINKLER/STANDPIPE WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents · 1 drawing sheet
INTERIOR BUILD-OUT ON FLOORS CELLAR (C3), 11 & 12 FOR SPRINKLER/STANDPIPE WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
28 documents · 1 drawing sheet
Sub-Basement3p · 3 filings · 20 docs
Fire ProtectionGeneralPlumbing
Modification to existing Plumbing fixtures, Sprinkler and Standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
27 documents · 1 drawing sheet
INTERIOR BUILD-OUT ON FLOORS 34, 36-38 SPRINKLER/STANDPIPE WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
21 documents · 1 drawing sheet
Modifications to the existing Standpipe System as per plans (Latham & Watkins - Floors 32 & 33 (CO)/ 33 & 34 (Marketing) - Phase 1.) No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet