Roof5p · 4 filings · 20 docs
ArchitectureGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
Installation of new guardrail at the inside perimeter or the main roof, inboard of the parapet. Removal of aluminum/steel decorative spires as the north face of the Auditorium on the 8th Floor setback roof. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents · 1 drawing sheet
Structural modifications as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 481p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modification to existing Plumbing fixtures, Sprinkler, and Standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
24 documents · 1 drawing sheet
Structural modifications as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
11 documents
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
13 documents
Floor 471p · 5 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modification to existing Plumbing fixtures, Sprinkler, and Standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
24 documents
Structural modifications as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
11 documents
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
13 documents
Latest 3 of 5 filings on this floor.
Floor 461p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to the existing HVAC System: Install (2) new AC Units, ductwork, diffusers, and FCU and associated piping on the 45th Floor (CO)/ 46th Floor (Mktg) as per plans (Bessemer Trust.) No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Modification to existing Plumbing fixtures, Sprinkler and Standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
27 documents
Structural modifications as per plans filed herewith. No change in use, egress or occupancy under this application. (Full list of related application numbers found in comment section)
On file for this project
20 documents
Latest 3 of 5 filings on this floor.
Floor 451p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to the existing HVAC System: Install (2) new AC Units, ductwork, diffusers, and FCU and associated piping on the 45th Floor (CO)/ 46th Floor (Mktg) as per plans (Bessemer Trust.) No change to use, egress or occupancy.
On file for this project
7 documents
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
8 documents · 1 drawing sheet
Modification to existing Plumbing fixtures, Sprinkler and Standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
27 documents
Latest 3 of 5 filings on this floor.
Floor 442p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modification to existing Plumbing fixtures, Sprinkler, and Standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
24 documents · 2 drawing sheets
Structural modifications as per plans filed herewith. No change in use, egress or occupancy under this application. (Full list of related application numbers found in comment section)
On file for this project
20 documents
Structural modifications as per plans filed herewith. No change in use, egress or occupancy under this application. (Full list of related application numbers found in comment section)
On file for this project
20 documents
Latest 3 of 4 filings on this floor.
Floor 434 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modification to existing Plumbing fixtures, Sprinkler and Standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
27 documents
Structural modifications as per plans filed herewith. No change in use, egress or occupancy under this application. (Full list of related application numbers found in comment section)
On file for this project
20 documents
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
14 documents
Latest 3 of 4 filings on this floor.
Floor 421p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modification to existing Plumbing fixtures, Sprinkler and Standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
27 documents
Structural modifications as per plans filed herewith. No change in use, egress or occupancy under this application. (Full list of related application numbers found in comment section)
On file for this project
20 documents
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
14 documents
Latest 3 of 4 filings on this floor.
Floor 411p · 3 filings · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction · Structural
Interior Alterations/modification to existing conference room to Execute IT Support Room including new demising walls, ceilings, and furniture on the 41st floor No change in use, egress, or occupancy
On file for this project
6 documents
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
8 documents
STRUCTURAL DEMOLITION - SLAB OPENING PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
24 documents · 1 drawing sheet
Floor 408p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
SPRINKLER MODIFICATIONS ON 40TH FLOOR (41ST MARKETTING) AS INDICATED ON PLANS FILED HEREWITH.
On file for this project
3 documents · 1 drawing sheet
MECHANICAL DUCT WORK ON 40TH FLOOR ( 41ST MARKETTING) AS INDICATED ON PLANS FILED HEREWITH.
On file for this project
6 documents · 1 drawing sheet
INTERIOR BUILD-OUT ON FLOORS 39 & 40 FOR MECHANICAL WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 394p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
PLUMBING WORK RELATED TO NEW PANTRY ADDITION ON 39TH FLOOR AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
INTERIOR BUILD-OUT ON FLOORS 39 & 40 FOR MECHANICAL WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
INTERIOR BUILD-OUT ON FLOORS 38 TO 41 FOR PLUMBING WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents
Latest 3 of 6 filings on this floor.
Floor 383p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Standpipe · Structural
INTERIOR BUILD-OUT ON FLOORS 34, 36-38 SPRINKLER/STANDPIPE WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
21 documents · 2 drawing sheets
INTERIOR BUILD-OUT ON FLOORS 34, 36-38 FOR PLUMBING WORK INCLUDING INSTALLATION OF CORE BATHROOM FIXTURES, LAVATORIES AND RELATING PIPING AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents
INTERIOR BUILD-OUT ON FLOORS 034, 036 THRU 038 FOR MECHANICAL WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents
Latest 3 of 4 filings on this floor.
Floor 377p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Standpipe · Structural
INTERIOR BUILD-OUT ON FLOORS 34, 36-38 SPRINKLER/STANDPIPE WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
21 documents · 4 drawing sheets
INTERIOR BUILD-OUT ON FLOORS 34, 36-38 FOR PLUMBING WORK INCLUDING INSTALLATION OF CORE BATHROOM FIXTURES, LAVATORIES AND RELATING PIPING AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents · 1 drawing sheet
INTERIOR BUILD-OUT ON FLOORS 034, 036 THRU 038 FOR MECHANICAL WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 366p · 4 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Standpipe · Structural · Supported Scaffold
INTERIOR BUILD-OUT ON FLOORS 34, 36-38 SPRINKLER/STANDPIPE WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
21 documents · 4 drawing sheets
INTERIOR BUILD-OUT ON FLOORS 34, 36-38 FOR PLUMBING WORK INCLUDING INSTALLATION OF CORE BATHROOM FIXTURES, LAVATORIES AND RELATING PIPING AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents
INTERIOR BUILD-OUT ON FLOORS 034, 036 THRU 038 FOR MECHANICAL WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 35
Floor 344p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Standpipe · Structural
INTERIOR BUILD-OUT ON FLOORS 34, 36-38 SPRINKLER/STANDPIPE WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
21 documents · 4 drawing sheets
INTERIOR BUILD-OUT ON FLOORS 34, 36-38 FOR PLUMBING WORK INCLUDING INSTALLATION OF CORE BATHROOM FIXTURES, LAVATORIES AND RELATING PIPING AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents
INTERIOR BUILD-OUT ON FLOORS 034, 036 THRU 038 FOR MECHANICAL WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents
Floor 335p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to the existing Sprinkler System as per plans (Latham & Watkins_Floors 32 & 33 (CO)/ 33 & 34(Marketing) PHASE 1.) No change to use, egress or occupancy.
On file for this project
13 documents · 1 drawing sheet
Modifications to the existing HVAC system and installation of AC Units and associated ductwork as per plans (Latham & Watkins, Floors 32 & 33 (CO)/ 33 & 34 (marketing) Phase 1.) No change to use, egress or occupancy.
On file for this project
10 documents
Installation of structural steel required for floor reinforcement and partition strengthening as per plans (Latham & Watkins, Floors 32 & 33 (CO)/ 33 & 34 (Marketing) PHASE 1.) No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 326p · 7 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to the existing Sprinkler System as per plans (Latham & Watkins_Floors 32 & 33 (CO)/ 33 & 34(Marketing) PHASE 1.) No change to use, egress or occupancy.
On file for this project
13 documents · 1 drawing sheet
Modifications to the existing HVAC system and installation of AC Units and associated ductwork as per plans (Latham & Watkins, Floors 32 & 33 (CO)/ 33 & 34 (marketing) Phase 1.) No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Installation of structural steel required for floor reinforcement and partition strengthening as per plans (Latham & Watkins, Floors 32 & 33 (CO)/ 33 & 34 (Marketing) PHASE 1.) No change to use, egress or occupancy.
On file for this project
4 documents
Latest 3 of 7 filings on this floor.
Floor 314p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Installation of plumbing fixtures and associated piping as per plans (Latham & Watkins, Floors 28-31 (CO)/ 29-32(Marketing) - PHASE 2.) No change to use, egress or occupancy.
On file for this project
4 documents
Modifications to the existing HVAC system and installation of two (2) 6-ton AC Units on the 31st Floor as per plans (Latham & Watkins - Floors 28-31 (CO)/ 29-32 (Marketing) PHASE 2.) No change to use, egress or occupancy.
On file for this project
32 documents · 2 drawing sheets
Installation of Structural Steel required for floor reinforcement and partition strengthening as per plans (Latham & Watkins, Floors 28-31 (CO)/ 29-32 (Marketing) PHASE 2.) No change to use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 305p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Installation of plumbing fixtures and associated piping as per plans (Latham & Watkins, Floors 28-31 (CO)/ 29-32(Marketing) - PHASE 2.) No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing HVAC system and installation of two (2) 6-ton AC Units on the 31st Floor as per plans (Latham & Watkins - Floors 28-31 (CO)/ 29-32 (Marketing) PHASE 2.) No change to use, egress or occupancy.
On file for this project
32 documents · 2 drawing sheets
Installation of Structural Steel required for floor reinforcement and partition strengthening as per plans (Latham & Watkins, Floors 28-31 (CO)/ 29-32 (Marketing) PHASE 2.) No change to use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 294p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Installation of plumbing fixtures and associated piping as per plans (Latham & Watkins, Floors 28-31 (CO)/ 29-32(Marketing) - PHASE 2.) No change to use, egress or occupancy.
On file for this project
4 documents
Modifications to the existing HVAC system and installation of two (2) 6-ton AC Units on the 31st Floor as per plans (Latham & Watkins - Floors 28-31 (CO)/ 29-32 (Marketing) PHASE 2.) No change to use, egress or occupancy.
On file for this project
32 documents · 1 drawing sheet
Installation of Structural Steel required for floor reinforcement and partition strengthening as per plans (Latham & Watkins, Floors 28-31 (CO)/ 29-32 (Marketing) PHASE 2.) No change to use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 284p · 5 filings · 20 docs
ElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Installation of plumbing fixtures and associated piping as per plans (Latham & Watkins, Floors 28-31 (CO)/ 29-32(Marketing) - PHASE 2.) No change to use, egress or occupancy.
On file for this project
4 documents
Modifications to the existing HVAC system and installation of two (2) 6-ton AC Units on the 31st Floor as per plans (Latham & Watkins - Floors 28-31 (CO)/ 29-32 (Marketing) PHASE 2.) No change to use, egress or occupancy.
On file for this project
32 documents · 2 drawing sheets
Installation of Structural Steel required for floor reinforcement and partition strengthening as per plans (Latham & Watkins, Floors 28-31 (CO)/ 29-32 (Marketing) PHASE 2.) No change to use, egress or occupancy.
On file for this project
9 documents
Latest 3 of 5 filings on this floor.
Floor 275p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Installation of plumbing fixtures and associated piping as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - PHASE 3.) Amendment to add sump pump on 24th flr (CO) No change to use, egress or occupancy.
On file for this project
8 documents
Installation of Structural Steel as required for floor reinforcement and strengthening partitions as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - Phase 3.) No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing hvac system as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - PHASE 3.) No change to use, egress or occupancy.
On file for this project
13 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 264p · 5 filings · 20 docs
ElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Installation of plumbing fixtures and associated piping as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - PHASE 3.) Amendment to add sump pump on 24th flr (CO) No change to use, egress or occupancy.
On file for this project
8 documents
Installation of Structural Steel as required for floor reinforcement and strengthening partitions as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - Phase 3.) No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing hvac system as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - PHASE 3.) No change to use, egress or occupancy.
On file for this project
13 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 254p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Installation of plumbing fixtures and associated piping as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - PHASE 3.) Amendment to add sump pump on 24th flr (CO) No change to use, egress or occupancy.
On file for this project
8 documents
Installation of Structural Steel as required for floor reinforcement and strengthening partitions as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - Phase 3.) No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing hvac system as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - PHASE 3.) No change to use, egress or occupancy.
On file for this project
13 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 243p · 6 filings · 20 docs
ElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Installation of plumbing fixtures and associated piping as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - PHASE 3.) Amendment to add sump pump on 24th flr (CO) No change to use, egress or occupancy.
On file for this project
8 documents
Installation of Structural Steel as required for floor reinforcement and strengthening partitions as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - Phase 3.) No change to use, egress or occupancy.
On file for this project
4 documents
Modifications to the existing hvac system as per plans (Latham & Watkins - Floors 24-27 (CO)/ 25-28 (Marketing) - PHASE 3.) No change to use, egress or occupancy.
On file for this project
13 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 23Under Construction10p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Project M01371290Permit Issued · 09/30/2026
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 23rd Floor (CO)/ 24th Floor (Mktg) as per plans (Latham & Watkins.) No change to use, egress or occupancy.
On file for this project
3 documents
Project M01371346Permit Issued · 09/24/2026
Modifications to the existing HVAC System: Install new ductwork, diffusers, and FCU and associated piping on the 23rd Floor (CO)/ 24th Floor (Mktg) as per plans (Latham & Watkins.) No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 23rd floor (HIG Capital) as per plans. No change to use, egress or occupancy.
On file for this project
7 documents
Latest 3 of 10 filings on this floor.
Floor 22Under Construction11p · 8 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Structural modifications as per plans filed herewith (New Steel Stairs from 18th Floors to 20th Floor; extending existing stair from 20th & 21st floors down to 18th & 19th floors). No change in use, egress or occupancy under this application.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing plumbing system on the 22nd floor (HIG Capital) as per plans. No change to use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 22nd floor (HIG Capital) as per plans. No change to use, egress or occupancy.
On file for this project
40 documents · 5 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 21Under Construction6p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications as per plans filed herewith (New Steel Stairs from 18th Floors to 20th Floor; extending existing stair from 20th & 21st floors down to 18th & 19th floors). No change in use, egress or occupancy under this application.
On file for this project
4 documents · 1 drawing sheet
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith, extending existing stair from 20th & 21st floors down to 18th & 19th floors. No change in use, egress or occupancy under this application.
On file for this project
4 documents
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents
Latest 3 of 9 filings on this floor.
Floor 20Under Construction6p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications as per plans filed herewith (New Steel Stairs from 18th Floors to 20th Floor; extending existing stair from 20th & 21st floors down to 18th & 19th floors). No change in use, egress or occupancy under this application.
On file for this project
4 documents · 1 drawing sheet
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith, extending existing stair from 20th & 21st floors down to 18th & 19th floors. No change in use, egress or occupancy under this application.
On file for this project
4 documents
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents
Latest 3 of 10 filings on this floor.
Floor 19Under Construction10p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications as per plans filed herewith (New Steel Stairs from 18th Floors to 20th Floor; extending existing stair from 20th & 21st floors down to 18th & 19th floors). No change in use, egress or occupancy under this application.
On file for this project
4 documents
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith, extending existing stair from 20th & 21st floors down to 18th & 19th floors. No change in use, egress or occupancy under this application.
On file for this project
4 documents
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents
Latest 3 of 8 filings on this floor.
Floor 18Under Construction18p · 8 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications as per plans filed herewith (New Steel Stairs from 18th Floors to 20th Floor; extending existing stair from 20th & 21st floors down to 18th & 19th floors). No change in use, egress or occupancy under this application.
On file for this project
4 documents · 1 drawing sheet
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith, extending existing stair from 20th & 21st floors down to 18th & 19th floors. No change in use, egress or occupancy under this application.
On file for this project
4 documents
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 171 filing · 6 docs
MechanicalStructural
Issued Permit Scope
Supported Scaffold
Installation of cantilevered working deck to support 15 foot high scaffold as per plans filed herewith.
On file for this project
6 documents
Floor 1611p · 8 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Supported Scaffold
Modifications to the existing sprinkler system on the 16th floor (Blank Rome) as per plans. No change to use, egress or occupancy
On file for this project
4 documents · 2 drawing sheets
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 16th floor (Blank Rome) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 6 drawing sheets
Modifications to the existing HVAC system on the 16th floor (Blank Rome) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 151 filing · 6 docs
MechanicalStructural
Issued Permit Scope
Supported Scaffold
Installation of cantilevered working deck to support 15 foot high scaffold as per plans filed herewith.
On file for this project
6 documents
Floor 142p · 2 filings · 18 docs
MechanicalStructural
Issued Permit Scope
Supported Scaffold
Modifications to the existing HVAC system on the 13th floor (Latham & Watkins- Marketing Floor 14) as per plans. No change to use, egress or occupancy.
On file for this project
12 documents · 2 drawing sheets
Installation of cantilevered working deck to support 15 foot high scaffold as per plans filed herewith.
On file for this project
6 documents
Floor 137p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to the existing sprinkler system on the 13th floor (Latham & Watkins- Marketing Floor 14) as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Modifications to the existing standpipe system on the 13th floor (Latham & Watkins- Marketing Floor 14) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing plumbing system on the 13th floor (Latham & Watkins- Marketing Floor 14) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 125p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
INTERIOR BUILD-OUT ON FLOORS CELLAR (C3),11 & 12 FOR PLUMBING WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents
INTERIOR BUILD-OUT ON FLOORS CELLAR (C3), 11 & 12 FOR SPRINKLER/STANDPIPE WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
28 documents · 2 drawing sheets
INTERIOR BUILD-OUT ON FLOORS CELLAR (C3), 11 & 12 FOR MECHANICAL WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
24 documents
Latest 3 of 5 filings on this floor.
Floor 112p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
INTERIOR BUILD-OUT ON FLOORS CELLAR (C3),11 & 12 FOR PLUMBING WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents
INTERIOR BUILD-OUT ON FLOORS CELLAR (C3), 11 & 12 FOR SPRINKLER/STANDPIPE WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
28 documents · 2 drawing sheets
INTERIOR BUILD-OUT ON FLOORS CELLAR (C3), 11 & 12 FOR MECHANICAL WORK AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
24 documents
Floor 103 filings
MechanicalStructural
Issued Permit Scope
Mechanical Systems · Supported Scaffold
Modifications to the existing mechanical system (AVRA LL Demo) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents
Installation of temporary scaffolding to facilitate demolition of auditorium structure, filed separately under Alt1-122618499.
On file for this project
3 documents
Installation of cantilevered working deck to support 15 foot high scaffold as per plans filed herewith.
On file for this project
6 documents
Floor 91 filing
MechanicalStructural
Issued Permit Scope
Mechanical Systems · Supported Scaffold
Installation of temporary scaffolding to facilitate demolition of auditorium structure, filed separately under Alt1-122618499.
On file for this project
3 documents
Floor 8Under Construction2p · 5 filings · 18 docs
ArchitectureGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
Project M01446863Permit Issued · 10/02/2026
Renovations to the rooftop terrace including installation of a freestanding pergola and related finishes as per plans filed herewith.. No change in use, egress or occupancy.
Installation of new guardrail at the inside perimeter or the main roof, inboard of the parapet. Removal of aluminum/steel decorative spires as the north face of the Auditorium on the 8th Floor setback roof. No change to use, egress or occupancy.
On file for this project
4 documents
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 712p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
MECHANICAL WORK AT 7TH FLOOR AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this project
13 documents · 1 drawing sheet
PLUMBING WORK AS SHOWN ON PLANS FILED HEREWITH
On file for this project
6 documents
SPRINKLER MODIFCATIONS ON AN EXISTING SYSTEM AS SHOWN ON PLANS FILED HEREWITH.
On file for this project
9 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 611p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
MECHANICAL WORK AS SHOWN ON PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this project
11 documents
INTERIOR RENOVATION WORK IN COMMERCIAL OFFICE SPACE TO INCLUDE REMOVAL OF EXISTING & CONSTRUCTION OF NEW PARTITIONS, DOOR, FINISHES, CEILING AND RELATED CONSTRUCTION AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
4 documents · 5 drawing sheets
PLUMBING WORK AS SHOWN ON PLANS FILED HEREWITH
On file for this project
6 documents
Latest 3 of 6 filings on this floor.
Floor 517p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Filing herewith mechanical work on existing 5th floor space, Meeting Room. No change in use, egress or occupancy.
On file for this project
16 documents · 1 drawing sheet
Filing herewith sprinkler work on existing 5th floor space, Meeting Room. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Filing herewith sprinkler work on existing 5th floor. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 4Under Construction10p · 5 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
10 documents · 8 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
8 documents
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents
Latest 3 of 5 filings on this floor.
Floor 3Under Construction1p · 4 filings · 8 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Project M01363338Permit Issued · 09/24/2026
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents
Project M01363347Permit Issued · 04/07/2026
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
1 document
Latest 3 of 4 filings on this floor.
Floor 2Under Construction14p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
10 documents · 12 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
8 documents
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents
Latest 3 of 11 filings on this floor.
Floor 1Under Construction23p · 24 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Install new Gas Fired Commercial Kitchen Cooking Equipment, Plumbing Fixtures and associated Gas/ CW/ Sanitary Piping on the 1st Floor & Mezzanine as per plans (L'Artusi Restaurant.) No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modifications to the existing Sprinkler System: Remove (6) heads and install (26) new heads on the Mezzanine, Remove (57) heads and install (61) new heads on the 1st Floor and associated piping as per plans (L'Artusi Restaurant.)
On file for this project
4 documents
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 1st Floor & Mezzanine as per plans (L'Artusi Restaurant.) No change to use, egress or occupancy.
On file for this project
8 documents
Latest 3 of 24 filings on this floor.
MezzanineUnder Construction26p · 18 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructuralZ
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Install new Gas Fired Commercial Kitchen Cooking Equipment, Plumbing Fixtures and associated Gas/ CW/ Sanitary Piping on the 1st Floor & Mezzanine as per plans (L'Artusi Restaurant.) No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modifications to the existing Sprinkler System: Remove (6) heads and install (26) new heads on the Mezzanine, Remove (57) heads and install (61) new heads on the 1st Floor and associated piping as per plans (L'Artusi Restaurant.)
On file for this project
4 documents
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 1st Floor & Mezzanine as per plans (L'Artusi Restaurant.) No change to use, egress or occupancy.
On file for this project
8 documents
Latest 3 of 18 filings on this floor.
CellarUnder Construction66p · 25 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing Sprinkler System: Remove (49) existing heads, Relocate (37) existing heads and install (110) new sprinkler heads on the Cellar (CO/ C1 (Mktg) Level as per plans (Rock Group - Concourse Project.)
On file for this project
3 documents · 2 drawing sheets
Minor interior demolition. Removal and disposal of interior partitions, fixtures, suspended ceilings, floor and wall finishes, selective piping on the Cellar (CO)/ C1 (Mktg) as per plans (RG - Concourse Project.) No change to use, egress or occupancy
On file for this project
7 documents · 44 drawing sheets
Remove plumbing fixtures and install new: (3) sinks, (1) HWH, (6) WCs, (8) Lavs, (1) UR, (2) FD, (6) Showers and associated CW/sanitary piping on the Cellar (CO)/ C1 (Mkg) Level as per plans (Concourse Project.) No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 25 filings on this floor.
Sub-CellarUnder Construction3p · 20 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Minor interior demolition of existing partitions. Build new partitions, add new doors and refinish floor on the SC2 (CO)/ C3 (Mktg) Level as per plans (RG - Bike Room.) No change to use, egress or occupancy.
On file for this project
6 documents · 3 drawing sheets
Modifications to the existing HVAC system: Reconfigure existing ductwork, diffusers, VAV's and accessories on the SC2 (CO)/ C3 (Mktg) as per plans (Rock Group - Bike Room Project) No change to use, egress or occupancy.
On file for this project
7 documents
Install (1) lavatory, (1) WC, (1) refrigerator, (2) floor drains and (1) pantry sink and associated piping on the Cellar (CO)/ Concourse (Mktg); Install new sanitary piping on the Sub-Cellar #2 (CO)/ C3 (Mktg) as per plans (Concourse Level New Game Room.)
On file for this project
4 documents
Latest 3 of 20 filings on this floor.
Basement1p · 1 filing · 6 docs
Mechanical
Modifications to the existing HVAC system (Louver & Airduct Replacement) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Sub-Basement1p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
Modifications to the existing plumbing system (AVRA LL Demo) as per plans. No change to use, egress or occupancy.
On file for this project
9 documents
Modifications to the existing mechanical system (AVRA LL Demo) as per plans. No change to use, egress or occupancy.
On file for this project
6 documents
Modification to existing Plumbing fixtures, Sprinkler and Standpipe system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
27 documents · 1 drawing sheet
Site & exterior5 filings · 20 docs
Architecture
Issued Permit Scope
Sign · Supported Scaffold
INSTALLATION OF NON-ILLUMINATED WALL SIGN (TED'S MONTANA GRILL).
On file for this project
5 documents · 1 drawing sheet
INSTALLATION OF NON-ILLUMINATED BLADE SIGN (TED'S MONTANA GRILL).
On file for this project
5 documents · 1 drawing sheet
INSTALLATION OF NON-ILLUMINATED BLADE SIGN (THE CAPITAL GRILLE).
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Filed — no permit issued16 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralOther
Modifications to the existing Sprinkler System: Relocate (3) existing sprinkler heads and associated sprinkler piping on the SC2 (CO)/ C3 (Mktg)Level as per plans (Rock Group - Bike Room.) No change to use, egress or occupancy
On file for this project
3 documents · 9 drawing sheets
Structural modifications: install new structural steel framing and removal of slab on the 23 (CO)/ 24 (Mktg) Floor as per plans (Latham & Watkins.) No change to use, egress or occupancy.
On file for this project
6 documents · 5 drawing sheets
Project M01371356Approved
Install new plumbing fixtures: (11) Lavatories, (11) WC, (3) UR, (2) sinks, (2) DF, (7) FDs, (1) DW, (1) CM, (2) HWH, (1) IM, (1) WD and associated CW/sanitary piping on the 23rd Floor (CO)/ 24th Floor (Mktg) as per plans (Latham & Waktins.)
On file for this project
1 document
Latest 3 of 16 filings on this floor.