RoofUnder Construction23p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
Mechanical Systems · Structural
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing Plumbing and Sprinkler systems. No change in occupancy, use or egress.
On file for this project
30 documents · 1 drawing sheet
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy. Buildings 444 East 68th Street, 410 East 68th Street & 411 East 67th Street.
On file for this project
10 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 212p · 1 filing · 14 docs
Fire Protection
Modification to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
On file for this project
14 documents · 2 drawing sheets
Floor 201p · 1 filing · 14 docs
Mechanical
Modification to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14Under Construction19p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Sprinkler modifications to accommodate IDF equipment room on the 14th floor in the existing Memorial Hospital building including work on floors 12 and 15. All work as per plans filed herewith.
On file for this project
41 documents · 1 drawing sheet
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy. Buildings 444 East 68th Street, 410 East 68th Street & 411 East 67th Street.
On file for this project
10 documents · 1 drawing sheet
Installation of new sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 13
Floor 123p · 3 filings · 20 docs
Fire ProtectionMechanical
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy. Buildings 444 East 68th Street, 410 East 68th Street & 411 East 67th Street.
On file for this project
10 documents · 1 drawing sheet
Installation of new sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy. Buildings 1275 York Avenue (MSKCC) & 425 East 67th Street (Haupt).
On file for this project
9 documents · 1 drawing sheet
Mechanical work on the 2nd, 11th, & 12th floors. No change inoccupancy, use or egress.
On file for this project
16 documents · 1 drawing sheet
Floor 111p · 1 filing · 9 docs
Fire Protection
Installation of new sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy. Buildings 1275 York Avenue (MSKCC) & 425 East 67th Street (Haupt).
On file for this project
9 documents · 1 drawing sheet
Floor 1010p · 2 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Sprinklers
Installation of new sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
Installation of new sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy. Buildings 1275 York Avenue (MSKCC) & 425 East 67th Street (Haupt).
On file for this project
9 documents · 1 drawing sheet
Floor 9Under Construction21p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing Plumbing and Sprinkler systems. No change in occupancy, use or egress.
On file for this project
30 documents · 2 drawing sheets
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy. Buildings 444 East 68th Street, 410 East 68th Street & 411 East 67th Street.
On file for this project
10 documents · 1 drawing sheet
Modifications to the existing Sprinkler system on the 9th floor. No change in occupancy, use or egress.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 8
Floor 7Under Construction22p · 8 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing Plumbing and Sprinkler systems. No change in occupancy, use or egress.
On file for this project
30 documents
Installation of new sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy. Buildings 1275 York Avenue (MSKCC) & 425 East 67th Street (Haupt).
On file for this project
9 documents · 1 drawing sheet
SPRINKLER MODIFICATIONS TO ACCOMMODATE THE IDF CLOSET/ OFFICE RENOVATION, BOBST BUILDING, IN THE EXISTING HOSPITAL BUILDING.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 6Under Construction36p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing Plumbing and Sprinkler systems. No change in occupancy, use or egress.
On file for this project
30 documents
BOBST ANESTHESIA: SPRINKLER WORK TO ACCOMMODATE THE ANESTHESIA WORK ROOM RENOVATION, BOBST BUILDING, IN THE EXISTING HOSPITAL BUILDING.
On file for this project
12 documents
BOBST ANESTHESIA: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE ANESTHESIA WORK ROOM RENOVATION, BOBST BUILDING, IN THE EXISTING HOSPITAL BUILDING.
On file for this project
6 documents
Latest 3 of 8 filings on this floor.
Floor 5Under Construction45p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing Plumbing and Sprinkler systems. No change in occupancy, use or egress.
On file for this project
30 documents
MSK HAUPT OR MITIGATION: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE 4TH FLOOR OR MITIGATION IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy. Buildings 444 East 68th Street, 410 East 68th Street & 411 East 67th Street.
On file for this project
10 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 4Under Construction124p · 8 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
BOBST 4 CARDIOLOGY: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE CARDIOLOGY SUITE RENOVATION THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents
BOBST 4 CARDIOLOGY: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE CARDIOLOGY SUITE RENOVATION THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents
Modifications to the existing Plumbing and Sprinkler systems. No change in occupancy, use or egress.
On file for this project
30 documents
Latest 3 of 8 filings on this floor.
Floor 3Under Construction124p · 17 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing Plumbing and Sprinkler systems. No change in occupancy, use or egress.
On file for this project
30 documents
Modifications to the existing Plumbing and Sprinkler systems on the 3rd floor. No change in occupancy, use or egress.
On file for this project
39 documents · 2 drawing sheets
MECHANICAL WORK ON THE 3RD FLOOR. NO CHANGE IN OCCUPANCY USE, OR EGRESS.
On file for this project
33 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2Under Construction46p · 14 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to the existing Plumbing and Sprinkler systems. No change in occupancy, use or egress.
On file for this project
30 documents
PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE A-249 CT REPLACEMENT, HAUPT, IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
14 documents · 5 drawing sheets
Filing for mechanical work as per plans submitted, fit-out renovation on the 2nd floor, and air handler replacement on the 3rd-floor setback roof. No change in egress, use, or occupancy.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 1Under Construction36p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems
Modifications to the existing Plumbing and Sprinkler systems. No change in occupancy, use or egress.
On file for this project
30 documents
Hot water interconnection through underground tunnel connecting 1275 York Avenue and 417 East 68 Street as per plans. No change of use, occupancy or egress.
On file for this project
16 documents · 2 drawing sheets
Installation of new sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy. Buildings 1275 York Avenue (MSKCC) & 425 East 67th Street (Haupt).
On file for this project
9 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Mezzanine2p · 2 filings · 20 docs
MechanicalPlumbing
STRUCTURAL SUPPORT FOR NEW CT SIM AND LINAC EQUIPEMENT ON THE 2ND & 3RD FLOORS. NO CHANGE IN OCCUPANCY, USE OR EGRESS
On file for this project
65 documents · 1 drawing sheet
Mechanical work on the 2nd, 11th, & 12th floors. No change inoccupancy, use or egress.
On file for this project
16 documents · 1 drawing sheet
Cellar1p · 1 filing · 9 docs
Electrical
Modification to HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Sub-Cellar2p · 1 filing · 9 docs
Fire Protection
Installation of new sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy. Buildings 1275 York Avenue (MSKCC) & 425 East 67th Street (Haupt).
On file for this project
9 documents · 2 drawing sheets
BasementUnder Construction18p · 8 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
On file for this project
31 documents · 4 drawing sheets
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy. Buildings 444 East 68th Street, 410 East 68th Street & 411 East 67th Street.
On file for this project
10 documents · 3 drawing sheets
Modification to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
On file for this project
14 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Sub-BasementUnder Construction30p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
On file for this project
31 documents
Structural work on the 1st floor. No change in occupancy, use or egress.
On file for this project
34 documents · 2 drawing sheets