Roof3p · 4 filings · 3 docs
ArchitectureEquipmentFire ProtectionMechanicalStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Structural · Supported Scaffold
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
On file for this project
3 documents · 1 drawing sheet
Modification to HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
INSTALLATION OF SYSTEM SCAFFOLDING AS PER DRAWINGS. SYSTEM SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 212p · 1 filing · 14 docs
Fire ProtectionMechanical
Issued Permit Scope
Sprinklers
Modification to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
On file for this project
14 documents · 2 drawing sheets
Floor 201p · 1 filing · 14 docs
Fire ProtectionMechanical
Issued Permit Scope
Sprinklers
Modification to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
Floor 19
Floor 18
Floor 17
Floor 162 filings · 10 docs
Fire ProtectionPlumbing
Issued Permit Scope
Plumbing · Sprinklers
STRUCTURAL SUPPORT FOR NEW RAMP AND HUNG MEP EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
48 documents
Installation of new sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents
Floor 152 filings · 10 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
STRUCTURAL SUPPORT FOR NEW RAMP AND HUNG MEP EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
48 documents
Installation of new sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
11 documents
Floor 14Under Construction2p · 3 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Sprinkler modifications to accommodate IDF equipment room on the 14th floor in the existing Memorial Hospital building including work on floors 12 and 15. All work as per plans filed herewith.
On file for this project
41 documents · 1 drawing sheet
Installation of new sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents
STRUCTURAL SUPPORT FOR NEW RAMP AND HUNG MEP EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
48 documents · 1 drawing sheet
Floor 13
Floor 121p · 2 filings · 1 doc
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
STRUCTURAL SUPPORT FOR NEW RAMP AND HUNG MEP EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
48 documents
Mechanical work on the 2nd, 11th, & 12th floors. No change inoccupancy, use or egress.
On file for this project
16 documents · 1 drawing sheet
Floor 111 filing · 11 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers
Mechanical work on the 2nd, 11th, & 12th floors. No change inoccupancy, use or egress.
On file for this project
16 documents
Floor 101p · 3 filings · 1 doc
Fire ProtectionGeneralMechanical
Issued Permit Scope
Sprinklers
Installation of new sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
12 documents · 1 drawing sheet
Additions and modifications to existing sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
9 documents
Additions and modifications to existing sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents
Floor 94p · 6 filings
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Modifications to the existing Sprinkler system on the 9th floor. No change in occupancy, use or egress.
On file for this project
5 documents · 1 drawing sheet
Plumbing modifications on the 9th floor. No change in occupancy, use or egress.
On file for this project
31 documents · 2 drawing sheets
INSTALLATION OF A TEMPORARY SCAFFOLD (FILED LOCATED) AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
3 documents
Latest 3 of 6 filings on this floor.
Floor 81 filing · 3 docs
MechanicalStructural
Issued Permit Scope
Supported Scaffold
INSTALLATION OF A TEMPORARY SCAFFOLD (FILED LOCATED) AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
3 documents
Floor 78p · 11 filings
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
MODIFICATION TO HVAC DUCTWORK AND PIPING TO ACCOMMODATE THE IDF CLOSET/ OFFICE RENOVATION, BOBST BUILDING, IN THE EXISTING HOSPITAL BUILDING.
On file for this project
12 documents · 1 drawing sheet
Re-filing of the previously approved Boiler drawings under DOB BIS # 123872103, Document #02, in order to call for inspection of boiler.
On file for this project
7 documents
INSTALLATION OF A TEMPORARY SCAFFOLD (FILED LOCATED) AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
3 documents
Latest 3 of 11 filings on this floor.
Floor 65p · 12 filings
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Modification to HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
9 documents
BOBST ANESTHESIA: SPRINKLER WORK TO ACCOMMODATE THE ANESTHESIA WORK ROOM RENOVATION, BOBST BUILDING, IN THE EXISTING HOSPITAL BUILDING.
On file for this project
12 documents
Installation of new sprinkler heads and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents
Latest 3 of 12 filings on this floor.
Floor 5Under Construction3p · 10 filings
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sign · Sprinklers · Structural · Supported Scaffold
MSK HAUPT OR MITIGATION: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE 4TH FLOOR OR MITIGATION IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents
MSK HAUPT OR MITIGATION: STRUCTURAL FRAMING TO ACCOMMODATE THE 4TH FLOOR OR MITIGATION IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents
REMOVING: EXISTING CO2 MANIFOLD, O2 MANIFOLD, N2O MANIFOLD, AND N2O TANK. INSTALLING: NEW CO2 TANK WITH VAPORIZERS AND REGULATOR CO2 CYLINDER RESERVE N2O MANIFOLD NEW CO2 PIPING FROM TANK AND RESERVE ROUTED VERTICALLY UP TO THE 6TH FLOOR.
On file for this project
10 documents
Latest 3 of 10 filings on this floor.
Floor 4Under Construction4p · 16 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sign · Sprinklers · Structural · Supported Scaffold
BOBST 4 CARDIOLOGY: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE CARDIOLOGY SUITE RENOVATION THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents
BOBST 4 CARDIOLOGY: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE CARDIOLOGY SUITE RENOVATION THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents
MSK HAUPT OR MITIGATION: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE 4TH FLOOR OR MITIGATION IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents
Latest 3 of 16 filings on this floor.
Floor 3Under Construction9p · 22 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sign · Sprinklers · Structural
Filing herewith general construction on the 3rd floor - (Theranostic Haupt) No change in egress, use, or occupancy.
On file for this project
21 documents
Structural work on the 3rd floor. No change in occupancy, use or egress.
On file for this project
49 documents
BOBST 4 CARDIOLOGY: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE CARDIOLOGY SUITE RENOVATION THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents
Latest 3 of 22 filings on this floor.
Floor 2Under Construction18p · 22 filings
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sign · Sprinklers · Structural
DEMO/NEW WORK HAUPT X-Ray/Fluoro: SPRINKLER MODIFICATIONS TO ACCOMMODATE THE X-RAY/FLUORO RENOVATION IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
18 documents
DEMO HAUPT X-Ray/Fluoro: REMOVAL OF INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE X-RAY/FLUORO RENOVATION, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents
MSK CT ANGIO FIT OUT: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE CT ANGIO RENOVATION IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
19 documents
Latest 3 of 22 filings on this floor.
Floor 1Under Construction19p · 22 filings
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sign · Sprinklers · Structural
Hot water interconnection through underground tunnel connecting 1275 York Avenue and 417 East 68 Street as per plans. No change of use, occupancy or egress.
On file for this project
16 documents · 2 drawing sheets
MSK CT ANGIO FIT OUT: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE CT ANGIO RENOVATION IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
19 documents
Modification to HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 22 filings on this floor.
Mezzanine1p · 1 filing · 20 docs
Plumbing
STRUCTURAL SUPPORT FOR NEW CT SIM AND LINAC EQUIPEMENT ON THE 2ND & 3RD FLOORS. NO CHANGE IN OCCUPANCY, USE OR EGRESS
On file for this project
65 documents · 1 drawing sheet
Cellar1p · 3 filings · 20 docs
ElectricalPlumbing
Issued Permit Scope
Plumbing
Modification to HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
9 documents · 1 drawing sheet
Minor demo of non-bearing partition work on the 3rd and 4th floors. No change in occupancy, use or egress.
On file for this project
20 documents
REMOVING: EXISTING CO2 MANIFOLD, O2 MANIFOLD, N2O MANIFOLD, AND N2O TANK. INSTALLING: NEW CO2 TANK WITH VAPORIZERS AND REGULATOR CO2 CYLINDER RESERVE N2O MANIFOLD NEW CO2 PIPING FROM TANK AND RESERVE ROUTED VERTICALLY UP TO THE 6TH FLOOR.
On file for this project
10 documents
Sub-Cellar1 filing · 11 docs
Fire ProtectionPlumbing
Issued Permit Scope
Plumbing · Sprinklers
Structural work on the 1st floor. No change in occupancy, use or egress.
On file for this project
34 documents
BasementUnder Construction4p · 1 filing · 20 docs
Fire ProtectionPlumbing
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
On file for this project
31 documents · 4 drawing sheets
Sub-BasementUnder Construction11 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
On file for this project
31 documents
Hot water interconnection through underground tunnel connecting 1275 York Avenue and 417 East 68 Street as per plans. No change of use, occupancy or egress.
On file for this project
16 documents
Modification to HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
9 documents
Latest 3 of 11 filings on this floor.
Site & exterior11 filings · 20 docs
ElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Plumbing · Sidewalk Shed · Supported Scaffold
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
3 documents · 2 drawing sheets
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
3 documents · 1 drawing sheet
INSTALLATION OF A TEMPORARY FENCE ENCLOSURE AS PER PLANS (FENCE PARTIALLY INSTALLED IN THE ROADWAY FOR OXYGEN TRAILER) . NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE ENCLOSURE INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 11 filings on this floor.
Filed — no permit issued5 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructuralOther
Modification/additions to existing sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
On file for this project
5 documents · 5 drawing sheets
Replacement of existing fence structure as shown on drawings. No change in use, egress or occupancy.
On file for this project
15 documents · 9 drawing sheets
No filed description on record for this project.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.