← Back
BuildNYC
Office, 20+ stories, with or without commercial
Bush Tower
130 WEST 42ND STREET · Name © OpenStreetMap contributors · BIN 1022577
💬 Discuss this project
1918Year Built
29Stories
O4Building Class
C6-7Zoning
217,855 sfGross Floor Area
74Units
LL97 Covered1 Active Violation 0 unresolved · 1 paperwork only ▸FISP: SWARMP
Office, 20+ stories, with or without commercial · Owner of record: Ryan · 14,246 sf lot · 15.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofCopper Roof Replacement26p · 2 filings · 20 docs
Floor 30Copper Roof Replacement10p · 1 filing · 14 docs
Floor 29Copper Roof Replacement10p · 1 filing · 14 docs
Floor 28Copper Roof Replacement11p · 1 filing · 14 docs
Floor 27
Floor 26K&LGroup3p · 2 filings · 12 docs
Floor 25
Floor 24Plumbing fixture and piping modification5p · 3 filings · 17 docs
Floor 23
Floor 22Somera Road2p · 2 filings · 9 docs
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 133p · 1 filing · 2 docs
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5Lee & Associates2p · 1 filing · 5 docs
Floor 4Lee & Associates2p · 1 filing · 5 docs
Floor 3Lee & Associates13p · 2 filings · 18 docs
Floor 2Lee & Associates7p · 3 filings · 14 docs
Floor 1Carrot Express, Lee & Associates +187p · 14 filings · 20 docs
MezzanineMechanical system installation13p · 7 filings · 20 docs
CellarMechanical system installation65p · 7 filings · 20 docs
Site & exteriorUncle Tetsu23p · 4 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
130W42 Opco37103/22/2026
Ryan17703/22/2026
130 West 42nd St Development6403/21/2026
Ryans1403/21/2026
Sama1003/21/2026
American Properties803/21/2026
Tribeca M603/22/2026
Vanke US507/08/2026
Ben Dan Co303/21/2026
UA Builders Group203/22/2026
Igon Construction Maintenance I203/22/2026
130 W 42 ST203/21/2026
Saci203/21/2026
Carrot Express103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Soyu Architecture206/23/2023
Emporium Design312/01/2022
Mohammad Ahead, PE408/04/2022
Fang Architect604/21/2022
Ejc Engineering409/29/2021
Darius Toraby Architects208/24/2021
MG Engineering1009/24/2020
HBC Architects203/09/2020
Jose L. Pena, P.E111/25/2019
Fogarty Finger Architecture110/08/2019
Sargenti Architects109/19/2019
Marin Architects109/16/2019
Frank S Caminiti, RA107/08/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Gillman Consulting5003/21/2026
Leekodesign203/21/2026
Arsenal Building Consultants403/21/2026
AEC Consulting Expediting403/21/2026
Louis Striar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kings Group NYScaffold1007/08/2026
United Builders GroupGeneral Contractor707/08/2026
New Roc ContractingGeneral Contractor507/08/2026
ArbrisScaffold307/08/2026
Igon Construction & MaintenanceGeneral Contractor307/08/2026
NT First DecorationGeneral Contractor303/21/2026
Malatesta PaladinoScaffold203/21/2026
DV PlumbingPlumbing207/08/2026
Flow-Right Fire SuppFire Protection207/08/2026
Brandl ElectricElectrical203/22/2026
Pro Star Plumbing, Heating & MechanicalPlumbing207/08/2026
Romcon ElectricElectrical203/22/2026
Accurate MechanicalFire Protection207/08/2026
City SignsSign hanger107/08/2026
Paul SignsSign hanger107/08/2026
Aqueduct MechanicalPlumbing107/08/2026
Avon Plumbing & HeatingPlumbing107/08/2026
Julian SprinklerFire Protection107/08/2026
QMB Plumbing & HeatingPlumbing107/08/2026
Ampere Electrical ServicesElectrical103/22/2026
QMB Plumbing & HeatingFire Protection107/08/2026
Conductor Electrical ServicesElectrical103/22/2026
Harry Dorowsky, Lic. ElectricElectrical103/21/2026
Double 'R' Electrical ContractingElectrical103/22/2026
Rem & Sons Lic Electric ContElectrical103/21/2026
Elpo Electrical ContgElectrical103/22/2026
Regional Electrical VoiceElectrical103/21/2026
Gustave Dileo, JRElectrical103/21/2026
R & L SystemsElectrical103/21/2026
Richard Wehner Electrical ContElectrical103/22/2026
Affinity Building SolutioGeneral Contractor107/08/2026
JJK Construction NYGeneral Contractor107/08/2026
Pawley Interior ContractingGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Korman Design & Build2055106/23/2023
Ejc Engineering4502309/29/2021
Fang Architect5513309/29/2021
Grand Inspection & Consulting6792208/30/2021
Sag Engineering & Consulting608809/24/2020
Building Lifecycle
All (224)Filed (38)Permit Issued (34)Signed Off (17)Facade (FISP) (13)Violation (60)Inspection (6)Objection (26)Special Inspection (30)
11/08/2025
Violation issued (ECB, open)
Construction
04/03/2024
Permit issued — Plumbing
M00779547-I1-PL
09/28/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/31/2023
Signed off — Alteration
installation of pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
M00578793-I1
07/27/2023
Permit issued — General Construction
M00889570-I1-GC
07/26/2023
Permit issued — Plumbing
M00889570-S1-PL
07/15/2023
Objection resolved — Addressed
07/10/2023
Special inspection requirement — Air barrier - visual inspection
YOUNGSAM YU
06/30/2023
Objection raised — Scope
06/23/2023
Filed — Alteration
RENOVATION OF STORE, INCLUDING REMOVAL AND INSTALLATION OF PARTITION. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
M00889570-S1
06/23/2023
Filed — Alteration
RENOVATION OF STORE, INCLUDING REMOVAL AND INSTALLATION OF PARTITION. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
M00889570-I1
06/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
DAVID UH
05/05/2023
Cycle 9 facade inspection completed
05/01/2023
Cycle 9 facade report signed — SWARMP
03/01/2023
Permit issued — Supported Scaffold
M00578793-S1-SF
01/31/2023
Permit issued — General Construction
M00566193-I1-GC
01/09/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/16/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/12/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/01/2022
Filed — Alteration
MINOR MODIFICATIONS TO EXISTING PLUMBING FIXTURES AND RELATED PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00779547-P1
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/05/2022
Signed off — Alteration
M00578822-I1
10/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/01/2022
Permit issued — Plumbing
M00779547-I1-PL
08/30/2022
Permit issued — Sidewalk Shed
M00578793-I1-SH
08/04/2022
Filed — Alteration
installation of pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
M00578793-P1
08/04/2022
Permit issued — General Construction
M00776711-I1-GC
07/28/2022
Filed — Alteration
MINOR MODIFICATIONS TO EXISTING PLUMBING FIXTURES AND RELATED PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00779547-I1
07/28/2022
Filed — Alteration
MINOR INTERIOR RENOVATION AND REARRANGEMENT OF EXISTING COMMERCIAL (RETAIL - NON-ASSEMBLY) SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00776711-I1
07/18/2022
Special inspection requirement — Final
TIMOTHY WELSH
07/13/2022
Permit issued — General Construction
M00566193-I1-GC
06/02/2022
Permit issued — Supported Scaffold
M00578793-S1-SF
05/11/2022
Signed off — Alteration
Installation of new HVAC system and related ductwork/piping for restaurant renovation as per plans filed herewith. No change in use, egress or occupancy under this application.
M00399435-I1
04/21/2022
Filed — No Work
M00723156-I1
04/04/2022
Permit issued — Supported Scaffold
M00578793-S1-SF
04/01/2022
Filed — Alteration
installation of pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
M00578793-S1
02/20/2022
Cycle 9 facade report submitted
01/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/20/2022
Objection raised — Admin
01/20/2022
Objection resolved — Addressed
01/19/2022
Filed — No Work
M00664718-I1
11/29/2021
Permit issued — General Construction
M00566193-I1-GC
10/22/2021
Signed off — Alteration
Modification to existing sprinkler system for eating and drinking establishment renovation as per plans filed herewith. No change in use, egress or occupancy under this application.
M00400227-I1
10/13/2021
Signed off — Alteration
Installation of new plumbing fixtures and related piping for restaurant renovation as per plans filed herewith. No change in use, egress or occupancy under this application.
M00400756-I1
10/12/2021
Objection raised — Admin
10/12/2021
Objection resolved — Addressed
10/12/2021
Objection raised — Scope
10/12/2021
Objection resolved — Addressed
10/08/2021
Filed — No Work
M00606771-I1
10/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
10/01/2021
Special inspection requirement — Mechanical Systems
ERIC CHANG
10/01/2021
Special inspection requirement — HVAC insulation and sealing
ERIC CHANG
10/01/2021
Special inspection requirement — Energy Code Compliance Inspections
ERIC CHANG
10/01/2021
Special inspection requirement — Final
ERIC CHANG
09/30/2021
Special inspection requirement — HVAC insulation and sealing
DEZHANG FANG
09/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
09/30/2021
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
09/30/2021
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
09/29/2021
Filed — Alteration
Installation of new plumbing fixtures and related piping for restaurant renovation as per plans filed herewith. No change in use, egress or occupancy under this application.
M00400756-P1
Latest 60 of 224 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPro Star Plumbing, Heating & Mechanical04/03/2024
DOB NOWGeneral ConstructionPermit IssuedJJK Construction NY07/27/2023
DOB NOWPlumbingSigned-offAvon Plumbing & Heating07/26/2023
DOB NOWSupported ScaffoldPermit IssuedArbris03/01/2023
DOB NOWGeneral ConstructionSigned-offNew Roc Contracting01/31/2023
DOB NOWPlumbingPermit IssuedPro Star Plumbing, Heating & Mechanical09/01/2022
DOB NOWSidewalk ShedSigned-offKings Group NY08/30/2022
DOB NOWGeneral ConstructionPermit IssuedPawley Interior Contracting08/04/2022
DOB NOWGeneral ConstructionSigned-offNew Roc Contracting07/13/2022
DOB NOWSupported ScaffoldPermit IssuedArbris06/02/2022
DOB NOWSupported ScaffoldPermit IssuedArbris04/04/2022
DOB NOWGeneral ConstructionSigned-offNew Roc Contracting11/29/2021
DOB NOWProtection and Mechanical MethodsSigned-offKings Group NY09/09/2021
DOB NOWSidewalk ShedSigned-offKings Group NY08/20/2021
DOB NOWSupported ScaffoldSigned-offKings Group NY08/20/2021
DOB NOWMechanical SystemsSigned-offNT First Decoration08/19/2021
DOB NOWPlumbingSigned-offQMB Plumbing & Heating04/30/2021
DOB NOWSprinklersSigned-offAccurate Mechanical12/08/2020
DOB NOWSprinklersSigned-offQMB Plumbing & Heating11/18/2020
DOB NOWMechanical SystemsSigned-offIgon Construction Maintenance10/19/2020
DOB NOWPlumbingSigned-offDV Plumbing10/05/2020
DOB NOWSprinklersSigned-offFlow-Right Fire Supp09/28/2020
DOB NOWMechanical SystemsSigned-offUnited Builders Group07/28/2020
DOB NOWMechanical SystemsSigned-offUnited Builders Group06/04/2020
DOB NOWMechanical SystemsSigned-offIgon Construction Maintenance02/04/2020
DOB NOWSprinklersSigned-offAccurate Mechanical02/04/2020
DOB NOWPlumbingSigned-offDV Plumbing01/16/2020
DOB NOWSprinklersSigned-offFlow-Right Fire Supp01/15/2020
DOB NOWMechanical SystemsSigned-offUnited Builders Group01/13/2020
DOB NOWSignSigned-offElmer Dawson01/03/2020
DOB NOWSprinklersSigned-offJulian Plumbing & Heating11/06/2019
DOB NOWMechanical SystemsSigned-offAffinity Building Solutio10/23/2019
DOB NOWConstruction FencePermit IssuedMalatesta Paladino09/25/2019
DOB NOWPlumbingSigned-offAqueduct Mechanical08/06/2019
BISPLISSUEDM&G Plumbing and Heating07/13/2022
BISPLISSUEDCommerical Plumbing Svces09/24/2021
BISOTISSUEDNT First Decoration08/04/2021
BISOTISSUEDNT First Decoration11/02/2020
BISOTISSUEDIgon Construction & Maintenance10/15/2020
BISOTISSUEDNT First Decoration10/09/2020
+ 44 more permits on file
1 project · most recent 12/01/2022
Gas Water/Sanitary
FiledStatusContractorScope
12/01/2022Permit IssuedPro Star Plumbing, Heating & MechanicalGas, Water/Sanitary
25 projects · most recent 02/28/2023
General Wiring Lighting
FiledStatusContractorScope
02/28/2023CompleteE-J Electric Installation CoGeneral Wiring
11/17/2022CompleteElpo Electrical ContgGeneral Wiring
04/15/2022Permit IssuedHigh Quality Electric of—
04/12/2021CompleteConductor Electrical ServicesGeneral Wiring
02/22/2021Permit IssuedHI-Rite ElectricGeneral Wiring
01/22/2021Permit IssuedKJK Electric—
12/08/2020CompleteRomcon ElectricGeneral Wiring
02/28/2020Permit IssuedConductor Electrical ServicesGeneral Wiring
08/03/2019CompleteRichard Wehner Electrical ContGeneral Wiring, Lighting
06/18/2019CompleteTroon Electric of New YorGeneral Wiring
05/11/2019Permit IssuedBrandl Electric—
05/10/2019Permit IssuedBrandl Electric—
05/10/2019CompleteBrandl ElectricGeneral Wiring
04/12/2019CompleteJLC Electrical ContractingGeneral Wiring
01/08/2019CompleteAmpere Electrical Services—
1 project · most recent 08/04/2022
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/04/2022Permit IssuedArbrisScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/16/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/12/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
07/10/2023Air barrier - visual inspectionYOUNGSAM YUenergy_progress
06/23/2023Fire-Resistant Penetrations and JointsDAVID UHspecial
07/18/2022FinalTIMOTHY WELSHprogress
10/01/2021Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
10/01/2021Mechanical SystemsERIC CHANGspecial
10/01/2021HVAC insulation and sealing ERIC CHANGenergy_progress
10/01/2021Energy Code Compliance InspectionsERIC CHANGprogress
10/01/2021FinalERIC CHANGprogress
09/30/2021HVAC insulation and sealing DEZHANG FANGenergy_progress
09/30/2021Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
09/30/2021Energy Code Compliance InspectionsDEZHANG FANGprogress
09/30/2021Fire-Resistance Rated ConstructionDEZHANG FANGprogress
09/28/2021HVAC insulation and sealing DEZHANG FANGenergy_progress
09/28/2021Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
09/28/2021Energy Code Compliance InspectionsDEZHANG FANGprogress
09/28/2021Fire-Resistance Rated ConstructionDEZHANG FANGprogress
08/25/2021Insulation placement and R valuesDARIUS TORABYenergy_progress
08/25/2021FinalDARIUS TORABYprogress
08/18/2021Sprinkler SystemsRUWAN RAJAPAKSEspecial
08/18/2021Fire-Resistant Penetrations and JointsRUWAN RAJAPAKSEspecial
08/18/2021FinalMOHAMMAD AHEADprogress
08/17/2021FinalDARIUS TORABYprogress
08/17/2021Insulation placement and R valuesDARIUS TORABYenergy_progress
09/23/2020Energy Code Compliance InspectionsChester Kowalskiprogress
09/23/2020HVAC insulation and sealing Chester Kowalskienergy_progress
Latest 25 of 36.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Carrot ExpressRestaurant / Food ServiceFloor 1
Project M00776711 Alteration · Permit Entire · 07/28/2022
Project M00779547 Alteration · Permit Entire · 07/28/2022
K&LGroupOfficeFloor 26
Project M00401457 Alteration · LOC Issued · 09/24/2020
Project M00401470 Alteration · LOC Issued · 09/24/2020
Lee & AssociatesOfficeFloors 1–5
Project M00254852 Alteration · LOC Issued · 11/25/2019
Somera RoadOfficeFloor 22
Project M00231718 Alteration · LOC Issued · 10/09/2019
Project M00231822 Alteration · LOC Issued · 10/09/2019
Uncle TetsuRestaurant / Food Service—
Project M00181440 Alteration · LOC Issued · 07/08/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 4,059 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch11
09/03/2026M00566193-I1Request digital key ↗
09/03/2026M00578822-I1Request digital key ↗
09/02/2026M00578793-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00201490-I1Request digital key ↗
09/05/2026M00266898-P1Request digital key ↗
09/05/2026M00266898-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler6
09/05/2026M00231822-I1Request digital key ↗
09/05/2026M00266916-I1Request digital key ↗
09/05/2026M00267082-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
09/05/2026M00231718-I1Request digital key ↗
09/05/2026M00266869-I1Request digital key ↗
09/05/2026M00267049-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly5
09/05/2026M00226446-I1Request digital key ↗
09/05/2026M00239683-I1Request digital key ↗
09/02/2026M00723156-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sign2
09/05/2026M00181440-I1Request digital key ↗
09/05/2026M00254852-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
09/03/2026M00580059-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00228068-I1Request digital key ↗
▸Applications & Permits771
▸BISPLAN / WORK APPROVAL APPLICATION413
07/06/2022103392446Open ↗
07/06/2022122054169Open ↗
04/13/2022122216191Open ↗
Showing 3 of 413 on file for this type
▸BISWORK PERMIT APPLICATION324
07/14/2022122054169Open ↗
09/24/2021123683291Open ↗
08/05/2021123683291Open ↗
Showing 3 of 324 on file for this type
▸DOB NOWLPC Approval/Permit20
09/05/2026M00266898-I1Open ↗
09/05/2026M00266898-P1Open ↗
09/01/2026M00779547-I1Open ↗
Showing 3 of 20 on file for this type
▸BISPLACE OF ASSEMBLY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1133
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications945
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION517
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 517 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST153
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 153 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT143
10/13/2020140955768Open ↗
10/02/2020140955795Open ↗
09/25/2020140957533Open ↗
Showing 3 of 143 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature38
09/05/2026M00228068-I1Open ↗
09/05/2026M00239683-I1Open ↗
09/05/2026M00231718-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/05/2026M00181440-I1Open ↗
09/01/2026M00399435-I1Open ↗
09/01/2026M00399435-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026M00266916-I1Open ↗
09/02/2026M00266916-I1Open ↗
09/01/2026M00399435-I1Open ↗
Showing 3 of 15 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
10/13/2020140955768Open ↗
10/02/2020140955795Open ↗
09/25/2020140957533Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
10/13/2020140955768Open ↗
10/02/2020140955795Open ↗
09/25/2020140957533Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment301
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE119
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 119 on file for this type
▸BISEQUIPMENT USE PERMITS50
11/09/2020122019582Open ↗
11/04/2020122019582Open ↗
Showing 2 of 50 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT45
11/09/2020122019582Open ↗
11/04/2020122019582Open ↗
07/19/2020122019582Open ↗
Showing 3 of 45 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA35
11/03/2021123457918Open ↗
09/27/2021123144739Open ↗
11/27/2020122266975Open ↗
Showing 3 of 35 on file for this type
▸BISSELF-CERT PLUMBING NOTICE30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISSCHEDULE B - PLUMBING22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸Safety & Tenant Protection8
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00181440-I1Open ↗
▸Environmental & Asbestos257
▸BISASBESTOS: CERTIFICATION (DEP ACP5)190
10/13/2020140955768Open ↗
10/02/2020140955795Open ↗
09/25/2020140957533Open ↗
Showing 3 of 190 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
09/05/2026M00231718-I1Open ↗
09/05/2026M00266869-I1Open ↗
09/05/2026M00266898-I1Open ↗
Showing 3 of 24 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00566193-I1Open ↗
▸Energy Compliance249
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS148
01/28/2020123748631Open ↗
Showing 1 of 148 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS64
10/01/2021122216191Open ↗
10/01/2021122216191Open ↗
01/28/2020123748631Open ↗
Showing 3 of 64 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY15
10/01/2021122216191Open ↗
10/01/2021122216191Open ↗
10/01/2021122216191Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)9
06/10/2022122054169Open ↗
01/27/2022122216191Open ↗
10/04/2021140955795Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
10/13/2020140955768Open ↗
10/02/2020140955795Open ↗
09/25/2020140957533Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00400756-I1Open ↗
▸Inspections & Test Reports58
▸BISTECHNICAL REPORT: RESPONSIBILITY28
10/04/2021140955795Open ↗
10/04/2021140955795Open ↗
10/01/2021122216191Open ↗
Showing 3 of 28 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
03/31/2021123327275Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs485
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST172
10/22/2021123144739Open ↗
10/04/2021140955795Open ↗
09/29/2021123683291Open ↗
Showing 3 of 172 on file for this type
▸BISLANDMARKS APPROVAL156
10/13/2020140955768Open ↗
10/02/2020140955795Open ↗
09/25/2020140957533Open ↗
Showing 3 of 156 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION60
07/14/2022122054169Open ↗
03/19/2020123402941Open ↗
02/03/2020123683291Open ↗
Showing 3 of 60 on file for this type
▸BISADMINISTRATIVE OBJECTIONS48
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 48 on file for this type
▸BISLANDMARKS SIGNOFF20
06/14/2022122054169Open ↗
03/30/2022122216191Open ↗
10/22/2021123144739Open ↗
Showing 3 of 20 on file for this type
▸BISSUPERSEDING LETTER13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
04/12/2022122216191Open ↗
10/22/2020122216191Open ↗
10/20/2020122216191Open ↗
Showing 3 of 6 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSHED LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M00566193-I1Open ↗
▸Cost, Insurance & Ownership405
▸BISCOST AFFIDAVIT387
10/13/2020140955768Open ↗
10/02/2020140955795Open ↗
09/25/2020140957533Open ↗
Showing 3 of 387 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW318
04/01/2025122740258Open ↗
06/10/2022122054169Open ↗
11/23/2021122216191Open ↗
Showing 3 of 18 on file for this type
▸Filing & Intake Forms485
▸BISEFILING COVER SHEET222
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 222 on file for this type
▸BISBOROUGH INTAKE FORM140
08/05/2021123683291Open ↗
03/19/2020123402941Open ↗
02/21/2020123472731Open ↗
Showing 3 of 140 on file for this type
▸BISADDITIONAL INFORMATION109
04/13/2022122216191Open ↗
08/31/2021140955768Open ↗
10/26/2020122216191Open ↗
Showing 3 of 109 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET14
10/13/2020140955768Open ↗
10/02/2020140955795Open ↗
09/25/2020140957533Open ↗
Showing 3 of 14 on file for this type
▸Other Documents24
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026M00566193-P1Open ↗
08/13/2026M00566193-I1Open ↗