| Owner | Filings | Most Recent |
|---|---|---|
| 1345 EASE HOLD LLC | 2,805 | 09/15/2026 |
| VEMA GROUP | 12 | 07/08/2026 |
| JRM CONSTRUCTION MGMT | 6 | 03/22/2026 |
| FISHER BROTHERS CO | 24 | 03/22/2026 |
| TURNER CONSTRUCTION CO | 1 | 03/22/2026 |
| 1345 LEASEHOLD LIMITED PARTN | 9 | 03/22/2026 |
| FISHER BROS. MANAGEMENT | 3 | 03/22/2026 |
| HAWAIIAN SIXTH AVE CORP. | 1 | 03/22/2026 |
| THE BARRINGTON CO | 2 | 03/22/2026 |
| FISCHER 6 AVE CORP | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ROBERT DERECTOR ASSOCIATES | 73 | 09/03/2026 |
| GENSLER | 26 | 08/26/2026 |
| PATTI & ANTHES CONSULTING ENGINEERS | 112 | 08/04/2026 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 42 | 08/03/2026 |
| OFFICE OF JAMES RUDERMAN | 36 | 07/20/2026 |
| TPG ARCHITECTURE, LLP | 5 | 12/09/2025 |
| COSENTINI ASSOCIATES | 24 | 11/25/2025 |
| BRAND ACCESS SOLUTIONS | 3 | 08/20/2025 |
| CFS ENGINEERING, DPC | 10 | 07/18/2025 |
| STUDIOS ARCHITECTURE | 3 | 07/11/2025 |
| LILKER ASSOCIATES CONSULTING ENGINE | 5 | 06/03/2025 |
| FRANK S CAMINITI, RA | 1 | 04/07/2025 |
| CORGAN | 2 | 03/11/2025 |
| AMA CONSULTING ENGINEERS, PC | 11 | 12/09/2024 |
| ANDREW FREDMAN ARCHITECT LLC | 1 | 12/03/2024 |
| WELLWORTH CONSULTING LLC | 2 | 09/19/2024 |
| KZ ENGINEERING, P.C | 3 | 08/06/2024 |
| CPENGINEERING PC | 2 | 07/30/2024 |
| SSM DESIGN LLP D/B/A SPECTOR GROUP | 1 | 07/22/2024 |
| LINEA ARCHITECTS, P.C. | 4 | 07/03/2024 |
| TOHFAZ UDDIN PE PC | 1 | 09/13/2023 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 08/16/2023 |
| DIAZ ARCHITECTS INC.,PA | 1 | 05/16/2023 |
| THORNTON TOMASETTI | 2 | 02/09/2023 |
| SALVATORE LAFERLITA | 1 | 08/05/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| RIZZO GROUP | 281 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 44 | 03/21/2026 |
| ROBERT R BISACCIA | 28 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 8 | 03/21/2026 |
| BOHLER ENGINEERING | 3 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 3 | 03/21/2026 |
| LOMBARDO BUILDING CONSULTANTS | 1 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| JP EXPEDITE | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JAMES E FITZGERALD INC | General Contractor | 91 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 76 | 07/22/2026 |
| STRUCTURE TONE, LLC | General Contractor | 32 | 07/08/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 27 | 08/12/2026 |
| ARMON MECHANICAL INC | Fire Protection | 23 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 18 | 07/25/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 16 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 11 | 08/20/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 11 | 09/18/2026 |
| VERSATILE SERVICES LLC | General Contractor | 11 | 07/08/2026 |
| JOHN GALLIN & SON, INC | General Contractor | 10 | 07/08/2026 |
| NYC FIRE SPRINKLER CORP | Fire Protection | 8 | 08/26/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 8 | 08/07/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 7 | 08/14/2026 |
| PAR PLUMBING CO., INC | Plumbing | 7 | 07/08/2026 |
| MAC FELDER INC | Plumbing | 7 | 07/08/2026 |
| TRISTATE PLBG SVCS CORP | Plumbing | 7 | 07/08/2026 |
| VEMA GROUP LLC | General Contractor | 5 | 07/08/2026 |
| ARMON MECHANICAL INC | Plumbing | 5 | 07/08/2026 |
| RALPH OCCHIPINTI | Electrical | 5 | 03/21/2026 |
| ADCO ELEC'L CORP | Electrical | 5 | 03/22/2026 |
| ALPHONSE, MICHAEL | Electrical | 4 | 03/21/2026 |
| SOH PAR SPRINKLER LLC | Fire Protection | 4 | 09/09/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 4 | 07/08/2026 |
| PEREIRA, WESLLEY | Electrical | 4 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AK ENGINEERING PC | 678 | 91 | 09/03/2026 |
| SAG ENGINEERING & CONSULT | 608 | 178 | 08/04/2026 |
| CFS ENGINEERING, PC | 615 | 7 | 07/18/2025 |
| MILROSE CONSULTANTS LLC | 2003 | 13 | 06/03/2025 |
| ALAN MARGOLIN & ASSOC | 423 | 17 | 12/09/2024 |
| CDG ARCHITECTS LLC /DBA: | 1327 | 1 | 06/30/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Construction Fence | Permit Issued | SAFWAY ATLANTIC, LLC | 09/17/2026 |
| DOB NOW | Standpipe | Signed-off | SOH PAR SPRINKLER LLC | 09/08/2026 |
| DOB NOW | Sprinklers | Signed-off | SOH PAR SPRINKLER LLC | 09/08/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 08/18/2026 |
| DOB NOW | Sprinklers | Permit Issued | AGGRESSIVE FIRE PROT LLC | 08/13/2026 |
| DOB NOW | Sprinklers | Signed-off | NYC FIRE SPRINKLER CORP | 08/12/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | CLUNE CONSTRUCTION CO LP | 08/11/2026 |
| DOB NOW | General Construction | Permit Issued | CLUNE CONSTRUCTION CO LP | 08/10/2026 |
| DOB NOW | Sprinklers | Permit Issued | WASOFF PLBG & UTILITY CO | 08/06/2026 |
| DOB NOW | Standpipe | Permit Issued | NYC FIRE SPRINKLER CORP | 08/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 08/06/2026 |
| DOB NOW | Sprinklers | Signed-off | PAR FIRE PROTECTION LLC | 07/31/2026 |
| DOB NOW | Standpipe | Signed-off | PAR FIRE PROTECTION LLC | 07/31/2026 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 07/24/2026 |
| DOB NOW | Standpipe | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 07/24/2026 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 07/24/2026 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 07/24/2026 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 07/24/2026 |
| DOB NOW | Structural | Signed-off | JRM CONSTRUCTION MGMT LLC | 07/20/2026 |
| DOB NOW | Structural | Signed-off | JRM CONSTRUCTION MGMT LLC | 07/16/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 07/16/2026 |
| DOB NOW | Structural | Signed-off | JRM CONSTRUCTION MGMT LLC | 07/16/2026 |
| DOB NOW | Structural | Signed-off | JRM CONSTRUCTION MGMT LLC | 07/16/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 07/16/2026 |
| DOB NOW | Structural | Signed-off | JRM CONSTRUCTION MGMT LLC | 07/16/2026 |
| DOB NOW | Structural | Signed-off | JRM CONSTRUCTION MGMT LLC | 07/16/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM CONSTRUCTION MGMT LLC | 07/16/2026 |
| DOB NOW | Mechanical Systems | Signed-off | JRM CONSTRUCTION MGMT LLC | 07/15/2026 |
| DOB NOW | Structural | Signed-off | JRM CONSTRUCTION MGMT LLC | 07/15/2026 |
| DOB NOW | Mechanical Systems | Signed-off | JRM CONSTRUCTION MGMT LLC | 07/15/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 07/15/2026 |
| DOB NOW | Structural | Signed-off | JRM CONSTRUCTION MGMT LLC | 07/15/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 07/15/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM CONSTRUCTION MGMT LLC | 07/15/2026 |
| DOB NOW | Mechanical Systems | Signed-off | JRM CONSTRUCTION MGMT LLC | 07/15/2026 |
| DOB NOW | Structural | Signed-off | JRM CONSTRUCTION MGMT LLC | 07/15/2026 |
| DOB NOW | Mechanical Systems | Signed-off | JRM CONSTRUCTION MGMT LLC | 07/15/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 07/15/2026 |
| DOB NOW | Mechanical Systems | Signed-off | JRM CONSTRUCTION MGMT LLC | 07/15/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 07/15/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/03/2026 | Signed-off | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems | Cooling Climatemaster SCP012ADBL0S0TS 11,100 BTU · Wshp ×6 SCP018ADBL0S0TS 18,100 BTU · Wshp ×6 SCB012ADBL0S0TS 11,100 BTU · Wshp ×3 SCB024ALBL0S0TS 22,500 BTU · Wshp ×3 SCB030ALB0S0TS 28,600 BTU · Wshp ×3 Above Air MCW-005S1-7 1,000 CFM ×6 |
| 08/04/2026 | Permit Issued | CLUNE CONSTRUCTION CO LP | Air Conditioning Systems | Cooling |
| 08/03/2026 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems | Cooling Climatemaster SCB012ADBL0S0TS 11,100 BTU · Wshp ×4 SCB030ALBBL0S0TS 28,600 BTU · Wshp ×2 SCB036ALBL0S0TS 36,700 BTU · Wshp ×2 SCP012ADBL0S0TS 11,100 BTU · Wshp ×2 SCB048ALBL0S0TS 1,600 CFM ×1 SCP030ALBL0S0TS 925 CFM · Wshp ×1 Florida Heat Pump CL012-HZ 11,100 BTU · Wshp ×2 CL030-HZ 28,600 BTU · Wshp ×1 CL048-HZ 46,000 BTU · Wshp ×1 |
| 07/22/2026 | Signed-off | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems | Cooling Climatemaster SCCB012ADBL0S0TS 11,100 BTU · Wshp ×4 SCB018ADBL0S0TS 18,100 BTU · Wshp ×2 SCP030ALBL0S0TS 22,500 BTU · Wshp ×1 Florida Heat Pump CL012-HZ 11,100 BTU · Wshp ×5 CL018-HZ 18,100 BTU · Wshp ×2 CL024-HZ 22,500 BTU · Wshp ×1 |
| 07/21/2026 | Signed-off | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems | Cooling Climatemaster SCB012ADBL0S0TS 11,100 BTU · Wshp ×8 SCB024ALBL0S0TS 22,500 BTU · Wshp ×6 SCP024ALBL0S0TS 22,500 BTU · Wshp ×4 SCP030ALBL0S0TS 28,600 BTU · Wshp ×4 CL030-HZ 28,600 BTU · Wshp ×2 Above Air MCW-005S1-7 1,000 CFM ×4 |
| 07/13/2026 | Signed-off | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems | |
| 07/10/2026 | Signed-off | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems | |
| 07/09/2026 | Signed-off | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems | |
| 07/09/2026 | Signed-off | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems | Cooling Above Air MCW-005S1-7 1,000 CFM · Crac Unit ×1 |
| 07/09/2026 | Signed-off | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems, Ventilation Systems | Cooling Climatemaster SCP024ALBL0C0TS 804 CFM · Wshp ×4 SCB018ADBL0C0TS 619 CFM · Wshp ×2 SCP012AJBL0C0TS 401 CFM · Wshp ×2 SCB036AKBL0C0TS 1,153 CFM · Wshp ×1 SCB042ALBL0C0TS 1,215 CFM · Wshp ×1 SC-024 804 CFM · Wshp ×4 SC-012 401 CFM · Wshp ×2 SC-018 619 CFM · Wshp ×2 SC-036 1,153 CFM · Wshp ×1 SC-042 1,215 CFM · Wshp ×1 Above Air MCW-005S1-7-00000-EC-00-UF2-XS 1,000 CFM · Crac Unit ×3 Florida Heat Pump CL024-HZ 800 CFM · Wshp ×4 CL012-HZ 375 CFM · Wshp ×2 CL018-HZ 600 CFM · Wshp ×2 CL036-HZ 1,200 CFM · Wshp ×2 |
| 06/24/2026 | Signed-off | CLUNE CONSTRUCTION CO LP | Air Conditioning Systems | Cooling Florida Heat Pump CL009-2HZC 8,200 BTU · Wshp ×2 CL015-2HZC 15,100 BTU · Wshp ×1 CL042 42,900 BTU · Wshp ×1 Compu-Aire MTW-1.5 19,600 BTU ×2 |
| 06/03/2025 | Signed-off | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems | Cooling Water Furnace UVH036 3 tons · Wshp ×30 UVH024 2 tons · Wshp ×20 UVH060 5 tons · Wshp ×10 UBH015 1 tons · Wshp ×5 UBH024 2 tons · Wshp ×5 UVH048 4 tons · Wshp ×5 |
| 07/30/2020 | Permit Issued | JAMES E FITZGERALD INC | Air Conditioning Systems, Heating Systems | Cooling Mammoth G350VHE 10,500 CFM ×1 Heating Water Furnace VV048 1,800 CFM · Wshp ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/03/2026 | Signed-off | PAR FIRE PROTECTION LLC | 2,247 heads, 6 outlets |
| 08/04/2026 | Permit Issued | AGGRESSIVE FIRE PROT LLC | — |
| 08/03/2026 | Permit Issued | PAR FIRE PROTECTION LLC | 2,942 heads |
| 07/22/2026 | Permit Issued | NYC FIRE SPRINKLER CORP | 1,460 heads |
| 07/21/2026 | Permit Issued | NYC FIRE SPRINKLER CORP | 4,349 heads, 3 outlets |
| 07/13/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 708 heads, 3 outlets |
| 07/10/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 916 heads |
| 07/09/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 300 heads |
| 07/09/2026 | Signed-off | NYC FIRE SPRINKLER CORP | 690 heads |
| 07/09/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 346 heads |
| 06/24/2026 | Signed-off | AGGRESSIVE FIRE PROT LLC | 1,157 heads |
| 05/12/2026 | Signed-off | SOH PAR SPRINKLER LLC | 33 heads, 2 outlets |
| 04/13/2026 | Signed-off | ARMON MECHANICAL INC | 11,894 heads, 12 outlets |
| 07/18/2025 | Signed-off | S.B.A. PLUMBING CORP | 264 heads |
| 04/21/2022 | Signed-off | ABCO-PEERLESS SPRKLR CORP | 554 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/03/2026 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 08/04/2026 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 08/03/2026 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 07/22/2026 | Permit Issued | LAB PLBG & HTG CO INC | Water/Sanitary |
| 07/21/2026 | Permit Issued | LAB PLBG & HTG CO INC | Water/Sanitary |
| 07/13/2026 | Signed-off | MAC FELDER INC | — |
| 07/10/2026 | Signed-off | MAC FELDER INC | Water/Sanitary |
| 07/09/2026 | Signed-off | MAC FELDER INC | Water/Sanitary |
| 07/09/2026 | Permit Issued | LAB PLBG & HTG CO INC | Water/Sanitary |
| 07/09/2026 | Signed-off | MAC FELDER INC | Water/Sanitary |
| 06/24/2026 | Signed-off | GEORGE BRESLAW PLBNG LLC | Water/Sanitary |
| 04/13/2026 | Signed-off | A&A PLUMBING CORP | Water/Sanitary |
| 07/18/2025 | — | — | — |
| 08/02/2022 | Permit Issued | S.B.A. PLUMBING CORP | Water/Sanitary |
| 07/30/2020 | Signed-off | TRISTATE PLBG SVCS CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/01/2026 | Permit Issued | ADCO ELEC'L CORP | General Wiring |
| 08/19/2026 | Permit Issued | ADCO ELEC'L CORP | 1 meters |
| 04/27/2026 | Permit Issued | POWER-TECH INSTALL. ELEC' | General Wiring |
| 02/27/2026 | Complete | ADCO ELEC'L CORP | General Wiring |
| 02/23/2026 | Complete | EMPIRE STATE ELEC MAINT & | General Wiring |
| 02/05/2026 | Permit Issued | TRI-STATE ELECL WIRNG INC | General Wiring |
| 01/13/2026 | Permit Issued | COGEN ELEC'L SERVICES,INC | General Wiring |
| 12/20/2025 | Permit Issued | ADCO ELEC'L CORP | General Wiring |
| 09/26/2025 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 09/26/2025 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 09/26/2025 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 09/15/2025 | Permit Issued | ADCO ELEC'L CORP | 1 meters |
| 08/14/2025 | Complete | HUGH O'KANE ELEC. CO. INC | General Wiring |
| 08/13/2025 | Permit Issued | NEAD ELECTRIC INC. | General Wiring |
| 08/13/2025 | Permit Issued | NEAD ELECTRIC INC. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/03/2026 | Signed-off | PAR FIRE PROTECTION LLC | Steel, Concrete |
| 08/03/2026 | Permit Issued | PAR FIRE PROTECTION LLC | Steel, Concrete |
| 07/22/2026 | Signed-off | JRM CONSTRUCTION MGMT LLC | Steel, Concrete |
| 07/21/2026 | Permit Issued | NYC FIRE SPRINKLER CORP | Steel, Concrete |
| 07/13/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 2 scope_items |
| 07/10/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | Steel |
| 07/09/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | Steel, Concrete |
| 07/09/2026 | Signed-off | NYC FIRE SPRINKLER CORP | Steel |
| 07/09/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | Steel |
| 06/01/2026 | Signed-off | NUCOR CONSTRUCTION CORP | Steel, Concrete |
| 04/13/2026 | Signed-off | JAMES E FITZGERALD INC | Steel, Concrete |
| 05/08/2025 | Signed-off | STRUCTURE TONE, LLC | Steel, Concrete |
| 05/08/2025 | Signed-off | STRUCTURE TONE, LLC | Steel, Concrete |
| 07/31/2020 | Permit Issued | JAMES E FITZGERALD INC | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2025 | Permit Issued | SAFWAY ATLANTIC, LLC | Scaffold |
| 07/15/2025 | Permit Issued | SAFWAY ATLANTIC, LLC | Sidewalk Shed |
| 08/06/2024 | Permit Issued | VEMA GROUP LLC | Scaffold |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/27/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/26/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/26/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 08/24/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/20/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/17/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/17/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/05/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/05/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 07/31/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/31/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 07/31/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 07/15/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/15/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 04/24/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 04/08/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 03/31/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/31/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 03/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/09/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/23/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/11/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/03/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/08/2026 | Maintenance information | Ari Kamo | energy_progress |
| 09/08/2026 | HVAC-R and service water piping design and insulation | Ari Kamo | energy_progress |
| 09/08/2026 | HVAC-R and service water heating equipment | Ari Kamo | energy_progress |
| 09/08/2026 | Final | Ari Kamo | progress |
| 09/08/2026 | Mechanical Systems | Ari Kamo | special |
| 09/08/2026 | HVAC-R and service water heating system controls | Ari Kamo | energy_progress |
| 09/08/2026 | HVAC-R and service water heating system controls | Ari Kamo | energy_progress |
| 09/08/2026 | HVAC-R and service water piping design and insulation | Ari Kamo | energy_progress |
| 09/08/2026 | Energy Code Compliance Inspections | Ari Kamo | progress |
| 09/08/2026 | Final | Ari Kamo | progress |
| 09/08/2026 | Mechanical Systems | Ari Kamo | special |
| 09/08/2026 | Lighting controls | Ari Kamo | energy_progress |
| 09/08/2026 | Maintenance information | Ari Kamo | energy_progress |
| 09/08/2026 | HVAC-R and service water piping design and insulation | Ari Kamo | energy_progress |
| 09/08/2026 | Interior lighting power | Ari Kamo | energy_progress |
| 09/08/2026 | HVAC-R and service water heating system controls | Ari Kamo | energy_progress |
| 09/08/2026 | Mechanical Systems | Ari Kamo | special |
| 09/08/2026 | HVAC-R and service water heating equipment | Ari Kamo | energy_progress |
| 09/08/2026 | Lighting controls | Ari Kamo | energy_progress |
| 09/08/2026 | Lighting controls | Ari Kamo | energy_progress |
| 09/08/2026 | Duct leakage testing, insulation and design | Ari Kamo | energy_progress |
| 09/08/2026 | HVAC-R and service water piping design and insulation | Ari Kamo | energy_progress |
| 09/08/2026 | Final | Ari Kamo | progress |
| 09/08/2026 | Interior lighting power | Ari Kamo | energy_progress |
| 09/08/2026 | Maintenance information | Ari Kamo | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Paul, Weiss | Office | Floors 12–17, 28–43 | Project M01353683 Project M01242020 Project M01237237 Project M01246266 Project M01238674 Project M01238675 Project M01237236 Project M01238494 Project M01238508 Project M01237203 Project M01237218 Project M01237235 |
| Clearwater | Office | Floor 9 | Project M01326604 |
| Brevan Howard | Office | Floor 20 | Project M01256477 |
| Ellenoff Grossman & Schole | Office | Floor 11 | Project M01093436 |
| ICE | Office | Floors 5–8 | Project M01026466 |
| Greenspoon Marder | Office | Floor 22 | Project M00858267 |
| Global Infrastructure Management | Office | Floor 30 | Project M00716433 |
| Man Group | Office | Floor 21 | Project M00671093 Project M00671124 Project M00671132 Project M00671136 |
| PJ Solomon | Office | Floor 31 | Project M00340557 |
| Wagamama | Restaurant / Food Service | Cellar | Project M00247342 |
| Quality Bistro | Restaurant / Food Service | Floor 1 | Project M00276635 |
| Fortress | Office | Floor 23 | Project M00197734 |
| Alliance Bernstein | Office | Floors 1–5 | Project M00046108 |