| Owner | Filings | Most Recent |
|---|---|---|
| SL GREEN REALTY CORP | 1,259 | 09/18/2026 |
| RECKSON ASSOCIATES | 222 | 03/21/2026 |
| METROPOLITAN-919 3RD AVE, LLC | 14 | 03/21/2026 |
| RECKSON ASSOCIATES REALTY | 7 | 03/21/2026 |
| 1350 LLC | 6 | 03/21/2026 |
| 360 EAST 72ND STREET OWNERS | 4 | 03/21/2026 |
| SL Green | 3 | 03/21/2026 |
| FINALY GENERAL CONTRACT | 2 | 03/21/2026 |
| SEABURY | 2 | 03/21/2026 |
| EFH PROPERTIES | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ROBERT DERECTOR ASSOCIATES | 9 | 08/12/2026 |
| LPJ ARCHITECT, PC | 1 | 07/31/2026 |
| AMA CONSULTING ENGINEERS, PC | 2 | 06/16/2026 |
| MERIDIAN DESIGN ASSOCIATES | 1 | 06/05/2026 |
| HUNTSMAN ARCHITECTURAL GROUP | 3 | 05/21/2026 |
| WELLWORTH CONSULTING LLC | 1 | 05/12/2026 |
| WB ENGINEERS & CONSULTANTS PLLC | 56 | 04/20/2026 |
| LOFFREDO BROOKS ARCHITECTS P.C. | 23 | 04/20/2026 |
| DRAFT MASTER ENGINEERING PC | 1 | 03/27/2026 |
| CANY ARCHITECTURE & ENGINEERING DPC | 3 | 03/09/2026 |
| SONI ENGINEERING CONSULTING | 1 | 02/02/2026 |
| EDG | 5 | 01/08/2026 |
| SCHERER DESIGN GROUP | 1 | 11/07/2025 |
| SRA ARCHITECTURE + ENGINEERING, PC | 1 | 04/15/2025 |
| VOCON | 2 | 03/31/2025 |
| SEVERUD ASSOCIATES | 3 | 01/25/2024 |
| JACK STONE ENGINEERS, PC | 8 | 06/23/2023 |
| SMARTDESIGN ARCHITECTURE, PLLC | 2 | 02/20/2023 |
| JAMES P. STROKE, PE | 2 | 10/26/2022 |
| TOHFAZ UDDIN PE PC | 2 | 01/26/2022 |
| CORGAN | 1 | 10/25/2021 |
| GOLDMAN COPELAND ASSOCIATES | 1 | 08/09/2021 |
| HC ARCHITECT, PC | 2 | 05/27/2021 |
| DXU LLC | 1 | 04/26/2021 |
| CASE ENGINEERING, INC. | 1 | 04/22/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| RIZZO GROUP | 109 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| LMS-ACE SERVICES | 5 | 03/21/2026 |
| ORGANISATION ARCHITECTURE | 2 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 1 | 03/21/2026 |
| JP EXPEDITE | 4 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | 4 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| NUCOR CONSTRUCTION CORP | General Contractor | 23 | 07/08/2026 |
| FINALY GENL CONTR CORP | General Contractor | 15 | 07/08/2026 |
| PINE RIDGE CNSN MGMT LLC | General Contractor | 12 | 07/08/2026 |
| A&A PLUMBING CORP | Plumbing | 9 | 07/08/2026 |
| SYNERGY CONSTRUCTION INC | General Contractor | 8 | 07/08/2026 |
| CONCEPT CONSTRUCTION SERV | General Contractor | 8 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 8 | 08/13/2026 |
| PSI PARTNERS, LLC | Fire Protection | 6 | 07/08/2026 |
| REIDY CONTRACTING GROUP | General Contractor | 6 | 06/28/2026 |
| VERSATILE SERVICES LLC | General Contractor | 5 | 07/08/2026 |
| Z BARCLAY GROUP NYC CORP | General Contractor | 5 | 07/08/2026 |
| SKH MECHANICAL CORP | Fire Protection | 5 | 07/08/2026 |
| LEVINE, GEORGE | Fire Protection | 5 | 03/21/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 5 | 07/08/2026 |
| FERRAN CONTRACTING CORP | General Contractor | 5 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 4 | 08/21/2026 |
| DK CONSTRUCTION ONE, CORP | General Contractor | 4 | 07/08/2026 |
| STRUCTURE TONE, LLC | General Contractor | 4 | 07/08/2026 |
| MOSTOTECH SERVICES INC | General Contractor | 3 | 03/21/2026 |
| O'CONNOR, MOXIE | Electrical | 3 | 03/21/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 3 | 07/08/2026 |
| EAST COAST OFFICE SOLUT | General Contractor | 3 | 07/08/2026 |
| ALUMALINE INC | General Contractor | 3 | 03/21/2026 |
| DEGENNARO III, CHARLES | Electrical | 3 | 03/21/2026 |
| AIR STREAM AIR CONDITIONING | General Contractor | 3 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| PROJECT TACTICAL SOLUTION | 5859 | 4 | 08/12/2026 |
| CODEGREEN | 510 | 3 | 06/16/2026 |
| WB ENGINEERING | 533 | 56 | 04/20/2026 |
| DRAFT MASTER ENGINEERING | 701 | 1 | 03/27/2026 |
| CANY ARCHITECTURE & ENGIN | 1125 | 1 | 03/09/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 23 | 03/09/2026 |
| SONI ENGINEERING CONSULTI | 9819 | 1 | 02/02/2026 |
| EDG | 2578 | 5 | 01/08/2026 |
| SCHERER DESIGN GROUP | 7921 | 1 | 11/07/2025 |
| SRA INSPECTIONS | 3461 | 3 | 07/23/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 09/17/2026 |
| DOB NOW | Sprinklers | Permit Issued | CAPITOL FIRE SPRINKLER CO | 09/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM CONSTRUCTION MGMT LLC | 08/20/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 08/13/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | SPRING SCAFFOLDING LLC | 08/12/2026 |
| DOB NOW | Plumbing | Permit Issued | ZATOS PLBG AND HTG INC | 07/08/2026 |
| DOB NOW | Sprinklers | Permit Issued | AGGRESSIVE FIRE PROT LLC | 06/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM CONSTRUCTION MGMT LLC | 06/23/2026 |
| DOB NOW | Structural | Permit Issued | FERRAN CONTRACTING CORP | 06/12/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 06/08/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | SPRING SCAFFOLDING LLC | 05/15/2026 |
| DOB NOW | General Construction | Permit Issued | REIDY CONTRACTING GROUP | 04/28/2026 |
| DOB NOW | Antenna | Permit Issued | ODYSSIA GLOBAL COMM. CORP | 04/27/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | REIDY CONTRACTING GROUP | 04/17/2026 |
| DOB NOW | General Construction | Permit Issued | EAST COAST OFFICE SOLUT | 03/30/2026 |
| DOB NOW | General Construction | Signed-off | VERSATILE SERVICES LLC | 03/27/2026 |
| DOB NOW | General Construction | Signed-off | EAST COAST OFFICE SOLUT | 03/26/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | SKYLINE RESTORATION INC | 02/18/2026 |
| DOB NOW | Sprinklers | Permit Issued | MORA FIRE PROTECTION LLC | 01/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | MORA FIRE PROTECTION LLC | 01/06/2026 |
| DOB NOW | General Construction | Permit Issued | FINALY GENL CONTR | 01/05/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 01/05/2026 |
| DOB NOW | General Construction | Signed-off | LAKE CONTRACTING LLC | 11/06/2025 |
| DOB NOW | General Construction | Permit Issued | Z BARCLAY GROUP NYC CORP | 11/06/2025 |
| DOB NOW | General Construction | Signed-off | VERSATILE SERVICES LLC | 10/24/2025 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 09/24/2025 |
| DOB NOW | General Construction | Permit Issued | Z BARCLAY GROUP NYC CORP | 09/18/2025 |
| DOB NOW | General Construction | Permit Issued | Z BARCLAY GROUP NYC CORP | 07/14/2025 |
| DOB NOW | Structural | Permit Issued | FERRAN CONTRACTING CORP | 06/16/2025 |
| DOB NOW | General Construction | Permit Issued | REIDY CONTRACTING GROUP | 05/27/2025 |
| DOB NOW | Sprinklers | Signed-off | ABCO-PEERLESS SPRKLR CORP | 04/04/2025 |
| DOB NOW | Standpipe | Signed-off | ABCO-PEERLESS SPRKLR CORP | 04/04/2025 |
| DOB NOW | Mechanical Systems | Signed-off | NUCOR CONSTRUCTION CORP | 01/17/2025 |
| DOB NOW | General Construction | Permit Issued | NUCOR CONSTRUCTION CORP | 01/17/2025 |
| DOB NOW | General Construction | Signed-off | ALUMALINE INC | 11/13/2024 |
| DOB NOW | Structural | Signed-off | LAKE CONTRACTING LLC | 11/06/2024 |
| DOB NOW | Sprinklers | Signed-off | SKH MECHANICAL CORP | 10/23/2024 |
| DOB NOW | Sprinklers | Permit Issued | A + SPRINKLER CORP | 09/26/2024 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 07/30/2024 |
| DOB NOW | Sprinklers | Signed-off | FULL CAPACITY FIRE CORP | 07/18/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/12/2026 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Heating and Air Conditioning Systems | Heat / Cool |
| 09/06/2024 | Permit Issued | REIDY CONTRACTING GROUP | Air Conditioning Systems | Cooling Climatemaster TC-060 1,940 CFM · Wshp ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/03/2026 | Permit Issued | CAPITOL FIRE SPRINKLER CO | 127 heads |
| 06/16/2026 | Permit Issued | AGGRESSIVE FIRE PROT LLC | 7 heads |
| 05/24/2024 | Permit Issued | A + SPRINKLER CORP | 242 heads |
| 12/06/2023 | Permit Issued | PSI PARTNERS, LLC | 7 heads |
| 08/22/2022 | Permit Issued | MILLER PLUMBING & HTG INC | — |
| 09/11/2019 | Signed-off | RAEL AUTOMATIC SPR.CO INC | 204 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/03/2026 | — | — | — |
| 08/03/2026 | Permit Issued | DEPENDABLE MECH CORP | Water/Sanitary |
| 04/20/2026 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 03/27/2026 | Permit Issued | ZATOS PLBG AND HTG INC | Gas |
| 05/24/2024 | Signed-off | CONNELLY & SONS PLUMBING | Water/Sanitary |
| 12/06/2023 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 06/23/2023 | Signed-off | COASTLINE PLUMBING & HTG | Water/Sanitary |
| 02/17/2023 | Signed-off | COASTLINE PLUMBING & HTG | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/29/2026 | Permit Issued | ENNELL GRP ELECTRIC CORP | General Wiring |
| 08/05/2026 | Permit Issued | ASSOCIATED ELEC CONT OF N | General Wiring |
| 05/14/2026 | Complete | FLAG ELECTRIC INC | — |
| 05/12/2026 | Permit Issued | TOP SHELF ELECTRIC CORP | — |
| 02/02/2026 | Permit Issued | MRD ELEC'L SERVICES, INC | General Wiring |
| 09/21/2025 | Permit Issued | R.J. ELEC AND MAINTENANCE | General Wiring |
| 10/21/2024 | Complete | FLAG ELECTRIC INC | General Wiring |
| 06/24/2024 | Complete | ENNELL GRP ELECTRIC CORP | General Wiring |
| 05/17/2024 | Complete | CROSSWIRE ELECTRICAL INC | General Wiring |
| 04/22/2024 | Complete | FREEDOM ELECTRIC & DATA | General Wiring |
| 04/14/2024 | Complete | CITYWIDE ELEC'L WIRING IN | General Wiring |
| 02/19/2024 | Complete | MIKOMA ELECTRIC LLC | General Wiring |
| 03/17/2023 | Complete | MASSARO ELECTRIC CORP. | General Wiring |
| 01/16/2023 | Complete | M&T ELECTRICAL LLC | — |
| 07/22/2022 | Complete | ARBOR ELECTRIC SVCS INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/09/2026 | — | — | 2 scope_items |
| 01/08/2026 | Signed-off | LAKE CONTRACTING LLC | Concrete |
| 12/02/2025 | Permit Issued | FERRAN CONTRACTING CORP | 2 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/12/2026 | Permit Issued | SPRING SCAFFOLDING LLC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/02/2026 | Permit Issued | SKYLINE RESTORATION INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/03/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/03/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/29/2026 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 06/08/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/29/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/27/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/26/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/17/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/15/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/15/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 05/15/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/04/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/04/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/27/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/27/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/04/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/04/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/04/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 12/11/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/09/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/09/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/04/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/04/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/07/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/03/2026 | HVAC-R and service water piping design and insulation | Max Lee | energy_progress |
| 08/03/2026 | Maintenance information | Max Lee | energy_progress |
| 08/03/2026 | HVAC-R and service water heating equipment | Max Lee | energy_progress |
| 08/03/2026 | Energy Code Compliance Inspections | Max Lee | progress |
| 08/03/2026 | Lighting controls | Max Lee | energy_progress |
| 08/03/2026 | Interior lighting power | Max Lee | energy_progress |
| 08/03/2026 | HVAC-R and service water heating system controls | Max Lee | energy_progress |
| 06/26/2026 | Public Assembly Emergency Lighting | Young Suh | progress |
| 06/09/2026 | Fire-Resistant Penetrations and Joints | James Sullivan Jr | special |
| 06/03/2026 | Fire-Resistant Penetrations and Joints | Max Lee | special |
| 06/03/2026 | Sprayed fire-resistant materials | Max Lee | special |
| 06/03/2026 | Post-installed Anchors | Max Lee | special |
| 06/03/2026 | Fire-Resistant Penetrations and Joints | Max Lee | special |
| 06/01/2026 | Mechanical Systems | Max Lee | special |
| 06/01/2026 | Sprinkler Systems | Max Lee | special |
| 06/01/2026 | Final | Max Lee | progress |
| 06/01/2026 | Final | Max Lee | progress |
| 05/11/2026 | Final | James Sullivan Jr | progress |
| 05/11/2026 | Lighting controls | James Sullivan Jr | energy_progress |
| 05/11/2026 | Post-installed Anchors | James Sullivan Jr | special |
| 05/11/2026 | Mechanical Systems | James Sullivan Jr | special |
| 05/11/2026 | Duct leakage testing, insulation and design | James Sullivan Jr | energy_progress |
| 05/11/2026 | Interior lighting power | James Sullivan Jr | energy_progress |
| 04/20/2026 | HVAC-R and service water heating system controls | David Bonifacic | energy_progress |
| 04/20/2026 | Maintenance information | David Bonifacic | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| GEICO | Office | Floor 25 | Project M01409985 Project M01410000 Project M01410008 |
| Warner Bros. Discovery | Office | Floor 28 | Project M01400185 Project M01400223 Project M01400279 |
| CRHGroup Services | Office | Floor 26 | Project M01051929 |
| Just Salad | Restaurant / Food Service | Cellar, Floor 1 | Project M00894578 Project M00824007 Project M00824011 Project M00824013 Project M00824016 Project M00549518 Project M00549531 |
| Casdin Capital | Office | Floor 26 | Project M00792115 Project M00792129 |
| Dolby Digital | Office | Floor 28 | Project M00755383 |
| Raines & Feldman | Office | Floor 22 | Project M00682728 Project M00682743 Project M00682760 Project M00682776 Project M00682718 |
| TigerRisk | Office | Floor 33 | Project M00600308 |