136 EAST 64TH STREET
MANHATTAN · BIN 1042117
💬 Discuss this project
1928Year Built
11Stories
D4Building Class
C1-8XZoning
139,590 sfGross Floor Area
81Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMP
Elevator cooperative · Owner of record: 136 E 64 St · 15,850 sf lot · 8.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projects1 filing
RoofFacade restoration1p · 1 filing · 7 docs
Penthouse1p · 1 filing · 20 docs
Floor 11Unit 11A, Unit 11D3 filings · 16 docs
Floor 10
Floor 9Unit 9E, Unit 9F2p · 3 filings · 20 docs
Floor 8Unit 8D, Unit 8E, Unit 8FUnder Construction1p · 2 filings · 19 docs
Floor 7Unit 7E4p · 1 filing · 20 docs
Floor 6Unit 6A, Unit 6F2 filings · 11 docs
Floor 5Unit 5C1 filing · 7 docs
Floor 4Unit 4A, Unit 4C1p · 2 filings · 17 docs
Floor 3
Floor 2Unit 2B, Unit 2D, Unit 2F6 filings · 20 docs
Floor 1Unit 1A, Unit 1B4p · 7 filings · 20 docs
CellarBoiler replacement in partial cellarUnder Construction7p · 5 filings · 20 docs
Site & exteriorFacade restoration2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
136 East 64th Street9107/08/2026
136 E 64th ST_CORP1403/22/2026
Dubin & Co403/21/2026
136 East 6403/21/2026
136 E. 64th Tenants203/21/2026
136 64 St Owners203/21/2026
Brown Harris Stevens Residential Ma110/04/2026
Perry 136 East 64 Stereet Assco103/22/2026
Natura103/22/2026
BHS Residential MNGT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Division One ConstructionGeneral Contractor507/08/2026
Mea ConstructionGeneral Contractor407/08/2026
Comfort Tech Mechanicalspecialty_contractor407/08/2026
LemxScaffold407/08/2026
King Kong G/CGeneral Contractor307/08/2026
Structure VenturesGeneral Contractor307/08/2026
Quinn-OnelliGeneral Contractor307/08/2026
Frankie Plumbing & HeatingPlumbing307/08/2026
Mac Interior ConstructionGeneral Contractor303/21/2026
Mastro BrothersGeneral Contractor303/21/2026
Preserv BLD Restoration ManagementGeneral Contractor307/08/2026
Hod Piping & HeatingPlumbing207/08/2026
Dutchman ContractingGeneral Contractor203/21/2026
Village P & H NYPlumbing207/08/2026
Conde ElectricElectrical203/22/2026
Bell Fuel OilPlumbing210/04/2026
Hamilton Air CompanyGeneral Contractor203/21/2026
Arma ElectricElectrical203/22/2026
Palone Brothers AirGeneral Contractor203/21/2026
Stanley Ruth CoGeneral Contractor203/21/2026
Princeton InteriorsGeneral Contractor107/08/2026
Santa I ContractingGeneral Contractor107/08/2026
Accurate MechanicalPlumbing107/08/2026
Amer-A-Pipe Plumbing & HeatingPlumbing107/08/2026
Cam Energy Heating & MechanicalPlumbing107/08/2026
Five Star P and H CoPlumbing107/08/2026
Flytiger P & HPlumbing107/08/2026
Master 2 Plumbing & HeatingPlumbing107/08/2026
Otec Plumbing & Heating ServicesPlumbing107/08/2026
PP CousinPlumbing107/08/2026
Star Cities PLB & HeatingPlumbing107/08/2026
Tap PlumbingPlumbing106/28/2026
Tri City Mechanical GroupPlumbing107/08/2026
Amato VincentElectrical103/21/2026
Water Dynamic P & HPlumbing107/08/2026
Amsterdam ElectricElectrical103/22/2026
Leader Electric CoElectrical103/21/2026
Judd ElectricElectrical103/21/2026
JLC Electrical ContractingElectrical103/21/2026
Fiu Corp Dba Fiu ElectricElectrical103/22/2026
A & S ElectricElectrical103/21/2026
Jas Electrical ServicesElectrical103/21/2026
K & G Electric CoElectrical103/21/2026
Marks ElectricElectrical103/22/2026
Madison ElectricElectrical103/21/2026
J&R Rey Electric ContractingElectrical103/21/2026
Titanium ElectricalElectrical103/22/2026
United Electrical Cont'gElectrical103/22/2026
Vma ElectricalElectrical103/21/2026
Big Apple Business SolGeneral Contractor104/09/2026
Emg Industrial ChimneyGeneral Contractor107/08/2026
Garzon & Pina ConstructionGeneral Contractor107/08/2026
KBRNYGeneral Contractor104/09/2026
Panorama Windowsspecialty_contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Badaly Architect7137105/22/2026
DTLS Architecture8388105/22/2026
Aht Engineering8836401/21/2026
Konoski Engineering9111201/21/2026
Qwa Studio9293407/21/2025
Robert F. Germain Jr. PE5100206/09/2025
Steel Core Engineering PL1098105/07/2025
Ryan Special Engineering2018311/06/2023
Niza Works of Architects6101810/25/2023
GM Huang Architecture PLL1398310/06/2023
Hsu & Associates8025104/14/2023
Michael Zenreich Architects1724102/22/2023
Special Testing & Consulting1688110/28/2022
Winton Group Architecture4343103/31/2022
Chen Engineering Services1826311/08/2021
Jack Green Associates422111/02/2021
Zaskorski & Associates AR6121108/20/2021
Anz Consulting Engineering3946105/14/2021
AR-Tech Engineering6659403/03/2021
New York Engineering Associates851205/28/2020
Anthony Morali Architect4810103/20/2020
Building Lifecycle
All (300)Filed (60)Permit Issued (56)Signed Off (31)Facade (FISP) (9)Violation (19)Inspection (33)Objection (62)Special Inspection (30)
09/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/04/2026
Permit issued — Plumbing
M01222824-I1-PL
06/26/2026
Permit issued — Plumbing
M01381349-S1-PL
06/18/2026
Permit issued — General Construction
M01381349-I1-GC
05/26/2026
Signed off — Alteration
Filing herewith for replacement of AC unit in Unit 11A
M01342471-I1
05/22/2026
Filed — Alteration
PL WORK FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01381349-I1
05/22/2026
Filed — Alteration
PL WORK FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01381349-S1
05/13/2026
Permit issued — General Construction
M01162332-I1-GC
04/21/2026
Signed off — Alteration
Minor non-structural partition layout changes and selective new finishes, fixtures and equipment throughout
M01104584-I1
04/01/2026
Special inspection requirement — Final
Mark Bearak
04/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Mark Bearak
04/01/2026
Special inspection requirement — Fenestration air leakage
Mark Bearak
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mark Bearak
04/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Mark Bearak
04/01/2026
Special inspection requirement — Post-installed Anchors
SHAHIN BADALY
04/01/2026
Special inspection requirement — Fenestration areas
Mark Bearak
03/13/2026
Permit issued — Mechanical Systems
M01342471-I1-MS
02/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABRAHAM TAWIL
02/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
ABRAHAM TAWIL
01/21/2026
Filed — Alteration
Filing herewith for replacement of AC unit in Unit 11A
M01342471-I1
01/21/2026
Filed — Alteration CO
ADDITION OF SHOWER & BATHTUB IN CONJUNCTION WITH CONVERSIONOF EXISTING DOCTORS OFFICE IN UNIT #1B TO RESIDENTIALAPARTMENT AND IN CONJUNCTION WITH PLUMBING RENOVATIONSFILED SEPARATELY UNDER DOB #M01133692-S1.
M01162332-P1
01/21/2026
Special inspection requirement — Maintenance information
christopher konoski
01/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
christopher konoski
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
christopher konoski
01/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
christopher konoski
01/21/2026
Special inspection requirement — Ventilation and air distribution system
christopher konoski
01/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
christopher konoski
01/21/2026
Special inspection requirement — Energy Code Compliance Inspections
christopher konoski
01/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
ABRAHAM TAWIL
01/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABRAHAM TAWIL
01/05/2026
Special inspection requirement — Mechanical Systems
christopher konoski
01/05/2026
Special inspection requirement — Final
christopher konoski
12/02/2025
Signed off — Alteration
(1).RELOCATE THE WATER FIXTURES IN THE EXISTING KITCHEN. (2).RELOCATE WATER FIXTURES IN THE MASTER BATHROOM. (3). ADD A SHOWER TO THE BATHROOM IN THE STUDY ROOM. (4).REPLACE BATHTUB WITH SHOWER IN THE SECONDARY BATHROOM. (5).ADD A LAUNDRY MACHINE.
M01192855-I1
12/01/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/20/2025
Signed off — Alteration
(1).RELOCATE THE WATER FIXTURES IN THE EXISTING KITCHEN. (2).RELOCATE WATER FIXTURES IN THE MASTER BATHROOM. (3). ADD A SHOWER TO THE BATHROOM IN THE STUDY ROOM. (4).REPLACE BATHTUB WITH SHOWER IN THE SECONDARY BATHROOM. (5).ADD A LAUNDRY MACHINE.
M01192855-S1
11/20/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/31/2025
Permit issued — General Construction
M01162332-I1-GC
10/31/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/30/2025
Signed off — Alteration
INTERIOR RENOVATION IN AN EXISTING APARTMENT 7E. REPLACE THREE (3) WINDOWS. NO CHANGE IN USE, OCCPUANCY OR EGRESS.
M00896529-I1
09/30/2025
Signed off — Alteration
INTERIOR RENOVATION IN AN EXISTING APARTMENT 7E. REPLACE THREE (3) WINDOWS. NO CHANGE IN USE, OCCPUANCY OR EGRESS.
M00896529-S2
09/30/2025
Signed off — Alteration
INTERIOR RENOVATION IN AN EXISTING APARTMENT 7E. REPLACE THREE (3) WINDOWS. NO CHANGE IN USE, OCCPUANCY OR EGRESS.
M00896529-S3
09/02/2025
Permit issued — General Construction
M01104584-I1-GC
09/02/2025
Permit issued — General Construction
M01162332-I1-GC
08/15/2025
Special inspection requirement — Lighting in dwelling units
Kun Wu
08/15/2025
Special inspection requirement — Lighting controls
Kun Wu
08/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Kun Wu
08/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
Kun Wu
08/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kun Wu
08/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
Kun Wu
08/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Kun Wu
08/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kun Wu
08/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Kun Wu
07/28/2025
Objection resolved — Addressed
07/21/2025
Filed — Alteration
(1).RELOCATE THE WATER FIXTURES IN THE EXISTING KITCHEN. (2).RELOCATE WATER FIXTURES IN THE MASTER BATHROOM. (3). ADD A SHOWER TO THE BATHROOM IN THE STUDY ROOM. (4).REPLACE BATHTUB WITH SHOWER IN THE SECONDARY BATHROOM. (5).ADD A LAUNDRY MACHINE.
M01192855-P1
07/21/2025
Filed — Alteration
(1).RELOCATE THE WATER FIXTURES IN THE EXISTING KITCHEN. (2).RELOCATE WATER FIXTURES IN THE MASTER BATHROOM. (3). ADD A SHOWER TO THE BATHROOM IN THE STUDY ROOM. (4).REPLACE BATHTUB WITH SHOWER IN THE SECONDARY BATHROOM. (5).ADD A LAUNDRY MACHINE.
M01192855-P2
07/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kun Wu
06/20/2025
Permit issued — Plumbing
M01192855-S1-PL
06/12/2025
Permit issued — Boiler Equipment
M01222824-S1-BE
06/12/2025
Permit issued — Plumbing
M01222824-I1-PL
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBell Fuel Oil09/04/2026
DOB NOWPlumbingPermit IssuedTap Plumbing06/26/2026
DOB NOWGeneral ConstructionPermit IssuedSanta I Contracting06/18/2026
DOB NOWGeneral ConstructionPermit IssuedQuinn-Onelli05/13/2026
DOB NOWMechanical SystemsSigned-offComfort Tech Mechanical03/13/2026
DOB NOWGeneral ConstructionPermit IssuedQuinn-Onelli10/31/2025
DOB NOWGeneral ConstructionSigned-offKBRNY09/02/2025
DOB NOWGeneral ConstructionPermit IssuedQuinn-Onelli09/02/2025
DOB NOWPlumbingSigned-offFlavio Mechanical06/20/2025
DOB NOWBoiler EquipmentSigned-offApproved Oil Co of Brooklyn06/12/2025
DOB NOWPlumbingPermit IssuedBell Fuel Oil06/12/2025
DOB NOWGeneral ConstructionPermit IssuedPanorama Windows05/14/2025
DOB NOWGeneral ConstructionSigned-offBig Apple Business Sol04/29/2025
DOB NOWPlumbingSigned-offPP Cousin04/21/2025
DOB NOWPlumbingSigned-offVillage P & H NY02/20/2025
DOB NOWMechanical SystemsSigned-offComfort Tech Mechanical01/14/2025
DOB NOWGeneral ConstructionSigned-offStructure Ventures01/13/2025
DOB NOWMechanical SystemsSigned-offComfort Tech Mechanical11/06/2024
DOB NOWGeneral ConstructionSigned-offPreserv BLD Restoration Management01/16/2024
DOB NOWSuspended ScaffoldSigned-offPreserv Building Restoration01/10/2024
DOB NOWGeneral ConstructionSigned-offStructure Ventures01/03/2024
DOB NOWSidewalk ShedSigned-offLemx12/05/2023
DOB NOWGeneral ConstructionSigned-offPalone Brothers Air12/04/2023
DOB NOWPlumbingSigned-offVillage P & H NY12/04/2023
DOB NOWGeneral ConstructionSigned-offStructure Ventures08/04/2023
DOB NOWGeneral ConstructionSigned-offKing Kong G/C06/22/2023
DOB NOWPlumbingSigned-offFlytiger P & H05/05/2023
DOB NOWGeneral ConstructionSigned-offKing Kong G/C04/28/2023
DOB NOWPlumbingSigned-offOtec Plumbing & Heating Services04/24/2023
DOB NOWGeneral ConstructionSigned-offPrinceton Interiors04/17/2023
DOB NOWPlumbingSigned-offAnthony Disabato03/28/2023
DOB NOWGeneral ConstructionSigned-offMastro Brothers02/27/2023
DOB NOWGeneral ConstructionSigned-offPreserv BLD Restoration Management01/20/2023
DOB NOWSidewalk ShedSigned-offLemx12/08/2022
DOB NOWGeneral ConstructionSigned-offMea Construction07/21/2022
DOB NOWPlumbingSigned-offAmer-A-Pipe Plumbing & Heating06/23/2022
DOB NOWPlumbingSigned-offMaster 2 Plumbing & Heating05/23/2022
DOB NOWGeneral ConstructionSigned-offMea Construction05/11/2022
DOB NOWPlumbingSigned-offHod Piping & Heating12/30/2021
DOB NOWGeneral ConstructionPermit IssuedHamilton Air Company11/22/2021
+ 60 more permits on file
2 projects · most recent 01/21/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/21/2026Signed-offComfort Tech MechanicalAir Conditioning Systems
Cooling
Sigma SIG-SDSH060D 60,000 BTU · Wshp ×1
11/02/2021Permit IssuedHamilton Air CompanyAir Conditioning Systems
Cooling
Ice Air 5RSAN13A 18,700 BTU · Ptac ×2
8RSAN18 16,600 BTU · Ptac ×1
3 projects · most recent 05/22/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/22/2026Permit IssuedTap PlumbingGas, Water/Sanitary
01/21/2026——Water/Sanitary
06/09/2025Permit IssuedBell Fuel OilGas
25 projects · most recent 08/06/2026
General Wiring
FiledStatusContractorScope
08/06/2026CompleteCL Electrical—
06/24/2026Permit IssuedW 8 ElectricGeneral Wiring
04/19/2026CompleteAccurate Electrical—
03/01/2026CompleteAccurate Electrical—
09/29/2025CompleteA.L. ElectricalGeneral Wiring
09/15/2025CompleteAmsterdam ElectricGeneral Wiring
07/28/2025CompleteTitanium ElectricalGeneral Wiring
07/11/2025Permit IssuedKings Electric Co—
06/05/2025CompleteLaura Electrical Lighting—
04/14/2025CompleteArma ElectricGeneral Wiring
01/27/2025CompleteArgon Electrical—
12/13/2024CompleteGalaxy ElectricGeneral Wiring
07/01/2024CompleteFiu Corp Dba Fiu Electric—
05/31/2024CompleteLaredo Electric—
03/27/2024CompleteRobert Chimenti—
▾Field Inspections (DOB CAP) — 33
DateTypeResultReport
09/18/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/01/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/20/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/31/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/18/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/22/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/03/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
Latest 25 of 33.
▾Special Inspection Requirements (DOB NOW) — 117
DateRequirementInspectorRole
04/01/2026Fenestration and door U-factor and product ratingsMark Bearakenergy_progress
04/01/2026Fenestration areasMark Bearakenergy_progress
04/01/2026Energy Code Compliance InspectionsMark Bearakprogress
04/01/2026Fire-Resistant Penetrations and JointsMark Bearakspecial
04/01/2026Fenestration air leakageMark Bearakenergy_progress
04/01/2026FinalMark Bearakprogress
04/01/2026Post-installed AnchorsSHAHIN BADALYspecial
02/06/2026Fire-Resistance Rated ConstructionABRAHAM TAWILprogress
02/06/2026Fire-Resistant Penetrations and JointsABRAHAM TAWILspecial
01/21/2026Energy Code Compliance Inspectionschristopher konoskiprogress
01/21/2026HVAC-R and service water heating system controlschristopher konoskienergy_progress
01/21/2026HVAC-R and service water piping design and insulationchristopher konoskienergy_progress
01/21/2026Maintenance informationchristopher konoskienergy_progress
01/21/2026HVAC-R and service water heating equipmentchristopher konoskienergy_progress
01/21/2026Fire-Resistant Penetrations and Jointschristopher konoskispecial
01/21/2026Ventilation and air distribution systemchristopher konoskienergy_progress
01/14/2026Fire-Resistance Rated ConstructionABRAHAM TAWILprogress
01/14/2026Fire-Resistant Penetrations and JointsABRAHAM TAWILspecial
01/05/2026Finalchristopher konoskiprogress
01/05/2026Mechanical Systemschristopher konoskispecial
08/15/2025Fire-Resistant Penetrations and JointsKun Wuspecial
08/15/2025Tenant Protection Plan ComplianceKun Wuspecial
08/15/2025Energy Code Compliance InspectionsKun Wuprogress
08/15/2025Lighting in dwelling unitsKun Wuenergy_progress
08/15/2025Lighting controlsKun Wuenergy_progress
Latest 25 of 117.
▾Documents — 1,083 on file (BIS + DOB NOW)
▸Plans & Drawings60
▸DOB NOWPlans/Sketch46
09/04/2026M00483445-I1Request digital key ↗
09/04/2026M00483445-P1Request digital key ↗
09/03/2026M00521982-I1Request digital key ↗
Showing 3 of 46 on file for this type
▸DOB NOWPlans/Sketch - Plumbing12
09/04/2026M00347751-I1Request digital key ↗
09/04/2026M00390703-P2Request digital key ↗
09/04/2026M00390703-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00314397-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸Applications & Permits205
▸BISPLAN / WORK APPROVAL APPLICATION86
05/11/2023141023461Open ↗
03/13/2023104687581Open ↗
03/13/2023104687581Open ↗
Showing 3 of 86 on file for this type
▸BISWORK PERMIT APPLICATION61
05/12/2023141023461Open ↗
11/09/2022123843635Open ↗
05/19/2021123797445Open ↗
Showing 3 of 61 on file for this type
▸DOB NOWLPC Approval/Permit53
09/04/2026M00347751-I1Open ↗
09/03/2026M00518254-I1Open ↗
08/17/2026M01381349-S1Open ↗
Showing 3 of 53 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
10/30/2023123843635Open ↗
07/08/2021123797445Open ↗
▸Seals & Professional Certifications264
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION77
05/19/2021123797445Open ↗
06/12/2020123843118Open ↗
03/02/2020123484461Open ↗
Showing 3 of 77 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature59
09/05/2026M00306325-I1Open ↗
09/04/2026M00347751-I1Open ↗
09/04/2026M00314397-I1Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWProgress Inspector Seal & Signature55
09/23/2026M01342471-I1Open ↗
09/23/2026M01342471-I1Open ↗
09/23/2026M00555744-I1Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature41
09/23/2026M00555744-I1Open ↗
09/23/2026M00555744-I1Open ↗
09/23/2026M01342471-I1Open ↗
Showing 3 of 41 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
05/11/2023141023461Open ↗
Showing 1 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
05/11/2023141023461Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
05/11/2023141023461Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment70
▸BISSELF-CERT PLUMBING NOTICE26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE19
03/13/2023104687581Open ↗
12/06/2019123484461Open ↗
12/03/2019123484461Open ↗
Showing 3 of 19 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION2
03/02/2021123843118Open ↗
Showing 1 of 2 on file for this type
▸BISPLUMBING (PL) SIGNOFF2
04/06/2022123797445Open ↗
03/02/2021123843118Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
03/02/2021123843118Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/28/2022123545672Open ↗
▸Safety & Tenant Protection26
▸BISTenant Protection Plan and Notes11
02/05/2020123797445Open ↗
06/15/2020123843118Open ↗
Showing 2 of 11 on file for this type
▸DOB NOWTenant Protection Plan7
09/04/2026M00347751-I1Open ↗
Showing 1 of 7 on file for this type
▸BISSTREET TREE CHECKLIST5
09/26/2022123843635Open ↗
02/05/2020123797445Open ↗
12/24/2019123726245Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
05/12/2023141023461Open ↗
▸Environmental & Asbestos85
▸DOB NOWDEP ACP-5: Asbestos Assessment Report56
09/04/2026M00347751-I1Open ↗
09/04/2026M00314397-I1Open ↗
09/03/2026M00518254-I1Open ↗
Showing 3 of 56 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)22
03/13/2023104687581Open ↗
05/20/2020123910009Open ↗
04/24/2020123843118Open ↗
Showing 3 of 22 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Energy Compliance62
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS28
03/02/2020123484461Open ↗
03/02/2020123484461Open ↗
12/24/2019123726245Open ↗
Showing 3 of 28 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS13
03/02/2021123843118Open ↗
03/02/2020123484461Open ↗
Showing 2 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
03/10/2021123910009Open ↗
01/29/2021123910009Open ↗
09/24/2020123910009Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
09/03/2026M00518254-I1Open ↗
Showing 1 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE3
02/05/2020123797445Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/10/2021123910009Open ↗
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY18
05/11/2023141023461Open ↗
02/28/2023104687581Open ↗
02/28/2023104687581Open ↗
Showing 3 of 18 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
12/14/2022123545672Open ↗
04/06/2022123797445Open ↗
▸BISMECHANICAL SYSTEMS1
12/14/2022123545672Open ↗
▸Approvals, Objections & Sign-offs92
▸BISLANDMARKS APPROVAL33
05/11/2023141023461Open ↗
07/18/2020123843118Open ↗
06/29/2020123797445Open ↗
Showing 3 of 33 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST33
06/21/2024141023461Open ↗
12/15/2022123545672Open ↗
03/10/2021123910009Open ↗
Showing 3 of 33 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
09/20/2022123843635Open ↗
04/28/2022123797445Open ↗
07/08/2021123797445Open ↗
Showing 3 of 6 on file for this type
▸BISLANDMARKS SIGNOFF5
12/15/2022123545672Open ↗
06/08/2022123797445Open ↗
03/10/2021123910009Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
03/13/2020102909569Open ↗
Showing 1 of 5 on file for this type
▸BISFINAL1
12/14/2022123545672Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
04/06/2022123797445Open ↗
▸Cost, Insurance & Ownership69
▸BISCOST AFFIDAVIT65
09/26/2022123843635Open ↗
03/10/2021123910009Open ↗
03/02/2021123843118Open ↗
Showing 3 of 65 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
12/13/2024123843635Open ↗
12/14/2022123545672Open ↗
06/07/2022123797445Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms105
▸BISBOROUGH INTAKE FORM39
05/19/2021123797445Open ↗
06/12/2020123843118Open ↗
04/10/2020123910009Open ↗
Showing 3 of 39 on file for this type
▸BISADDITIONAL INFORMATION34
05/09/2022123797445Open ↗
07/12/2021123797445Open ↗
05/14/2021123797445Open ↗
Showing 3 of 34 on file for this type
▸BISEFILING COVER SHEET27
09/20/2022123843635Open ↗
05/01/2020123843118Open ↗
04/10/2020123910009Open ↗
Showing 3 of 27 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
05/11/2023141023461Open ↗
Showing 1 of 5 on file for this type
▸Other Documents20
▸DOB NOWProof of Historic Building5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
04/24/2020123843118Open ↗
04/24/2020123843118Open ↗
▸DOB NOWProperty Ownership Certification2
08/19/2026M01162332-P1Open ↗
08/19/2026M01162332-I1Open ↗
▸BISTCO - Supporting Documents1
05/09/2022123797445Open ↗
▸BISPLOT DIAGRAM1
02/05/2020123797445Open ↗
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type