| Owner | Filings | Most Recent |
|---|---|---|
| 136 Madison Ave | 404 | 03/22/2026 |
| 1140 LLC | 10 | 03/21/2026 |
| President of 136 Madison Corp Ma | 4 | 03/21/2026 |
| Plaza Madison | 4 | 03/21/2026 |
| Ben Dan Co | 3 | 03/21/2026 |
| 136 Madison Corp MNGR 136Masn | 2 | 03/21/2026 |
| Gva Williams | 2 | 03/21/2026 |
| Interpubli | 1 | 03/21/2026 |
| 136 Madison LLC by 136 Madison | 1 | 03/21/2026 |
| NYC Department of Environmental Protection | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Aza Engineering | 1 | 10/08/2026 |
| Twig Consulting Engineers | 6 | 05/15/2026 |
| Nelson Architecture & Interiors | 1 | 05/13/2026 |
| Arra Architecture | 7 | 04/27/2026 |
| Peter Pennoyer Architects | 8 | 10/17/2025 |
| Jack Green Associates | 6 | 09/24/2025 |
| Montroy Architecture | 9 | 09/23/2025 |
| Stantec | 8 | 11/14/2024 |
| Rottet Studio | 1 | 10/01/2024 |
| The Eipel Engineering Group | 1 | 12/01/2023 |
| Charles B Breen | 9 | 04/18/2023 |
| Grant | 1 | 11/18/2022 |
| Cosentini Associates | 2 | 01/27/2022 |
| Robert Derector Associates | 2 | 10/28/2019 |
| Baileys Engineering | 1 | 06/26/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| William Vitacco Associates | 38 | 03/21/2026 |
| DVA Advisors | 17 | 03/21/2026 |
| Metropolis Group | 18 | 03/21/2026 |
| Codegreen | 5 | 03/21/2026 |
| AE Design Solution | 2 | 03/21/2026 |
| EA Design Group | 4 | 03/21/2026 |
| Construction Permit Services | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Phase 3 Interiors | General Contractor | 17 | 07/08/2026 |
| Grushinsky Pipng & Heating | Fire Protection | 8 | 07/08/2026 |
| Safety Plumbing & Heating | Plumbing | 4 | 03/22/2026 |
| Optimus Construction & Development* | General Contractor | 4 | 07/08/2026 |
| G.B. & Son | Plumbing | 4 | 03/22/2026 |
| Everest Scaffolding | Scaffold | 3 | 07/08/2026 |
| AP Mechanical | specialty_contractor | 3 | 07/08/2026 |
| Iconic Builders NYC | General Contractor | 3 | 07/08/2026 |
| D.D.S. Mechanical PBG & Heating | Plumbing | 3 | 07/08/2026 |
| Nucor Construction | General Contractor | 2 | 03/21/2026 |
| Watch Hill Wireless Solu | General Contractor | 2 | 07/08/2026 |
| Amsterdam Electric | Electrical | 2 | 03/22/2026 |
| A&A Plumbing | Plumbing | 2 | 07/08/2026 |
| DDS Mechanical FPS | Fire Protection | 2 | 07/08/2026 |
| Ashlar Mechanical | Fire Protection | 1 | 07/08/2026 |
| Patriot Electric | Electrical | 1 | 03/22/2026 |
| Caruso Vincent | Electrical | 1 | 03/21/2026 |
| Jim Electric | Electrical | 1 | 03/22/2026 |
| Elizabeth A Mahoney | Electrical | 1 | 03/21/2026 |
| R.J.C. Mechanical | Plumbing | 1 | 07/08/2026 |
| R.J.C. Mechanical | Fire Protection | 1 | 07/08/2026 |
| Arch Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Aza Engineering | 7235 | 1 | 10/08/2026 |
| JS Building Consulting | 4959 | 18 | 05/15/2026 |
| Twig Special Inspections | 885 | 3 | 02/06/2026 |
| Jack Green Associates | 422 | 3 | 09/24/2025 |
| PSI Agency | 254 | 3 | 10/01/2024 |
| The Eipel Engineering Group | 2714 | 1 | 12/01/2023 |
| Charles B Breen Associate | 3812 | 9 | 04/18/2023 |
| Grant Engineering Consulting | 3512 | 1 | 11/18/2022 |
| Codegreen | 510 | 2 | 01/27/2022 |
| DNA Controlled Inspection | 554 | 2 | 10/28/2019 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | DDS Mechanical FPS | 05/21/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Optimus Construction & Development* | 05/21/2026 |
| DOB NOW | Plumbing | Permit Issued | D.D.S. Mechanical PBG & Heating | 05/21/2026 |
| DOB NOW | General Construction | Permit Issued | Optimus Construction & Development* | 05/19/2026 |
| DOB NOW | Sprinklers | Signed-off | Grushinsky Pipng & Heating | 01/08/2026 |
| DOB NOW | Sprinklers | Signed-off | DDS Mechanical FPS | 10/21/2025 |
| DOB NOW | Plumbing | Signed-off | D.D.S. Mechanical PBG & Heating | 10/21/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Optimus Construction & Development* | 10/20/2025 |
| DOB NOW | General Construction | Signed-off | Optimus Construction & Development* | 10/20/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Phase 3 Interiors | 07/28/2025 |
| DOB NOW | Sprinklers | Signed-off | Grushinsky Pipng & Heating | 07/25/2025 |
| DOB NOW | General Construction | Signed-off | Phase 3 Interiors | 07/01/2025 |
| DOB NOW | Plumbing | Signed-off | R.J.C. Mechanical | 11/25/2024 |
| DOB NOW | Sprinklers | Signed-off | R.J.C. Mechanical | 11/25/2024 |
| DOB NOW | General Construction | Signed-off | Iconic Builders NYC | 10/04/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Iconic Builders NYC | 10/04/2024 |
| DOB NOW | Sprinklers | Signed-off | Grushinsky Pipng & Heating | 09/12/2024 |
| DOB NOW | Antenna | Signed-off | Watch Hill Wireless Solu | 03/28/2024 |
| DOB NOW | Plumbing | Signed-off | A&A Plumbing | 02/01/2024 |
| DOB NOW | Structural | Signed-off | Phase 3 Interiors | 12/20/2023 |
| DOB NOW | Sprinklers | Signed-off | Grushinsky Pipng & Heating | 12/05/2023 |
| DOB NOW | Mechanical Systems | Signed-off | Phase 3 Interiors | 12/05/2023 |
| DOB NOW | General Construction | Signed-off | Phase 3 Interiors | 12/04/2023 |
| DOB NOW | Plumbing | Signed-off | A&A Plumbing | 09/12/2023 |
| DOB NOW | Sprinklers | Signed-off | Grushinsky Pipng & Heating | 09/08/2023 |
| DOB NOW | Mechanical Systems | Signed-off | Phase 3 Interiors | 09/08/2023 |
| DOB NOW | General Construction | Signed-off | Phase 3 Interiors | 09/07/2023 |
| DOB NOW | General Construction | Signed-off | Phase 3 Interiors | 06/10/2023 |
| DOB NOW | Mechanical Systems | Signed-off | AP Mechanical | 04/21/2023 |
| DOB NOW | Mechanical Systems | Signed-off | AP Mechanical | 03/30/2023 |
| DOB NOW | Antenna | Signed-off | Watch Hill Wireless Solu | 12/08/2022 |
| DOB NOW | Sprinklers | Signed-off | Grushinsky Pipng & Heating | 11/23/2022 |
| DOB NOW | Mechanical Systems | Signed-off | AP Mechanical | 08/24/2022 |
| DOB NOW | Plumbing | Signed-off | Arch Plumbing & Heating | 03/08/2022 |
| DOB NOW | Sprinklers | Signed-off | Grushinsky Pipng & Heating | 03/08/2022 |
| DOB NOW | Sprinklers | Signed-off | Grushinsky Pipng & Heating | 02/02/2022 |
| DOB NOW | General Construction | Signed-off | Phase 3 Interiors | 02/02/2022 |
| DOB NOW | Mechanical Systems | Signed-off | Phase 3 Interiors | 02/02/2022 |
| DOB NOW | General Construction | Signed-off | Phase 3 Interiors | 07/22/2021 |
| DOB NOW | Sprinklers | Signed-off | Ashlar Mechanical | 11/18/2019 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/08/2026 | — | — | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric PUHY-EM96YXU-A 8 tons · Heat Pump Outdoor ×1 |
| 05/15/2026 | Permit Issued | Optimus Construction & Development* | Heating and Air Conditioning Systems, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/15/2026 | Permit Issued | DDS Mechanical FPS | 140 heads |
| 09/24/2025 | Signed-off | DDS Mechanical FPS | 154 heads |
| 02/08/2022 | Signed-off | Grushinsky Pipng & Heating | 22 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/15/2026 | Permit Issued | D.D.S. Mechanical PBG & Heating | Water/Sanitary |
| 09/24/2025 | Signed-off | D.D.S. Mechanical PBG & Heating | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/13/2026 | Permit Issued | Borowide Elect'l Contractors | — |
| 08/28/2026 | Complete | H. & L. Electric | General Wiring |
| 06/26/2026 | Permit Issued | Lume Electric | — |
| 06/26/2026 | Complete | Lume Electric | — |
| 05/21/2026 | Permit Issued | Etricity Electrical Co | General Wiring |
| 05/01/2026 | Permit Issued | Amsterdam Electric | General Wiring |
| 05/01/2026 | Permit Issued | Amsterdam Electric | General Wiring |
| 02/04/2026 | Permit Issued | Nee Electrical | General Wiring |
| 10/20/2025 | Permit Issued | Etricity Electrical Co | — |
| 08/14/2025 | Complete | Vlashava Electric Contracting | General Wiring |
| 10/09/2024 | Complete | Conductor Electrical Services | — |
| 10/09/2024 | Complete | Conductor Electrical Services | General Wiring |
| 03/12/2024 | Complete | Amsterdam Electric | General Wiring |
| 02/08/2024 | Complete | Attractive Lighting Electrical | General Wiring |
| 06/12/2023 | Complete | Amsterdam Electric | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/21/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/17/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/02/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/16/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/14/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/08/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/08/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/06/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/06/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/06/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/05/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/26/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/11/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/08/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/02/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/30/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/17/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/12/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/12/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/30/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/30/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/08/2022 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/06/2022 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/26/2022 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/21/2022 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/24/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 09/24/2026 | Post-installed Anchors | — | special |
| 09/24/2026 | Mechanical Systems | — | special |
| 09/24/2026 | Energy Code Compliance Inspections | — | progress |
| 09/24/2026 | Final | — | progress |
| 09/24/2026 | Maintenance information | — | energy_progress |
| 09/24/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 09/24/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 05/15/2026 | Post-installed Anchors | Julian Saavedra | special |
| 04/21/2026 | Maintenance information | Julian Saavedra | energy_progress |
| 04/21/2026 | Fire-Resistant Penetrations and Joints | Julian Saavedra | special |
| 04/21/2026 | HVAC-R and service water heating equipment | Julian Saavedra | energy_progress |
| 04/21/2026 | HVAC-R and service water heating system controls | Julian Saavedra | energy_progress |
| 04/21/2026 | HVAC-R and service water piping design and insulation | Julian Saavedra | energy_progress |
| 02/06/2026 | Mechanical Systems | Dave Wall | special |
| 02/06/2026 | HVAC-R and service water heating equipment | Dave Wall | energy_progress |
| 02/06/2026 | Duct leakage testing, insulation and design | Dave Wall | energy_progress |
| 02/06/2026 | HVAC-R and service water piping design and insulation | Dave Wall | energy_progress |
| 02/06/2026 | Interior lighting power | Dave Wall | energy_progress |
| 02/06/2026 | Maintenance information | Dave Wall | energy_progress |
| 02/06/2026 | HVAC-R and service water heating system controls | Dave Wall | energy_progress |
| 02/06/2026 | Final | Dave Wall | progress |
| 02/06/2026 | Post-installed Anchors | Dave Wall | special |
| 02/06/2026 | Fire-Resistant Penetrations and Joints | Dave Wall | special |
| 09/15/2025 | Fire-Resistance Rated Construction | Julian Saavedra | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Target | Retail | Floor 15 | Project M01239154 |
| Bernhardt | Retail | Floor 3 | Project M01103206 Project M01099686 Project M01065750 Project M01103204 |
| Colliers Internationals | Office | Floors 7, 8, 10 | Project M00858959 |
| The Hive TV | Office | Floor 4 | Project M00663153 Project M00663189 Project M00663227 |
| Specialty Food Association | Office | Floor 12 | Project M00236570 Project M00236579 |