| Owner | Filings | Most Recent |
|---|---|---|
| 92ND STREET Y | 270 | 09/13/2026 |
| RICHTER & RATNER CONTRACT | 3 | 03/22/2026 |
| 92ND STREET YM YWHA | 51 | 03/22/2026 |
| YOUNG MENS WOMENS HEBREW ASSOC | 8 | 03/22/2026 |
| 92 ST Y M YWHA | 2 | 03/22/2026 |
| 92 YM YWHA | 1 | 03/22/2026 |
| 92 Y W YMHA | 1 | 03/22/2026 |
| COLGATE ENTERPRISE | 6 | 03/21/2026 |
| YM YW HEBREW ASSOC DBA 92ND ST Y | 7 | 03/21/2026 |
| PHOENIX | 3 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| CANY ARCHITECTURE & ENGINEERING DPC | 4 | 07/02/2026 |
| BEYER BLINDER BELLE | 45 | 04/22/2026 |
| KOHLER RONAN, LLC | 64 | 04/01/2026 |
| ASHRAF CORP | 6 | 10/27/2025 |
| SILMAN | 12 | 10/10/2025 |
| ALWAYS FAST SERVICES CORP | 1 | 09/27/2025 |
| ALTIERI | 2 | 07/17/2025 |
| MSM ENGINEERING SERVICES, PLLC | 5 | 04/16/2025 |
| ROSA CONSULTING ENGINEERS, D.P.C. | 1 | 01/29/2025 |
| NEW YORK ENGINEERING ASSOC., P.C. | 1 | 12/04/2024 |
| EN-POWER GROUP | 2 | 10/24/2024 |
| ROBERT SILMAN ASSOC STRUCT ENG DPC | 7 | 12/14/2023 |
| NEW YORK ENGINEERS LLC | 3 | 12/22/2022 |
| MPS ENGINEERING PLLC | 1 | 12/13/2022 |
| JOSEPH PELL LOMBARDI, ARCHITECT | 2 | 05/11/2022 |
| SYSKA HENNESSY GROUP | 2 | 08/10/2020 |
| PLAN B ENGINEERING | 3 | 02/13/2020 |
| THORNTON TOMASETTI | 2 | 02/12/2020 |
| A-SQUARED | 2 | 09/20/2019 |
| KZ ENGINEERING, P.C | 1 | 10/25/2017 |
| Representative | Filings | Most Recent |
|---|---|---|
| JAM CONSULTANTS, INC. | 260 | 03/21/2026 |
| RPO | 2 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 6 | 03/21/2026 |
| J A EXPEDITING | 4 | 03/21/2026 |
| NEW YORK ENGINEERING ASSOCIATES P | 2 | 03/21/2026 |
| METROPOLIS GROUP INC | 3 | 03/21/2026 |
| RIZZO GROUP | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| RICHTER & RATNER CONTRACTING | General Contractor | 52 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 14 | 07/08/2026 |
| GROUP S LLC | General Contractor | 6 | 03/21/2026 |
| TITAN CONSTRUCTION SERVIC | General Contractor | 5 | 04/09/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 5 | 07/08/2026 |
| UNIVERSAL PLUMBING INC | Plumbing | 5 | 07/23/2026 |
| CAPITOL FIRE SPRINKLER CO | Fire Protection | 5 | 07/08/2026 |
| COLGATE ENTERPRISE CORP | General Contractor | 4 | 07/08/2026 |
| TRI-STATE DISMANTLING CORP | General Contractor | 3 | 04/09/2026 |
| A + SPRINKLER CORP | Fire Protection | 3 | 07/08/2026 |
| DARBY CONSTRUCTION SVC LL | General Contractor | 3 | 07/14/2026 |
| ALMAR PLUMBING & HTG CORP | Plumbing | 2 | 07/08/2026 |
| ALBA SERVICES INC | General Contractor | 2 | 07/08/2026 |
| A PLUS PLUMBING CORP | Plumbing | 2 | 07/08/2026 |
| LIT GROUP, INC | General Contractor | 2 | 03/21/2026 |
| G.BASSOLINO PLUMBING LTD | Plumbing | 2 | 07/08/2026 |
| GEORGE BASSOLINO | Plumbing | 2 | 03/21/2026 |
| E.W. HOWELL CO, LLC | General Contractor | 2 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 2 | 07/08/2026 |
| ALLIANCE PLUMBING CORP | Plumbing | 2 | 07/08/2026 |
| CEPRINE CONSTRUCTION INC | General Contractor | 1 | 07/08/2026 |
| BIRNBAUM, ALAN | Electrical | 1 | 03/21/2026 |
| BOROWIDE ELECT'L CONTR'S | Electrical | 1 | 03/22/2026 |
| FISHER, MARLANDO | Electrical | 1 | 03/21/2026 |
| J & S PLBG & HTG CORP | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ATLAS ATC ENGINEERING INC | 8011 | 73 | 07/02/2026 |
| DELTA TESTING LABS | 687 | 21 | 04/01/2026 |
| KZ ENGINEERING, P.C. | 4665 | 2 | 03/13/2025 |
| CANY ARCHITECTURE & ENGIN | 1125 | 1 | 02/28/2025 |
| NEW YORK ENGINEERING ASSO | 851 | 1 | 12/04/2024 |
| GROUP-S LLC | 5216 | 2 | 10/24/2024 |
| ENGINEERING CONSULTING SE | 2050 | 3 | 12/22/2022 |
| M/P/S ENGINEERING PLLC | 1588 | 1 | 12/13/2022 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 3 | 04/22/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | UNIVERSAL PLUMBING INC | 07/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | SHAMROCK MECHANICAL INC | 07/16/2026 |
| DOB NOW | General Construction | Permit Issued | DARBY CONSTRUCTION SVC LL | 07/13/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | DARBY CONSTRUCTION SVC LL | 07/10/2026 |
| DOB NOW | Standpipe | Permit Issued | CAPITOL FIRE SPRINKLER CO | 05/19/2026 |
| DOB NOW | Boiler Equipment | Signed-off | AMERICAN BOILER & WELDING | 05/04/2026 |
| DOB NOW | General Construction | Signed-off | DARBY CONSTRUCTION SVC LL | 04/17/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | ANDAMIO SCAFFOLDING LLC | 03/24/2026 |
| DOB NOW | Structural | Signed-off | TITAN CONSTRUCTION SERVIC | 02/26/2026 |
| DOB NOW | Plumbing | Signed-off | ALMAR PLUMBING & HTG CORP | 02/04/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | TRI-STATE DISMANTLING COR | 01/16/2026 |
| DOB NOW | Plumbing | Signed-off | UNIVERSAL PLUMBING INC | 01/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | CAPITOL FIRE SPRINKLER CO | 01/06/2026 |
| DOB NOW | Structural | Signed-off | RICHTER & RATNER CONTRACTING | 01/05/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | RICHTER & RATNER CONTRACTING | 01/05/2026 |
| DOB NOW | General Construction | Permit Issued | RICHTER & RATNER CONTRACTING | 01/05/2026 |
| DOB NOW | General Construction | Permit Issued | GROUP S LLC | 12/22/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 12/16/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 12/16/2025 |
| DOB NOW | Plumbing | Signed-off | ALMAR PLUMBING & HTG CORP | 10/21/2025 |
| DOB NOW | Supported Scaffold | Signed-off | ANDAMIO SCAFFOLDING LLC | 09/29/2025 |
| DOB NOW | General Construction | Signed-off | RICHTER & RATNER CONTRACTING | 09/25/2025 |
| DOB NOW | Plumbing | Signed-off | G.BASSOLINO PLUMBING LTD | 09/16/2025 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 09/08/2025 |
| DOB NOW | General Construction | Signed-off | RICHTER & RATNER CONTRACTING | 08/26/2025 |
| DOB NOW | Mechanical Systems | Signed-off | RICHTER & RATNER CONTRACTING | 08/26/2025 |
| DOB NOW | Structural | Signed-off | RICHTER & RATNER CONTRACTING | 08/26/2025 |
| DOB NOW | Plumbing | Signed-off | UNIVERSAL PLUMBING INC | 07/29/2025 |
| DOB NOW | General Construction | Signed-off | RICHTER & RATNER CONTRACTING | 05/28/2025 |
| DOB NOW | Mechanical Systems | Signed-off | RICHTER & RATNER CONTRACTING | 05/28/2025 |
| DOB NOW | Structural | Signed-off | RICHTER & RATNER CONTRACTING | 05/28/2025 |
| DOB NOW | Structural | Permit Issued | RICHTER & RATNER CONTRACTING | 05/22/2025 |
| DOB NOW | General Construction | Signed-off | RICHTER & RATNER CONTRACTING | 05/22/2025 |
| DOB NOW | Foundation | Signed-off | RICHTER & RATNER CONTRACTING | 05/22/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | ANDAMIO SCAFFOLDING LLC | 03/31/2025 |
| DOB NOW | General Construction | Signed-off | TITAN CONSTRUCTION SERVIC | 03/21/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | TITAN CONST SERVICES LLC | 03/14/2025 |
| DOB NOW | Supported Scaffold | Signed-off | ANDAMIO SCAFFOLDING LLC | 03/11/2025 |
| DOB NOW | Boiler Equipment | Signed-off | JACK PICCINI, INC | 02/07/2025 |
| DOB NOW | Plumbing | Signed-off | CARDOZA PLUMBING WMBE | 02/04/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/22/2026 | Permit Issued | RICHTER & RATNER CONTRACT | Heating and Air Conditioning Systems | Heat / Cool Daikin OAH017GDDM 8,000 CFM · Ahu ×2 |
| 03/16/2026 | Permit Issued | DARBY CONSTRUCTION SVC LL | Heating and Air Conditioning Systems | Heat / Cool Modine HER 50 380 CFM · Electric Heater ×1 |
| 02/08/2026 | Signed-off | RICHTER & RATNER CONTRACT | Others | Other Little Giant VCMX-20ULS-C SERVING COOLING COIL CONDENSATE. 1 BTU · Pump ×1 |
| 07/31/2025 | Permit Issued | RICHTER & RATNER CONTRACT | Air Conditioning Systems, Heating and Air Conditioning Systems | Heat / Cool Tmi Climate Solutions AHU-M-I-3M-IF-T-KD 334,000 BTU · Doas ×1 Tmi M240033-02 334,000 BTU · Doas ×1 Cooling Mitsubishi Electric PUZ-A36NKA7 36,000 BTU · Split System ×1 MXZ-SM48NAM2 36,000 BTU · Split System ×1 |
| 02/27/2025 | Signed-off | RICHTER & RATNER CONTRACT | Others | Other Trane UCCA06 171,380 BTU · Ahu ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/01/2026 | Permit Issued | CAPITOL FIRE SPRINKLER CO | Sprinkler System |
| 07/31/2025 | Signed-off | CAPITOL FIRE SPRINKLER CO | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/22/2026 | Signed-off | A PLUS PLUMBING CORP | Water/Sanitary |
| 04/01/2026 | Signed-off | UNIVERSAL PLUMBING INC | Storm, Water/Sanitary |
| 03/16/2026 | Permit Issued | UNIVERSAL PLUMBING INC | Water/Sanitary |
| 02/08/2026 | Signed-off | ALMAR PLUMBING & HTG CORP | Gas, Water/Sanitary |
| 07/31/2025 | Signed-off | UNIVERSAL PLUMBING INC | Water/Sanitary |
| 10/24/2024 | Signed-off | G.BASSOLINO PLUMBING LTD | Water/Sanitary |
| 12/22/2022 | Signed-off | ACCURATE MECHANICAL INC | Gas |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/28/2026 | Complete | TRANSFORM ELECTL CONTRS I | General Wiring |
| 07/15/2026 | Permit Issued | ALBA ELECTRIC CORP | General Wiring |
| 01/14/2026 | Permit Issued | DENALI ELECTRIC CORP | — |
| 01/06/2026 | Permit Issued | LMEC ELECTRIC INC | General Wiring, Lighting |
| 06/11/2025 | Permit Issued | LMEC ELECTRIC INC | General Wiring |
| 06/10/2025 | Permit Issued | LMEC ELECTRIC INC | General Wiring, Lighting |
| 02/25/2025 | Permit Issued | LMEC ELECTRIC INC | — |
| 01/30/2025 | Complete | TRANSFORM ELECTL CONTRS I | — |
| 01/26/2025 | Permit Issued | DENALI ELECTRIC CORP | — |
| 01/03/2025 | Permit Issued | BOROWIDE ELECT'L CONTR'S | — |
| 12/31/2024 | Permit Issued | RONAN ELECTRICAL LLC | — |
| 02/29/2024 | Complete | V ELECTRIC NY INC | General Wiring |
| 08/28/2023 | Complete | HIGH LEG 208 VOLTS ELECL | General Wiring |
| 08/02/2023 | Permit Issued | ROBERT B SAMUELS, INC | General Wiring |
| 07/05/2023 | Complete | BOROWIDE ELECT'L CONTR'S | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/22/2026 | Permit Issued | RICHTER & RATNER CONTRACT | Steel, Concrete |
| 07/31/2025 | Signed-off | UNIVERSAL PLUMBING INC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/13/2025 | Permit Issued | TITAN CONST SERVICES LLC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/31/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/29/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/17/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/22/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/13/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/01/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/03/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/16/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/16/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/17/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/03/2025 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 11/21/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 11/21/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/06/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/22/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/16/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/16/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/02/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/02/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/29/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/18/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 08/13/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/13/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/03/2026 | Fire-Resistant Penetrations and Joints | GIORGI KHARDZEISHVILI | special |
| 06/03/2026 | Sprayed fire-resistant materials | GIORGI KHARDZEISHVILI | special |
| 06/03/2026 | Luminous Exit Path Markings | GIORGI KHARDZEISHVILI | special |
| 06/03/2026 | Maintenance information | GIORGI KHARDZEISHVILI | energy_progress |
| 06/03/2026 | Interior lighting power | GIORGI KHARDZEISHVILI | energy_progress |
| 06/03/2026 | Mastic and Intumescent Fire-resistant Coatings | GIORGI KHARDZEISHVILI | special |
| 06/03/2026 | Electrical motors and elevators | GIORGI KHARDZEISHVILI | energy_progress |
| 06/03/2026 | Metering | GIORGI KHARDZEISHVILI | energy_progress |
| 06/03/2026 | Lighting controls | GIORGI KHARDZEISHVILI | energy_progress |
| 06/03/2026 | Fire-Resistance Rated Construction | GIORGI KHARDZEISHVILI | progress |
| 04/17/2026 | Lighting controls | GIORGI KHARDZEISHVILI | energy_progress |
| 04/17/2026 | Fire-Resistance Rated Construction | GIORGI KHARDZEISHVILI | progress |
| 04/17/2026 | Fire-Resistant Penetrations and Joints | GIORGI KHARDZEISHVILI | special |
| 04/17/2026 | Sprayed fire-resistant materials | GIORGI KHARDZEISHVILI | special |
| 04/17/2026 | Maintenance information | GIORGI KHARDZEISHVILI | energy_progress |
| 04/17/2026 | Interior lighting power | GIORGI KHARDZEISHVILI | energy_progress |
| 04/17/2026 | Electrical motors and elevators | GIORGI KHARDZEISHVILI | energy_progress |
| 04/17/2026 | Luminous Exit Path Markings | GIORGI KHARDZEISHVILI | special |
| 04/17/2026 | Metering | GIORGI KHARDZEISHVILI | energy_progress |
| 04/17/2026 | Mastic and Intumescent Fire-resistant Coatings | GIORGI KHARDZEISHVILI | special |
| 04/08/2026 | Fenestration and door U-factor and product ratings | Ivan Zurkiwskyj | energy_progress |
| 04/08/2026 | Post-installed Anchors | GIORGI KHARDZEISHVILI | special |
| 04/08/2026 | Tenant Protection Plan Compliance | — | special |
| 04/08/2026 | Final | Ivan Zurkiwskyj | progress |
| 04/01/2026 | Tenant Protection Plan Compliance | RICHARD GREENWALD | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| 92NY | Office | Cellar, Sub-basement, Basement, Ground, Floors 1–11, Penthouse, Roof | Project M01353416 Project M01326431 Project M01235976 Project M01235968 Project M01299506 Project M01130126 Project M01130120 Project M01080724 Project M01080701 Project M01077016 Project M08021358 |
| 92nd Street Y | Office | Cellar, Basement, Floors 1–4, 9, 10, Mezzanine, Roof | Project M01098223 Project M00945612 Project M00850949 Project M08013745 Project M00786717 Project M00786729 Project M00786737 Project M00793384 Project M00786683 Project M00762488 Project M00762491 Project M00781274 |
| 92Y YM & YWHA | Other | Basement, Floor 1, Mezzanine | Project M00230520 |