| Owner | Filings | Most Recent |
|---|---|---|
| 92nd St | 276 | 10/14/2026 |
| 92nd St YM/Ywha | 51 | 03/21/2026 |
| YM & Ywhebrew Associates Dba 92nd St Y | 7 | 03/21/2026 |
| Phoenix | 3 | 03/21/2026 |
| 92 Y | 3 | 03/21/2026 |
| Ymwha | 2 | 03/21/2026 |
| 150 E 93 Corp | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Kohler Ronan | 67 | 10/02/2026 |
| Cany Architecture & Engineering | 4 | 07/02/2026 |
| Beyer Blinder Belle | 45 | 04/22/2026 |
| Ashraf | 6 | 10/27/2025 |
| Silman | 12 | 10/10/2025 |
| Always Fast Services | 1 | 09/27/2025 |
| Altieri | 2 | 07/17/2025 |
| MSM Engineering Services | 5 | 04/16/2025 |
| Rosa Consulting Engineers | 1 | 01/29/2025 |
| New York & Company | 4 | 12/04/2024 |
| EN-Power Group | 2 | 10/24/2024 |
| Robert Silman Associates Structural Engineering | 7 | 12/14/2023 |
| MPS Engineering | 1 | 12/13/2022 |
| Joseph Pell Lombardi, Architect | 2 | 05/11/2022 |
| Syska Hennessy Group | 2 | 08/10/2020 |
| Plan B Engineering | 3 | 02/13/2020 |
| Thornton Tomasetti | 2 | 02/12/2020 |
| A-Squared | 2 | 09/20/2019 |
| KZ Engineering | 1 | 10/25/2017 |
| Representative | Filings | Most Recent |
|---|---|---|
| J.A.M. Associates | 260 | 03/21/2026 |
| RPO | 2 | 03/21/2026 |
| Synergy Building Consultants | 6 | 03/21/2026 |
| J A Expediting | 4 | 03/21/2026 |
| New York & Company | 2 | 03/21/2026 |
| Arra Architecture | 1 | 03/21/2026 |
| Rizzo Group | 4 | 03/21/2026 |
| Metropolis Group | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Richter & Ratner Contracting | General Contractor | 52 | 07/08/2026 |
| Andamio Scaffolding | Scaffold | 14 | 07/08/2026 |
| Group S | General Contractor | 6 | 03/21/2026 |
| Universal Plumbing | Plumbing | 5 | 07/23/2026 |
| JRM Construction Management | General Contractor | 5 | 07/08/2026 |
| Titan Construction Services | General Contractor | 5 | 04/09/2026 |
| Capitol Fire Sprinkler Co | Fire Protection | 5 | 07/08/2026 |
| Colgate Enterprise | Scaffold | 4 | 07/08/2026 |
| Tri-State Dismantling | Scaffold | 3 | 04/09/2026 |
| Darby Construction Service | General Contractor | 3 | 07/14/2026 |
| A + Sprinkler | Fire Protection | 3 | 07/08/2026 |
| A Plus Plumbing | Plumbing | 2 | 07/08/2026 |
| E.W. Howell Co | General Contractor | 2 | 07/08/2026 |
| Lit Group | General Contractor | 2 | 03/21/2026 |
| G.bassolino Plumbing | Plumbing | 2 | 07/08/2026 |
| Sirina Fire Protection | Fire Protection | 2 | 07/08/2026 |
| Alba Services | General Contractor | 2 | 07/08/2026 |
| Alliance Plumbing | Plumbing | 2 | 07/08/2026 |
| Almar Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| George Bassolino | Plumbing | 2 | 03/21/2026 |
| Linphill Electrical Contracting | Electrical | 1 | 03/21/2026 |
| Ronan Electrical | Electrical | 1 | 03/22/2026 |
| Bronxdale Electric | Electrical | 1 | 03/21/2026 |
| Avron | General Contractor | 1 | 07/08/2026 |
| Denali Electric | Electrical | 1 | 03/21/2026 |
| Shamrock Mechanical | Fire Protection | 1 | 07/17/2026 |
| Borowide Elect'l Contractors | Electrical | 1 | 03/22/2026 |
| Judd Electric | Electrical | 1 | 03/21/2026 |
| Ceprine Construction | Scaffold | 1 | 07/08/2026 |
| Accurate Mechanical | Plumbing | 1 | 07/08/2026 |
| Accurate Mechanical | Fire Protection | 1 | 07/08/2026 |
| A & M Warshaw Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| M F Electrical Service Co | Electrical | 1 | 03/21/2026 |
| Donato Plumbing | Plumbing | 1 | 07/08/2026 |
| KG Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Delta Testing Labs | 687 | 22 | 10/02/2026 |
| Atlas ATC Engineering | 8011 | 73 | 07/02/2026 |
| KZ Engineering | 4665 | 2 | 03/13/2025 |
| Cany Architecture & Engineering | 1125 | 1 | 02/28/2025 |
| New York Engineering Associates | 851 | 1 | 12/04/2024 |
| Group-S | 5216 | 2 | 10/24/2024 |
| Engineering Consulting SE | 2050 | 3 | 12/22/2022 |
| M/P/S Engineering | 1588 | 1 | 12/13/2022 |
| Atlantic Engineeringlabor | 1381 | 3 | 04/22/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Signed-off | Richter & Ratner Contracting | 09/04/2026 |
| DOB NOW | Plumbing | Permit Issued | Universal Plumbing | 07/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | Shamrock Mechanical | 07/16/2026 |
| DOB NOW | General Construction | Permit Issued | Darby Construction Service | 07/13/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Darby Construction Service | 07/10/2026 |
| DOB NOW | Standpipe | Permit Issued | Capitol Fire Sprinkler Co | 05/19/2026 |
| DOB NOW | Boiler Equipment | Signed-off | American Boiler & Welding | 05/04/2026 |
| DOB NOW | General Construction | Signed-off | Darby Construction Service | 04/17/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Andamio Scaffolding | 03/24/2026 |
| DOB NOW | Structural | Signed-off | Titan Construction Services | 02/26/2026 |
| DOB NOW | Plumbing | Signed-off | Almar Plumbing & Heating | 02/04/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Tri-State Dismantling | 01/16/2026 |
| DOB NOW | Plumbing | Signed-off | Universal Plumbing | 01/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | Capitol Fire Sprinkler Co | 01/06/2026 |
| DOB NOW | Structural | Signed-off | Richter & Ratner Contracting | 01/05/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Richter & Ratner Contracting | 01/05/2026 |
| DOB NOW | General Construction | Signed-off | Richter & Ratner Contracting | 01/05/2026 |
| DOB NOW | General Construction | Permit Issued | Group S | 12/22/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | Andamio Scaffolding | 12/16/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | Andamio Scaffolding | 12/16/2025 |
| DOB NOW | Plumbing | Signed-off | Almar Plumbing & Heating | 10/21/2025 |
| DOB NOW | Supported Scaffold | Signed-off | Andamio Scaffolding | 09/29/2025 |
| DOB NOW | General Construction | Signed-off | Richter & Ratner Contracting | 09/25/2025 |
| DOB NOW | Plumbing | Signed-off | G.bassolino Plumbing | 09/16/2025 |
| DOB NOW | Sprinklers | Permit Issued | Sirina Fire Protection | 09/08/2025 |
| DOB NOW | General Construction | Signed-off | Richter & Ratner Contracting | 08/26/2025 |
| DOB NOW | Structural | Signed-off | Richter & Ratner Contracting | 08/26/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Richter & Ratner Contracting | 08/26/2025 |
| DOB NOW | Plumbing | Signed-off | Universal Plumbing | 07/29/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Richter & Ratner Contracting | 05/28/2025 |
| DOB NOW | Structural | Signed-off | Richter & Ratner Contracting | 05/28/2025 |
| DOB NOW | General Construction | Signed-off | Richter & Ratner Contracting | 05/28/2025 |
| DOB NOW | General Construction | Signed-off | Richter & Ratner Contracting | 05/22/2025 |
| DOB NOW | Structural | Signed-off | Richter & Ratner Contracting | 05/22/2025 |
| DOB NOW | Foundation | Signed-off | Richter & Ratner Contracting | 05/22/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Andamio Scaffolding | 03/31/2025 |
| DOB NOW | General Construction | Signed-off | Titan Construction Services | 03/21/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | Titan Construction Services | 03/14/2025 |
| DOB NOW | Supported Scaffold | Signed-off | Andamio Scaffolding | 03/11/2025 |
| DOB NOW | Boiler Equipment | Signed-off | Jack Piccini | 02/07/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/02/2026 | Permit Issued | Darby Construction Service | Heating and Air Conditioning Systems | Heat / Cool Modine HER 50 380 CFM · Electric Heater ×2 |
| 04/22/2026 | Permit Issued | Richter & Ratner Contracting | Heating and Air Conditioning Systems | Heat / Cool Daikin OAH017GDDM 8,000 CFM · Ahu ×2 |
| 02/08/2026 | Signed-off | Richter & Ratner Contracting | Others | Other Little Giant VCMX-20ULS-C SERVING COOLING COIL CONDENSATE. 1 BTU · Pump ×1 |
| 07/31/2025 | Signed-off | Richter & Ratner Contracting | Air Conditioning Systems, Heating and Air Conditioning Systems | Heat / Cool Tmi Climate Solutions AHU-M-I-3M-IF-T-KD 334,000 BTU · Doas ×1 Tmi M240033-02 334,000 BTU · Doas ×1 Cooling Mitsubishi Electric PUZ-A36NKA7 36,000 BTU · Split System ×1 MXZ-SM48NAM2 36,000 BTU · Split System ×1 |
| 02/27/2025 | Signed-off | Richter & Ratner Contracting | Others | Other Trane UCCA06 171,380 BTU · Ahu ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/02/2026 | Permit Issued | Shamrock Mechanical | Sprinkler System |
| 04/01/2026 | Permit Issued | Capitol Fire Sprinkler Co | Sprinkler System |
| 07/31/2025 | Signed-off | Capitol Fire Sprinkler Co | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/02/2026 | Permit Issued | Universal Plumbing | Water/Sanitary |
| 04/22/2026 | Signed-off | A Plus Plumbing | Water/Sanitary |
| 04/01/2026 | Signed-off | Universal Plumbing | Storm, Water/Sanitary |
| 02/08/2026 | Signed-off | Almar Plumbing & Heating | Gas, Water/Sanitary |
| 07/31/2025 | Signed-off | Universal Plumbing | Water/Sanitary |
| 10/24/2024 | Signed-off | G.bassolino Plumbing | Water/Sanitary |
| 12/22/2022 | Signed-off | Accurate Mechanical | Gas |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/14/2026 | Permit Issued | Ronan Electrical | General Wiring |
| 07/28/2026 | Complete | Transform Electl Contractors I | General Wiring |
| 07/15/2026 | Permit Issued | Alba Electric | General Wiring |
| 01/14/2026 | Permit Issued | Denali Electric | — |
| 01/06/2026 | Permit Issued | Lmec Electric | General Wiring, Lighting |
| 06/11/2025 | Permit Issued | Lmec Electric | General Wiring |
| 06/10/2025 | Permit Issued | Lmec Electric | General Wiring, Lighting |
| 02/25/2025 | Permit Issued | Lmec Electric | — |
| 01/30/2025 | Complete | Transform Electl Contractors I | — |
| 01/26/2025 | Permit Issued | Denali Electric | — |
| 01/03/2025 | Complete | Borowide Elect'l Contractors | — |
| 12/31/2024 | Permit Issued | Ronan Electrical | — |
| 02/29/2024 | Complete | V Electric NY | General Wiring |
| 08/28/2023 | Complete | High Leg 208 Volts Electrical | General Wiring |
| 08/02/2023 | Permit Issued | Robert B Samuels | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/22/2026 | Permit Issued | Richter & Ratner Contracting | Steel, Concrete |
| 07/31/2025 | Signed-off | Universal Plumbing | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/13/2025 | Permit Issued | Titan Construction Services | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/31/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/29/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/22/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/15/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/13/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/01/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/16/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/16/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/21/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 11/21/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/22/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/16/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/16/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/02/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/02/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/29/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/18/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 08/13/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/13/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/13/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/13/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 08/11/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/07/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/31/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/31/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 10/02/2026 | Tenant Protection Plan Compliance | — | special |
| 10/02/2026 | Post-installed Anchors | RICHARD GREENWALD | special |
| 10/02/2026 | HVAC-R and service water piping design and insulation | RICHARD GREENWALD | energy_progress |
| 10/02/2026 | Maintenance information | RICHARD GREENWALD | energy_progress |
| 10/02/2026 | Shutoff dampers | RICHARD GREENWALD | energy_progress |
| 10/02/2026 | HVAC-R and service water heating equipment | RICHARD GREENWALD | energy_progress |
| 10/02/2026 | Fire-Resistance Rated Construction | RICHARD GREENWALD | progress |
| 10/02/2026 | Sprinkler Systems | RICHARD GREENWALD | special |
| 10/02/2026 | Final | RICHARD GREENWALD | progress |
| 10/02/2026 | Fire-Resistant Penetrations and Joints | RICHARD GREENWALD | special |
| 10/02/2026 | Mechanical Systems | RICHARD GREENWALD | special |
| 10/02/2026 | Tenant Protection Plan Compliance | — | special |
| 10/02/2026 | Duct leakage testing, insulation and design | RICHARD GREENWALD | energy_progress |
| 10/02/2026 | Tenant Protection Plan Compliance | — | special |
| 10/02/2026 | Post-installed Anchors | RICHARD GREENWALD | special |
| 10/02/2026 | Fire-Resistant Penetrations and Joints | RICHARD GREENWALD | special |
| 10/02/2026 | HVAC-R and service water heating system controls | RICHARD GREENWALD | energy_progress |
| 06/03/2026 | Fire-Resistant Penetrations and Joints | GIORGI KHARDZEISHVILI | special |
| 06/03/2026 | Electrical motors and elevators | GIORGI KHARDZEISHVILI | energy_progress |
| 06/03/2026 | Sprayed fire-resistant materials | GIORGI KHARDZEISHVILI | special |
| 06/03/2026 | Mastic and Intumescent Fire-resistant Coatings | GIORGI KHARDZEISHVILI | special |
| 06/03/2026 | Metering | GIORGI KHARDZEISHVILI | energy_progress |
| 06/03/2026 | Luminous Exit Path Markings | GIORGI KHARDZEISHVILI | special |
| 06/03/2026 | Fire-Resistance Rated Construction | GIORGI KHARDZEISHVILI | progress |
| 06/03/2026 | Lighting controls | GIORGI KHARDZEISHVILI | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| 92NY | Arts / Culture / Entertainment | Sub-cellar, Cellar, Sub-basement, Floors 1–11, Mezzanine, Penthouse, Roof | Project M01353416 Project M01326431 Project M01235976 Project M01235968 Project M01299506 Project M01271004 Project M01130126 Project M01130120 Project M01080724 Project M01080701 Project M01077016 Project M08046471 |
| 92nd Street Y | Community Facility | Cellar, Basement, Floors 1–4, 9, 10, Mezzanine, Roof | Project M01098223 Project M00945612 Project M08013745 Project M00786717 Project M00786729 Project M00786737 Project M00793384 Project M00786683 Project M00762488 Project M00762491 Project M00781274 Project M00761603 |