Roof13p · 5 filings · 20 docs
ArchitectureEquipmentMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems
Facade restoration to include masonry, pointing, limestone patching, sills, lintels, terracotta, stucco patching, and patch roof.
On file for this project
7 documents · 1 drawing sheet
installation of mechanical units as per plans. No change to use ,egress or occupancy.
On file for this project
10 documents
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
On file for this project
16 documents · 9 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 141 filing · 17 docs
Architecture
Issued Permit Scope
General Construction
Phase II work -REPLACEMENT OF GLASS PANELS AND ENLARGED DOOR AT LEVEL 13 EXISTING GREENHOUSE FACADE. GREENHOUSE EXISTING TO REMAIN. PAINTING OF EXISTING GREENHOUSE STRUCTURE. EXTERIOR TERRACE WORK.
On file for this project
17 documents
Floor 132p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
INTERIOR RENOVATION ON THE 13TH FLOOR OF AN EXISTING TRIPLEX APARTMENT (#1104). RELOCATION OF EXISTING PLUMBING FIXTURES. NEW FLOOR DRAIN. REFER TO PLUMBING FIXTURE COUNT TABLE.NO CHANGE IN USE, EGRESS AND/OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
PLUMBING ALTERATIONS AT LEVELS 11, 12 AND 13.MASTER BATH RELOCATION OF BATH AND CAPPING OF SHOWER. KITCHENRELOCATION OF SINK AND DISHWASHER TO NEW ISLAND. GREENHOUSEADDITION OF SINK. REPLACEMENT OF EXISTING RANGE ON EXISTING GAS PIPING.REPLACE SINK ON L13
On file for this project
28 documents · 1 drawing sheet
Phase II work -REPLACEMENT OF GLASS PANELS AND ENLARGED DOOR AT LEVEL 13 EXISTING GREENHOUSE FACADE. GREENHOUSE EXISTING TO REMAIN. PAINTING OF EXISTING GREENHOUSE STRUCTURE. EXTERIOR TERRACE WORK.
On file for this project
17 documents
Latest 3 of 5 filings on this floor.
Floor 125 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
PLUMBING ALTERATIONS AT LEVELS 11, 12 AND 13.MASTER BATH RELOCATION OF BATH AND CAPPING OF SHOWER. KITCHENRELOCATION OF SINK AND DISHWASHER TO NEW ISLAND. GREENHOUSEADDITION OF SINK. REPLACEMENT OF EXISTING RANGE ON EXISTING GAS PIPING.REPLACE SINK ON L13
On file for this project
28 documents
Interior renovation of the apartment associated with the mechanical work scope. The proposed work includes replacing existing HVAC units. No change in use, egress, or occupancy under this a[application.
On file for this project
11 documents
Phase II work -REPLACEMENT OF GLASS PANELS AND ENLARGED DOOR AT LEVEL 13 EXISTING GREENHOUSE FACADE. GREENHOUSE EXISTING TO REMAIN. PAINTING OF EXISTING GREENHOUSE STRUCTURE. EXTERIOR TERRACE WORK.
On file for this project
17 documents
Latest 3 of 5 filings on this floor.
Floor 113p · 6 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
installation of mechanical units as per plans. No change to use ,egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
PLUMBING ALTERATIONS AT LEVELS 11, 12 AND 13.MASTER BATH RELOCATION OF BATH AND CAPPING OF SHOWER. KITCHENRELOCATION OF SINK AND DISHWASHER TO NEW ISLAND. GREENHOUSEADDITION OF SINK. REPLACEMENT OF EXISTING RANGE ON EXISTING GAS PIPING.REPLACE SINK ON L13
On file for this project
28 documents
Interior renovation of the apartment associated with the mechanical work scope. The proposed work includes replacing existing HVAC units. No change in use, egress, or occupancy under this a[application.
On file for this project
11 documents
Latest 3 of 6 filings on this floor.
Floor 101 filing · 11 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Interior renovation of the apartment associated with the mechanical work scope. The proposed work includes replacing existing HVAC units. No change in use, egress, or occupancy under this a[application.
On file for this project
11 documents
Floor 91 filing · 20 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
Renovation to existing duplex unit #808. Partition, finish and fixture work. No change to use, egress or occupancy under this application.
On file for this project
27 documents
Floor 84p · 4 filings · 20 docs
ArchitectureDMFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
Renovation to existing duplex unit #808. Partition, finish and fixture work. No change to use, egress or occupancy under this application.
On file for this project
27 documents · 1 drawing sheet
RENOVATION OF THE EXISTING UNIT #814. CONSTRUCTION OF NEW PARTITION AS PER ATTACHED PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
7 documents
RENOVATION OF AN EXISTING APARTMENT #807 AT THE 7TH & 8TH FLOORS. NO CHANGE IN USE, EGRESS OR OCCUPANCY PROPOSED UNDER THIS APPLICATION.
On file for this project
19 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 73 filings · 14 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
RENOVATION OF THE EXISTING UNIT #814. CONSTRUCTION OF NEW PARTITION AS PER ATTACHED PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
7 documents
RENOVATION OF AN EXISTING APARTMENT #807 AT THE 7TH & 8TH FLOORS. NO CHANGE IN USE, EGRESS OR OCCUPANCY PROPOSED UNDER THIS APPLICATION.
On file for this project
19 documents
INTERIOR RENOVATION OF EXISTING CONDOMINIUM UNIT 808/809 TO INSTALL NEW PARTITIONS, DOORS, AND CLOSET DOORS. NO CHANGE IN USE, EGRESS, OCCUPANCY, OR AREA.
On file for this project
6 documents
Floor 64p · 3 filings · 14 docs
ArchitectureDMFire ProtectionMechanicalZ
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
INTERIOR RENOVATION TO UNIT 605 ON THE 6TH FLOOR. WORK TO INCLUDE MINOR PARTITION WORK AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents · 3 drawing sheets
Mechanical work file in conjunction with office renovation of the 6th Floor
On file for this project
8 documents
Renovation of an existing office on the 6th Floor. No change to use, egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
Floor 5Under Construction4p · 2 filings · 15 docs
ArchitectureDMFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
Replace plumbing fixtures on existing rough-in at unit 507 on the 5th floor.
On file for this project
15 documents · 1 drawing sheet
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION APPLICATION FOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 3 drawing sheets
Floor 42 filings · 14 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
Minor partition work to renovate existing commercial space on the 4th flr. No change to use, bulk or egress
On file for this project
11 documents
Relocate 2 sink, 1 new dw, 5 new sinks
On file for this project
4 documents
Floor 3
Floor 2
Floor 1Under Construction4p · 3 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Sprinklers
Interior renovation of existing commercial space to install the counter table, service table, commercial cooking equipment, relocate the restroom, etc. No change of use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Repair existing vault space to include the replacement of deteriorated steel beams, and storefront cladding (no change in storefront opening). No change in use egress or occupancy.
On file for this project
9 documents · 2 drawing sheets
INTERIOR ALTERATIONS TO EXISTING COMMERCIAL SPACE TO INCLUDE NON-LOAD BEARING DEMO, PARTITION AND FINISHES WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
On file for this project
6 documents · 1 drawing sheet
MezzanineUnder Construction3p · 2 filings · 14 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction
Interior renovation of existing commercial space to install the counter table, service table, commercial cooking equipment, relocate the restroom, etc. No change of use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
INTERIOR ALTERATIONS TO EXISTING COMMERCIAL SPACE TO INCLUDE NON-LOAD BEARING DEMO, PARTITION AND FINISHES WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
On file for this project
6 documents · 2 drawing sheets
CellarUnder Construction2 filings · 15 docs
ArchitectureFire ProtectionStructural
Issued Permit Scope
General Construction · Sprinklers · Structural
Repair existing vault space to include the replacement of deteriorated steel beams, and storefront cladding (no change in storefront opening). No change in use egress or occupancy.
On file for this project
9 documents
INTERIOR ALTERATIONS TO EXISTING COMMERCIAL SPACE TO INCLUDE NON-LOAD BEARING DEMO, PARTITION AND FINISHES WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
On file for this project
6 documents
Site & exteriorUnder Construction5 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalStructural
Issued Permit Scope
Construction Fence · General Construction · Sidewalk Shed · Structural
FILE TEMPORARY CONSTRUCTION FENCE ON OPEN SPACE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
4 drawing sheets
Repair existing vault space to include the replacement of deteriorated steel beams, and storefront cladding (no change in storefront opening). No change in use egress or occupancy.
On file for this project
9 documents · 7 drawing sheets
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
On file for this project
6 documents · 12 drawing sheets
Latest 3 of 5 filings on this floor.
Filed — no permit issued4 filings · 20 docs
ArchitectureDMGeneralPlumbing
Interior Renovation Change of Use on 5th Floor Units 504 and 505 From Manufacturing to Offices. Plumbing to remain on existing roughing. No Change in Egress and Bulk.
On file for this project
5 documents · 7 drawing sheets
No filed description on record for this project.
On file for this project
5 documents · 6 drawing sheets
Demolition of interior partitions and related hung ceiling of a commercial space on the 1st floor and 1st floor mezzanine. The work is limited to removing the drywall partitions and hung ceiling. All the existing pl and mh systems are to remain.
On file for this project
6 documents · 6 drawing sheets
Latest 3 of 4 filings on this floor.