14 HORATIO STREET
MANHATTAN · West Village · BIN 1011066
💬 Discuss this project
1959Year Built
17Stories
D4Building Class
C1-6Zoning
127,072 sfGross Floor Area
163Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMP
Elevator cooperative · Owner of record: 14 Horatio St Apts · 11,245 sf lot · 11.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFacade repairs and scaffolding7p · 1 filing · 14 docs
Floor 16Unit 17FH7p · 2 filings · 18 docs
Floor 15
Floor 14
Floor 13
Floor 12Unit 12C1p · 1 filing · 5 docs
Floor 11Unit 11B, Unit 11C5p · 1 filing · 14 docs
Floor 10
Floor 9
Floor 8Unit 8B3p · 1 filing · 6 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Unit 2E, Unit 2K1p · 2 filings · 9 docs
Floor 1Unit 1E, Unit 1F, Unit 1G +18p · 4 filings · 18 docs
Site & exteriorFacade repairs and scaffolding11p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
14 Horatio Street Apt7003/22/2026
Key Real Estate Associates303/21/2026
PF Financial Services203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Michael A Labbe501/20/2026
Ira Frazin Architect301/15/2026
Reform Architecture105/14/2025
KN3 Engineering109/08/2023
Joseph K. Blum Co208/17/2022
Paul Gurdak Architect207/12/2022
KZ Engineering103/04/2021
Ajemian Design109/28/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution203/21/2026
Idm Associates1003/21/2026
Municipal Building Consultants603/21/2026
Hovann403/21/2026
Jenny Flores Expediting103/21/2026
Synergy Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ceprine ConstructionScaffold603/21/2026
Pofi ConstructionGeneral Contractor307/08/2026
Paul Quinn Plumbing & HeatingPlumbing309/18/2026
Catman PlumbingPlumbing207/08/2026
Berkley General ContractorsGeneral Contractor207/08/2026
Aqua Plumbing & HeatingPlumbing207/08/2026
Apollo Plumbing & HeatingPlumbing207/08/2026
Amor ElectricElectrical203/21/2026
Hello ChapterGeneral Contractor107/08/2026
Go Pro Plumbing and HeatingPlumbing107/08/2026
Go Pro Restoration & Maintenancespecialty_contractor107/08/2026
Dynamic ElectricalElectrical103/21/2026
J.S.V. ElectricElectrical103/21/2026
K & G Electric CoElectrical103/21/2026
A.K. Electrical ContractingElectrical103/21/2026
Warren Ostroff ElectricElectrical103/21/2026
C&G A-Plus Interior RemodGeneral Contractor104/09/2026
Arree ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Studio BLS Architects7991401/20/2026
Ira Frazin Architect3318301/15/2026
Reform Architecture9444105/14/2025
Joseph K. Blum Co1741208/17/2022
Richard H. Balser Engineering3028109/28/2020
Building Lifecycle
All (188)Filed (16)Permit Issued (20)Signed Off (9)Facade (FISP) (12)Violation (48)Inspection (8)Objection (52)Special Inspection (23)
09/17/2026
Permit issued — Plumbing
M01328631-S1-PL
06/15/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
06/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/24/2026
Permit issued — Plumbing
M01328631-S1-PL
03/18/2026
Permit issued — General Construction
M01328631-I1-GC
03/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/12/2026
Permit issued — Plumbing
M00973183-I1-PL
02/24/2026
Objection resolved — Addressed
02/24/2026
Objection resolved — Addressed
02/24/2026
Objection resolved — Addressed
02/24/2026
Objection resolved — Addressed
02/23/2026
Objection resolved — Addressed
02/23/2026
Objection resolved — Addressed
02/23/2026
Objection resolved — Addressed
02/11/2026
Signed off — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING APARTMENT 8B ON THE EIGHTH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01218472-I1
02/10/2026
Objection raised — Scope
02/06/2026
Objection raised — Inspections
02/06/2026
Objection raised — Other
02/06/2026
Objection raised — Admin
02/06/2026
Objection raised — Structural
02/06/2026
Objection raised — Structural
02/06/2026
Objection raised — Structural
01/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
IRA FRAZIN
01/20/2026
Filed — Alteration
Combination of apartments 11B & 11C On the 11th floor. remove and construct non-structural partitions. Remove 1 kitchen , modification to lighting fixtures and lighting control . all as per plan. No change in Use Egress or Occupancy .
M01328631-I1
01/20/2026
Filed — Alteration
Combination of apartments 11B & 11C On the 11th floor. remove and construct non-structural partitions. Remove 1 kitchen , modification to lighting fixtures and lighting control . all as per plan. No change in Use Egress or Occupancy .
M01328631-S1
01/15/2026
Filed — Alteration
PLUMBING FIXTURES INSTALATION AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00973183-P2
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Labbe
12/04/2025
Special inspection requirement — Final
Michael Labbe
12/04/2025
Special inspection requirement — Lighting in dwelling units
Michael Labbe
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Labbe
12/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Michael Labbe
12/04/2025
Special inspection requirement — Lighting controls
Michael Labbe
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IRA FRAZIN
06/13/2025
Permit issued — General Construction
M01218472-I1-GC
05/29/2025
Objection resolved — Addressed
05/21/2025
Objection raised — Scope
05/14/2025
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING APARTMENT 8B ON THE EIGHTH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01218472-I1
04/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dionisio Cortes Ortega
04/30/2025
Special inspection requirement — Final
Dionisio Cortes Ortega
02/07/2025
Signed off — Alteration
PLUMBING WOK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APT #1EFG. WORK INVOLVE REMOVAL RELOCATION REPLACEMENT AND INSTALLATION OF A NEW PLUMBING FIUXTURES , ALL AS PER PLAN . NO CHANGE IN USE EGRESS OR OCCUPANCY (OT JOB #m01017216)
M01017623-I1
01/28/2025
Permit issued — Plumbing
M00973183-I1-PL
01/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/14/2025
Permit issued — General Construction
M00972705-I1-GC
01/09/2025
Signed off — Alteration
M00449164-I1
01/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/15/2024
Signed off — Alteration
INTERIOR RENOVATION TO EXISTING APARTMENT 1EFG, WORK INCLUDE REMOVE AND CONSTRUCT NEW NON BEARING PARTITIONS . MINOR MODIFICATION TO LIGHTING FIXTURES OR CONTROL . ALL AS PER PLAN. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01017216-I1
08/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/16/2024
Permit issued — Plumbing
M01017623-I1-PL
05/13/2024
Permit issued — General Construction
M01017216-I1-GC
04/16/2024
Filed — Alteration
PLUMBING FIXTURES INSTALATION AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00973183-I1
04/16/2024
Filed — Alteration
RENOVATION & PARTIAL COMBINATION OF TWO EXISTING APARTMENTS INCLUDING NON-STRUCTURAL PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00972705-I1
04/11/2024
Objection raised — Other
04/11/2024
Objection resolved — Addressed
04/10/2024
Objection raised — Other
04/10/2024
Objection resolved — Addressed
04/10/2024
Objection raised — Accessibility
04/10/2024
Objection resolved — Addressed
04/10/2024
Objection raised — Fire_Protection
04/10/2024
Objection resolved — Addressed
Latest 60 of 188 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPaul Quinn Plumbing & Heating09/17/2026
DOB NOWPlumbingPermit IssuedPaul Quinn Plumbing & Heating03/24/2026
DOB NOWGeneral ConstructionPermit IssuedBerkley General Contractors03/18/2026
DOB NOWPlumbingPermit IssuedCatman Plumbing03/12/2026
DOB NOWGeneral ConstructionSigned-offHello Chapter06/13/2025
DOB NOWPlumbingPermit IssuedCatman Plumbing01/28/2025
DOB NOWGeneral ConstructionPermit IssuedC&G A-Plus Interior Remod01/14/2025
DOB NOWPlumbingSigned-offPaul Quinn Plumbing & Heating05/16/2024
DOB NOWGeneral ConstructionSigned-offBerkley General Contractors05/13/2024
DOB NOWGeneral ConstructionSigned-offPofi Construction11/16/2023
DOB NOWGeneral ConstructionSigned-offGo Pro Restoration & Maintenance12/06/2022
DOB NOWPlumbingSigned-offGo Pro Plumbing and Heating10/03/2022
DOB NOWGeneral ConstructionSigned-offPofi Construction05/10/2022
DOB NOWSidewalk ShedSigned-offCeprine Construction03/02/2022
DOB NOWGeneral ConstructionSigned-offPofi Construction05/10/2021
DOB NOWPlumbingSigned-offAqua Plumbing & Heating04/30/2021
DOB NOWPlumbingSigned-offApollo Plumbing & Heating04/08/2021
DOB NOWSidewalk ShedSigned-offCeprine Construction03/11/2021
DOB NOWPlumbingSigned-offAqua Plumbing & Heating01/21/2021
DOB NOWPlumbingSigned-offApollo Plumbing & Heating12/07/2020
BISPLISSUEDPlumbing-It Mechanical07/19/2022
BISPLISSUEDGo Pro Plumbing and Heating02/23/2022
BISOTISSUEDK & D Contractors01/08/2021
BISOTISSUEDTauland Kitchen & Bath12/18/2020
BISOTISSUEDK & D Contractors10/19/2020
BISPLISSUEDMaster 2 Plumbing & Heating05/03/2018
BISOTISSUEDMea Construction04/12/2018
BISOTISSUEDVrex Construction04/12/2018
BISOTISSUEDEdras Group07/22/2016
BISOTISSUEDEdras Group06/21/2016
BISPLISSUEDBedrock Plumbing & Heating09/18/2015
BISOTISSUEDC C Controlled Combustion08/20/2015
BISEQISSUEDEverest Scaffolding07/27/2015
BISMHISSUEDMichilli07/02/2015
BISOTISSUEDMichilli07/02/2015
BISOTISSUEDMichilli07/02/2015
BISOTISSUEDC C Controlled Combustion06/24/2015
BISPLISSUEDCC Controlled Plumbing Co06/24/2015
BISOTISSUEDMichilli06/17/2015
BISOTISSUEDMichilli06/17/2015
+ 30 more permits on file
2 projects · most recent 01/20/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/20/2026Permit IssuedPaul Quinn Plumbing & HeatingGas, Water/Sanitary
01/15/2026Permit IssuedCatman PlumbingGas, Water/Sanitary
25 projects · most recent 09/22/2026
General Wiring
FiledStatusContractorScope
09/22/2026Permit IssuedValentis ElectricGeneral Wiring
03/22/2026Permit IssuedRobert ChimentiGeneral Wiring
02/23/2026Permit IssuedLina ElectricGeneral Wiring
02/02/2026Permit IssuedJ.S.V. ElectricGeneral Wiring
10/27/2025CompleteJ.S.V. ElectricGeneral Wiring
10/06/2025CompleteAmor ElectricGeneral Wiring
06/08/2025CompleteTitanium Electrical—
02/22/2025CompleteRobert ChimentiGeneral Wiring
06/25/2024CompleteEmpire Lic Electrical Contractors—
03/11/2024CompleteApollo Electric USA—
11/06/2023CompleteA.C. Morgan ElectricGeneral Wiring
10/30/2023CompleteE & M Electrical NYGeneral Wiring
10/25/2023Permit IssuedS.A.L. Electric CoGeneral Wiring
10/04/2023CompleteS.A.L. Electric Co—
10/03/2023Permit IssuedJames Lewis Elect'lGeneral Wiring
1 project · most recent 01/20/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
01/20/2026Permit IssuedPaul Quinn Plumbing & HeatingTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/15/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
06/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/20/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
01/26/2026Fire-Resistant Penetrations and JointsIRA FRAZINspecial
12/04/2025Fire-Resistant Penetrations and JointsMichael Labbespecial
12/04/2025FinalMichael Labbeprogress
12/04/2025Lighting in dwelling unitsMichael Labbeenergy_progress
12/04/2025Fire-Resistant Penetrations and JointsMichael Labbespecial
12/04/2025Energy Code Compliance InspectionsMichael Labbeprogress
12/04/2025Lighting controlsMichael Labbeenergy_progress
12/02/2025Fire-Resistant Penetrations and JointsIRA FRAZINspecial
04/30/2025Fire-Resistant Penetrations and JointsDionisio Cortes Ortegaspecial
04/30/2025FinalDionisio Cortes Ortegaprogress
03/10/2024Fire-Resistant Penetrations and JointsMichael Labbespecial
12/07/2023Fire-Resistant Penetrations and JointsIRA FRAZINspecial
12/07/2023Lighting controlsIRA FRAZINenergy_progress
12/07/2023Lighting in dwelling unitsIRA FRAZINenergy_progress
12/06/2023FinalIRA FRAZINprogress
08/18/2023Final—progress
08/19/2022FinalJAMES BLUMprogress
08/19/2022Air barrier - visual inspectionJAMES BLUMenergy_progress
08/19/2022Energy Code Compliance InspectionsJAMES BLUMprogress
08/19/2022Structural Stability – Alterations of existing buildingsJAMES BLUMspecial
08/19/2022MasonryJAMES BLUMspecial
06/13/2022FinalPAUL GURDAK-WARCHOLprogress
07/07/2020Energy Code Compliance InspectionsMichael Labbeprogress
▾Documents — 638 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch12
09/02/2026M00756399-I1Request digital key ↗
08/29/2026M00906246-I1Request digital key ↗
08/27/2026M01017623-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00398177-I1Request digital key ↗
08/15/2026M00367387-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00449164-I1Request digital key ↗
09/04/2026M00449164-P1Request digital key ↗
▸Applications & Permits137
▸BISWORK PERMIT APPLICATION62
07/19/2022103541231Open ↗
02/24/2022103922356Open ↗
01/11/2021140951744Open ↗
Showing 3 of 62 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION58
07/15/2022103541231Open ↗
07/14/2022103541231Open ↗
07/05/2022104041831Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWLPC Approval/Permit15
08/13/2026M00972705-I1Open ↗
08/13/2026M00973183-I1Open ↗
08/13/2026M00973183-P2Open ↗
Showing 3 of 15 on file for this type
▸BISLL114/19 PERMIT RESTRICTION2
10/19/2020140951744Open ↗
09/17/2020140917140Open ↗
▸Seals & Professional Certifications127
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION63
01/17/2019123203229Open ↗
04/27/2018123207788Open ↗
03/20/2018123207788Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/04/2026M00398177-I1Open ↗
09/04/2026M00449164-I1Open ↗
09/04/2026M00449164-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/02/2026M00367387-I1Open ↗
08/31/2026M01218472-I1Open ↗
08/27/2026M01328631-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/07/2026M01017623-I1Open ↗
09/02/2026M01328631-S1Open ↗
08/31/2026M01218472-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
03/20/2018123207788Open ↗
Showing 1 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
03/20/2018123207788Open ↗
06/15/2016140495836Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
09/15/2020140951744Open ↗
07/14/2020140917140Open ↗
06/15/2016140495836Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
06/15/2016140495836Open ↗
Showing 1 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
09/15/2020140951744Open ↗
07/14/2020140917140Open ↗
Showing 2 of 3 on file for this type
▸Trade Schedules & Equipment48
▸BISSELF-CERT PLUMBING NOTICE22
01/04/2016122372707Open ↗
Showing 1 of 22 on file for this type
▸BISSCHEDULE B - PLUMBING13
07/14/2022103541231Open ↗
Showing 1 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
09/27/2018123203229Open ↗
03/07/2018123203229Open ↗
02/26/2016122372707Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
07/21/2016122372707Open ↗
06/08/2016122372707Open ↗
▸BISEQUIPMENT USE PERMITS2
07/21/2016122372707Open ↗
06/08/2016122372707Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection8
▸BISTENANT PROTECTION PLAN AND NOTES5
09/18/2020140951744Open ↗
07/14/2020140917140Open ↗
06/15/2016140495836Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00367387-I1Open ↗
08/13/2026M00398177-I1Open ↗
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos41
▸BISASBESTOS: CERTIFICATION (DEP ACP5)18
09/15/2020140951744Open ↗
07/14/2020140917140Open ↗
03/20/2018123207788Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/04/2026M00398177-I1Open ↗
09/04/2026M00449164-P1Open ↗
09/04/2026M00449164-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance49
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS21
01/17/2019123203229Open ↗
01/17/2019123203229Open ↗
04/27/2018123207788Open ↗
Showing 3 of 21 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS13
06/04/2021140917140Open ↗
05/27/2021140951744Open ↗
05/27/2021140951744Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
06/04/2021140917140Open ↗
05/27/2021140951744Open ↗
09/15/2020140951744Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
09/15/2020140951744Open ↗
07/14/2020140917140Open ↗
06/15/2016140495836Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00449164-I1Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY16
07/08/2022104041831Open ↗
07/08/2022103541231Open ↗
03/05/2022103922356Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
11/25/2016121388088Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs71
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST24
07/11/2022104041831Open ↗
03/07/2022103922356Open ↗
06/09/2021140917140Open ↗
Showing 3 of 24 on file for this type
▸BISLANDMARKS APPROVAL23
09/18/2020140951744Open ↗
08/25/2020140917140Open ↗
01/17/2019123203229Open ↗
Showing 3 of 23 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
07/19/2022103541231Open ↗
12/03/2020140917140Open ↗
08/22/2017122358929Open ↗
Showing 3 of 7 on file for this type
▸BISLANDMARKS SIGNOFF4
03/07/2022103922356Open ↗
06/04/2021140917140Open ↗
05/27/2021140951744Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER2
07/19/2022103541231Open ↗
02/24/2022103922356Open ↗
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership50
▸BISCOST AFFIDAVIT47
07/08/2022104041831Open ↗
07/08/2022103541231Open ↗
06/09/2021140917140Open ↗
Showing 3 of 47 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
04/13/2018123207788Open ↗
Showing 1 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
02/25/2022103922356Open ↗
▸Filing & Intake Forms58
▸BISEFILING COVER SHEET20
03/20/2018123207788Open ↗
03/07/2018123203229Open ↗
Showing 2 of 20 on file for this type
▸BISBOROUGH INTAKE FORM16
07/19/2022103541231Open ↗
10/27/2021103922356Open ↗
07/28/2021103922356Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION15
03/19/2018123207788Open ↗
04/21/2016122372707Open ↗
04/01/2016122358929Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
09/15/2020140951744Open ↗
07/14/2020140917140Open ↗
06/15/2016140495836Open ↗
Showing 3 of 7 on file for this type
▸Other Documents14
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
02/24/2022103922356Open ↗
01/11/2021140951744Open ↗
01/11/2021140951744Open ↗
Showing 3 of 9 on file for this type
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLOCAL LAW 58-1987 WAIVER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDHCR DOCUMENT1
02/08/2022103922356Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type