| Owner | Filings | Most Recent |
|---|---|---|
| NYC ECONOMIC DEVELOPEMENT CORP | 482 | 09/25/2026 |
| NEW YORK CITY ECONOMIC DEVELOPMENT | 35 | 07/08/2026 |
| BIOBAT | 53 | 07/08/2026 |
| NYC DSBS 8 | 1 | 03/22/2026 |
| DEPARTMENT OF BUSINESS SE | 1 | 03/22/2026 |
| NYCEDC | 36 | 03/22/2026 |
| ALTRONIX | 1 | 03/22/2026 |
| NYCSCA | 1 | 03/21/2026 |
| NYSCA | 1 | 03/21/2026 |
| NYC ECONOMIC DEVELOP | 9 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| OVE ARUP & PARTNERS PC | 15 | 09/16/2026 |
| ARUP US INC | 7 | 08/21/2026 |
| STANTEC | 6 | 07/28/2026 |
| HC PEC | 9 | 07/24/2026 |
| SILMAN | 2 | 07/10/2026 |
| VAMOS ARCHITECTS | 5 | 06/12/2026 |
| PERKINS and WILL | 8 | 06/03/2026 |
| JONATHAN CICCONI | 3 | 03/27/2026 |
| JAROS BAUM & BOLLES | 4 | 03/25/2026 |
| LAYNG PEW | 2 | 11/20/2025 |
| DEWBERRY ENGINEERS INC | 1 | 11/20/2025 |
| SAGE AND COOMBE ARCHITECTS | 1 | 06/17/2025 |
| RLM ENGINEERING PLLC | 14 | 04/08/2025 |
| FRANKLYN ESTRELLA ARCHITECT PLLC | 2 | 03/14/2025 |
| R CLADDING CONSULTING & ENGINEERING | 1 | 02/20/2025 |
| M JUST ARCHITECTURE PC | 6 | 12/24/2024 |
| STRACAR ENGINEERING, P.C. | 2 | 12/03/2024 |
| FREYER COLLABORATIVE ARCHITECTS | 3 | 10/10/2024 |
| KEY CIVIL ENGINEERING PC | 1 | 09/19/2024 |
| SYSKA HENNESSY GROUP | 5 | 09/05/2024 |
| BACKFORTY ARCHITECTURE, LLC | 8 | 08/12/2024 |
| STUDIO 16 ARCHITECTURE PLLC | 1 | 05/21/2024 |
| JACK GREEN ASSOCIATES | 2 | 03/12/2024 |
| DESIMONE CONSULTING ENGINEERING | 2 | 07/12/2023 |
| RISE ARCHITECTURE NJ LLC | 1 | 06/02/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| CODE | 12 | 03/21/2026 |
| CONVERSANO ASSOCIATES, INC. | 22 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 100 | 03/21/2026 |
| JUST ARCHITECTURE | 22 | 03/21/2026 |
| D D EXPEDITORS | 2 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 03/21/2026 |
| CITY EXPEDITING | 2 | 03/21/2026 |
| STRACAR ENGINEERING P C | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| H.M. HUGHES CO. INC | General Contractor | 13 | 07/08/2026 |
| SUFFOLK CONSTRUCTION COMP | General Contractor | 9 | 07/08/2026 |
| PJP INSTALLERS INC | General Contractor | 8 | 09/25/2026 |
| BHY CONTRACTOR INC | General Contractor | 8 | 07/08/2026 |
| HUNTER ROBERTS CONSTRUCTION | General Contractor | 5 | 04/09/2026 |
| DONNELLY MECHANICAL CORP | General Contractor | 4 | 07/08/2026 |
| RAEL AUTOMATIC SPR.CO INC | Fire Protection | 4 | 06/28/2026 |
| SEAN COAKLEY P & H INC | Plumbing | 3 | 07/08/2026 |
| SEAN COAKLEY P & H INC | Fire Protection | 3 | 07/08/2026 |
| GALVIN BROTHERS INC | General Contractor | 3 | 03/21/2026 |
| NEW YORK INT'L BUILDERS * | General Contractor | 3 | 03/21/2026 |
| CARDOZA PLUMBING CORP | Plumbing | 3 | 07/08/2026 |
| LOUIS L.BUTTERMARK & SONS | Plumbing | 3 | 09/16/2026 |
| PARKVIEW P&H INC | Plumbing | 3 | 07/08/2026 |
| THE MCKISSACH GROUP INC | General Contractor | 2 | 07/02/2026 |
| PACE PLUMBING CORP | Plumbing | 2 | 07/08/2026 |
| JOSHUA ANDERSON | Electrical | 2 | 03/21/2026 |
| CARDOZA PLUMBING CORP | Fire Protection | 2 | 07/08/2026 |
| H BRONNER & SON PLBG & HTG | Plumbing | 2 | 07/08/2026 |
| EAGLE INTERIORS INC | General Contractor | 2 | 03/21/2026 |
| J. CAIAZZO PLBG & HTG COR | Plumbing | 2 | 07/08/2026 |
| PACE PLUMBING CORP | Fire Protection | 2 | 07/08/2026 |
| AVC GENERAL CONTRACTING L | General Contractor | 2 | 07/08/2026 |
| HOME SQUIRREL NY LLC | General Contractor | 2 | 03/21/2026 |
| RAYMOND MCQUILLAN | Electrical | 2 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| BUREAU VERITAS NA | 6902 | 26 | 09/16/2026 |
| HANSEN ENGINEERING PC | 8174 | 10 | 04/08/2025 |
| CROSSCHECK INSPECTION SER | 544 | 5 | 03/14/2025 |
| STRACAR SPECIAL INSPECTIO | 229 | 1 | 12/03/2024 |
| FREYER COLLABORATIVE ARCH | 2198 | 2 | 10/10/2024 |
| A TECH ENGINEERING NYC, P | 6738 | 1 | 05/21/2024 |
| JACK GREEN ASSOCIATES | 422 | 3 | 03/12/2024 |
| URBAN ENGINEERS OF NEW YO | 470 | 8 | 07/12/2023 |
| PSI AGENCY INC. | 254 | 5 | 03/01/2023 |
| CONSULTING ENGINEER | 5093 | 3 | 02/01/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | PJP INSTALLERS INC | 09/24/2026 |
| DOB NOW | Plumbing | Permit Issued | LOUIS L.BUTTERMARK & SONS | 09/15/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | PJP INSTALLERS INC | 07/27/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | PJP INSTALLERS INC | 07/27/2026 |
| DOB NOW | General Construction | Permit Issued | THE MCKISSACH GROUP INC | 06/17/2026 |
| DOB NOW | Structural | Permit Issued | THE MCKISSACH GROUP INC | 06/16/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PJP INSTALLERS INC | 06/11/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | PJP INSTALLERS INC | 06/03/2026 |
| DOB NOW | General Construction | Permit Issued | SUFFOLK CONSTRUCTION COMP | 05/08/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SUFFOLK CONSTRUCTION COMP | 05/08/2026 |
| DOB NOW | Structural | Permit Issued | SUFFOLK CONSTRUCTION COMP | 05/08/2026 |
| DOB NOW | General Construction | Permit Issued | SUFFOLK CONSTRUCTION COMP | 05/08/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PJP INSTALLERS INC | 03/20/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SUFFOLK CONSTRUCTION COMP | 03/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SUFFOLK CONSTRUCTION COMP | 02/06/2026 |
| DOB NOW | Standpipe | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 02/05/2026 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 02/05/2026 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 01/29/2026 |
| DOB NOW | Sprinklers | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 01/29/2026 |
| DOB NOW | Plumbing | Permit Issued | PARKVIEW P&H INC | 01/23/2026 |
| DOB NOW | Plumbing | Permit Issued | PARKVIEW P&H INC | 01/20/2026 |
| DOB NOW | Plumbing | Permit Issued | PARKVIEW P&H INC | 01/20/2026 |
| DOB NOW | Structural | Permit Issued | SUFFOLK CONSTRUCTION COMP | 12/22/2025 |
| DOB NOW | General Construction | Permit Issued | SUFFOLK CONSTRUCTION COMP | 12/03/2025 |
| DOB NOW | General Construction | Permit Issued | SUFFOLK CONSTRUCTION COMP | 11/26/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | PJP INSTALLERS INC | 10/23/2025 |
| DOB NOW | Plumbing | Permit Issued | LOUIS L.BUTTERMARK & SONS | 10/03/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | PJP INSTALLERS INC | 09/23/2025 |
| DOB NOW | Earth Work | Permit Issued | HUNTER ROBERTS CONSTRUCTION | 05/30/2025 |
| DOB NOW | Sprinklers | Signed-off | EXPERT FIRE SPRINKLER,LLC | 02/03/2025 |
| DOB NOW | Plumbing | Permit Issued | LIQUID PLBG & HTNG SCS IN | 12/09/2024 |
| DOB NOW | General Construction | Permit Issued | BHY CONTRACTOR INC | 12/06/2024 |
| DOB NOW | Sprinklers | Permit Issued | J. CAIAZZO PLBG & HTG COR | 12/05/2024 |
| DOB NOW | Plumbing | Permit Issued | J. CAIAZZO PLBG & HTG COR | 12/05/2024 |
| DOB NOW | Mechanical Systems | Signed-off | RAFFO CONSTRUCTION CORP | 10/18/2024 |
| DOB NOW | General Construction | Permit Issued | GLORY R CONSTRUCTION INC | 10/10/2024 |
| DOB NOW | Plumbing | Permit Issued | LOUIS L.BUTTERMARK & SONS | 10/08/2024 |
| DOB NOW | Sprinklers | Signed-off | MANENGEERING BUREAU, INC | 10/03/2024 |
| DOB NOW | Plumbing | Signed-off | PACE PLUMBING CORP | 10/01/2024 |
| DOB NOW | General Construction | Signed-off | HUNTER ROBERTS CONSTRUCTION | 09/26/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/21/2026 | Permit Issued | SUFFOLK CONSTRUCTION COMP | Heating and Air Conditioning Systems | Heat / Cool |
| 06/03/2026 | Permit Issued | SUFFOLK CONSTRUCTION COMP | Generators, Heating Systems | |
| 03/25/2026 | — | — | Air Conditioning Systems, Generators, Heating Systems, Ventilation Systems | Ventilation Strobic Air TRI-STACK- (3) M54B60N500I6 69,350 CFM · Exhaust Fan ×1 Generators John Deere 6090HFG86 300 kW · Generator ×1 |
| 08/08/2025 | Permit Issued | SUFFOLK CONSTRUCTION COMP | Air Conditioning Systems, Heating Systems | |
| 10/10/2024 | Permit Issued | HOME SQUIRREL NY LLC | Air Conditioning Systems | Cooling |
| 02/01/2023 | Permit Issued | NEGLIACCIO | Associated Ducts and Piping | — |
| 09/21/2022 | — | — | Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric PUMY-P36NKMU3 36,000 BTU · Vrf Outdoor ×1 PUMY-P60NKMU3 60,000 BTU · Vrf Outdoor ×1 Ventilation Greenheck G-097-VG 200 CFM · Exhaust Fan ×1 G-099-VG 1,050 CFM · Exhaust Fan ×1 G-120-VG 1,450 CFM · Exhaust Fan ×1 SQ-90-G 250 CFM · Exhaust Fan ×1 SQ-95-G 600 CFM · Condensing Unit ×1 SQ-97-VG 310 CFM · Exhaust Fan ×1 |
| 03/15/2022 | Permit Issued | BHY CONTRACTOR INC | Air Conditioning Systems, Associated Ducts and Piping | Cooling Stulz CeilAir OHS-040-W 39,000 BTU · Crac Unit ×2 |
| 07/13/2021 | — | — | Associated Ducts and Piping | Ducts & Piping __Junk__ Thermostat ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/16/2026 | — | — | 326 heads |
| 11/12/2025 | Permit Issued | RAEL AUTOMATIC SPR.CO INC | 2,581 heads, 1 outlets |
| 08/07/2024 | — | — | — |
| 09/21/2022 | — | — | — |
| 07/12/2021 | Permit Issued | SEAN COAKLEY P & H INC | 17 heads |
| 12/09/2019 | Permit Issued | SEAN COAKLEY P & H INC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/16/2026 | — | — | — |
| 05/27/2026 | — | — | Storm |
| 11/12/2025 | — | — | — |
| 08/07/2025 | Permit Issued | PARKVIEW P&H INC | Storm, Water/Sanitary |
| 06/27/2025 | Permit Issued | PARKVIEW P&H INC | Water/Sanitary |
| 12/03/2024 | Permit Issued | LIQUID PLBG & HTNG SCS IN | Water/Sanitary |
| 08/07/2024 | Permit Issued | J. CAIAZZO PLBG & HTG COR | Water/Sanitary |
| 09/20/2022 | — | — | Water/Sanitary |
| 03/15/2022 | Signed-off | H BRONNER & SON PLBG & HT | Water/Sanitary |
| 07/12/2021 | Permit Issued | SEAN COAKLEY P & H INC | Water/Sanitary |
| 12/09/2019 | Signed-off | SEAN COAKLEY P & H INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/06/2026 | Permit Issued | NEWBRIDGE ELECTL CONTNG | General Wiring |
| 07/17/2026 | Permit Issued | NEWBRIDGE ELECTL CONTNG | General Wiring |
| 07/16/2026 | Permit Issued | NEWBRIDGE ELECTL CONTNG | General Wiring |
| 07/13/2026 | Permit Issued | KND LICENSED ELEC'L CONT' | General Wiring, Lighting |
| 03/18/2026 | Permit Issued | KND LICENSED ELEC'L CONT' | — |
| 11/29/2025 | Complete | GOODALL ELECTRIC CORP | — |
| 09/30/2025 | Permit Issued | SPICE ELECTRIC COMPANY | — |
| 07/21/2025 | Permit Issued | CORPORATE ELEC. GROUP INC | General Wiring |
| 10/22/2024 | Complete | GOODALL ELECTRIC CORP | — |
| 10/18/2024 | Complete | GOODALL ELECTRIC CORP | — |
| 08/22/2024 | Permit Issued | CORPORATE ELEC. GROUP INC | General Wiring |
| 07/31/2024 | Complete | OM ELECTRIC, INC | General Wiring |
| 06/05/2024 | Cancelled | OM ELECTRIC, INC | General Wiring |
| 08/09/2022 | Permit Issued | BRANDL ELECTRIC INC. | General Wiring |
| 07/06/2021 | Complete | KND LICENSED ELEC'L CONT' | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/28/2026 | — | — | 2 scope_items |
| 07/10/2026 | — | — | 1 scope_items |
| 06/12/2026 | — | — | 1 scope_items |
| 04/13/2026 | Permit Issued | SUFFOLK CONSTRUCTION COMP | Steel, Concrete |
| 04/06/2026 | — | — | Steel, Concrete |
| 03/04/2026 | Permit Issued | THE MCKISSACK GROUP INC | Steel, Concrete |
| 03/02/2026 | — | — | Steel, Concrete |
| 11/20/2025 | — | — | Concrete |
| 06/30/2025 | Permit Issued | SUFFOLK CONSTRUCTION COMP | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/24/2026 | Permit Issued | PJP INSTALLERS INC | Scaffold |
| 07/24/2026 | Permit Issued | PJP INSTALLERS INC | Scaffold |
| 06/02/2026 | Permit Issued | PJP INSTALLERS INC | Scaffold |
| 09/23/2025 | Permit Issued | PJP INSTALLERS INC | Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/26/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 05/12/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/18/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/17/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/15/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/18/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 01/06/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 12/31/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 12/24/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 08/08/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 08/08/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 06/25/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/20/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/23/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/16/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/28/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/28/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 03/25/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/24/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/21/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/16/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/30/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/27/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/04/2024 | Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test | Certified | View ↗ |
| 12/04/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/07/2026 | Fire-Resistant Penetrations and Joints | IBRAHIM MOURAD | special |
| 07/07/2026 | Sprinkler Systems | IBRAHIM MOURAD | special |
| 07/07/2026 | Post-installed Anchors | IBRAHIM MOURAD | special |
| 07/06/2026 | Final | IBRAHIM MOURAD | progress |
| 07/06/2026 | Heating Systems | IBRAHIM MOURAD | special |
| 07/06/2026 | Fire-Resistant Penetrations and Joints | IBRAHIM MOURAD | special |
| 07/06/2026 | Mechanical Systems | IBRAHIM MOURAD | special |
| 07/06/2026 | Post-installed Anchors | IBRAHIM MOURAD | special |
| 06/22/2026 | Post-installed Anchors | IBRAHIM MOURAD | special |
| 06/22/2026 | Fire-Resistant Penetrations and Joints | IBRAHIM MOURAD | special |
| 06/22/2026 | Mechanical Systems | IBRAHIM MOURAD | special |
| 06/22/2026 | Final | IBRAHIM MOURAD | progress |
| 04/30/2026 | Fire-Resistant Penetrations and Joints | IBRAHIM MOURAD | special |
| 04/30/2026 | Post-installed Anchors | IBRAHIM MOURAD | special |
| 04/30/2026 | Sprayed fire-resistant materials | IBRAHIM MOURAD | special |
| 04/30/2026 | Final | IBRAHIM MOURAD | progress |
| 04/30/2026 | Fire-Resistance Rated Construction | IBRAHIM MOURAD | progress |
| 04/30/2026 | Masonry | IBRAHIM MOURAD | special |
| 03/30/2026 | Structural Steel - High Strength Bolting | IBRAHIM MOURAD | special |
| 03/30/2026 | Structural Steel - Welding | IBRAHIM MOURAD | special |
| 03/30/2026 | Final | IBRAHIM MOURAD | progress |
| 03/30/2026 | Concrete - Cast-In-Place | IBRAHIM MOURAD | special |
| 03/30/2026 | Masonry | IBRAHIM MOURAD | special |
| 03/30/2026 | Post-installed Anchors | IBRAHIM MOURAD | special |
| 03/30/2026 | Structural Stability – Alterations of existing buildings | IBRAHIM MOURAD | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Fete Society | Other | Floor 4 | Project B01094839 |
| Li-lac Chocolates | Restaurant / Food Service | — | Project B00968534 |
| regenlab usa | Laboratory | Floor 2 | Project B00546186 |