← Back
Three families
147 STERLING PLACE
BROOKLYN · BIN 3024355
💬 Discuss this project
1882Year Built
3Stories
C0Building Class
R7BZoning
3,288 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 1,646 sf lot · 2 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 20 docs
Floor 1
Basement2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMS CONTRACTOR603/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES H. BAER -ARCHITECT311/13/2025
NY BUILDING ASSOCIATES INC106/28/2024
MOHAMMAD AHEAD, PE103/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
BROOKLYN SOLARWORKS103/21/2026
RELIABLE EXPEDITING303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BAYSIDE BUILDERS INCGeneral Contractor604/09/2026
AMS CONTRACTOR INCGeneral Contractor303/21/2026
BROOKLYN SOLARWORKS LLCGeneral Contractor203/21/2026
JOHN HLAD P & H CO., INCPlumbing207/08/2026
RICHARD NEUElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
P GEORGOPOULOS ARCHITECT889211/13/2025
SEBASTIAN M. D'ALESSANDRO1127311/13/2025
NKM ENGINEERING PLLC6244106/28/2024
Building Lifecycle
All (85)Filed (5)Permit Issued (10)Signed Off (3)Violation (8)Inspection (5)Objection (24)Special Inspection (30)
05/06/2026
Violation issued (HPD, closed)
A
02/20/2026
Signed off — Alteration
PLUMBING WORK CONSISTS OF THE REMOVAL OF EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING AND THE INSTALLATION OF NEW PLUMBING FIXTURES AND ASSOCIATED PIPING. ALL NEW WORK SHALL BE CONNECTED TO THE EXISTING SERVICES. NO CHANGE TO EGRESS
B08038176-I1
02/20/2026
Signed off — Alteration
CONSTRUCT NEW 2 STORY REAR YARD ADDITION - WORK TO INCLUDE SELECT DEMOLITION OF INTERIOR PARTITION, FINISHES AND FIXTURES AND THE INSTALLATION OF NEW PARTITIONS, FINISHES AND FIXTURES
B08037939-I1
12/21/2025
Special inspection requirement — Concrete - Cast-In-Place
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Subgrade Inspections
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Structural Cold-Formed Steel
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Vasilios Georgopoulos
12/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Vasilios Georgopoulos
12/21/2025
Special inspection requirement — Structural Steel - Details
Vasilios Georgopoulos
12/21/2025
Special inspection requirement — Masonry
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Footing and Foundation
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Final
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Fenestration air leakage
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Interior lighting power
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Fenestration areas
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Insulation placement and R values
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Air barrier - visual inspection
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Maintenance information
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Exterior lighting power
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Lighting in dwelling units
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Lighting controls
Sebastian D'Alessandro
12/21/2025
Special inspection requirement — Protection of exposed foundation insulation
Sebastian D'Alessandro
11/13/2025
Filed — Alteration
CONSTRUCT NEW 2 STORY REAR YARD ADDITION - WORK TO INCLUDE SELECT DEMOLITION OF INTERIOR PARTITION, FINISHES AND FIXTURES AND THE INSTALLATION OF NEW PARTITIONS, FINISHES AND FIXTURES
B08037939-P1
02/28/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/26/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/04/2025
Permit issued — Plumbing
B08038176-I1-PL
01/13/2025
Permit issued — Structural
B08037939-I1-ST
01/13/2025
Permit issued — Foundation
B08037939-I1-FO
01/10/2025
Permit issued — Foundation
B08037939-I1-GC
09/23/2024
Signed off — Alteration
B00991050-I1
07/19/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/11/2024
Permit issued — Solar
B00991050-I1-SL
06/28/2024
Filed — Alteration
B00991050-I1
06/28/2024
Permit issued — Plumbing
B08038176-I1-PL
06/04/2024
Permit issued — General Construction
B08037939-I1-FO
06/03/2024
Permit issued — General Construction
B08037939-I1-ST
05/30/2024
Permit issued — Foundation
B08037939-I1-GC
03/01/2024
Objection raised — Other
03/01/2024
Objection resolved — Addressed
01/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
01/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
01/16/2024
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
01/16/2024
Special inspection requirement — Final
NARESH MAHANGU
01/16/2024
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
11/20/2023
Violation issued (HPD, closed)
I
05/25/2023
Objection raised — Other
05/25/2023
Objection resolved — Addressed
05/25/2023
Objection raised — Scope
05/25/2023
Objection resolved — Addressed
05/25/2023
Objection raised — Admin
05/25/2023
Objection resolved — Addressed
04/20/2023
Filed — Alteration
PLUMBING WORK CONSISTS OF THE REMOVAL OF EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING AND THE INSTALLATION OF NEW PLUMBING FIXTURES AND ASSOCIATED PIPING. ALL NEW WORK SHALL BE CONNECTED TO THE EXISTING SERVICES. NO CHANGE TO EGRESS
B08038176-I1
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOHN HLAD P & H CO., INC02/04/2025
DOB NOWStructuralSigned-offBAYSIDE BUILDERS INC01/13/2025
DOB NOWFoundationSigned-offBAYSIDE BUILDERS INC01/13/2025
DOB NOWFoundationSigned-offBAYSIDE BUILDERS INC01/10/2025
DOB NOWSolarSigned-offBROOKLYN SOLARWORKS LLC07/11/2024
DOB NOWPlumbingSigned-offJOHN HLAD P & H CO., INC06/28/2024
DOB NOWGeneral ConstructionSigned-offBAYSIDE BUILDERS INC06/04/2024
DOB NOWGeneral ConstructionSigned-offBAYSIDE BUILDERS INC06/03/2024
DOB NOWFoundationSigned-offBAYSIDE BUILDERS INC05/30/2024
DOB NOWSidewalk ShedPermit IssuedAMS CONTRACTOR INC03/11/2022
BIS—ISSUEDCALHOUN CONSTRUCTION CO LLC05/09/2000
3 projects · most recent 08/08/2024
General Wiring
FiledStatusContractorScope
08/08/2024CompleteBROOKYLN SOLARWORKS, LLC—
07/29/2024CompleteK.N.C ELECTRIC INCGeneral Wiring
03/13/2022Permit IssuedRICHARD NEU—
1 project · most recent 03/10/2022
Sidewalk Shed
FiledStatusContractorScope
03/10/2022Permit IssuedAMS CONTRACTOR INCSidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/28/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/19/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/19/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
12/21/2025Concrete - Cast-In-PlaceSebastian D'Alessandrospecial
12/21/2025Subgrade InspectionsSebastian D'Alessandrospecial
12/21/2025Subsurface Investigations (Borings/Test Pits)Sebastian D'Alessandrospecial
12/21/2025Structural Cold-Formed SteelSebastian D'Alessandrospecial
12/21/2025Structural Stability – Alterations of existing buildingsVasilios Georgopoulosspecial
12/21/2025Fire-Resistant Penetrations and JointsSebastian D'Alessandrospecial
12/21/2025Construction Operations Influencing Adjacent StructuresVasilios Georgopoulosspecial
12/21/2025Structural Steel - DetailsVasilios Georgopoulosspecial
12/21/2025MasonrySebastian D'Alessandrospecial
12/21/2025Footing and FoundationSebastian D'Alessandroprogress
12/21/2025FinalSebastian D'Alessandroprogress
12/21/2025Energy Code Compliance InspectionsSebastian D'Alessandroprogress
12/21/2025Fire-Resistance Rated ConstructionSebastian D'Alessandroprogress
12/21/2025Fenestration air leakageSebastian D'Alessandroenergy_progress
12/21/2025Interior lighting powerSebastian D'Alessandroenergy_progress
12/21/2025Fenestration areasSebastian D'Alessandroenergy_progress
12/21/2025Insulation placement and R valuesSebastian D'Alessandroenergy_progress
12/21/2025Air barrier - visual inspectionSebastian D'Alessandroenergy_progress
12/21/2025Maintenance informationSebastian D'Alessandroenergy_progress
12/21/2025Exterior lighting powerSebastian D'Alessandroenergy_progress
12/21/2025Lighting in dwelling unitsSebastian D'Alessandroenergy_progress
12/21/2025Fenestration and door U-factor and product ratingsSebastian D'Alessandroenergy_progress
12/21/2025HVAC-R and service water piping design and insulationSebastian D'Alessandroenergy_progress
12/21/2025Lighting controlsSebastian D'Alessandroenergy_progress
12/21/2025Protection of exposed foundation insulationSebastian D'Alessandroenergy_progress
Latest 25 of 30.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/31/2026B00695395-I1Request digital key ↗
08/27/2026B08037939-I1Request digital key ↗
08/27/2026B08037939-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/13/2026B08037939-P1Open ↗
08/13/2026B08037939-I1Open ↗
08/13/2026B00991050-I1Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B08037939-P1Open ↗
08/13/2026B08037939-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B08037939-I1Open ↗
09/01/2026B08037939-I1Open ↗
09/01/2026B08037939-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B08037939-I1Open ↗
09/01/2026B08037939-I1Open ↗
09/01/2026B08037939-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/31/2026B00695395-I1Open ↗
08/27/2026B08037939-I1Open ↗
08/27/2026B08037939-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026B08037939-P1Open ↗
08/27/2026B08037939-I1Open ↗
08/27/2026B08038176-I1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026B08037939-I1Open ↗
08/13/2026B08037939-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B08037939-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B00991050-I1Open ↗
▸Other Documents6
▸DOB NOWSite Survey: Initial2
08/13/2026B08037939-P1Open ↗
08/13/2026B08037939-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B08037939-P1Open ↗
08/13/2026B08037939-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026B08037939-P1Open ↗
08/13/2026B08037939-I1Open ↗