← Back
BuildNYC
Over six families without stores
Sterling Place Rehabs
1483 ST JOHNS PLACE · BIN 3036877
💬 Discuss this project
1922Year Built
4Stories
C1Building Class
R6Zoning
31,200 sfGross Floor Area
32Units
LL97 CoveredRent Stabilized12 Active Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: NYC Pact Preservation Partners · 9,019 sf lot · 3.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofApartment kitchen and bathroom renovationUnder Construction9p · 4 filings · 20 docs
BulkheadBulkhead and fire escape repairs1p · 1 filing · 12 docs
Floor 4Apartment kitchen and bathroom renovationUnder Construction55p · 3 filings · 20 docs
Floor 3Apartment kitchen and bathroom renovationUnder Construction55p · 3 filings · 20 docs
Floor 2Apartment kitchen and bathroom renovationUnder Construction55p · 3 filings · 20 docs
Floor 1Apartment kitchen and bathroom renovationUnder Construction60p · 3 filings · 20 docs
CellarApartment kitchen and bathroom renovationUnder Construction72p · 6 filings · 20 docs
Site & exteriorNYCHA Reid Park Rock facade repairs29p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority304/09/2026
NYC Pact Preservation Partners303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Dagher Engineering712/26/2025
Madsen Consulting Engineering209/03/2025
Ashraf403/26/2025
SLM Architecture202/13/2025
Socotec204/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rybak Development203/21/2026
Metropolis Group2203/21/2026
Danico Services1203/21/2026
KD Designs103/21/2026
Socotec103/21/2026
BK Constructiondba SRT Construction103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Pyramid Etc CompaniesGeneral Contractor407/08/2026
BK Construction ServicesScaffold407/08/2026
Dual Fuel CompanyGeneral Contractor303/21/2026
FSC D&CGeneral Contractor307/08/2026
Arsenal ScaffoldScaffold203/21/2026
Dual Fuel Plumbing & HeatingPlumbing207/08/2026
Premier ConstructionScaffold104/09/2026
A & E PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins18031312/26/2025
Joel Phagoo, PE2416108/26/2024
Building Lifecycle
All (148)Filed (21)Permit Issued (19)Signed Off (9)Violation (60)Inspection (7)Objection (2)Special Inspection (30)
07/09/2026
Violation issued (HPD, open)
B
07/09/2026
Violation issued (HPD, open)
B
06/18/2026
Violation issued (HPD, open)
C
05/20/2026
Violation issued (HPD, open)
B
05/12/2026
Signed off — Alteration
Facade repairs. No change in egress, use or occupancy.
B00931306-I1
05/11/2026
Signed off — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B00980568-I1
05/11/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00952127-I1
05/11/2026
Signed off — Alteration
MECHANICAL WORK INCLUDES INSTALLATION OF NEW GAS VENT DUCTS IN BOILER ROOM
B00979773-I1
04/08/2026
Signed off — Alteration
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
B00923948-I1
03/24/2026
Violation issued (HPD, open)
C
03/24/2026
Violation issued (HPD, closed)
B
03/20/2026
Violation issued (HPD, closed)
A
03/19/2026
Signed off — Alteration
Installation of plumbing fixtures along with related piping.
B00978986-I1
03/17/2026
Permit issued — General Construction
B00919094-I1-GC
03/13/2026
Violation issued (HPD, closed)
A
03/13/2026
Violation issued (HPD, open)
C
03/13/2026
Violation issued (HPD, closed)
C
03/13/2026
Violation issued (HPD, closed)
C
03/13/2026
Violation issued (HPD, closed)
C
03/13/2026
Violation issued (HPD, open)
B
03/13/2026
Violation issued (HPD, closed)
C
03/13/2026
Violation issued (HPD, open)
A
03/11/2026
Violation issued (HPD, closed)
B
03/11/2026
Violation issued (HPD, closed)
B
03/11/2026
Violation issued (HPD, closed)
C
03/11/2026
Violation issued (HPD, closed)
C
03/10/2026
Signed off — Alteration
STRUCTURAL WORK FOR REPAIRS AT BULKHEAD AND FOR REPAIRS AT NORTH AND EAST EXISTING FIRE ESCAPE AT MULTIPLE LANDINGS AS NEEDED.
B00911880-I1
02/24/2026
Violation issued (HPD, closed)
C
02/24/2026
Violation issued (HPD, closed)
B
02/11/2026
Violation issued (HPD, open)
B
02/04/2026
Violation issued (HPD, closed)
C
02/04/2026
Violation issued (HPD, closed)
C
02/01/2026
Signed off — Alteration
INSTALL DEBRIS CHUTE AS PER PLANS IN ORDER TO PERFORM FACADE REPAIR. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DEBRIS CHUTE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
B01018845-I1
01/22/2026
Violation issued (HPD, open)
B
01/22/2026
Violation issued (HPD, closed)
C
01/22/2026
Violation issued (HPD, closed)
C
01/22/2026
Violation issued (HPD, closed)
C
01/16/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/16/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/12/2026
Violation issued (HPD, closed)
B
01/12/2026
Violation issued (HPD, closed)
A
01/12/2026
Violation issued (HPD, open)
B
01/12/2026
Violation issued (HPD, closed)
A
01/12/2026
Violation issued (HPD, closed)
A
01/12/2026
Violation issued (HPD, open)
B
01/05/2026
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
01/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
01/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
01/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
01/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
01/01/2026
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
01/01/2026
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
12/30/2025
Violation issued (HPD, closed)
C
12/30/2025
Violation issued (HPD, closed)
C
12/30/2025
Violation issued (HPD, closed)
B
12/26/2025
Filed — Alteration
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
B00980568-P1
12/24/2025
Violation issued (HPD, closed)
C
12/24/2025
Violation issued (HPD, closed)
C
12/24/2025
Violation issued (HPD, closed)
B
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedFSC D&C03/17/2026
DOB NOWGeneral ConstructionPermit IssuedFSC D&C08/06/2025
DOB NOWGeneral ConstructionSigned-offPyramid Etc Companies07/01/2025
DOB NOWSidewalk ShedSigned-offBK Construction Services05/05/2025
DOB NOWBoiler EquipmentSigned-offDual Fuel Plumbing & Heating04/07/2025
DOB NOWMechanical SystemsSigned-offDual Fuel Company04/07/2025
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating04/07/2025
DOB NOWStructuralSigned-offPyramid Etc Companies02/10/2025
DOB NOWSuspended ScaffoldPermit IssuedPremier Construction02/03/2025
DOB NOWPlumbingSigned-offA & E Plumbing11/26/2024
DOB NOWMechanical SystemsSigned-offPyramid Etc Companies09/30/2024
DOB NOWGeneral ConstructionPermit IssuedFSC D&C09/29/2024
DOB NOWSuspended ScaffoldPermit IssuedPremier Construction09/13/2024
DOB NOWSuspended ScaffoldPermit IssuedPremier Construction08/30/2024
DOB NOWGeneral ConstructionSigned-offPyramid Etc Companies07/01/2024
DOB NOWProtection and Mechanical MethodsSigned-offPremier Construction05/03/2024
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold04/29/2024
DOB NOWSidewalk ShedSigned-offBK Construction Services04/29/2024
DOB NOWSuspended ScaffoldPermit IssuedPremier Construction04/10/2024
1 project · most recent 04/01/2025
Heating Systems Others
FiledStatusContractorScopeMake / Model / Capacity
04/01/2025Signed-offDual Fuel CompanyHeating Systems, Others
Heating
A.O. Smith A.O. SMITH BTH-120 120,000 BTU · Water Heater ×2
Lochinvar KBX0650N 650,000 BTU · Boiler ×2
Other
N/A n/a 1 CFM ×8
1 project · most recent 11/17/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/17/2025Signed-offDual Fuel Plumbing & HeatingGas, Water/Sanitary
4 projects · most recent 04/09/2025
General Wiring
FiledStatusContractorScope
04/09/2025Permit IssuedItkin Electric—
04/25/2024CompleteHigh Quality Electric of—
04/22/2024Permit IssuedZena Electric—
02/26/2018CompleteA Tech Electric EnterprisesGeneral Wiring
1 project · most recent 08/26/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
08/26/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/16/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/16/2026Pass-Final Boiler Equipment InspectionPassView ↗
01/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/05/2026No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
09/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
01/01/2026Heating SystemsSAMI HAJJAR P.Especial
01/01/2026Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
01/01/2026HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
01/01/2026Maintenance informationSAMI HAJJAR P.Eenergy_progress
01/01/2026HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
01/01/2026HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
11/18/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
11/18/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
11/18/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
11/18/2025Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
11/18/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
11/18/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
11/12/2025Tenant Protection Plan Compliance—special
09/11/2025Structural Steel - DetailsSAMI HAJJAR P.Especial
09/11/2025Structural Steel - WeldingSAMI HAJJAR P.Especial
09/11/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
09/11/2025FinalSAMI HAJJAR P.Eprogress
09/11/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
08/12/2025Tenant Protection Plan Compliance—special
08/12/2025Structural Steel - WeldingSAMI HAJJAR P.Especial
08/12/2025Structural Steel - DetailsSAMI HAJJAR P.Especial
08/12/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
08/12/2025FinalSAMI HAJJAR P.Eprogress
02/14/2025Lighting controlsSAMI HAJJAR P.Eenergy_progress
02/14/2025Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
Latest 25 of 65.
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/25/2026B01018995-I1Request digital key ↗
08/25/2026B00931306-I1Request digital key ↗
08/25/2026B00931306-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸Seals & Professional Certifications43
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/25/2026B00931306-I1Open ↗
08/25/2026B01037569-I1Open ↗
08/25/2026B01018845-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
10/03/2026B00911880-I1Open ↗
10/03/2026B00911880-I1Open ↗
09/01/2026B00919094-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
10/03/2026B00911880-I1Open ↗
09/01/2026B00919094-P1Open ↗
09/01/2026B00919094-P1Open ↗
Showing 3 of 13 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026B00923948-I1Open ↗
08/22/2026B00979773-I1Open ↗
08/19/2026B00952127-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/20/2026B00911880-I1Open ↗
08/13/2026B00931306-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/19/2026B00952127-I1Open ↗
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
08/25/2026B00931306-I1Open ↗
08/25/2026B01018845-I1Open ↗
08/25/2026B01018845-P1Open ↗
Showing 3 of 14 on file for this type
▸Other Documents8
▸DOB NOWManufacturer's Specifications4
08/13/2026B01018995-I1Open ↗
08/13/2026B01108507-I1Open ↗
08/13/2026B01167930-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/13/2026B01108507-I1Open ↗
08/13/2026B01167930-I1Open ↗
08/13/2026B01101440-I1Open ↗
Showing 3 of 4 on file for this type