15 WEST 12TH STREET
MANHATTAN · Greenwich Village · BIN 1009622
💬 Discuss this project
1957Year Built
13Stories
D4Building Class
R6Zoning
66,201 sfGross Floor Area
79Units
LL97 CoveredRent Stabilized0 Active Violations 1 likely answered ▸FISP: SWARMP
Elevator cooperative · Owner of record: 12 Street Apartments · 8,609 sf lot · 7.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofOrsid Realty CORP1p · 1 filing · 12 docs
PenthouseUnit PH, Unit PHB4p · 1 filing · 4 docs
Floor 133p · 2 filings · 9 docs
Floor 12Unit 12A, Unit 12E1p · 1 filing · 7 docs
Floor 11Unit 11AE14p · 1 filing · 20 docs
Floor 10Unit 10D8p · 2 filings · 20 docs
Floor 9
Floor 8
Floor 7Unit 7A, Unit 7B8p · 3 filings · 20 docs
Floor 6Unit 6E15p · 1 filing · 17 docs
Floor 5
Floor 4Unit 4D, Unit 4F, Unit 4GUnder Construction5p · 3 filings · 20 docs
Floor 3Unit 3C9p · 1 filing · 17 docs
Floor 2
Floor 11 filing · 5 docs
Cellar12th Street Apartment Corp8p · 4 filings · 20 docs
Site & exteriorOrsid Realty CORP22p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
12th Street Apartment6003/22/2026
Pan AM Equities1307/08/2026
12th St Apt203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Five Borough Filing & Expediting803/21/2026
Idm Associates1203/21/2026
Bromark Consulting Services103/21/2026
Rite One Expediting103/21/2026
J Callahan Consulting1003/21/2026
Anthony Potestio203/21/2026
MJ Expeditng Service603/21/2026
D D Expeditors403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BR Construction GroupGeneral Contractor407/08/2026
NY Fine Interiors & WoodwGeneral Contractor407/08/2026
Bohemia J&PGeneral Contractor307/08/2026
Source Construction ManagementGeneral Contractor304/09/2026
AJ Renovation GroupGeneral Contractor303/21/2026
Avarga ConstructionGeneral Contractor303/21/2026
Avarga ConstructionScaffold303/21/2026
Orbit Plumbing & HeatingPlumbing307/08/2026
Aircon Heating & CoolingGeneral Contractor203/21/2026
S & T ConstructionGeneral Contractor207/30/2026
Agius Plumbing & HeatingPlumbing207/08/2026
Authentic PlumbingPlumbing207/08/2026
East Coast MechnacialPlumbing207/08/2026
East Coast PetroleumGeneral Contractor203/21/2026
Xpress Plumbing and HeatingPlumbing107/01/2026
FSM ElectricalElectrical103/22/2026
GS ElectricElectrical103/22/2026
Norway ElectricElectrical103/21/2026
Midtown ElectricElectrical103/21/2026
Stellmann ElectricalElectrical103/22/2026
Emg Industrial ChimneyGeneral Contractor107/08/2026
Reyes EnterpriseGeneral Contractor107/08/2026
Everyday MechanicalPlumbing107/08/2026
Plumbing & Heating DoctorPlumbing107/08/2026
Procore MechanicalPlumbing107/08/2026
Elpo Electrical ContgElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Evan Chan Architect5605310/12/2026
Hawa Engineering7982704/03/2026
Robert F. Germain Jr. PE5100602/20/2026
March Chadwick, Architect2253201/07/2025
SRS Architect2434308/19/2022
Joseph K. Blum Co1741207/20/2022
Cortney Walleston Architects3881308/03/2021
Richard Kreshtool Architects2867203/09/2021
Building Lifecycle
All (281)Filed (41)Permit Issued (36)Signed Off (20)Facade (FISP) (13)Violation (48)Inspection (17)Objection (76)Special Inspection (30)
10/12/2026
Filed — Alteration
FILING APPLICATION FOR COMBINATION OF APARTMENT 4F/4G. WORK INCLUDES INTERIOR RENOVATIONS OF 4F KITCHEN AND BATHROOM ONLY, REPLACING PLUMBING FIXTURES, APPLIANCES, AND CABINETRY, AND FLOORING WORK THROUGHOUT UNIT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01351828-P1
10/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
Evan Chan
09/29/2026
Signed off — Alteration
REPLACE PLUMBING FIXTURES IN CONJUNCTION WITH INTERIOR RENOVATION OF APARTMENT #7A . ALL AS PER PLANS SUBMITTED HEREWITH.
M01274014-I1
09/29/2026
Signed off — Alteration
REPLACE , RELOCATE AND INSTALL NEW PLUMBING FIXTURES IN APARTMENT #3C, IN CONJUNCTION WITH THE INTERIOR RENOVATION FILED UNDER APPLICATION M0133043-I1 , NO CHNGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01335043-S1
09/29/2026
Signed off — Alteration
REPLACE PLUMBING FIXTURES IN CONJUNCTION WITH INTERIOR RENOVATION OF APARTMENT #7A . ALL AS PER PLANS SUBMITTED HEREWITH.
M01274014-S1
09/21/2026
Signed off — Alteration
REPLACE , RELOCATE AND INSTALL NEW PLUMBING FIXTURES IN APARTMENT #3C, IN CONJUNCTION WITH THE INTERIOR RENOVATION FILED UNDER APPLICATION M0133043-I1 , NO CHNGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01335043-I1
08/31/2026
Signed off — Alteration
REPLACEMENT (1) NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS BOOSTER, NEW GAS TRAIN, RECONNECT HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00857343-I1
08/31/2026
Signed off — Alteration
REPLACEMENT (1) NEW COMBINATION GAS/OIL BURNER ON EXISTING LOW PRESSURE BOILER. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00857370-I1
07/29/2026
Permit issued — General Construction
M01351828-I1-GC
06/03/2026
Permit issued — Plumbing
M01351828-S1-PL
06/01/2026
Permit issued — General Construction
M01351828-I1-GC
04/24/2026
Permit issued — Plumbing
M01332774-S1-PL
04/21/2026
Filed — Alteration
FILING APPLICATION FOR COMBINATION OF APARTMENT 4F/4G. WORK INCLUDES INTERIOR RENOVATIONS OF 4F KITCHEN AND BATHROOM ONLY, REPLACING PLUMBING FIXTURES, APPLIANCES, AND CABINETRY, AND FLOORING WORK THROUGHOUT UNIT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01351828-S1
04/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
WASEEM HAKEEM
04/06/2026
Special inspection requirement — Energy Code Compliance Inspections
WASEEM HAKEEM
04/06/2026
Special inspection requirement — Interior lighting power
WASEEM HAKEEM
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
WASEEM HAKEEM
04/06/2026
Special inspection requirement — Final
frank denner
04/06/2026
Special inspection requirement — Lighting in dwelling units
WASEEM HAKEEM
04/03/2026
Filed — Alteration
MINOR PARTITIONS INSTALLATION IN APT#6E ON THE 6TH FLOOR, AND FINISHES AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01332774-P1
04/02/2026
Permit issued — General Construction
M01332774-I1-GC
03/04/2026
Filed — Alteration
MINOR PARTITIONS INSTALLATION IN APT#6E ON THE 6TH FLOOR, AND FINISHES AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01332774-S1
03/04/2026
Filed — Alteration
MINOR PARTITIONS INSTALLATION IN APT#6E ON THE 6TH FLOOR, AND FINISHES AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01332774-I1
02/21/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/20/2026
Filed — Alteration
REPLACEMENT (1) NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS BOOSTER, NEW GAS TRAIN, RECONNECT HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M00857343-P2
02/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/18/2026
Objection resolved — Addressed
02/18/2026
Objection resolved — Addressed
02/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/11/2026
Objection raised — Admin
02/11/2026
Objection raised — Structural
02/04/2026
Filed — Alteration
FILING APPLICATION FOR COMBINATION OF APARTMENT 4F/4G. WORK INCLUDES INTERIOR RENOVATIONS OF 4F KITCHEN AND BATHROOM ONLY, REPLACING PLUMBING FIXTURES, APPLIANCES, AND CABINETRY, AND FLOORING WORK THROUGHOUT UNIT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01351828-I1
02/04/2026
Permit issued — Plumbing
M01335043-S1-PL
01/27/2026
Signed off — Alteration
Combine apartment 7B with 7CD minor work only.
M00520772-I1
01/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
Evan Chan
01/22/2026
Signed off — Alteration
Removal of stove from Unit 7B
M00881453-I1
01/08/2026
Permit issued — General Construction
M01335043-I1-GC
12/23/2025
Filed — Alteration
REPLACE , RELOCATE AND INSTALL NEW PLUMBING FIXTURES IN APARTMENT #3C, IN CONJUNCTION WITH THE INTERIOR RENOVATION FILED UNDER APPLICATION M0133043-I1 , NO CHNGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01335043-S1
12/23/2025
Filed — Alteration
REPLACE , RELOCATE AND INSTALL NEW PLUMBING FIXTURES IN APARTMENT #3C, IN CONJUNCTION WITH THE INTERIOR RENOVATION FILED UNDER APPLICATION M0133043-I1 , NO CHNGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01335043-I1
12/22/2025
Signed off — Alteration
M01024705-I1
12/19/2025
Permit issued — Suspended Scaffold
M01024705-I1-SC
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
WASEEM HAKEEM
12/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
WASEEM HAKEEM
12/16/2025
Special inspection requirement — Final
frank denner
12/16/2025
Special inspection requirement — Energy Code Compliance Inspections
frank denner
12/16/2025
Special inspection requirement — Lighting in dwelling units
frank denner
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
WASEEM HAKEEM
12/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
WASEEM HAKEEM
12/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
WASEEM HAKEEM
12/16/2025
Special inspection requirement — Interior lighting power
frank denner
12/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
WASEEM HAKEEM
12/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
WASEEM HAKEEM
11/13/2025
Permit issued — Plumbing
M01274014-S1-PL
10/15/2025
Permit issued — General Construction
M01274014-I1-GC
09/12/2025
Filed — Alteration
REPLACE PLUMBING FIXTURES IN CONJUNCTION WITH INTERIOR RENOVATION OF APARTMENT #7A . ALL AS PER PLANS SUBMITTED HEREWITH.
M01274014-I1
09/12/2025
Filed — Alteration
REPLACE PLUMBING FIXTURES IN CONJUNCTION WITH INTERIOR RENOVATION OF APARTMENT #7A . ALL AS PER PLANS SUBMITTED HEREWITH.
M01274014-S1
09/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
WASEEM HAKEEM
08/21/2025
Permit issued — Plumbing
M00857343-I1-PL
Latest 60 of 281 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedS & T Construction07/29/2026
DOB NOWPlumbingPermit IssuedXpress Plumbing and Heating06/03/2026
DOB NOWGeneral ConstructionPermit IssuedS & T Construction06/01/2026
DOB NOWPlumbingSigned-offAgius Plumbing & Heating04/24/2026
DOB NOWGeneral ConstructionPermit IssuedBohemia J&P04/02/2026
DOB NOWPlumbingSigned-offAgius Plumbing & Heating02/04/2026
DOB NOWGeneral ConstructionSigned-offBohemia J&P01/08/2026
DOB NOWSuspended ScaffoldSigned-offAvarga Construction12/19/2025
DOB NOWPlumbingSigned-offProcore Mechanical11/13/2025
DOB NOWGeneral ConstructionSigned-offBohemia J&P10/15/2025
DOB NOWPlumbingSigned-offEast Coast Mechnacial08/21/2025
DOB NOWMechanical SystemsSigned-offNY Fine Interiors & Woodw05/23/2025
DOB NOWPlumbingSigned-offAuthentic Plumbing03/14/2025
DOB NOWBoiler EquipmentSigned-offEast Coast Petroleum02/07/2025
DOB NOWGeneral ConstructionSigned-offSource Construction Management10/07/2024
DOB NOWSuspended ScaffoldSigned-offAvarga Construction05/06/2024
DOB NOWSuspended ScaffoldSigned-offAvarga Construction03/25/2024
DOB NOWPlumbingSigned-offEast Coast Mechnacial12/26/2023
DOB NOWGeneral ConstructionPermit IssuedEast Coast Petroleum11/30/2023
DOB NOWGeneral ConstructionSigned-offEmg Industrial Chimney11/29/2023
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating11/29/2023
DOB NOWSidewalk ShedSigned-offAvarga Construction08/16/2023
DOB NOWGeneral ConstructionPermit IssuedAvarga Construction08/16/2023
DOB NOWGeneral ConstructionSigned-offBR Construction Group02/10/2023
DOB NOWGeneral ConstructionSigned-offSource Construction Management02/06/2023
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating03/24/2022
DOB NOWGeneral ConstructionSigned-offNY Fine Interiors & Woodw03/21/2022
DOB NOWMechanical SystemsSigned-offAircon Heating Cooling11/19/2021
DOB NOWPlumbingSigned-offAuthentic Plumbing11/05/2021
DOB NOWGeneral ConstructionSigned-offBR Construction Group10/06/2021
DOB NOWGeneral ConstructionSigned-offSource Construction Management08/20/2021
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating05/18/2021
DOB NOWGeneral ConstructionPermit IssuedAJ Renovation Group05/11/2021
DOB NOWGeneral ConstructionSigned-offReyes Enterprise04/06/2021
DOB NOWPlumbingSigned-offEveryday Mechanical03/17/2021
DOB NOWPlumbingPermit IssuedMathew Weiss03/02/2020
BISOTISSUEDRDT Home Inprovement01/10/2020
BISOTISSUEDVMLTD11/15/2019
BISPLISSUEDForward Mechanical08/17/2018
BISOTISSUEDJ.E. Levine Builders08/08/2018
+ 46 more permits on file
6 projects · most recent 10/12/2026
Water/Sanitary Gas
FiledStatusContractorScope
10/12/2026Permit IssuedXpress Plumbing and HeatingWater/Sanitary
04/03/2026Signed-offAgius Plumbing & HeatingGas, Water/Sanitary
02/20/2026Signed-offEast Coast MechnacialGas
12/23/2025Signed-offAgius Plumbing & HeatingGas, Water/Sanitary
09/12/2025Signed-offProcore MechanicalGas, Water/Sanitary
01/22/2020——Water/Sanitary
20 projects · most recent 09/11/2026
General Wiring
FiledStatusContractorScope
09/11/2026CompleteLaredo ElectricGeneral Wiring
08/11/2026Permit IssuedBrandl ElectricGeneral Wiring
01/29/2026CompleteLaredo Electric—
10/23/2025CompleteLaredo Electric—
10/31/2023Permit IssuedHigh Quality Electric of—
05/10/2023CompleteFused Electric ContngGeneral Wiring
12/05/2022CompleteGotham Wiring LicensedGeneral Wiring
04/12/2022CompleteGotham Wiring LicensedGeneral Wiring
04/10/2022CompleteGS ElectricGeneral Wiring
04/07/2022CompleteFSM ElectricalGeneral Wiring
10/26/2021CompleteTriboro Electrical Contracting CoGeneral Wiring
09/27/2021CompleteArree ElectricGeneral Wiring
07/09/2021Permit IssuedEssex ElectricGeneral Wiring
04/01/2021CompletePolyphase Electric—
11/29/2019Permit IssuedMartinez Electrical ContGeneral Wiring
2 projects · most recent 04/03/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
04/03/2026Signed-offAgius Plumbing & HeatingTenant Protection Plan 72 Hour
09/12/2025Signed-offProcore MechanicalTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
04/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/07/2025Pass-Final Boiler Equipment InspectionPassView ↗
07/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/17/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/21/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/21/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/31/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/15/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
10/11/2026Tenant Protection Plan ComplianceEvan Chanspecial
04/06/2026Fire-Resistant Penetrations and JointsWASEEM HAKEEMspecial
04/06/2026Lighting in dwelling unitsWASEEM HAKEEMenergy_progress
04/06/2026Interior lighting powerWASEEM HAKEEMenergy_progress
04/06/2026Finalfrank dennerprogress
04/06/2026Energy Code Compliance InspectionsWASEEM HAKEEMprogress
04/06/2026Tenant Protection Plan ComplianceWASEEM HAKEEMspecial
01/27/2026Tenant Protection Plan ComplianceEvan Chanspecial
12/16/2025Fire-Resistance Rated ConstructionWASEEM HAKEEMprogress
12/16/2025Tenant Protection Plan ComplianceWASEEM HAKEEMspecial
12/16/2025Fire-Resistant Penetrations and JointsWASEEM HAKEEMspecial
12/16/2025Tenant Protection Plan ComplianceWASEEM HAKEEMspecial
12/16/2025Fire-Resistant Penetrations and JointsWASEEM HAKEEMspecial
12/16/2025Lighting in dwelling unitsfrank dennerenergy_progress
12/16/2025Interior lighting powerfrank dennerenergy_progress
12/16/2025Energy Code Compliance Inspectionsfrank dennerprogress
12/16/2025Finalfrank dennerprogress
12/14/2025Tenant Protection Plan ComplianceWASEEM HAKEEMspecial
12/14/2025Fire-Resistant Penetrations and JointsWASEEM HAKEEMspecial
09/12/2025Tenant Protection Plan ComplianceWASEEM HAKEEMspecial
08/20/2025Fire-Resistant Penetrations and JointsWASEEM HAKEEMspecial
08/19/2025Finalfrank dennerprogress
07/28/2025Tenant Protection Plan Compliance—special
07/25/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
10/11/2023FinalMatthew Bremerprogress
Latest 25 of 69.
▾Documents — 810 on file (BIS + DOB NOW)
▸Plans & Drawings40
▸DOB NOWPlans/Sketch35
09/04/2026M00482026-I1Request digital key ↗
09/04/2026M00482054-I1Request digital key ↗
09/03/2026M00520772-P1Request digital key ↗
Showing 3 of 35 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00283670-I1Request digital key ↗
08/15/2026M00469233-I1Request digital key ↗
08/14/2026M00300887-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
08/14/2026M00464117-I1Request digital key ↗
08/14/2026M00464117-P1Request digital key ↗
▸Applications & Permits153
▸BISWORK PERMIT APPLICATION66
07/10/2020123892154Open ↗
01/13/2020123791708Open ↗
11/18/2019123892154Open ↗
Showing 3 of 66 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION54
02/05/2020120365354Open ↗
01/17/2020122215478Open ↗
12/30/2019122215478Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWLPC Approval/Permit32
10/13/2026M01351828-P1Open ↗
09/02/2026M00688855-I1Open ↗
09/02/2026M00556551-P2Open ↗
Showing 3 of 32 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications181
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION66
12/23/2019123791708Open ↗
10/18/2019123892154Open ↗
09/10/2019122215478Open ↗
Showing 3 of 66 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature41
10/13/2026M01351828-P1Open ↗
09/05/2026M00300887-I1Open ↗
09/04/2026M00469233-I1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWProgress Inspector Seal & Signature37
10/03/2026M00556551-I1Open ↗
10/03/2026M00556551-I1Open ↗
10/03/2026M00556551-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
10/13/2026M01351828-P1Open ↗
10/03/2026M00556551-I1Open ↗
09/23/2026M00857370-I1Open ↗
Showing 3 of 24 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/02/2018140786497Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment44
▸BISSELF-CERT PLUMBING NOTICE16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING16
08/02/2018140786497Open ↗
Showing 1 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE11
04/15/2019123734600Open ↗
10/17/2017123135696Open ↗
08/11/2017122887518Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS1
06/28/2018123258991Open ↗
▸Safety & Tenant Protection13
▸BISTenant Protection Plan and Notes11
12/23/2019123791708Open ↗
10/18/2019123892154Open ↗
04/15/2019123734600Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWTenant Protection Plan2
08/14/2026M00300887-I1Open ↗
08/13/2026M00283670-I1Open ↗
▸Environmental & Asbestos73
▸DOB NOWDEP ACP-5: Asbestos Assessment Report32
10/13/2026M01351828-P1Open ↗
09/02/2026M00679075-I1Open ↗
09/02/2026M00679125-I1Open ↗
Showing 3 of 32 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)21
12/23/2019123791708Open ↗
04/15/2019123734600Open ↗
08/02/2018140786497Open ↗
Showing 3 of 21 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/21/2026M01274014-I1Open ↗
08/21/2026M01274014-S1Open ↗
08/20/2026M01335043-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance66
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS36
12/23/2019123791708Open ↗
11/14/2019123892154Open ↗
10/18/2019123892154Open ↗
Showing 3 of 36 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS20
03/29/2021123791708Open ↗
03/24/2021123892154Open ↗
09/10/2019122215478Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/29/2021123791708Open ↗
03/24/2021123892154Open ↗
08/02/2018140786497Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/29/2021123791708Open ↗
03/24/2021123892154Open ↗
Showing 2 of 3 on file for this type
▸Approvals, Objections & Sign-offs93
▸BISLANDMARKS APPROVAL37
01/08/2020123791708Open ↗
11/07/2019123892154Open ↗
10/18/2019123892154Open ↗
Showing 3 of 37 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST27
03/29/2021123791708Open ↗
03/24/2021123892154Open ↗
09/10/2019122215478Open ↗
Showing 3 of 27 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
08/27/2019122215478Open ↗
06/29/2018123258991Open ↗
03/20/2018140209708Open ↗
Showing 3 of 10 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLANDMARKS SIGNOFF2
03/29/2021123791708Open ↗
09/25/2017121635962Open ↗
▸Cost, Insurance & Ownership63
▸BISCOST AFFIDAVIT56
03/29/2021123791708Open ↗
03/24/2021123892154Open ↗
12/23/2019123791708Open ↗
Showing 3 of 56 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT7
05/18/2017123087774Open ↗
Showing 1 of 7 on file for this type
▸Filing & Intake Forms64
▸BISEFILING COVER SHEET27
12/23/2019123791708Open ↗
10/18/2019123892154Open ↗
04/15/2019123734600Open ↗
Showing 3 of 27 on file for this type
▸BISADDITIONAL INFORMATION20
03/14/2018123258991Open ↗
08/24/2017122887518Open ↗
08/21/2017123294657Open ↗
Showing 3 of 20 on file for this type
▸BISBOROUGH INTAKE FORM15
02/05/2020120365354Open ↗
01/17/2020122215478Open ↗
12/30/2019122215478Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
08/02/2018140786497Open ↗
Showing 1 of 2 on file for this type
▸Other Documents17
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
06/28/2018123258991Open ↗
02/14/2018123258991Open ↗
10/27/2017122887518Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDHCR Document5
10/13/2026M01351828-P1Open ↗
08/17/2026M01351828-S1Open ↗
08/14/2026M01351828-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProof of Historic Building2
09/02/2026M00688855-I1Open ↗
08/13/2026M00688855-P1Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDHCR DOCUMENT1
09/05/2019122215478Open ↗
▸DOB NOWCalculations1
08/13/2026M01024705-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01024705-I1Open ↗